Top Banner
RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State. Pridhvi Envirotech (P) Ltd Page 1 EXCUTIVE SUMMARY M/s. SMR Builders (P) Limited is one of the leading construction group is in existence over 2 decades. It has executed several residential and commercial complexes in Hyderabad and Bangalore. M/S SMR Builders acquired a semi developed site with an area of 86,401 Square meters of land at Sy. NO. 113 to 119, 121 & 126 in Kondapur (V), Serilingampally (M), RR District, Teleangana. It had submitted an application for Environmental Clearance for Phase I construction activity with overall area of 37,382.88 Square Meters with total build up area of 1,47,997.66 Square Meters and same is under process at MOEF vide File No. F. 21-120/2014-IA.III M/S SMR Builders now proposed develop phase II in the project with in the rest of the land area of 47,825.36 Square Meters with total build up area of 3,95,849.3 Square meters Following facilities are proposed to be developed in Phase II of the project 7 blocks with total number of 1699 flats Each Block varies between 15 floors to 36 floors EWS and LIG housing for Low Income Groups & Economically Weaker Sections as per the Government Norms with total number of 212 LIG Flats and 210 EWS Flats Parking place in 1,13,497.5 Square meters are in basement and Cellars including parking for EWS and LIG housing and Visitors Gated Community with 24 Hours Security 24 Hours Water supply
49

SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

Oct 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 1

EXCUTIVE SUMMARY

M/s. SMR Builders (P) Limited is one of the leading construction group

is in existence over 2 decades. It has executed several residential and

commercial complexes in Hyderabad and Bangalore.

M/S SMR Builders acquired a semi developed site with an area of 86,401

Square meters of land at Sy. NO. 113 to 119, 121 & 126 in Kondapur

(V), Serilingampally (M), RR District, Teleangana.

It had submitted an application for Environmental Clearance for Phase I

construction activity with overall area of 37,382.88 Square Meters with

total build up area of 1,47,997.66 Square Meters and same is under

process at MOEF vide File No. F. 21-120/2014-IA.III

M/S SMR Builders now proposed develop phase II in the project with in

the rest of the land area of 47,825.36 Square Meters with total build up

area of 3,95,849.3 Square meters

Following facilities are proposed to be developed in Phase II of the

project

• 7 blocks with total number of 1699 flats

• Each Block varies between 15 floors to 36 floors

• EWS and LIG housing for Low Income Groups & Economically

Weaker Sections as per the Government Norms with total number

of 212 LIG Flats and 210 EWS Flats

• Parking place in 1,13,497.5 Square meters are in basement and

Cellars including parking for EWS and LIG housing and Visitors

• Gated Community with 24 Hours Security

• 24 Hours Water supply

Page 2: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 2

• Club House

• Back up power supply

• Sewage Treatment Plant

As the total area proposed to be developed is more than 1, 50,000

Square Meters, as per the EIA notification 2006, this comes under B1

category. Now this application is submitted for TOR approval for the

project for conducting necessary EIA Studies for clearance of the project.

Page 3: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 3

1. 0 ABOUT PROMOTERS

Over the years SMR Holdings' flagship company SMR Builders Pvt. Ltd.

has perfected the art of building dreams. A pioneer and expert in the

construction of residential/housing projects, it takes pride in its project

management and quality control expertise. The quality control team

ensures topnotch quality while the project management team makes

sure schedules are met and promises kept.

The company has always created wonderful homes, excellent shopping

complexes and functional office spaces. Breathtaking landscaped

gardens, awe inspiring elevations and Vaastu compliant interiors make

every venture an architectural marvel.

SMR Holdings has been developed 7.5 million sq.ft. of commercial and

residential spaces. Further 4.5 million sq.ft. of premium living spaces

across Bangalore and Hyderabad is on its way. First SMR Holdings has

always set benchmarks and will now raise the bar in providing quality

construction

Some of the Prestigious projects executed by SMR Builders are

Hyderabad Projects

SMR VINAY PRANGAN

Residential Apartments Madhapur

SMR VINAY ACROPOLIS

Residential Apartments Madhapur

SMR VINAY METROPOLIS Residential Apartments

Miyapur

SMR SRUJANA Residential Apartments

Sanjiva Reddy Nagar

Page 4: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 4

SMR VINAY VISION Residential Apartments

West Marredpally

SMR ARCADE Shopping/Offices/Residences

Chikkadpally

EXCELLENCY APARTMENTS Residential Apartments

Malakpet

PRUTHVI MANSIONS Residential Apartments

Domalguda

SMR SARTAJ PLAZA Commercial cum Residential Complex

Sikh Road

SMR EMPIRE Residential Complex

West Marredpally

SMR RAM RESIDENCY Residential Apartments

West Marredpally

SMR HABITAT Residential Apartments

West Marredpally

DAYASHANKAR'S SMR SQUARE

Residential Apartments New Boiguda

SMR SOWMYA

Residential Apartments West Marredpally

Bangalore Projects

SMR VINAY REGENCY Commercial & Residential Apartments

Horamavu Ring Road

SMR VINAY ESTATES Commercial Complex

Horamavu Ring Road

SMR CASTLE Residential Apartments

Dhodda Banaswadi

SMR VINAY CASCADES Residential Apartments

Bangalore

SMR HEIGHTS

Residential Apartments Dr.C.V.Raman Road

SMR HERITAGE

Residential Apartments Thippasandra

SMR VINAY HARMONY

Residential Apartments Banaswadi, Main Road

SMR VINAY SAPPHIRE

Residential Apartments Banaswadi, Main Road

Page 5: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 5

SMR VINAY VATIKA

Residential Apartments

Maruthi Seva Nagar

The Vision and Mission of SMR Builders

Vision, Mission & Values

Vision

To deliver high value and good quality construction coupled with on time

delivery schedules. Qualified professionals and self directed teams work

relentlessly towards elevating customer satisfaction levels.

Mission

To retain its position as one of the leading construction houses in South India by continuously innovating and constructing quality eco-friendly

structures.

Values

At First SMR Holdings every customer is valued and every effort is

directed to deliver beyond all expectations. Fulfilling promises, providing affordable housing solutions, delivering honest results and transparency

have always been the company’s prime strengths. The company also

takes up a number of social service and community building activities.

