SMEC (MALAYSIA) SDN BERHAD Company No: 22168-H

CAPABILITY STATEMENT – PLANT & ENERGY

Page 2: Smec Malaysia Plant & Energy - Capability Statement

Page 1 of 24

CA

PA

BIL

ITY

ST

AT

EM

EN

T 2

01

3

INTRODUCTION 1

COMPANY DETAILS 6

MAIN ORGANISATIONAL GROUPS 8

RELEVANT PROJECT PROFILE IN MALAYSIA 13

PROJECT DIRECTORY 16

APPENDICES – PROJECTS DATA SHEET

FURTHER ENQUIRIES : SMEC (MALAYSIA) SDN BHD Mechanical and Electrical Department Unit 703, Block B Phileo Damansara II Jalan 16/11, Section 16, 46350 Petaling Jaya Selangor Darul Ehsan,Malaysia Telephone: 603-7955 0305 Facsimilie: 603-7955 2110 Email : [email protected] Website : www.smecmal.com.my

TABLE OF CONTENTS

Page 3: Smec Malaysia Plant & Energy - Capability Statement

Page 2 of 24

LANGKAWI INCINERATOR PLANT

Page 4: Smec Malaysia Plant & Energy - Capability Statement

Page 3 of 24

IN

TR

OD

UC

TIO

N

INTRODUCTION

SMEC (Malaysia) Sdn Bhd is a locally registered engineering consultancy firm providing

multidisciplinary consultancy services in hydro and thermal power generation,

transmission & distribution, dam engineering, water resources, roads & transportation,

regional development and infrastructure and water supply.

SMEC (formerly known as Snowy Mountains Engineering Corporation) has a long history

of working in Malaysia. SMEC first established an office in Malaysia in 1970 in Kuala

Lumpur. In 1991 the Malaysian operations was incorporated as SMEC (Malaysia) Sdn

Bhd to better serve the needs of an expanding clients in Malaysia and the neighbouring

countries.

SMEC (Malaysia) became a wholly Malaysian owned company in May 2000 and is

registered with the Board of Engineers Malaysia and the Ministry of Finance Malaysia.

The firm is supported by local professionals, sub-professionals and administrative staff.

For specialist skills and additional resources SMEC (Malaysia) draws staff from SMEC

International of Australia, a large international engineering consulting and project

management organisation, which has successfully completed more than 2000 separate

projects in Australia and in 62 other countries for international funding and aid agencies,

as well as for government organisation and private sector clients.

THERMAL POWER EXPERTISE

SMEC (Malaysia) Sdn Bhd in association with SMEC International Pty Ltd provides expert

engineering consulting services in thermal power generation and associated industries to

clients both in Malaysia and worldwide. SMEC’s primary focus is to provide a multi-

disciplined approach to the investigation, implementation and execution of power projects

including:

Combined cycle

Cogeneration

Biogas/Landfill gas

Green energy

Geothermal

SGEC 9.95MW EFB POWER PLANT PROJECT

Page 5: Smec Malaysia Plant & Energy - Capability Statement

Page 4 of 24

This multi-disciplined approach includes all of the mechanical, electrical and civil

engineering work associated with these types of projects, either as designers, project

managers or turnkey specifiers.

Combined with the primary plant design, SMEC can also provide the investigative, design

and project management for the fuel delivery systems and the electrical reticulation

systems including:

Gas systems

Coal in-feed systems

Liquid fuel systems

Waste handling systems

Substation design

Protection

Metering

Transmission lines

DESIGN PHILOSOPHY

SMEC differentiates itself from other engineering consultancies by being hands-on

designers capable of taking detailed design all the way through from conception to

realisation. Our design philosophy requires a clear understanding of the client’s processes

and the relevant technologies, and consequently promotes a greater sense of project

ownership. This approach cultivates lateral and innovative thinking and ensures a unique

solution for every project.

SMEC promotes a design and management style that includes preliminary and detailed

designs, procurement of packages of plant, interface design, construction supervision and

commissioning. This can result in a ‘crafted’ design that is specific to a client’s

requirements.

Consequently SMEC often crosses the boundaries between consulting, project

management and detailed engineering. While this approach is more labour intensive on

our part, it results in reduced project start times and tighter cost control.

Where the client requires a ‘turnkey’ approach, SMEC can act either as the client

representative, or as the designers for the turnkey supplier. SMEC’s understanding of the

requirements of detailed design also allows us to implement both meaningful and

practicable turnkey specifications, ensuring economical cost solutions.

NUR, 225 MW COMBINED CYCLE POWER PLANT FACILITY

Page 6: Smec Malaysia Plant & Energy - Capability Statement

Page 5 of 24

CLIENT INVOLVEMENT

SMEC firmly believes that an active client involvement is necessary for the successful

implementation of a power project, with the project being a tripartite relationship between

the client, supplier and consultant. In this way, the client has control over the day to day

designs that will effect the ultimate operation of the plant.

The detailed design approach that we promote includes the client’s engineers and plant

operators being an integral part of the design team. This ensures the best match of

equipment components to be specified and purchased for the project.

Page 7: Smec Malaysia Plant & Energy - Capability Statement

Page 6 of 24

CO

MP

AN

Y D

ET

AI

LS

COMPANY DETAILS

REGISTERED NAME : SMEC (Malaysia) Sdn Bhd

DATE OF INCORPORATION : 25th July 1991

COMPANY NUMBER : 221681-H

REGISTERED ADDRESS : Lot 6.05, Level 6, KPMG Tower 8th

1st Avenue, Bandar Utama,

47800 Petaling Jaya, Selangor Darul Ehsan

TYPE OF BUSINESS : ENGINEERING CONSULTANCY & PROJECT

MANAGEMENT SERVICES

TELEPHONE NO : (603) – 7955 0305

FAX NO : (603) – 7955 2110

E-MAIL : [email protected]

BOARD OF DIRECTORS : Ir. Zainal Abidin bin Othman

Ir. Kalaichelvan Arumugam

Ir. Fadhlullah Bin Bakarom @ Abu Bakar

Ir. Punitha Rajan Doraisamy

COMPANY SHARE HOLDER : Zainal Abidin Bin Othman 128,000

Kalaichelvan Arumugam 109,500

Punitha Rajan Doraisamy 12,500

Fadhullah bin Bakarom 500

Total share: 250,500

CONTACT DETAILS

Contact Persons:

1. Ir. Zainal Abidin Bin Othman : 012 – 2060613

2. Ir. Kalaichelvan Arumugam : 012 – 3266709

3. Ir. Punitha Rajan Doraisamy : 012 – 2110921

4. Ir. Fadhullah bin Bakarom : 012 - 3933322

Page 8: Smec Malaysia Plant & Energy - Capability Statement

Page 7 of 24

NUMBER OF MANAGEMENT STAFF AND STAFF :

No Description

Pro

fess

ion

al

Cat

ego

ry

Man

agem

en

t

Cat

ego

ry

Exec

uti

ve

Cat

ego

ry

Oth

er

Cat

ego

ry

Total

a) Bumiputra 31 1 5 21 58

b) Non-Bumiputra 26 2 5 11 45

c) Foreigners 1 1 0 2

TOTAL 58 3 11 33 105

BREAKDOWN OF PROFESSIONAL STAFF ARE AS FOLLOWS:-

1. CIVIL & STRUCTURAL ENGINEERING : 36

2. MECHANICAL ENGINEERING : 8

3. ELECTRICAL ENGINEERING : 9

4. OTHERS ARE AS FOLLOWS:

a. Environmental Engineer : 1 b. Chemical Engineer : 1 c. Quality Manager : 1 d. Surveyor Land & Quantity : 2 : 5

TOTAL: 58

OPERATING OFFICE: Unit 509, Block B, Phileo Damansara II, Jalan 16/11, Section 16, 46350 Petaling Jaya, Selangor Darul Ehsan Telephone : 03 79550305 Facsimile : 03 79552110 Email : [email protected] Website : www.smecmal.com.my

