Top Banner
SmartPlant Enterprise in Grenland Group The New Vision with SPE Core P2C2 - 2010 Insert Company Logo Here Tonia Pedersen Terje Ørbeck Grenland Group, Norway
30

Smart Plant Enterprise 2010

Apr 07, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Smart Plant Enterprise 2010

SmartPlant Enterprise in Grenland Group

The New Vision with SPE Core

P2C2 - 2010

Insert Company Logo Here

Tonia PedersenTerje Ørbeck Grenland Group, Norway

Page 2: Smart Plant Enterprise 2010

Grenland Group

� An experienced oil & gas engineering, procurement and construction company

� Strong customer focus

� Uncompromising attitude in HSE matters

� An attractive employer for highly qualified

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 2 –

� An attractive employer for highly qualified personnel

� 1200 employees in Norway and Asia

Page 3: Smart Plant Enterprise 2010

Business areas

• World leading fabricator of subsea equipment

• NOK 683m in revenues in 2008

• Major supplier of maintenance & modification services to

the Norwegian continental shelf

• NOK 566.5m in revenues in 2008

Grenland Group Fabrication

Grenland GroupOffshore Partner

SmartPlant Enterprise – Experience The PowerNovember 3, 2010 – 3 –

• Leading supplier of engineering & procurement services

worldwide

• NOK 402m in revenues in 2008

Grenland Group Solutions

• Grenland Industri: Blue-collar resource company – NOK 137.8m in revenues in 2008

• GGEA: Onshore and offshore electrical & automation services, NOK 64.4m in revenues in 2008

Independent Subsidiaries

Page 4: Smart Plant Enterprise 2010

GLOBAL ENGINEERING

GG locations

GG representative Offices

Oslo

Drammen

Tønsberg

Stokke

Sandefjord

Langesund

Stathelle

Skien

SmartPlant Enterprise – Experience The Power– 4 –

HoustonNingbo/Shanghai, China

Kuala Lumpur

Szczecin, Poland

��

� Korea

Mexico�Qatar

�Spain

Aberdeen

India

Brasil

�Egypt

Skien

Porsgrunn

Notodden

Skudeneshavn

Stavanger

Harstad

��

November 3, 2010

Page 5: Smart Plant Enterprise 2010

Design & studies

� Rig design, Semisubmersible’s & Drillship design

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 5 –

Page 6: Smart Plant Enterprise 2010

Design studies

� Well intervention Equipment & Products

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 6 –

Page 7: Smart Plant Enterprise 2010

EXISTING CAD SYSTEM IN GG, 2006

� Complicated CAD Picture

� To many CAD/ Design system

� Innefficient data sharing

PDMS 3D MODELLING PIP/STR.

TEKLA-XSTEEL STRUCTURE

SMARTPLANT INSTRUMENTATION

PLANTSPACE - PIPING

PDS - PIPING

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 7 –

� Difficult to support all projects/ end users

� Key business driver to identify ’one’-system which could improve this picture dramatically

MICROSTATION

PLANTSPACE - PIPING

AUTOCAD

PROSESS. - manuel

MANUEL SYST.

EXCEL

Page 8: Smart Plant Enterprise 2010

Consolidated with SmartPlant Enterprise

DISIPLINE TOOLS

Pip

ing

Sm

artP

l 3D

Stru

ktu

r

Sm

artP

l 3D

Pro

sess

Sm

artPl P

&ID

Elec|tro

/Instr

Sm

artPl In

str.

Hvac

Sm

artPl 3D

Mech

an

ical

So

lid m

od

elling

Solid 2D/Review

Dra

ugh

ting

Sm

artS

ketch

DN

V

Na

uticu

s/Sesa

n

Intellish

ip

Ana

lysis

Sm

p R

eview

Sm

p M

ark

up

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 8 –

Sm

artPl P

&ID

Sm

artPl In

str.

So

lid m

od

elling

IFS

Financial

IFS

ProjectIFS

Purchasing

Sm

p M

ark

up

HIDOC

DOCUMENT

MANAGEMENT

SMARTPLANT FOUNDATION

Page 9: Smart Plant Enterprise 2010

A New Focus with SPE Core

SPE Core /

SmartPlant

Foundation

. Tag Register

. Doc Register

. Reporting Tool

Sm

artP

lant

Des

ign

Tool

s

Customer Systems

SmartMarine/SmartPlant 3D

SmartPlant Enterprise – Experience The PowerNovember 3, 2010 – 9 –

. Workflow

. Progress

. Asset Register

Sm

artP

lant

Des

ign

Engineering to Order and Project

Delivery

IFS

Lotus Notes

HiDoc

SmartPlant Electrical

SmartPlant Instrumentation

SmartPlant P&ID

Page 10: Smart Plant Enterprise 2010

Projects with SPE Core

� Åsgard Swivel, October 2010-present

Complete replacement of existing offshore swivel for

Åsgard A.

� Disciplines: Piping, Structural, Electro, Process,

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 10 –

Instrumentation

� Deliveries: Piping Isometrics, Piping MTO, Weight & CoG data,

client procurement data, Structural Arrangements & Detail

manufacturing drawings. Tag Master List, Tag-Document and

Tag-Tag relationships.