Page 6: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 6

2. 0 ABOUT THE PROJECT

2.1 SALIENT FEATURES OF THE PROJECT

M/S SMR Builders acquired a semi developed site with an area of 86,401

Square meters of land at Sy. NO. 113 to 119, 121 & 126 in Kondapur

(V), Serilingampally (M), RR District, Teleangana.

It had submitted an application for Environmental Clearance for Phase I

construction activity with overall area of 37,382.88 Square Meters with

total build up area of 1,47,997.66 Square Meters and same is under

process at MOEF vide File No. F. 21-120/2014-IA.III

M/S SMR Builders now proposed develop phase II in the project with in

the rest of the land area of 47,825.36 Square Meters with total build up

area of 3,95,849.3 Square meters. The Project at a glance is given

below

TABLE 2.1 PROJECT AT A GLANCE

Feature Details

Total Area of development in Phase

II

47,825.36 Square meters

Total Project cost Rs. 875.0 Crores

Total No.of flats 1699 Flats, 212 LIG Flats & 210

EWS Flats

Total Built up area including

parking

3,95,849.3 Square meters

Location Sy. No. 113 to 119, 121 & 126,

Kondapur (V), Serilingampally(M),

RR District, Telangana

Longitude 170 28’ 02.3” N &

170 28’ 13.8” N

Page 7: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 7

Latitude 780 20’ 0.6” E & 780 20’ 14.0”

E

Distance from Nearest Air Port Shamshabad Airport – 40 kms

Distance from Nearest Village Part of Kondapur Village

Total water requirement 1270.0KLD

Source of water 70% from HMWS & SB and and

30% recycled

Total Area for greenbelt 9,357.33 Sq.mts

Total investment for environmental

Infrastructure and Green belt

development

Rs 1.5 Crores

2.2 ABOUT THE SITE

2.2.1 LOCATION DETAILS:

Features of the site:

The area comes under residential zone as per the Master Plan of HMDA

GO MS NO. 288, MA dated 03.04.2008. Copy of the certificate confirming

the same is enclosed at Annexure I

The site is adjacent to Hitech city to Atapur road. The geographical co-

ordinates of Residential complex are between 170 28’ 02.3” & 170 28’

13.8” N latitude and 780 20’ 0.6” E & 780 20’ 14.0” longitude. Mean

Elevation above MSL is varying between 573 meters to 580 Meters

2.2.2. Accessibility & Existing Road network

The proposed site is in Sy. No. 113 to 119, 121 & 126, in Kondapur (V),

Serilingampally (M), RR District, state of Telangana The Site is

connected to Old Mumbai Highway ( 36 Meters Road) in the Western side

at a distance of 0.21 KM and Kothapeta – Gachibouli Road in Eastern

side. The site is adjacent to Majid Banda Road which is currently 24

Meters Road but expanding to 36 Meters Road.

Page 8: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 8

2.2.3 .Topography & Surrounding features of the site

The Land is undulated area with elevation difference of about 7 metes.

Following are the surrounding features of the proposed site

South Direction - State Bank Institute of Rural Development premises

North Direction - Sudarsan Nagar (Residential Colony)

Eastern Direction - Neighbor’s Vacant Residential plots

Western Direction – Sudarshan Nagar (Residential Colony

Topo sheet of the area is given at Figure 2.1. Base map of the Area is

given at Figure 2.2, photographs of the site are given at Figure 2.3

and Location map is given at Figure 2.4

2.2.4. Water Bodies & other features of the site and 10 KM radius

The major surface water bodies within the 10 kms radius are Osman

Sagar at about 8.4 KM in the upstream of the site in the South Western

Direction, Durgam Cheruvu is at about 8.0 KM in the North Eastern

direction of the site.

Kothaguda RF is at about 2.3 KM from the proposed site in the North

Eastern direction

2.2.5 Ecologically sensitive Areas

Kasu Brahmananda Reddy National Part is at about 9.6 KM from the site.

However no eco sensitive zone was declared around the Park and no

restrictions are in place on developmental activities

The Salient features of site and surroundings are given in the table

below

Page 9: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 9

TABLE 2.2: SALIENT FEATURES OF PROJECT SITE

Village

Mandal

District

Kondapur

Seri Lingampally

Ranga Reddy

Longitude 170 28’ 02.3” N & 170 28’ 13.8”

Latitude 780 20’ 0.6” E & 780 20’ 14.0”

Ambient Temperature Minimum 100 C

Maximum 430C

Humidity 55 – 65 %

Rainfall 800 – 1100 mm per Annum

Climate Tropical & Semi-Arid

Type of soil Hard Morum soil with outcraps

Distance from Urban area Within the urban area

Distance from nearest Air

Port

Shamshabad Airport – 40 kms

Distance from nearest

village

Part of Kondapur Village

Distance from nearest

surface water source

Osman sagar – 8.4 kms

upstream

Reserve Forest Kottaguda RF – 2.3 kms

Any historical monuments

within 10 KM radius

None

Any ecologically sensitive

areas within 10 KM radius

Kasu Bhramananda Reddy

National Park - 9.6 kms

Topography Plain and land locked

Page 10: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 10

FIGURE NO: 2.1 – TOPO SHEET OF THE AREA – 10 KM RADIUS

Page 11: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 11

Figure 2.2 Base Map of the Area

Page 12: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 12

Figure 2.3 Site photographs

Page 13: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 13

Page 14: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 14

FIGURE 2.4

LOCATION MAP OF THE SITE

Page 15: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 15

3.0 Conceptual Plan

3.1 Total Plot Area

SMR Builders acquired a total of 21.35 Acres of land in residential zone.

After leaving area for Road widening of t he adjacent road from current

24 Meters to 36 Meters, the site is proposed to be developed in two

phases. In the first phase 37,989.59 Square meters are proposed to be

developed for which an application for getting Environmental Clearance

is already filed. In the second phase it is proposed to develop rest.

Below table gives overall area statement of the site

Table 3.1 Overall Area statement of the plot

S.No Land use Area in Square Meters

1 Total Plot area 86,401.00

2 Area affected for road

widening

1,192.76

3 Net Area available for

development

85,208.24

4. Net area proposed to be

developed in 1st Phase ( EC

application is under

process in MOEF)

37,989.59

5 Net area proposed to be

developed in Phase II

47,825.36

3.2 Development plan for Phase II: This application is made for environmental clearance for the

development plan in Phase II activities. It is proposed to develop 7

residential blocks, EWS block and LIG Block apart from the Amenities

block. Total green belt & Land scaping area proposed in this phase is

Page 16: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 16

9,357.23 Square Meters which is about 19.56 % of total area which

almost double the statutory requirement in the State of Telangana.