Mechanical and Electrical Department Unit 703, Block B Phileo Damansara II Jalan 16/11, Section 16, 46350 Petaling Jaya Selangor Darul Ehsan,Malaysia Telephone: 603-7955 0305 Facsimilie: 603-7955 2110 Email : [email protected] Website : www.smecmal.com.my

Page 9: Smec Malaysia Plant & Energy - Capability Statement

Page 8 of 24

SMEC INTERNATIONAL OVERSEAS OFFICES:

Cooma, Australia Brisbane, Australia

Sydney, Australia Melbourne, Australia

Canberra, Australia Perth, Australia

Almaty, Kazakstan Jakarta, Indonesia

Auckland, New Zealand Lesotho, Africa

Beijing, China New Delhi, India

Dhaka, Bangladesh Phnom Penh, Cambodia

Dubai, United Arab Emirates Port Moresby, Papua New Guinea

Hanoi, Vietnam Toreja

Hong Kong

Page 10: Smec Malaysia Plant & Energy - Capability Statement

Page 8 of 24

MA

IN

OR

GA

NI

SA

TIO

NA

L G

RO

UP

S

MAIN ORGANISATIONAL GROUPS

The following core groups form the core of the design and management of projects. As

well as providing the necessary design functions, the groups also provide representatives

for site supervision and commissioning.

POWER SYSTEM GROUP

This group provides the conceptual designs, scoping studies and project definitions for the

power projects, and defines the operating parameters and budget constraints. Based on

these, the group will assemble process flow diagrams, concept designs and bid

specifications for the primary and ancillary plant.

MECHANICAL GROUP

This group will detail and assemble the mechanical systems and develop the piping,

instrumentation, equipment and installation details. The group also provides the detailed

installation requirements, or assembles specifications for turnkey supply contracts.

ELECTRICAL GROUP

This group provides the primary and detailed designs for the electrical switchgear,

protection and metering design, control and instrumentation, as well as Man Machine

Interface and SCADA design.

CIVIL AND STRUCTURAL GROUP

All of the civil works associated with the plant including; geotechnical services, civil and

structural engineering, architectural, water supply, water treatment, sanitation and

wastewater, building services and fire engineering designs are detailed under this group.

Page 11: Smec Malaysia Plant & Energy - Capability Statement

Page 9 of 24

SPECIALIST GROUPS

SMEC has a number of specialist groups in house. They include:

FINANCIAL SERVICES SPECIALISTS

From the raw cost data provided by the various groups and the long term operating and

maintenance costs provided by the Power System group, the financial services specialists

can assist in the development of financial models that may be required to assess the

viability of any power scheme.

ENVIRONMENTAL SPECIALISTS

Environmental specialists provide input in regard to overall preparation of Assessments

of Environmental Effects for projects, and guidance regarding streamlining and

minimisation of cost and lead times associated with the consents process.

This group is able to provide input into development of Environmental Management

Systems for projects.

PROTECTION SPECIALISTS

Protection specialists provide the analysis and selection of protection schemes for the

primary power plant, substation and transmission systems.

TRANSMISSION LINE SPECIALISTS

Transmission line specialists can provide high voltage transmission line design and

construction supervision as well as route assessment, foundation design, and tower and

communications designs.

OIL AND GAS SPECIALISTS

Primary designs, equipment selection, pipelines, supervision of installation and

commissioning for any of the fuel groups that may be required.

Page 12: Smec Malaysia Plant & Energy - Capability Statement

Page 10 of 29

PO

WE

R G

EN

ER

AT

IO

N S

ER

VIC

ES

SMEC has been involved in many aspects of power plant development including studies,

resource permitting and power plant construction. Examples of projects that the partners in

SMEC have been involved in are described later in this document.

SMEC is a multi-disciplinary engineering organisation specialising in thermal power. The

principal services offered include:

Pre-feasibility and feasibility studies

Cost estimation and financial analysis

Project planning, organisation and monitoring

Value Engineering

Detailed mechanical, electrical and civil engineering design

Systems optimisations

Bid documentation, evaluation and award

Contract administration

Engineering design review

Construction supervision and commissioning

Transmission and distribution planning, design and construction management

Power generation plant refurbishment

SCREEN PRINTOUT FROM LANGKAWI INCINERATOR PLANT WITH POWER GENERATION CONTROL SYSTEM

The following descriptions, photographs, and supporting information summarise SMEC’s most

recent projects in the energy sector;

Page 13: Smec Malaysia Plant & Energy - Capability Statement

Page 11 of 20

Kina Biopower Biomass Power Plant 1 x 11.5MW

Seguntor Bioenergy Biomass Power Plant 1 x 11.5MW

Maju Intan Biomass Power Plant 1 x 12.5MW

Langkawi 100TPD Incinerator Plant 1 x 1MW

Page 14: Smec Malaysia Plant & Energy - Capability Statement

Page 12 of 20

RELEVANT PROJECT PROFILE IN MALAYSIA DATE PROJECT CLIENT

2013 – ongoing “Cadangan Membina & Menyiapkan Projek-Projek Pendidikan Rancangan Malaysia ke Sepuluh (RMK-10) Pakej Khas Pra Sekolah untuk Kementerian Pelajaran Malaysia – Pakej 7 (Kelantan dan Terengganu)

Kementerian Malaysia

2013 – ongoing Technical Due Diligence Study of Biogas & Biomass in Kerteh, Terengganu

Deleum Berhad

2012 – ongoing Independent Checking Engineer (ICE) for Taiko Metals Sdn Bhd (TMSB)

Bank Pembangunan Malaysia Berhad

2012 – ongoing Feasibility Study Report for Palm Oil Empty Fruit Bunch Biomass Power Plant in Kluang, Johor

Confidential

2012 – ongoing Engineering Consultancy Services for Feasibility Study, Design, Supervision, Testing and Commissioning of Clinical Waste (CWtE) Facility

Faber Group Berhad

August 2011 – January 2012

Bentong Biomass Energy Project – Post Application Assessment & Monitor Consulting Services

Malaysia Debt Venture Berhad

2010 – ongoing Pre-School Electrical& Mechanical Consultancy Services Kementerian Pelajaran Malaysia

2010 – ongoing 12.5MW Maju Intan Biomass Power Plant Project in Teluk Intan, Perak

Colben Energy Holding (Maju Intan) Ltd

2009 – December 2011

Construction of Hangar Facility for Search & Rescue Agency (APMM) Subang Malaysia

Ministry of Public Work (JKR)

2006 – 2008 Hulu Terengganu Hydroelectric Project Tender Design for Civil, Mechanical and Electrical Works

Tenaga Nasional Berhad

2006 – 2008 Ulu Jelai Hydroelectric Project – Tender Design for Civil, Mechanical and Electrical Works

Tenaga Nasional Berhad

2008 – ongoing 50tpd and 15tpd household Waste Incineration Plant projects for Cameron Highlands and Pulau Tioman – Engineering, Procurement and Contruction Management of Civil, Mechanical and Electrical Works

XCN Technology Sdn Bhd

2008 – ongoing 20tpd and 100tpd household Waste Incineration Plant projects for Pulau Pangkor and Pulau Langkawi – Engineering, Procurement and Contruction Management of Civil, Mechanical and Electrical Works

XCN Technology Sdn Bhd

2008 – 2009 100,000tpy Biodiesel Plant Project in Ayudthaya, Thailand – Tender Design of Electrical and Mechanical Works for Balance of Plant

SMEC International Pty Ltd

2007 – 2009 Power Prospect – 9.9MW Biomass Power Plant Project, Thailand – Tender Design of Civil, Electrical and Mechanical Works

Power Prospect Company Limited

2007 – 2008 Mieco 30MW Biomass Thermal Capacity Power Plant Project – Feasibility Study for Converting Diesel Fired Thermal System to Biomass Fired System

Mieco Manufacturing Sdn Bhd

2007 – 2008 PT. Ciliandra Perkasa 250,000 TPY Biodiesel Project at Dumai – Tender Design for Electrical and Mechanical Works for Balance of Plant System

PT. Ciliandra Perkasa

2007 – 2009 GOMEDIC – 100, 000 TPY Biodiesel Plant

Gomedic Sdn Bhd

2006 – 2008 Vita 250,000TPY Biodiesel Power Plant in Thailand

Vita Biodiesel Ltd

2006 – 2009 Himpunan Sari 250,000TPY Biodiesel Power Plant in Kemaman, Terengganu

Himpunan Sari Sdn Bhd

2006 – 2008

200,000TPY Biodiesel Plant Project at Dumai, Sumatera, Indonesia – Preliminary Design

PT Indonesian Renewable

Page 15: Smec Malaysia Plant & Energy - Capability Statement

Page 13 of 20

2006 – 2007

Jupiter Biofuels Kuantan Project – Engineering, Procument and Construction Management of Civil, Electrical and Mechanical Works

Jupiter Biofuels Sdn Bhd

2006 – 2007

SPC Biodiesel Plant Project - Tender design and project management for civil, electrical and mechanical works.