Overall area statement of plot in Phase II is presented in the Table 3.2

below

Table 3.2 Development Plan of the Phase II

S.NO Land Use Plinth Area in square meters

1 Residential block ( Plinth Area)

15562.38

2 Amenities 2468.52

3 Utilities 1920.44

4 Land scape & Green belt 9357.33

5 Roads 12820.29

6 Vacant Areas (Set backs & other vacant space)

5696.40

Total area 47,825.36

3.3 Details of Residential Blocks & Flats:

It is proposed to develop 7 Residential blocks, one EWS block and one

LIG Block as detailed below

TABLE 3.3 – NUMBER OF FLOORS AND AREA

S.

No

Block

Details

No. of Floors Area

(Sq.Mts)

1 Block-I A 22 33166.60

2 Block-I B 15 23200.11

3 Block-II A 22 25706.82

4 Block-II B 15 15418.08

5 Block-III 22 24665.56

Page 17: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 17

6 Block - IV 25 72863.63

7 Block - V 36 66308.17

Total Main

Block

261328.96

8 Amenities

Block

G +3 9961.38

9 EWS Block G+5 4273.74

10 LIG Block G+5 6787.62

Total 21022.8

Below Table gives block wise flats details proposed in Phase II

Table 3.4

Block wise Flats

Sl Description Block

IA Block

IB Block-

IIA Block IIB

Block - III

Block IV

Block - V

Total

1 No of floors 22 15 22 15 22 25 36

2

No of 2 BHK

flats

88 45 88 45 22 50 - 338

3 No of 3 BHK flats

154 120 88 60 154 250 180 1006

4 No of 4 BHK flats

- - - - - 175 180 355

Total 2BHK,

3 BHK and 4 BHK Flats

1699

5 No of 1 BHK flats (LIG)

- 15 - 59 - - - 74

6 LIG Flats in LIG Block

138

7

EWS Flats in

EWS Block

210

3.4 PARKING AREA:

The total area allocated for parking is 1,13,497.5 Sq.Mts, which can

accommodate 3000 four wheelers and 2000 two wheelers. The total

parking area is being proposed in the proposed project is given below.

Page 18: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 18

TABLE 3.5 – PARKING SPACE PROVISION

BASMENT – 1

SQ.MTS BASMENT – 2

SQ.MTS BASMENT – 3

SQ.MTS

BLOCK I 8315.55 8315.55 8680.31

BLOCK II 6583.14 6583.14 6871.91

BLOCK III 3464.81 3464.81 3616.80

BLOCK IV 9355.00 9355.00 9765.35

BLOCK V 6929.62 6929.62 7233.60

Amenities

Block 1461.0

1461.0 1461.0

LIG Block 746.75 746.75 746.75

EWS Block 470.0 470.0 470.0

TOTAL 37325.87 37325.87 38845.72

The conceptual Plan for the Phase II is given at Annexure III

3.5 ROADS & SET BACKS

As it is seven blocks of residential complex with amenities block and

parking area is provided in cellars, direct paved road from gate to cellar

areas would be provided. 12 Meter internal peripheral road is proposed

in the development of the site. Set backs as per the Building Norms in

the state would be left as detailed in the below table for free

movement of fire tender which is more than the Telangana state Fire

services directorate guidelines.

Page 19: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 19

Table 3.6

Set backs for the blocks Norms Vs Actual Proposed

S.No Block Height of

block In meters

Set back as

per Building Norm in Meters

Set Back

proposed in Meters

1 Block IA 68 17.5 17.5

2 Block IB 47 17.5 17.5

3 Block IIA 68 17.5 17.5

4 Block IIB 47 17.5 17.5

5 Block III 68 17.5 17.5

6 Block IV 77 18.5 18.5

7 Block V 110 21.5 21.5

8 Amenities

Block

14.9 5.0 Min-17.5 &

Max 21.5

9 LIG Block 17.9 6.0 6.0

10 EWS Block 17.9 6.0 6.0

3.6 STORM WATER DRAINS:

All along the block of the housing complex, storm water drains would

be provided to collect water during rains. They would adequately sized

to prevent over flooding of the site. Storm water collection sump is

proposed before discharging to municipal sewers.

Page 20: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 20

4.0 RESOURCE REQUIREMENTS

4.1 WATER REQUIREMENT:

As per National Building Code, 2005 (NBC), water requirement for

occupants is 135 litres/day/ person and for visitors the requirement is

15 litres/day/person. The total population likely to be accommodated

would be around 8500 people. Another 20 people would be there like

security and other support staff. Thus total water requirement for

inmates is estimated at 1150 KLD. Quantity estimated for guests and

visitors is estimated at another 10 KLD. Considering washings of floors

and other requirement, a total requirement is estimated at 1170 KLD.

Out of this, it is estimated that 270 KLD of water would be required for

toilet flushing’s and rest for other uses. Also it is estimated that about

100 KLD of water is required for landscaping and plantation purposes.

Thus total water requirement would be 1270 KLD.

It is proposed to source water from HMWS & SB and the treated waste

water would be recycled for toilet flashings and green belt. Any

additional treated waste is there, same will be connected to municipal

sewer.

The total sewage water generated is 1035 KLD. It is proposed to treat

the sewage in STP of capacity of 1200 KLD. The treated waste water is

used for Flushing & gardening (370 KLD). Rest of the 665 KLD of

treated water would be send to municipal sewer. Thus the total fresh

water requirement during occupational stage is would be 900 KLD as

detailed below

Page 21: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 21

TABLE 4.1 – WATER REQUIREMENT

S.N

o

Stream Quantity

(KLD)

Fresh/

Recycled

Waste

water generated

in KLD

Method of

treatment

1 Domestic

Water

900 Fresh 765 STP

2 Toilet Flushing

water

270 Recycled 270 STP

3 Gardening 100 Recycled - -

Losses 235

Total 1270 1270

4.2 POWER REQUIREMENT:

The power requirement for the proposed project is estimated as

9925 KVA which will be sourced from the TSCPDL

4.3 BACK-UP POWER DETAILS:

It is proposed to provide emergency power back up for lifts, water

pumping and common area lighting with two DG sets of 6 X 500

KVA capacities.