SPC Biodiesel Sdn Bhd

2006 – 2007 200,000 tonnes per year Biodiesel Plant Project at Lumut, Perak – Preliminary Design and Project Management

National Biofuels LP

2005 – 2009 Kina Biopower 11.5MW Biomass Power Plant at Sandakan, Sabah – Tender Design and Project Management

Kina Biopower Sdn Bhd

2005 – 2009 Seguntor Bioenergy 11.5MW Power Plant at Sandakan, Sabah – Tender Design and Project Management

Seguntor Bioenergy Sdn Bhd

2005 – 2007 Independent Checking Engineer For A 60,000 tonnes per year Biodiesel Plant Project in Lumut, Perak

Malaysia Debt Venture Berhad

2005 – 2006 SGEC 9.95MW EFB Power Plant Project – Detailed Engineering

Surat Thani Green Energy Co. Ltd

2005 – 2006 11.5MW Kampung Gajah Biomass Power Plant Project – Preliminary Design

Loji Biomass Electric Sdn Bhd

2005 – 2006 2.5MW Rice Husk Gasification Project – Preliminary Design

S.A.Continental

2005 – 2006 Jana Sawit Elektrik 11.5MW Biomass Power Plant Project

Jana Sawit Elektrik Sdn Bhd

2004 – 2005 Pedu Mini Hydroelectric (9MW) Project – Tender Design of electrical and mechanical works

Pedu Hydro Sdn Bhd

2004 – 2007

Specialist M&E Consultant for SMART Tunnel – Audit design, installation, testing and commissioning of electrical and mechanical works

Jabatan Pengairan dan Saliran

2004 – 2005 Hydro Ranking Appraisal Study Tenaga Nasional Berhad

2004 – 2008 11MW Naluri Ventures Pasir Gudang Biomass Power Station Project – Tender Design and Project Management

Naluri Ventures Sdn Bhd

2004 70MW Combined Cycle Power Plant in Xaanshi Province, China. Pre-Feasibility Study

UC Utara Sdn Bhd

2004 Steam Piping Stress Analysis for the 1.5MW Titi Sarong Rice Husk Fired Power Plant Project in Malaysia

Jebsen & Jessen Process Engineering (M) Sdn Bhd

2003 9.9MW Mungcharoen Rice Husk Power Plant Project, Thailand – Tender design

Consortium Jebsen&Jessen-Vyncke-KHEC

2003

Supervising Engineer for Penchala Tunnel Electrical and Mechanical System – Project Management

CMC di Ravenna (Malaysia) Sdn Bhd

2002 – ongoing

Technical Advisors for Bakun (2100MW) Hydroelectric Power Project – Design audit, contracts management, construction supervision, testing and commissioning of civil, electrical and mechanical works

Sarawak Hidro Sdn Bhd

2001 – 2005 NH5 Tuni – Annakapalli Road Project, India Design (including Mechanical & Electrical services)

UE Construction Sdn Bhd

2001 – 2005 NH45 Tambaram to Tindivana Road Design, India Design Works (including Mechanical & Electrical services)

UE Construction Sdn Bhd

2002 Electrical & Mechanical Tender Evaluation for Sarawak Hidro Sdn Bhd

Sarawak Hidro Sdn Bhd

2002 Tender documentation and Evaluation of VHF/UHF Communication System for National Parks in Vietnam

United Nations Office for Project Services

2002 Palm Oil Waste to Energy Power Plant – Prefeasibility Study

TH Group Berhad

2002

Bakun Hydroelectric Power Project Tender Design for CW2 Package for M&E Package

YTL-Theiss

2001 – 2004 Kenyir II (300MW) Hydroelectric Power Plant Project Tenaga Nasional Berhad

2001 – 2002 Singapore Thermal Dynamic Recovery (TDR) Waste Disposal Plant Project

World Oasis Engineering Pte Ltd

Page 16: Smec Malaysia Plant & Energy - Capability Statement

Page 14 of 20

2000 – 2001 Implementation of Management Information System for the NUR Independent Power Utility

Northern Utility Resources Sdn Bhd

2001 – 2001 Commissioning Supervision for the 225MW Combined Cycle Power Plant

Northern Utility Resources Sdn Bhd

2000 – 2001 TNB Hydro Operation & Maintenance Strengthening

TNB Hidro Sdn Bhd

1999 - 2002 Project Management Consultant responsible for review of detail design, supervision and commissioning of the Electrical and Mechanical System for the Express Rail Link Project

Express Rail Link Sdn Bhd

1994 – 2000 World Bank Yemen Third Power Project Public Electricity Corporation of Yemen

1999 M&E Design Services for Ecopark and Orang Utan Rehabilitation Island utilizing solar energy system

Bukit Merah Laketown Resort

1999 Engineering Design Services for electrical and control system for the Chairlift system

Bukit Merah Laketown Resort

1998 Ulu Terengganu Hydroelectric Pumped Storage Option Feasibility Study

Tenaga Nasional Bhd

1997 – 1998 Bersia - Group Control Centre SCADA Project Tenaga Nasional Bhd

1996 Supervision of Overhaul of turbine generating unit at Temenggor Power Station

Tenaga Nasional Berhad

1996 Ulu Terengganu Hydroelectric Project Feasibility Study Permodalan Terengganu Berhad and Tenaga

Nasional Berhad

1995 Supervision of Overhaul of turbine generating unit at Sultan Mahmood Power Station

Tenaga Nasional Berhad

1995 – 1996 Kenyir Upgrading Tender Design Tenaga Nasional Berhad

1993 – 1994 Kenyir Hydroelectric Project Phase II – Feasibility study & design

Tenaga Nasional Berhad

1992 Sarawak – Sabah – Brunei Power Interconnection Feasibility Study

Sarawak Electricity Supply Corporation

1991 – 2001 Pergau (650MW) Hydroelectric Project Tenaga Nasional Berhad

1988 – 1990 Labuan Beaufort Power Interconnection Project Sabah Labuan – Beaufort Interconnection Sdn Bhd

1985 – 1988 Pergau Hydroelectric Project Feasibility Study National Electricity Board / Australian Development

Assistance Bureau

1985 – 1988 Ulu Ai Hydroelectric Project, Sarawak Sarawak Electricity Supply Corporation

Page 17: Smec Malaysia Plant & Energy - Capability Statement

Page 15 of 20

PR

OJ

EC

T D

IR

EC

TO

RY

PROJECT DIRECTORY

2008- ongoing

MAJU INTAN 12.5MW BIOMASS POWER PLANT PROJECT

Colben Energy (Maju Intan) Pte Ltd

The 12.5 MW will operate on palm empty fruit bunch fibres. The plant will also have biogas recovery facility from the effluent produced durin ghte fuel processing. SMEC(Malaysia) as the design consultant for the project carried out the feasibility study, development assistance to the owner, basic design, civil detail design, tender design and specification preparation for electrical and mechanical works. SMEC will also be responsible for the construction supervision, testing and commissioning.

2008- 2011

LANGKAWI 100TPD MUNICIPAL SOLID WASTE INCINERATOR PROJECT

XCN Technologies Sdn Bhd

SMEC(Malaysia) was involved in the project brief preparation for a turnkey development of the project by XCN Technologies for the Government of Malaysia. SMEC was subsequently retained to provide detailed design for the civil, electrical and mechanical works, procurement, project management, construction supervision, testing and commissioning. The facility includes 1 MW power generation from the waste heat recovery.

2008- 2011

Cameron Highlands 40TPD MUNICIPAL SOLID WASTE INCINERATOR PROJECT

XCN Technologies Sdn Bhd

SMEC(Malaysia) was involved in the project brief preparation for a turnkey development of the project by XCN Technologies for the Government of Malaysia. SMEC was subsequently retained to provide detailed design for the civil, electrical and mechanical works, procurement, project management, construction supervision, testing and commissioning.

2007- 2011

Pangkor 20TPD MUNICIPAL SOLID WASTE INCINERATOR PROJECT

XCN Technologies Sdn Bhd

SMEC(Malaysia) was involved in the project brief preparation for a turnkey development of the project by XCN Technologies for the Government of Malaysia. SMEC was subsequently retained to provide detailed design for the civil, electrical and mechanical works, procurement, project management, construction supervision, testing and commissioning.

2005- 2006

SGEC 9.9MW EFB Power Plant Project

Surat Thani Green Energy Co.Ltd

This palm empty fruit bunch biomass power plant project is located in Surat Thani, Southern Thailand. The EPC contractor for this project is Meidensha from Japan. SMEC (Malaysia) was responsible for the technical review and project management for the fuel handling system for the power plant. The fuel handling system is one of the most important sections for a power plant of this type and knowledge of the fuel characteristics is of utmost importance. The fuel handling system must feed the boiler approximately 21 tones per hour of shredded EFB.

Page 18: Smec Malaysia Plant & Energy - Capability Statement

Page 16 of 20

2005

Jana Sawit Elektrik 11.5MW Biomass Power Plant Project, Malaysia

Jana Sawit Elektrik Sdn Bhd`

Engaged by the Client to undertake feasibility study, application to SREP, negotiation of REPPA with the power utility company (TNB) and engineering design for an 11.5MW Palm Waste Biomass Power Plant Project in Chukai, Terengganu, Malaysia

2004 – 2006 11MW Naluri Ventures Pasir Gudang Power Station Project, Malaysia

Naluri Ventures Sdn Bhd

Engaged by the client responsible for the Engineering Procuremet and Construction Management of a 11.5 biomass (EFB) power plant at Pasir Gudang,

Johor, Malaysia utilizing empty fruit bunches and selling power to Tenaga Nasional Berhad (TNB) distribution grids. SMEC provided the feasibility study, vendor selection, financial model, assistance with authority approval, assistance in obtaining financing, tender design and tender document preparation for multiple tender packages, project management and construction supervision.

2004 1.5MWe Titi Sarong Rice Husk Power Plant, Malaysia

Jebsen & Jessen Process Engineering (M) Sdn Bhd

Engaged by Jebsen & Jessen Process Engineering (M) Sdn Bhd to undertake steam piping design and stress analysis of the Titi Sarong Rice Husk Power Plant at Parit Buntar, Perak. The project comprised of a 12t/hr biomass boiler and 1.5MWe extraction condensing steam turbine.

2003

30MW Geothermal Power Project, Papua New Guinea

Lihir Management Company

Engineering, Procurement and Construction Management (EPCM) of a new 30MW Geothermal Power Project at the Lihir Gold Mine, PNG.

2001/2002

KHTP NUR Independent Power Utility Project

Northern Utility Resources Sdn Bhd

Undertook design review for the plant control systems, (DCS, SCADA, MarkV, Security and Surveillance System, Fire Detection System, etc) and supervision for the commissioning of 225 MW Combined Cycle Power Plant Project and interconnection facilities at Kulim High Tech Park in Kedah. Facility comprised four (04) units of 35 MW gas turbine and two (02) units of 40 MW steam turbine.

2004 70MW Xaanshi Combined Cycle Pre-feasibility Study

UC Utara Sdn Bhd

Scoping study investigations into the cost and technical fasibility study of a normal 70MW combined cycle power station in Xaanshi Province, China. The plants were designed for peak loading using costs from GT Pro databases and confirmation from local suppliers.

Page 19: Smec Malaysia Plant & Energy - Capability Statement

Page 17 of 20

2004 1.5MWe Titi Sarong Rice Husk Power Plant, Malaysia

Jebsen & Jessen Process Engineering (M) Sdn Bhd

Engaged by Jebsen & Jessen Process Engineering (M) Sdn Bhd to undertake steam piping design and stress analysis of the Titi Sarong Rice Husk Power Plant at Parit Buntar, Perak. The project comprised of a 12t/hr biomass boiler and 1.5MWe extraction condensing steam turbine.

2003

30MW Geothermal Power Project, Papua New Guinea

Lihir Management Company

Engineering, Procurement and Construction Management (EPCM) of a new 30MW Geothermal Power Project at the Lihir Gold Mine, PNG.

2002

6MW Geothermal Power Project, Papua New Guinea

Lihir Management Company

Project Management of a 6MW Geothermal Power Project at the Lihir Gold Mine, PNG. The project also involves a feasibility study into the expansion of the site with an additional 20 to 30MW.

2001/2002

KHTP NUR Independent Power Utility Project

Northern Utility Resources Sdn Bhd

Undertook design review for the plant control systems, (DCS, SCADA, MarkV, Security and Surveillance System, Fire Detection System, etc) and supervision for the commissioning of 225 MW Combined Cycle Power Plant Project and interconnection facilities at Kulim High Tech Park in Kedah. Facility comprised four (04) units of 35 MW gas turbine and two (02) units of 40 MW steam turbine.

2005

Jana Sawit Elektrik 11.5MW Biomass Power Plant Project, Malaysia

Jana Sawit Elektrik Sdn Bhd

Engaged by the Client to undertake feasibility study, application to SREP, negotiation of REPPA with the power utility company, (TNB) and engineering design for an 11.5MW Palm Waste Biomass Power Plant Project in Chukai, Terengganu, Malaysia

2004- - 2005

Pedu Mini Hydroelectric (9MW) Project, Malaysia

Pedu Hydro Sdn Bhd

SMEC carried out generation optimization studies, turbine evaluation for equipment selection. A tender design was carried out by the by for the entire electrical and mechanical systems for project including turbine and auxiliaries design, generations and auxiliaries design, 33kv transmission system, communication and control systems, hollow jet valve operations review and automation, building services. SMEC also prepared request for proposal and obtained various proposals from prospective supplier were obtained and evaluated for final tendering.

Page 20: Smec Malaysia Plant & Energy - Capability Statement

Page 18 of 20

2004 – 2007

11MW Naluri Ventures Pasir Gudang Power Station Project, Malaysia

Naluri Ventures Sdn Bhd

Engineering, Procurement and Construction Management (EPCM) of a 11MW Palm Waste Biomass Power Plant Project at Pasir Gudang, Johor, Malaysia

2003 – 2004

Mungcharoen 9.9MW Rice Husk Power Plant, Thailand

Consortium KHEC-Vyncke-Jebsen&Jessen

Design and tendering for a 9.9MW Rice Husk Power Plant Project in Thailand. SMEC responsible for the process civil, mechanical and electrical design.

2001/2002 TDR Pyrolysis Facility

World Oasis, Singapore

Assistance with commissioning of the World Oasis TDR Pyrolysis (Waste to Energy) facility at Tuas, Singapore. The facility is a full scale prototype that had never been fully commissioned. SMEC-HGM is helping to re-design and re-commissioning the facility.

2004 70MW Xaanshi Combined Cycle Pre-feasibility Study

UC Utara Sdn Bhd

Scoping study investigations into the cost and technical fasibility study of a normal 70MW combined cycle power station in Xaanshi Province, China. The plants were designed for peak loading using costs from GT Pro databases and confirmation from local suppliers.

2001

2 x 60MW Coal Power Station Cost Study

Western Power

Scoping study invsetigations for a nominal 60MW Coal Fired Power Station for installation

in Myanmar. The station was to be located at Pakokku using coal from Sumatra and a

second 60MW Power Station at Letpadaung using coal from Sumatra or Kalewa.