4.4 FUEL REQUIREMENT:

The fuel requirement for 6 x 500 KVA is 900 Liters/day for 8 hours

operation of DG sets due to power outage. The fuel used in DG sets is

High Speed Diesel (HSD).

4.5 MAN POWER REQUIREMENT:

The maximum man power required for the development of proposed

project during construction phase is 100 persons. And during

occupational phase it would be around 20 people

Page 22: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 22

5.0 POLLUTION SOURCES – CHARACTERISTICS &

QUANTIFICATION

5.1 POLLUTION SOURCES

Pollutants generated due to project activities during both the

construction and operation phase are solid, liquid and gaseous in

nature. Also the generation of pollution could be continuous, periodic or

accidental. Sources of pollutants and their characteristics during the

construction and operation phase are given below in Table 5.1.

TABLE 5.1: POLLUTANT SOURCES AND CHARACTERISTICS

S.

No

Activity/Area Pollutant Pollutant

Characteristics

Frequency

CONSTRUCTION PHASE

1. Ground

working and

leveling

Air emissions

– PM, NOx,

SO2, CO

Dust from

construction

activities and

excavation.

Particulate

matter, NOx

and CO from

vehicle exhaust

Temporary

during

construction

phase only-

bulk of the

emissions are

expected from

ground working and leveling

activities.

Earth / solid waste

Solid waste from

construction

activity and

excavation.

Periodic.

Noise Noise generated

from construction

equipment and

Machinery

Temporary

during initial construction

phase

2. Labour Camps Sewage Sewage

generated from

temporary labor

camps on site

Temporary –

during the

initial

construction phase

Page 23: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 23

S.

No

Activity/Area Pollutant Pollutant

Characteristics

Frequency

Solid Waste Solid Waste

generated from

temporary labour camps on

site

Temporary –

during

the initial construction

phase

OPERATION PHASE

1. Vehicular

movement

Air emissions

and noise

Vehicle exhaust

emissions

Continuous /

Periodic

2. Diesel power

generators

Air emissions SO2, NOx, SPM,

CO from

fuel burning

Periodic, only

during

power failure

Noise Noise due to

running of

equipment

Periodic

Waste Used Oil

Generation

Periodic, during

oil changes

3. Residential Wastewater Wastewater

containing

food matter

Continuous /

Periodic

Domestic

Solid waste

Garbage / Food

waste

Continuous

4. Raw water

treatment

Wastewater Backwash water

discharge

Continuous

Solid waste Sludge from

coagulation

process

Continuous

5. S.T.P Solid waste Settled and

stabilized sludge

Continuous

Treated

water

Treated sewage

water used for

Greenbelt

Continuous

6. Diesel Storage Solid waste Settled sludge

during tank

cleaning

Occasional

Oil Oil spillage –

Accidental large

spills due to

pipe rupture

Oil Spillage - Small quantities

due to small

pipe leaks

Accidental /

Only due

to poor

housekeeping

Page 24: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 24

S.

No

Activity/Area Pollutant Pollutant

Characteristics

Frequency

7. Maintenance /

housekeeping

Wastewater Floor washing Continuous

Solid waste Used equipment parts and

garden wastes

Continuous

8. Vehicle Parking

Area

Oil Spills Minor oil leaks

in parking lot

Continuous –

small

Quantities

9. Storm water

drains

Wastewater Contamination

discharge from

site – Mainly

suspended

solids

During rainy

season

5.2 AIR EMISSION SOURCES

Air emissions have no boundaries and can migrate between areas

depending upon the wind direction and speed.

5.2.1 PREDICTED AIR EMISSIONS FROM THE SITE

CONSTRUCTION PHASE

During the construction phase, PM is expected to be the main pollutant

associated with on-site roads (paved and unpaved), stockpiles and

material handling. In this case, pollution emission sources shall be

distributed throughout the project site and shall fall under the category

of area source. The land acquired is fairly flat, so extensive formation

work is not expected during this phase. It is assumed that most of the

excavated material shall be used within the project, with minimal cut

and fill material to come from outside the site.

Due to the confined nature of heavy construction activity during this

limited period, tailpipe emissions from construction equipment are

assumed to be essentially negligible.

Page 25: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 25

OPERATIONAL PHASE

During the operational phase, the diesel generator sets to be operated

for back-up power supply are the major source of air pollution. From

this point source, the following pollutants are expected;

• PM, SO2, NOx and CO

Diesel Generator Set Fuel Combustion - Point Source

To serve as a emergency power back-up, 6 diesel generators of 500

KVA connected to individual stacks shall be installed. The diesel

generator sets are operated only during power failure thus conserving

fuel and reducing the pollution.

As a worst-case scenario, emissions were predicted assuming an

operation time of 24 hours. The emissions from the diesel generators

are provided in the following table:

TABLE 5.2 – DIESEL GENERATOR SET EMISSIONS

Capacity

of DG Set

No. of DG

Sets

Stack Heig

ht (m)

Diameter of

Stack (m)

Temp. of

exhaust gases

(0C)

Exit veloci

ty (m/se

c)

Pollutant Emission rate

(g/sec)

SPM SO2 NOx

500 KVA 6 5 mts 0.4 250 12.5 0.04 0.08 0.32

5.3 NOISE EMISSIONS SOURCES

The assessment of the impacts of noise on the surrounding community

depends upon:

� Characteristics of noise source (instantaneous, intermittent, or

continuous in nature, with the latter contributing the least to

noise pollution);

� Time of day at which noise occurs; and

� Location of noise source with respect to noise sensitive receptor.

Page 26: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 26

CONSTRUCTION PHASE

The description of construction activity as detailed in Section 4.2.1

(with regards to spatial phasing and type of sources) is also pertinent

to the noise emissions emitted in the construction phase. Sources of

noise emissions are expected from various types of construction

equipment.