2001

500 MW Victorian Combined Cycle Pre-Feasibility Study

Confidential Client

Scoping study investigations into the cost and dtechnical feasibility of a nominal 400 MW

and 500 MW combined cycle power station in Victoria. The Plants were designed for peak

loading using costs from SMEC-HGM databases and confirmation from suppliers.

2001

130 MW Maryvale Cogeneration Bid

Australian Pwper / Contact Energy Ltd

Technical preparation of Contract Energy Ltd's bid to Australian Paper, Maryvale for a

nominal 130 MW cogeneration facility. Work comprised detailed design and cost estimates

for two nominal 40 MW Frame 6B gas turbines and re-powering existing 50 MW steam

turbine plant.

Page 21: Smec Malaysia Plant & Energy - Capability Statement

Page 19 of 20

1999

78 MW Bundaberg Cogeneration Project

Multiplex Constructions Pty Ltd/Contact Australia Ltd

Pre-feasibility study for cogeneration options for the proposed Bundaberg Green Energy

Project. The nominal 78 MW cogeneration facility comprising 2 gas boilers, 1 black

liquor/bagasse boiler feeding a 20 MW and 30 MW back-pressure steam turbine generators

and 28 MW condensing steam turbine-generator. The facility would provide process steam

for the pulp and sugar mills.

1999

4 MW MDF Cogeneration Study

WESFI Manufacturing Pty Ltd

Engaged by WESFI to undertake an investigation into the potential for incorporating a

cogeneration facility into their existing MDF facility in Perth. The proposed facility was

based around a nominal 3.8 MW gas turbine, with the waste heat being used to operate a

wood fibre drier.

1999

Iraq Generation Study

United Nations Development Programme

Study to identifed options for the addition of generation capacity in the Northern

Governorates of Iraq. Study included assessment of the existing generation supply situation;

immediate, medium and long term generation requirements; identification of options for

increasing generation capacity and for connecting this additional capacity into the existing

system; and recommendations for implementing the additional generation capacity.

1996/1997

Darwin/Katherine Generation/Transmission Augmentation

Power and Water Authority, Northern Territory

The project determined the least cost generation system to supply loads in the

Darwin/Katherine area for the period 1998-2013. Study included data acquisition for the

studies, measurement of generator parameters, AVR and governor modeling; transient and

dynamic stability studies and loadflows; generation planning studies using probabilistic

simulation methodology, generation location optimisation, and feasibility of gas turbine

inlet-air cooling

1995/1996

National Load Dispatch Centre Project

Bangladesh Power Development Board

Project included the feasibility, design and specification for a SCADA/EMS for the National

Load Dispatch Centre (NLDC) for the whole of Bangladesh. The work also included

recommendations for an institutional framework within which the NLDC will operate with

respect to a proposed new grid corporation and a progressively deregulated power

industry.

Page 22: Smec Malaysia Plant & Energy - Capability Statement

Page 20 of 20

1994/1995

Power Pricing Management Information System

Asian Development Bank

Responsible for the conceptual design, development in-house, and training of staff in the

use of a Power Pricing Management Information System (PPMIS) for the Ministry of Electric

Power (MEP), PR China. The PPMIS was used for generation planning and includes a

comprehensive database with all generation, transmission, distribution and consumer data

for the whole of China.

1993/1994

System Planning and Frequency Stabilisation of the Inco-Soroako Power System

PT Inco

The project focused on staff development and training in the use of the operation simulation

model software for the INCO-Soroako power system. The system comprises 3 x 55 MW

hydro units, 2 x 28 MW steam units and 3 x 8 MW diesel units. Governors, AVRs and all

hydraulic systems were modelled in detail to investigate possible methods of controlling

large system frequency deviations.

1988/1989

Site Ranking Study for Thermal Power Stations

Australian Trade Commission (Austrade)

Feasibility study to rank thermal power stations in Egypt over a 20 year planning period.

The included all possible fuel sources, transport, transmission, geotechnical, geological

and environmental factors. Probabilistic simulation methods were used to model system

expansion to meet the load forecast with acceptable reliability.

Page 23: Smec Malaysia Plant & Energy - Capability Statement

AP

PE

ND

ICE

S –

PR

OJ

EC

TS

DA

TA

SH

EE

TS

Page 24: Smec Malaysia Plant & Energy - Capability Statement

GREEN TO ENERGY (GTE) 1.5MW BIOGASS POWER PLANT PROJECT

SURAT THANI, THAILAND Location

:

Surat Thani, Thailand

Type

:

1.5MW Biogas Power Plant

Installed Cost

:

Approximately USD2 million (Turnkey Contract)

Construction Period

:

April 2007 – February 2009

Commissioned

:

March 2009

The Biogas Power Project development by GTE is the construction of a 1.5MW Biogas Power Plant using POME as a primary fuel. The net power output of 1.35MW will be sold to Provincial Electricity Authority (PEA) under a Power Purchase Agreement (PPA) for a Very Small Power Producers (VSPP) – Non-Firm Contract. SMEC is engaged as the Independent Checking Engineer for the funder, the Siam Commercial Bank.

Page 25: Smec Malaysia Plant & Energy - Capability Statement

SPC BIODIESEL 100,000TPY BIODIESEL PLANT PROJECT

Location

:

POIC, Lahad Datu, Sabah, Malaysia

Type

:

100,000 tonnes peryear Biodiesel Plant

Installed Cost

:

Approximately RM 50million

Construction Period

:

November 2006 to August 2007

Commissioned

:

August 2007

This plant is a continuous process plant, producing Biodiesel (Methylester) as the main product, and glycerine as the secondary product utilizing palm RBD Olein and RBD Stearin. It has a production capability of generating 100,000 tonnes of biodiesel per year with 8,000 running hours per year. It also produces 11,600 tonnes of crude glycerine (82-85% purity) per year. The technology provider is Desmet Ballestra Oleo from Italy. SMEC were engaged to provide engineering consulting and project management services for the project.

Page 26: Smec Malaysia Plant & Energy - Capability Statement

PT CILIANDRA 250,000 TPY BIODIESEL PLANT PROJECT

Location : Dumai, Sumatera, Indonesia Type : 250,000 tonnes per year biodiesel plant Installed Cost : Approximately RM150 million Construction Period : 2007 - 2008 Commissioning : December 2008 The plant is a continuous process plant, producing Biodiesel (Methylester) as the main product and glycerine as the secondary product utilizing Crude Palm Oil. It has a production capability of generating 250,000 tonnes of Biodiesel per year with 8,000 running hours per year. It also produces 30,000 tonnes crude glycerine per year and a variety of oleo products for sale to the edible oil market. The technology provider is Desmet Ballestra Oleo from Italy. SMEC were engaged by PT Ciliandra Perkasa to provide detail engineering services for the civil and balance of plant.

Page 27: Smec Malaysia Plant & Energy - Capability Statement

KINA BIOPOWER 11.5MW BIOMASS POWER PLANT PROJECT

Location

:

Sandakan, Sabah, Malaysia

Type

:

11.5MW Biomass Fired Power Generation

Installed Cost

:

Approximately RM 64million (Turnkey Contract)

Construction Period

:

2006 - 2008

Commissioned

:

April 2008

This is a biomass power plant, with a capability of generating a gross power output of 11.5MW. The plant is designed for empty fruit bunch (EFB) as the fuel to burn and generate heat to the boiler. The boiler then generates steam to turn the turbine shaft to generate electric power. Under the Malaysian SREP scheme, Kina Biopower will supply up to 10MW (nett) power to SESB 33kV grid. SMEC is engaged in the capacity of Owner’s Engineer and Project Manager.

Page 28: Smec Malaysia Plant & Energy - Capability Statement

SEGUNTOR BIOENERGY 11.5MW BIOMASS POWER PLANT PROJECT Location

:

Sandakan, Sabah, Malaysia

Type

:

11.5MW Biomass Fired Power Generation

Installed Cost

:

Approximately RM 64million (Turnkey Contract)

Construction Period

:

2006 - 2008

Commissioned

:

July 2008

This is a biomass power plant, with a capability of generating a gross power output of 11.5MW. The plant is designed for empty fruit bunch (EFB) as the fuel to burn and generate heat to the boiler. The boiler then generates steam to turn the turbine shaft to generate electric power. Under the Malaysian SREP scheme, Kina Biopower will supply up to 10MW (nett) power to SESB 33kV grid. SMEC is engaged in the capacity of Owner’s Engineer and Project Manager.

Page 29: Smec Malaysia Plant & Energy - Capability Statement

POWER PROSPECT 9.9M BIOMASS POWER PLANT PROJECT

Location

:

Ayutthaya, Thailand

Type

:

9.9MW Rice Husk Power Generation

Installed Cost

:

Approximately USD17 million

Construction Period

:

21 months

Commissioning

:

December 2008

This is a biomass power plant with capability of generating a gross power output of 9.9MW and 20TPH of process steam. The plant is designed for rice husk fuel to burn and generate heat to the boiler. The boiler then generates steam to turn the turbine shaft to generate electric power. Under the Thailand SSP scheme, Power Prospect project will supply up to 8.0MW (nett) power to PEA 22kV grid. At the same time, supplying 20TPH process steam to the nearby rice mill. SMEC is engaged to provide Engineering, Procurement and Construction Management (EPCM) for the project.

Page 30: Smec Malaysia Plant & Energy - Capability Statement

NALURI VENTURES PASIR GUDANG BIOMASS POWER STATION PROJECT

Location

:

Pasir Gudang Industrial Park, Johor, Malaysia

Type

:

11.5MW Biomass Fired Power Generation

Installed Cost

:

Approximately RM 56 million

Construction Period

:

2004 - 2008

Commissioned

:

August 2008

SMEC is engaged to provide engineering consultancy, project management and technical support services for the project. The power plant is to be fuelled mainly (up to 100%) by oil palm empty fruit bunches (EFB) and shall possess the capacity and flexibility to utilize other biomass fuels such as oil palm shells, oil palm fibre and wood waste including wood chips, forest residues and sawdust. Under the Malaysian SREP scheme, Naluri will supply up to 9.9MW (nett) power to TNB 22kV grid.

Page 31: Smec Malaysia Plant & Energy - Capability Statement

SURAT THANI GREEN ENERGY 9.95MW EFB POWER PLANT PROJECT Location : Surat Thani, Thailand Type : 9.95MW EFB Fired Power Generation Installed Cost : Approximately USD18 million Construction Period : 24 months Commissioned : July 2007 This a biomass power plant, with capability of generating a gross power output of 9.95MW. The plant is designed for empty fruit bunch (EFB) as the fuel to burn and generate heat to the boiler. The boiler then generates steam to turn the turbine shaft to generate electric power. Under the Thailand SPP scheme, SGEC project will supply up to 8.8MW (nett) power to PEA 22kV grid. SMEC is engaged in the capacity of Owner’s Engineer and design consultant for the fuel treatment and fuel handling system.

Page 32: Smec Malaysia Plant & Energy - Capability Statement

MUNICIPAL SOLID WASTE INCINERATORS Owner : Ministry of Housing and Local Government of Malaysia Location : Pulau Langkawi, Pulau Pangkor, Pulau Tioman and Cameron Highlands, Labuan Type : Municipal Solid Waste Rotary Klin Incinerator Installed Cost : Ranging from RM20 million to RM70 million Construction Period : 18 months Commissioning : 2010 Incineration Capacity : Ranging from 20 tonnes per day to 100 tonnes per day SMEC responsible as EPCM Consultant for feasibility studies, engineering, procurement, construction, installation, supervision and commissioning for nominal 10,000 tonnes per annum waste incineration facility The facility was designed to burn municipal solid wastes. The facility comprises mechanical waste handling system, rotary klin with secondary chamber, air pollution control, boiler, turbine, ash handling system, waste water treatment system, cooling tower and flue stack. All these plants are polanned to be commissioned by year 2010.

Page 33: Smec Malaysia Plant & Energy - Capability Statement

BIOMASS FIRED GAS TURBINE FACILITY

Owner

:

Bioten Corporation / Thiess Pty Ltd

Location

:

Leeton, New South Wales, Australia

Type

:

Modified GE LM 1500 gas turbine generator

Installed Cost

:

A$ 12 million

Construction Period

:

-

Commissioned

:

Scheduled late 2002

SMEC undertook preliminary design, tendering and evaluation for the equipment supply of a 7.5 MW direct fired biomass gas turbine. Bioten Corporation of the United States developed the Biomass Fired Gas Turbine. It uses a modified LM-1500 gas turbine, which allows biomass to be burned directly in an offset combustor. The facility is simple and bypasses the need for complex and expensive gasification. Costs of setting up and running a plant is comparable with gas fired gas turbine systems. The Leeton facility was designed to burn rice hulls. The facility will be capable of burning any biomass material including other grain husks, cotton hulls, wood waste, sugar cane leaves and bagasse, urban tree cuttings, and the like.

Page 34: Smec Malaysia Plant & Energy - Capability Statement

SMEC Malaysia Green Energy Project and Services

Loca

tion

Fe

asib

ility S

tud

y

Ba

sic De

sign

an

d

Sp

ecifica

tion

De

taile

d D

esig

n

Au

tho

rity su

bm

ission

an

d a

pp

rov

al

Te

nd

er P

rep

ara

tion

Te

nd

er E

va

lua

tion

,

Cla

rificatio

n &

Re

po

rt

Co

ntra

ct Aw

ard

Pro

cure

me

nt

De

sign

Re

vie

w

O&

M R

ev

iew

Fa

ctory

Insp

ectio

n

an

d A

ccep

tan

ce T

est

Site

Su

pe

rvisio

n

Co

ntra

ct an

d

Ad

min

istatio

n

Re

po

rting

Liaso

n w

ith o

the

r

con

sulta

nt

Te

sting

&

Co

mm

ission

ing

BIOMASS POWER PLANT

Steam Turbine � � � � � � � � � � � �

Biomass Boiler � � � � � � � � � � � �

Fuel Treatment & Handling System (EFB) � � � � � � � � � � �

Compressed Air � � � � � � � � � � � �

Raw Water Treatment System � � � � � � � � � � �

Demin Water Treatment System � � � � � � � � � � �

Waste Water Treatment System � � � � � � � � � � �

Cooling Water System � � � � � � � � � � �

Firefighting & Fire Detection System � � � � � � � � � � � �

HVAC & CWSP � � � � � � � � � � � �

Crane � � � � � � � � � � � �

Weighbridge � � � � � � � � � � � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power and etc.)

� � � � � � � � � � �

Control Instrumentation & Monitoring System � � � � � � � � � �

Civil and Structure � � � � � � � � � � � � �

Steam Turbine � � � � � � � � � � � �

Biomass Boiler � � � � � � � � � � � �

Fuel Treatment & Handling System (EFB) � � � � � � � � � � �

Compressed Air � � � � � � � � � � � �

Raw Water Treatment System � � � � � � � � � � �

Demin Water Treatment System � � � � � � � � � � �

Waste Water Treatment System � � � � � � � � � � �

Cooling Water System � � � � � � � � � � �

Firefighting & Fire Detection System � � � � � � � � � � � �

HVAC & CWSP � � � � � � � � � � � �

Crane � � � � � � � � � � � �

Weighbridge � � � � � � � � � � � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power, Communication and etc.)