General noise levels generated from the operation of equipment and

machinery are provided in Table 5.3 below:

TABLE 5.3: NOISE LEVELS GENERATED FROM CONSTRUCTION

EQUIPMENT

Name of the

source

Noise Level at 16 m

(50 ft)from Source in dB (A)

Noise Level at 1 m from

Source (calculated)in dB(A)

Air Compressor 87 111

Back Hoe/Loader 81 105

Concrete Mixer Truck 85 109

Concrete Pumper 70 94

Concrete Vibrators 77 101

Cranes - mobile 81 105

Dump Truck 83 107

Generator Not Considered 75 (CPCB)

Hammering 86 110

Jackhammer 88 112

Pile Driver 100 124

Radial Arm Saw 80 104

Source:www.gvrd.bc.ca/education/pdf04/ColumbiaWorkshop1-

ConstructionNoise.pdf

The MoEF has not yet prescribed noise emission specifications for

construction equipment. However, the limited information available is

provided in Table 5.4.

Page 27: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 27

TABLE 5.4 – NOISE LIMITS FOR APPLIANCES AND

CONSTRUCTION EQUIPMENT AT MANUFACTURING STAGE

Equipment Noise Limit dB

(A)

Window Air Conditioner(1ton -1.5 tons)

68

Air Coolers 60

Diesel Generators 85-90

Compactors (rollers), Front Loaders,

Concrete Mixers, Cranes(movable),

Vibrators, and Saws

75

Source: http://dpcc.delhigovt.nic.in/pdf/Pollution_Control_Law.pdf

OPERATIONAL PHASE

During the operational phase, the diesel power generators will be the

major source of noise.

Diesel Generator Sets

Noise Limit for Generator sets run with Diesel

Noise limit for diesel generator sets (6 X 500 KVA) manufactured on or

after the 1st January, 2005.

The maximum permissible sound pressure level for new diesel

generator (DG) sets with rated capacity 6 X 500 KVA, manufactured on

or after the 1st January, 2005 shall be 75 dB(A) at 1 meter from the

enclosure surface.

Noise control for diesel generator will be as follows:-

Noise from DG set shall be controlled by providing an acoustic

enclosure or by treating the room acoustically, at the users end.

Page 28: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 28

The acoustic enclosure or acoustic treatment of the room shall be

designed for minimum 25 dB (A) insertion loss or for meeting the

ambient noise standards, whichever is on the higher side ( if the actual

ambient noise is on the higher side, it may not be possible to check the

performance of acoustic enclosure/ acoustic treatment. Under such

circumstances the performance may be checked for noise reduction

upto actual ambient noise level, preferably, in the night time).The

measurement for Insertion Loss may be done at different points at 0.5

m from the acoustic enclosure/ room. The DG set shall be provided

with proper exhaust muffler with insertion loss of minimum 25 dB

(A).These limits shall be regulated by the State Pollution Control Boards

and the State Pollution Control Committees.

Source: www.cpcb.nic.in

5.4 WATER AND WASTEWATER MANAGEMENT

5.4.1 WATER REQUIREMENTS

Water requirement during the construction phase will be met from

water tankers. The required water during the operational phase will be

sourced from HMWS & SB. However, in the event of non availability of

water or for any excess requirement of water during the operational

phase, the proponents are proposing backup with the aid of rainwater

collection in the reservoirs which will be duly treated, water recycling

and water tankers (in case of water supply failure). It is also

emphasized that at any stage of the project, groundwater reserves

would not be exploited for the water requirement. The water

requirements during various phases of the project are discussed below:

A) CONSTRUCTION PHASE

The project implementation would involve various construction

activities. The following section summarizes the water requirement, its

sources and management of wastewater.

Page 29: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 29

Site development:

Development of site for the proposed development involves excavation,

leveling of the ground surface and stock piling. However as the project

site is flat with no vegetation cover, the leveling activities would result

in very less water usage. Water requirement for any use at this stage

would be provided from water tankers. Similarly, the generation of

domestic wastewater can be managed on site.

Construction of building infrastructure:

The construction of building infrastructure that includes residential and

other units, Offices, restaurants and multiplex would require water and

may generate waste water too. Water demand during construction

phase would be for:

• Construction activities.

• Domestic use.

Construction phase may last for a period of approximately two years in

order to complete the earthwork, foundation lying, superstructure

development, service provision and finishing. The water requirement

during construction phase would be around 200 KLD. The water

requirement is being met from the water tankers.

B) OPERATIONAL PHASE

Daily Water Requirement and Sources:

It has been mentioned before that the domestic water requirements will

be met from the HMWS&SB Water supply scheme. The water

requirement for Flushing, Gardening, Landscaping and other purposes

would be met from duly treated recycled water. However, in case of

failure of HMWS&SB, water requirements are planned to be met partly

by ground water & through private tankers. Rain water will be

Page 30: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 30

recharged to the ground to augment the water table in the area. Water

tankers will be used only in case of any emergency or failure of water

supply by HMWS & SB or insufficiency of the water reservoir.

Water conservation: Water conservation is an important part of sustainable living and in

order to optimize the water requirement in the project, the developers

would incorporate the component of water conservation by means of

rainwater harvesting and water recycling using fixtures which are low

flow and water efficient models such as 3 litre capacity WC flushing

system, sensor operated urinals and taps to minimize the wastage of

water along with employee education and awareness programme and

selective use of dry type urinals. As per the approved plans from

GHMC, various mitigative measures shall be proposed to further

minimize the impacts.

Storm Water Management & Rain Water Harvesting Structures

It is proposed to channelizing the storm water by constructing water

drains leading to the storm water sump. In order to minimize the

surface runoff loss, groundwater recharging through groundwater

recharge pits at the project site has been planned. Appropriate design

considerations have been taken while designing the recharge pits.

5 .5 2 WASTEWATER QUANTIFICATION AND CHARACTERISTICS

The wastewater generation during construction and operational phase

is described below:

A) CONSTRUCTION PHASE

Waste water generation during construction period shall be from

construction labours and construction activities. Wastewater generation

due to construction activities would be very less. Since the project lies

in an urban stretch, preference would be given to the employment of

labours local to the area. This would result in settlement of less labour

colonies in the project site and hence less wastewater generation from

Page 31: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 31

the transit labour settlements. Wastewater generation from labour

toilet shall not exceed 20 KLD. Temporary toilets are planned for labour

during construction phase and waste water would be disposed to

municipal drain

B) OPERATIONAL PHASE

During this phase, it has been assumed that 80 % of the water supplied

will be discharged as wastewater (Source: Manual on sewerage and

sewage treatment, published by Government of India). Hence

approximately 225.0 m3 per day of domestic effluent would be

generated.

Wastewater generated is expected to have characteristics and pollution

load as shown in Table 5.5

TABLE 5.5

EXPECTED WASTEWATER CHARACTERISTICS AND POLLUTION

LOAD

Parameter Unit Concentration

Quantity KLD 1035

pH -- 6.5 – 8.5

Oil & Grease Mg/l 20

TSS Mg/l 200

BOD Mg/l 300

COD Mg/l 500

The wastewater with the foresaid characteristics can neither be

discharged into in land surface water nor reused. Suitable treatment

would be given to the wastewater so as to meet CPCB requirements

depending upon the end use. It is proposed to install a sewage

treatment plant of capacity 1200 KLD, to recover the recycled water of

quality suitable for use in flushing and gardening. A sewage treatment

Page 32: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 32

plant of 1200 KLD capacity based on Fluidized Aerobic Bio-Reactor

(FAB) technology is proposed to treat 1035 KLD of sewage water

generated in the proposed project. After treatment the water will be

used for Flushing & Gardening.

The treated wastewater shall meet the standard required for discharge

on land for horticulture. Table 5.6 gives the comparison of the

standards that would be met by the treated wastewater and quality

norms prescribed for discharge on land by irrigation.

TABLE – 5.6: DISCHARGE NORMS FOR WASTE WATER

Parameters Quality Norms Discharge On land for

irrigation

Quality Norms for Discharge in inland

surface water

Treated standard For proposed project

pH 5.5 – 9.0 5.5 – 9.0 6.5 to 8.5

Biological Oxygen

Demand

(BOD3 at 27°C) mg/l

100 30 <15

Chemical Oxygen

Demand (COD) mg/l

-- 250 <100

Suspended Solids 200 100 <30

Oil and Grease 10 10 <10

5.6 SOLID AND OTHER WASTES

Waste quantification and characterization exercise is being carried out

to estimate the quantum and type of waste that would be generated by

different activities due to proposed project during construction and

operation phase. The estimated quantity and quality of waste would

serve as a baseline for designing collection, transportation, treatment

and disposal options for solid waste generated due to proposed project.

Page 33: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 33

5.6.1 WASTE SOURCES AND QUANTIFICATION

Description of solid and other wastes generated from the site during

construction and operation phases of the project is given in Table 5.7

TABLE 5.7: SOLID AND OTHER WASTES GENERATED

S.

No.

Activity/Area Waste

Generated

Waste

Characteristics

Frequency of

generation

CONSTRUCTION PHASE

1. Earth Working

and Construction

Construction

Wastes

Earth, Stones,

concrete, bricks, lumber etc.

Larger

quantities will be

generated in

construction

phase.

2. Labour

quarters

Domestic

wastes

Mainly bio-

degradable

wastes including

food

wastes.

Temporary –

during

construction

phase.

OPERATIONAL PHASE

1. Residential

areas

Domestic

waste

Biodegradable

wastes (food

waste) and non-

biodegradable wastes (paper,

plastics etc.)

Daily

2. Set back area sweepings dust, leaves etc. Daily

3. Utilities

including Power

generation

Waste from

oil

Waste oil Only during oil

changes – six monthly.

4. Sewage Treatment

Plant

STP Sludge Stabilized sludge – to be used as

manure for the

landscaping.

Every week – after sludge

drying

operation.

Waste quantification has been done based on the activities proposed in

the project master plan. The waste generation for each activity has

been estimated based on National and International standards

applicable in similar setting. The following section gives the details of

Page 34: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 34

the type of waste generated by different activity, waste generation

factors and assumptions used for estimating waste generation.

Waste quantification and characterization exercise is being carried out

to estimate the quantum and type of waste that would be generated by

different activities due to the proposed project activity during the

construction and operation phase.

5.6.2 WASTE QUANTIFICATION

A) CONSTRUCTION PHASE

Construction activities create solid wastes that need to be disposed.

Such wastes include sand, concrete, gravel, stone, bricks, plastic,

paper, wood, metal and glass. According to a report prepared by the

Technology Information, Forecasting, and Assessment Council (TIFAC),

estimated waste generation during construction and demolition

operations is 60 kg/m2 and 500 kg/m2 respectively (TIFAC, 2001). This

waste after sorting can be used for backfilling in the basement and for

leveling purposes.

B) OPERATIONAL PHASE

Waste quantification has been carried out based on the activities

proposed in the project master plan. Waste generation factors for each

activity are as per the National and International standards applicable

in similar setting. Following section outlines details of the type of waste

generated by different activities.

Residential waste: Domestic garbage is anticipated from the

residential complex. Total solid waste estimated @ 1 Kg/day per house

hold. Thus total garbage anticipated from the complex will be 2121

kg/day which is proposed to be disposed to municipal solid waste

Page 35: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 35

disposal facility of MCH through local municipal authorities. About 100

Kgs/Day of solid waste anticipated from sewage treatment plant and

same will be used as manure.

Garden and open spaces: Waste from open spaces and garden

comprise of horticultural waste that will be generated by periodical lawn

mowing and trimming of trees. Horticulture waste generated is based

on the experience in other projects with similar setting. Assumed waste

generation factor for horticulture waste is 15 kg/acre / day or .0037 kg/

sq m /day. Table 5.8 gives detail of the estimated waste generation

TABLE 5.8 : ESTIMATED WASTE GENERATION FROM DIFFERENT

ACTIVITIES

Facilities Provided

Waste generation norms per unit

No. Of units/Area

Total Waste

Generated (Kg /day)

Residential area 1.0 kg/day 2121 flats 2121

Garden &

Open space

15 kg/Acre/day or

0.0037kg/sq m/day

15,053.73 55 Kgs/day

Total Waste Generated (kg/day) 2176

Kgs/day Say 2200

Kgs

5.6.3 WASTE CHARACTERIZATION

Waste characterization for the proposed project has been carried out on

the basis of waste characterization studies in similar settings. The

following section details the estimated waste generation for proposed

project during construction and operation phases.