� � � � � � � � � � �

Control Instrumentation & Monitoring System � � � � � � � � � �

Civil and Structure � � � � � � � � � � � � �

Sa

nd

ak

an

, Sa

ba

h, M

ala

ysia

Sa

nd

ak

an

, Sa

ba

h, M

ala

ysia

PROJECTS ACTIVITIES

Kina Biopower

Seguntor Bioenergy

SMEC (Malaysia) Sdn Bhd 1 of 6

Page 35: Smec Malaysia Plant & Energy - Capability Statement

SMEC Malaysia Green Energy Project and Services

Loca

tion

Fe

asib

ility S

tud

y

Ba

sic De

sign

an

d

Sp

ecifica

tion

De

taile

d D

esig

n

Au

tho

rity su

bm

ission

an

d a

pp

rov

al

Te

nd

er P

rep

ara

tion

Te

nd

er E

va

lua

tion

,

Cla

rificatio

n &

Re

po

rt

Co

ntra

ct Aw

ard

Pro

cure

me

nt

De

sign

Re

vie

w

O&

M R

ev

iew

Fa

ctory

Insp

ectio

n

an

d A

ccep

tan

ce T

est

Site

Su

pe

rvisio

n

Co

ntra

ct an

d

Ad

min

istatio

n

Re

po

rting

Liaso

n w

ith o

the

r

con

sulta

nt

Te

sting

&

Co

mm

ission

ing

PROJECTS ACTIVITIES

Steam Turbine � � � � � � � � � � � �

Biomass Boiler � � � � � � � � � � � �

Fuel Treatment & Handling System (EFB) � � � � � � � � � � �

Compressed Air � � � � � � � � � � � �

Raw Water Treatment System � � � � � � � � � � �

Demin Water Treatment System � � � � � � � � � � �

Waste Water Treatment System � � � � � � � � � � �

Cooling Water System � � � � � � � � � � �

Firefighting & Fire Detection System � � � � � � � � � � � �

HVAC & CWSP � � � � � � � � � � � �

Crane � � � � � � � � � � � �

Weighbridge � � � � � � � � � � � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power, Communication and etc.)

� � � � � � � � � � �

Control Instrumentation & Monitoring System � � � � � � � � � �

Civil and Structure � � � � � � � � � � � � �

Steam Turbine � � � �

Biomass Boiler � � � �

Fuel Treatment & Handling System (EFB) � � �

Compressed Air � � � � �

Raw Water Treatment System � � � �

Demin Water Treatment System � � � �

Waste Water Treatment System � � � �

Cooling Water System � � � �

Firefighting & Fire Detection System � � � � �

HVAC & CWSP � � � � �

Crane � � � � �

Weighbridge � � � � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power, Communication and etc.)

� � � �

Control Instrumentation & Monitoring System � � �

Civil and Structure � � � � �

Steam Turbine � � �

Biomass Boiler � � �

Fuel Treatment & Handling System (EFB) � �

Compressed Air � � � �

Raw Water Treatment System � � �

Demin Water Treatment System � � �

Waste Water Treatment System � � �

Cooling Water System � � �

Firefighting & Fire Detection System � � � �

HVAC & CWSP � � � �

Crane � � � �

Weighbridge � � � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power, Communication and etc.)

� � �

Control Instrumentation & Monitoring System � �

Civil and Structure � � � �

Joh

or, M

ala

ysia

Su

rat T

ha

ni, T

ha

ilan

dT

elu

k In

tan

, Pe

rak

, Ma

lay

sia

SGEC EFB Power Plant

Maju Intan Biomass Power Plant

Naluri Ventures Pasir Gudang

Biomass (EFB) Power Station

Project

SMEC (Malaysia) Sdn Bhd 2 of 6

Page 36: Smec Malaysia Plant & Energy - Capability Statement

SMEC Malaysia Green Energy Project and Services

Loca

tion

Fe

asib

ility S

tud

y

Ba

sic De

sign

an

d

Sp

ecifica

tion

De

taile

d D

esig

n

Au

tho

rity su

bm

ission

an

d a

pp

rov

al

Te

nd

er P

rep

ara

tion

Te

nd

er E

va

lua

tion

,

Cla

rificatio

n &

Re

po

rt

Co

ntra

ct Aw

ard

Pro

cure

me

nt

De

sign

Re

vie

w

O&

M R

ev

iew

Fa

ctory

Insp

ectio

n

an

d A

ccep

tan

ce T

est

Site

Su

pe

rvisio

n

Co

ntra

ct an

d

Ad

min

istatio

n

Re

po

rting

Liaso

n w

ith o

the

r

con

sulta

nt

Te

sting

&

Co

mm

ission

ing

PROJECTS ACTIVITIES

Steam Turbine � � � � � � � � � � �

Biomass Boiler � � � � � � � � � � �

Fuel Treatment & Handling System (EFB) � � � � � � � � � �

Compressed Air � � � � � � � � � � �

Raw Water Treatment System � � � � � � � � � �

Demin Water Treatment System � � � � � � � � � �

Waste Water Treatment System � � � � � � � � � �

Cooling Water System � � � � � � � � � �

Firefighting & Fire Detection System � � � � � � � � � � �

HVAC & CWSP � � � � � � � � � � �

Crane � � � � � � � � � � �

Weighbridge � � � � � � � � � � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power, Communication and etc.)

� � � � � � � � � �

Control Instrumentation & Monitoring System � � � � � � � � �

Civil and Structure � � � � � � � � � � � �

Steam Turbine � �

Biomass Boiler � �

Fuel Treatment & Handling System (EFB) � �

Compressed Air � �

Raw Water Treatment System � �

Demin Water Treatment System � �

Waste Water Treatment System � �

Cooling Water System � �

Firefighting & Fire Detection System � �

HVAC & CWSP � �

Crane � �

Weighbridge � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power, Communication and etc.)

� � �

Control Instrumentation & Monitoring System � �

Civil and Structure � �

Steam Turbine � �

Biomass Boiler � �

Fuel Treatment & Handling System (EFB) � �

Compressed Air � �

Raw Water Treatment System � �

Demin Water Treatment System � �

Waste Water Treatment System � �

Cooling Water System � �

Firefighting & Fire Detection System � �

HVAC & CWSP � �

Crane � �

Weighbridge � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power, Communication and etc.)

� � �

Control Instrumentation & Monitoring System � �

Civil and Structure � �

Steam Turbine � �

Th

aila

nd

Sa

raw

ak

, Ma

lay

siaS

ara

wa

k, M

ala

ysia

Power Prospect Rice Husk

Power Plant

Mas Gading Biomass Power

Plant

Mukah Biomass Power Plant

SMEC (Malaysia) Sdn Bhd 3 of 6

Page 37: Smec Malaysia Plant & Energy - Capability Statement

SMEC Malaysia Green Energy Project and Services

Loca

tion

Fe

asib

ility S

tud

y

Ba

sic De

sign

an

d

Sp

ecifica

tion

De

taile

d D

esig

n

Au

tho

rity su

bm

ission

an

d a

pp

rov

al

Te

nd

er P

rep

ara

tion

Te

nd

er E

va

lua

tion

,

Cla

rificatio

n &

Re

po

rt

Co

ntra

ct Aw

ard

Pro

cure

me

nt

De

sign

Re

vie

w

O&

M R

ev

iew

Fa

ctory

Insp

ectio

n

an

d A

ccep

tan

ce T

est

Site

Su

pe

rvisio

n

Co

ntra

ct an

d

Ad

min

istatio

n

Re

po

rting

Liaso

n w

ith o

the

r

con

sulta

nt

Te

sting

&

Co

mm

ission

ing

PROJECTS ACTIVITIES

Biomass Boiler � �

Fuel Treatment & Handling System (EFB) � �

Compressed Air � �

Raw Water Treatment System � �

Demin Water Treatment System � �

Waste Water Treatment System � �

Cooling Water System � �

Firefighting & Fire Detection System � �

HVAC & CWSP � �

Crane � �

Weighbridge � �

Electrical (HV, LV, Transmission, UPS system,

Lightning Protection System, Lighting and small

power, Communication and etc.)