A) CONSTRUCTION PHASE

During the construction phase, a considerable quantum (90%) of waste

generated at the project site would be inert waste, which largely

comprising of clay, sand, gravel, untreated wood (natural wood, no

Page 36: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 36

paint), brick, concrete, concrete block, asphalt, pipes, conduits and

light steel material. A major portion of this waste will be used for

backfilling the basement and other leveling purposes.

Table 5.9 gives an estimate of the average composition of waste that

shall be generated from the onsite construction activities.

TABLE 5.9 : WASTE COMPOSITION – CONSTRUCTION PHASE

S. No Constituents Percentage

Composition

1. Soil, Sand and Gravel 34.99

2. Brick and Masonry 29.95

3. Concrete 24.98

4. Metal 4.97

5. Bitumen 2.04

6. Wood 2.04

7. Other 1.02

Total 100

Source: Derived from TIFAC Report “Utilization of Waste from

Construction Industry”, 2001

B) OPERATIONAL PHASE

Waste generated during operational phase can be broadly subdivided

into following.

a) Biodegradable

b) Recyclable

c) Non recyclable(Inert)

Table 5.10 shows the estimated composition of waste generated in

proposed project during operation phase.

Page 37: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 37

TABLE 5.10: ESTIMATED WASTE COMPOSITION

S. No Characteristics of

Waste

Units Percentage

Composition

Physical Characteristics

1. Paper and paper board % 40

2. Glass /ceramics % 5

3. Metals % 3

4. Plastics % 11

5. Rubber and Leather % 1

6. Textile % 2

7. Wood % 1

8. Food waste % 18

9. Others (Garden and

Inert)

% 19

Total 100

5.7 OTHER STRESSORS LEADING TO ENVIRONMENTAL IMPACTS

5.7.1 Change in Landscape of the site: The landscape of the area

will change with the coming up of proposed project. The large vista,

interconnected lawns and open green areas will change the aesthetics

of the local area.

5.7.2 Stress on Road Network

As it is anticipated about 5000 vehicles are likely to be added to road

net work, there is possibility of stress on road network due to be

implementation of the project

5.7.3 Energy utilization & Conservation :

The total energy load requirement for the site is 9922.5 KVA. Out of

this Energy load for common areas, Lifts, Water Motors, ETP, Cellars &

Basements and Roads and garden area requirement is 167.25 KVA. It

is proposed to adopt the following energy saving measures to save

20% of total load

• LED Lighting

• Energy Efficient 5 star rated Motors for water and ETP

Page 38: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 38

• Energy Efficient 5 star rated Motors for Lifts

• Solar lighting for roads and Garden area

• Solar water heating system for blocks

• Other measures of natural ventilation & Lighting

5.7.4 Safety and Emergency handling system

Elaborate fire fighting system which include fire hydrant system,

portable fire extinguishers, smoke detection & Alarm systems are

proposed for all the residential blocks and cellars. Adequate fire water

is maintained as per the norms prescribed. Adequate set backs are

planed for easy movement of fire fighting vehicles in case of

emergencies

Page 39: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 39

6.0 IMPACT ASSESSMENT & MITIGATION MEASURES

6.1 IMPACT ASSESSMENT:

The potential impacts on the surrounding environment in the 10km

radial distance of proposed project site along with the mitigation

measures during construction and operational stages are summarized

in Table 6.1 and Table 6.2.

The construction phase is for a period of 24 months. Considering this to

be a relatively short period, all construction impacts can be considered

to be short term and temporary.

As for the operational phase, the project proponent shall ensure that

impacts are minimized and are within applicable/ specified limits by

TSPCB & CPCB by providing relevant pollution control equipment and/

or mitigation measures discussed in the following tables.

Page 40: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 40

TABLE – 6.1 - CONSTRUCTION PHASE - POTENTIAL IMPACTS AND MITIGATION MEASURES

S. No.

Environmental components

Potential impacts

Source of impacts Mitigation measures Remarks

1. Water

resources

Minor negative

& temporary impact on

surface &

ground water

resources.

Water requirement

of 50 - 70 KLD for construction

activities

Judicious use of water;

minimization of water consumption by use of

high-pressure hoses for

dust suppression

Water requirement

will be sourced from the outside water

tanker.

2. Surface water

quality

No impact Erosion and run-off

due to excavation/

construction

activities, especially in

monsoon season;

Discharge of waste water, construction

as well as

domestic.

Avoiding excavation in

monsoon season; providing

appropriate measures for

erosion and sediment control; providing adequate

sanitation facilities for

workers at site; avoiding discharge of untreated

wastewater in the area.

-

3. Ground water

quality

No impact Construction

activities

Storage area for fuels,

paints, thinners, etc. to be

such so as to avoid chances of spillage. No discharge to

ground water body.

-

4. Air quality Temporary

negative impact

Construction

equipment;

operation of DG

Carrying out construction

activity in temporary

enclosures, where feasible;

-

Page 41: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 41

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

sets for

construction power

requirement; vehicular traffic;

excavation;

concreting; etc.

water sprinkling for dust

suppression; regular

maintenance of construction equipment &

vehicles; use of fuel of

proper quality; use of

state-of-the-art

construction equipment &

methods

5. Noise Medium

negative &

temporary

Various

construction

activities; material and vehicular

movement

Use of low noise generating

state-of-the-art

construction equipment and construction techniques;

providing personnel

protective equipment to workers; providing

temporary enclosure for DG

set and other construction

activities, where feasible;

avoiding construction work

in the night time

-

Page 42: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 42

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

6. Land

(i) Land use/

requirement

No impact The total plot area

is 86,401 Sq. m.

No land conversion is

required as land is a vacant

plot and is designated for

Residential complex by

municipal corporation.

Site Premises is

designated as

Residential area

(ii) Solid wastes &

land pollution

Temporary

minor negative

impact

Construction

material handling;

construction wastes

handling and

disposal

Maintaining proper

inventory control for

reduced waste generation;

substitution of hazardous

raw materials by non-

hazardous materials, where

feasible; providing proper

facility for storage and

handling of fuel oils;

disposal of spent oils,

classified as hazardous waste by sale to authorized

third party; proper handling

and disposal of construction

wastes; Contractor’s to assume full responsibility

for clearing off construction

wastes

-

(iii) Geology &

Seismicity

No impact Construction of the

Residential

No heavy structure planned

as part of the project

All civil structures

shall be constructed

Page 43: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 43

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

complex as per earthquake

zone classification

7. Ecology Minor positive

impact

Construction

activity causing

impact on existing

ecosystem on-site

and top soil;

cutting of existing vegetation, if

required;

No trees on the site shall

be cut.

In fact green belt will be

developed all along the

building boundary, roadside

and lane divider. water sprinkling during

dust generation activities;

erosion and sediment

control; noise and fugitive dust control; restricting

construction activity during

night time

No ecologically

sensitive area such

as forest/

agricultural land will

be used for the

project. Presently, the site have few

trees. 7718.33 Sq.

m to be developed

as greenbelt & land scaping

8. Socio-economic

(i) Population and

literacy rate

Minor negative

and temporary

Increase in

population due to

possible temporary

settling of

construction

workers from

outside the study

area for the project

Employing local people to

the maximum extent

possible

About 50

construction workers

are expected to be

employed

Page 44: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 44

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

(ii) Employment Minor positive &

temporary

impact

Availability of

construction jobs

Employing local people to

the maximum extent

possible

About 50

construction workers

are expected to be employed

(ii) Amenities such

as education,

medical, water

supply, sanitation, etc.

No impact Needs of

construction

workers;

Employing local people to

the extent possible for

construction work; making

adequate provision through the contractors to handle

water, sanitary, medical

and fuel requirement of

construction workers to ensure that the existing

infrastructure is not

strained

-

(iv) Transportation Temporary

negative impact

Increased traffic

load due to transportation of

construction

materials and

workers

Ensuring that traffic is well

regulated. Use of non-peak hours for material

transportation

-

Page 45: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 45

TABLE – 6.2 - OPERATIONAL PHASE – POTENTIAL IMPACTS AND MITIGATION MEASURES

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

1. Water

resources

Minor negative

impact on surface

water resources

Moderate

negative impact

on ground water

resources due to

consumption.

Minor positive

impact due to

recharge by rainwater

harvesting.

Total water

requirement for the

proposed project is

1270 KLD.

(Fresh water 900

KLD &

S.T.P recycle370

KLD)

Recycle water will be used

Flushing and Gardening

The fresh water

will be sourced

from HMWS&SB.

2. Surface water

quality

No impact Discharge of

sewage and waste

water from utilities

Recycle water will be used

Flushing and Gardening

-

3. Ground water

quality

No impact Discharge of

sewage and waste

water from utilities

No discharge of

wastewater to ground

water body; use of treated sewage water for Flushing,

Gardening

Rainwater from

the rain water

harvesting will be used to recharge

ground water.

Page 46: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 46

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

4. Air quality Minor negative

impact (for SO2,

NOX and HC

emissions)

Fuel combustion in

DG sets

All emissions will be well

within the specified

emissions standards;

stack height = building

height +5 mts. for safe

dispersal of pollutants;

HSD with 0.05% sulfur content in DG sets;

periodic maintenance of

DG sets for reduced

emissions

All emissions well

within the

specified limits

5. Noise Minor negative

impact

Noise generating

rotating/ moving

equipment

Proper equipment

selection; mandatory

acoustic enclosure for DG

sets; regular maintenance of noise generating

equipment; providing

personnel protective

equipment to persons working in noisy areas;

suitable design and

location of utility block; development of suitable

green belt and landscaping

-

Page 47: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 47

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

6. Land environment

(i) Land use /

requirement

No impact Requirement of land

for the proposed

project

47,825.36 Sq.m of area

available for development

Once the project is

operational, no

additional land will

be required.

(ii) Solid wastes &

land pollution

Minor negative

impact

Handling and

disposal of

hazardous and solid wastes

Segregation of wet and

dry garbage – disposal of

dry garbage through off-site recycling or to

municipal waste collection

system and wet waste to

composting at site;

disposal of waste lube oils

by sale to authorized third

party; buy-back arrangement for waste

lead acid batteries

Though no solid/

hazardous waste

will be disposed off on land,

chances of

inadvertent

occasional spillage

on land cannot be

ruled out

(iii) Geology &

Seismicity

No impact Improper building

design not adhering

to specified codes;

improper building

maintenance

Regular maintenance of

the structures to withstand

natural phenomena;

carrying out the structural

integrity testing

-

9. Ecology No impact Emissions and

discharges from

project operations;

All emissions and

discharges including noise

will be within specified

-

Page 48: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 48

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

noise generation;

improper disposal of

wastes

standards; all solid/

hazardous waste will be

disposed off in environmentally sound

manner

10. Socio-economic factors

(i) Population and

literacy rate

No impact Increase in

population due to

settlement of

personnel and

their families from

outside the study

area for the

proposed project

Employing personnel from

within the study area to the

extent possible, subject to

availability of skilled

manpower requisite to the

job requirement

About 20

personnel would

get direct

employment from

the project

(ii) Employment Medium positive impact

Direct employment of personnel for

proposed project.

Employing personnel from within the study area to the

extent possible, subject to

availability of skilled

manpower requisite to the

job requirement

Approximately 20 persons Direct

employment and

20 persons

indirect

employment are

expected to be

employed for the

project

(ii) Amenities such as education,

No impact Requirement of various facilities

Employing personnel from within the study area to the

Various amenities in the study area

Page 49: SMR BUILDERSenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015. 1. 22. · Bangalore SMR HEIGHTS Residential Apartments Dr.C.V.Raman Road SMR HERITAGE Residential

RESIDENTIAL COMPLEX – PHASE II SMR BUILDERS PVT LTD, Sy.No 113 to 119,121&126, Kondapur (V), Seri lingampally (M),Rangareddy(D), Telangana State.

Pridhvi Envirotech (P) Ltd Page 49

S.

No.

Environmenta

l components

Potential

impacts

Source of impacts Mitigation measures Remarks

medical, water

supply,

sanitation, etc.

for the children of

personnel

employed from outside the study

area

extent possible, subject to

availability of skilled

manpower requisite to the job requirement

are adequate.

(iv) Transportation Medium negative

impact

Burden on the

existing road

infrastructure due to the increased

traffic from the

proposed project

Ensuring that vehicular

movement is controlled

during peak traffic hours; providing bus services from

the office to the nearest

railway station; encouraging

car-pools for office employees

-