� � �

Control Instrumentation & Monitoring System � �

Civil and Structure � �

MUNICIPAL SOLID WASTE INCINERATOR PLANT

Steam Turbine � � � � � � � � � � � � � � �

Waste Heat Recovery Boiler � � � � � � � � � � � � � � �

Waste Separation System � � � � � � � � � � � � � � � �

Air Pollution Control System � � � � � � � � � � � � � � � �

Compressed Air � � � � � � � � � � � � � � � �

Waste Water Treatment System � � � � � � � � � � � � � � � �

Demin Water Treatment System � � � � � � � � � � � � � � � �

Cooling Water System � � � � � � � � � � � � � � � �

Firefighting & Fire Detection System � � � � � � � � � � � � � � � �

HVAC & CWSP � � � � � � � � � � � � � � � �

Crane � � � � � � � � � � � � � � � �

Weighbridge � � � � � � � � � � � � � � � �

Electrical (HV, LV, UPS system, Lightning Protection

System, Communication, Lighting and small power

and etc.)

� � � � � � � � � � � � � � � �

Control Instrumentation & Monitoring System � � � � � � � � � � � � � � � �

Civil and Structure � � � � � � � � � � � � � � � �

Waste Separation System � � � � � � � � � � � � � � � �

Air Pollution Control System � � � � � � � � � � � � � � � �

Compressed Air � � � � � � � � � � � � � � � �

Waste Water Treatment System � � � � � � � � � � � � � � � �

Cooling Water System � � � � � � � � � � � � � � � �

Firefighting & Fire Detection System � � � � � � � � � � � � � � � �

HVAC & CWSP � � � � � � � � � � � � � � � �

Weighbridge � � � � � � � � � � � � � � � �

Electrical (LV, UPS system, Lightning Protection

System, Communication, Lighting and small power

etc.)

� � � � � � � � � � � � � � � �

Control Instrumentation & Monitoring System � � � � � � � � � � � � � � � �

Civil and Structure � � � � � � � � � � � � � � � �

Pa

ng

ko

r, Pe

rak

, Ma

lay

siaS

ara

wa

k, M

ala

ysia

Lan

gk

aw

i, Ke

da

h, M

ala

ysia

Saratok Biomass Power Plant

Langkawi MSW Incinerator

Pangkor MSW Incinerator

SMEC (Malaysia) Sdn Bhd 4 of 6

Page 38: Smec Malaysia Plant & Energy - Capability Statement

SMEC Malaysia Green Energy Project and Services

Loca

tion

Fe

asib

ility S

tud

y

Ba

sic De

sign

an

d

Sp

ecifica

tion

De

taile

d D

esig

n

Au

tho

rity su

bm

ission

an

d a

pp

rov

al

Te

nd

er P

rep

ara

tion

Te

nd

er E

va

lua

tion

,

Cla

rificatio

n &

Re

po

rt

Co

ntra

ct Aw

ard

Pro

cure

me

nt

De

sign

Re

vie

w

O&

M R

ev

iew

Fa

ctory

Insp

ectio

n

an

d A

ccep

tan

ce T

est

Site

Su

pe

rvisio

n

Co

ntra

ct an

d

Ad

min

istatio

n

Re

po

rting

Liaso

n w

ith o

the

r

con

sulta

nt

Te

sting

&

Co

mm

ission

ing

PROJECTS ACTIVITIES

Waste Separation System � � � � � � � � � � � � � � � �

Air Pollution Control System � � � � � � � � � � � � � � � �

Compressed Air � � � � � � � � � � � � � � � �

Waste Water Treatment System � � � � � � � � � � � � � � � �

Water Treatment System � � � � � � � � � � � � � � � �

Cooling Water System � � � � � � � � � � � � � � � �

Firefighting & Fire Detection System � � � � � � � � � � � � � � � �

HVAC & CWSP � � � � � � � � � � � � � � � �

Weighbridge � � � � � � � � � � � � � � � �

Electrical (LV, UPS system, Lightning Protection

System, Communication, Lighting and small power

and etc.)

� � � � � � � � � � � � � � � �

Control Instrumentation & Monitoring System � � � � � � � � � � � � � � � �

Civil and Structure � � � � � � � � � � � � � � � �

Waste Separation System � � � � � � � � � � � � � � � �

Air Pollution Control System � � � � � � � � � � � � � � � �

Compressed Air � � � � � � � � � � � � � � � �

Waste Water Treatment System � � � � � � � � � � � � � � � �

Cooling Water System � � � � � � � � � � � � � � � �

Firefighting & Fire Detection System � � � � � � � � � � � � � � � �

HVAC & CWSP � � � � � � � � � � � � � � � �

Weighbridge � � � � � � � � � � � � � � � �

Electrical (LV, UPS system, Lightning Protection

System, Communication, Lighting and small power

and etc.)

� � � � � � � � � � � � � � � �

Control Instrumentation & Monitoring System � � � � � � � � � � � � � � � �

Civil and Structure � � � � � � � � � � � � � � � �

Waste Separation System � � � � �

Air Pollution Control System � � � � �

Compressed Air � � � � �

Waste Water Treatment System � � � � �

Cooling Water System � � � � �

Firefighting & Fire Detection System � � � � �

HVAC & CWSP � � � � �

Weighbridge � � � � �

Electrical (LV, UPS system, Lightning Protection

System, Communication, Lighting and small power

and etc.)

� � � � �

Control Instrumentation & Monitoring System � � � � �

Civil and Structure � � � � �

Cameron MSW Incinerator

Tioman MSW Incinerator

Labuan MSW Incinerator

Lab

ua

n, S

ab

ah

, Ma

lay

siaC

am

ero

n H

igh

lan

ds, P

ah

an

g, M

ala

ysia

Pu

lau

Tio

ma

n, P

ah

an

g, M

ala

ysia

SMEC (Malaysia) Sdn Bhd 5 of 6

Page 39: Smec Malaysia Plant & Energy - Capability Statement

SMEC Malaysia Green Energy Project and Services

Loca

tion

Fe

asib

ility S

tud

y

Ba

sic De

sign

an

d

Sp

ecifica

tion

De

taile

d D

esig

n

Au

tho

rity su

bm

ission

an

d a

pp

rov

al

Te

nd

er P

rep

ara

tion

Te

nd

er E

va

lua

tion

,

Cla

rificatio

n &

Re

po

rt

Co

ntra

ct Aw

ard

Pro

cure

me

nt

De

sign

Re

vie

w

O&

M R

ev

iew

Fa

ctory

Insp

ectio

n

an

d A

ccep

tan

ce T

est

Site

Su

pe

rvisio

n

Co

ntra

ct an

d

Ad

min

istatio

n

Re

po

rting

Liaso

n w

ith o

the

r

con

sulta

nt

Te

sting

&

Co

mm

ission

ing

PROJECTS ACTIVITIES

BIODIESEL PLANT

Mechanical� � � � � � � � � � �

Electrical, Control & Monitoring System� � � � � � � � � � �

Civil and Structure� � � � � � � � � � �

Mechanical� � � � � � � �

Electrical, Control & Monitoring System� � � � � � � � �

Civil and Structure�

Mechanical� � � � � � � � � � �

Electrical, Control & Monitoring System� � � � � � � � � � �

Civil and Structure� � � � � � � � � � �

Mechanical� � � � � � � � � � �

Electrical, Control & Monitoring System� � � � � � � � � � �

Civil and Structure � � � � � � � � � � �

INDEPENDENT CHECKING ENGINEER

Mechanical �

Electrical, Control & Monitoring System�

Civil and Structure�

Mechanical �

Electrical, Control & Monitoring System�

Civil and Structure�

Mechanical �

Electrical, Control & Monitoring System�

Civil and Structure�

Mechanical �

Electrical, Control & Monitoring System�

Civil and Structure�

Bentong Biomass Power Plant

Pa

ha

ng

,

Ma

lay

sia

GTE Biogas Power Plant

Su

rat T

ha

ni,

Th

aila

nd

Serting EFB Biomass Power

Plant

Ne

ge

ri

Se

mb

ilan

,

Ma

lay

sia

Sa

ba

h, M

ala

ysia

Lereno Biodiesel Plant

Pe

rak

,

Ma

lay

sia

Himpunan sari

PT Ciliandra Perkasa Biodiesel

Plant

Se

lan

go

r,

Ma

lay

sia

Te

ren

gg

an

u,

Ma

lay

sia

Su

ma

tera

,

Ind

on

esia

SPC Biodiesel Plant

Gomedic Biodiesel Plant