Page 11: Smart Plant Enterprise 2010

Projects with SPE Core

� Gullfaks B, June 2010-present

Upgrade of water injection unit for Gullfaks B

� Disciplines: Process, Piping, Structural, Electro, Instrument,

HVAC

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 11 –

� Deliverables: Delivery P&ID Drawing, Linelist, Valvelist,

Equipment list, Piping Isometrics, Piping MTO, Piping &

Layout Arrangement drawings, Structural Arrgt . Drawings,

Structural Foundation Drawings. Tag Master List, Tag-

Document and Tag-Tag relationships.

Page 12: Smart Plant Enterprise 2010

SPF/SPE "In Use"

� Type Hierarchies

� Plant Break Down Structure

� Tag Type Hierarchy

� Document Type Hierarchy

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 12 –

� Classification Types

Page 13: Smart Plant Enterprise 2010

SPF/SPE "In Use"

� Configuration Spreadsheets

� Plant Break Down Structure

� Tag Type Hierarchy

� Document Type Hierarchy

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 13 –

� User Access

Page 14: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Tag Registry

� Central registry of all tags for each project.

� Central tag creation point for SmartPlant tools

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 14 –

� tag hierarchy reflects the individual tool

requirements for tag typing.

Page 15: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Data Loading Spreadsheets

� Bulk Tag Loading

� Easy to configure

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 15 –

Page 16: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Tag Publish

� SPE supports tag publish

to the SmartPlant tools.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 16 –

Page 17: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Tag Retrieve

� SPE published tags are

correlated with the tags

retrieved from Tools

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 17 –

Page 18: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Inconsistency Checking

� Central Tag Registry with ”Shared Objects” provides for easier checking of

tag data across disciplines.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 18 –

Page 19: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Document Registry

� SmartPlant Foundation updated regularly with Document meta data from

HiDoc via XML load files.

� HiDoc : central document

registry for transmittals

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 19 –

� SPF: tag-document

relationship registry

Page 20: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Tag - Document Linking

� SmartPlant published documents

incorporate tag-document links.

� Drag and Drop supported within

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 20 –

SPE Core between SPX Tags

and SPX Documents.

� Tag – Document relationship

report from SPF.

Page 21: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Published Document Workflow� HiDoc is updated with approved engineering documents via workflow.

� Published documents to be sent on

transmittal are first approved using a

SPF workflow step

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 21 –

� Approved documents are output via

SPE Core ’internal transmittal’

workstep for retrieval by HiDoc.

Page 22: Smart Plant Enterprise 2010

SPF/SPE "In Use"

Engineering Data Reporting� Bringing together engineering tag data

� Tag data distributed across

SmartPlant domains.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 22 –

� Shared Object references

’Last-In’ data

Page 23: Smart Plant Enterprise 2010

Short Term

� Full integration of tags between SPE and SPF and SmartPlant Tools

� Asset Managment

� Tag – Asset linking and reporting

SPF/SPE ”Next Steps"

SmartPlant Enterprise – Experience The Power

� More comprehensive tag data reporting from SPF

November 23, 2010 – 23 –

Page 24: Smart Plant Enterprise 2010

SPF/SPE ”Next Steps"

Longer Term

� ENS management of tags and documents in SPF

� Central Document Registry

� Document Transmittal

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 24 –

� Document Progress

Page 25: Smart Plant Enterprise 2010

Grenland Group can compete in a ”higher engineering division”.

� Centralized tag registry

� Tag – Document management

Benefits

SmartPlant Enterprise – Experience The Power

� Tag – Document management

� Centralized documentmanagement

November 23, 2010 – 25 –

Page 26: Smart Plant Enterprise 2010

� Workflow management

� End-User Access

� SPE Worksheets

Benefits (cont..)

� Transmittals

� ENS Management

� Asset Management

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 26 –

Page 27: Smart Plant Enterprise 2010

Challenges

� Integration between SPF and the Tools is crucial for a central tag registry.� Currently integration does not exist for all tag types for the ’ootb’ applications

� This is an ’Off the Shelf System’. � Require in-house configuration according to company standards.

� Requires time to determine what is ’Out of the Box’

� What is required to be configured to ensure an ’up and running’ system.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 27 –

� Each tool requires a talented Administrator� Require much more knowledge in IT (operating system, networking and databases)

� Still require good engineering knowledge

� Positive ’can-do’ attitude

� Management Support� Support for time and resources is essential

� This is not a tool that is immediately ’up and running’ after installation

Page 28: Smart Plant Enterprise 2010

Challenges (cont..)

� Communication and Training� Effective communication channels

� Between tool administrators and between administrators and end-users

� End-user training of tools and work processes

� This is a new approach to engineering and is confronting for some engineers.

� Testing� Easy to introduce problems.

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 28 –

� Easy to introduce problems.

� Remember this is an integrated system

� Change Management� Configuration and data dictionary changes must be co-ordinated and managed

� Work Process Management� Determining a effective engineering work processes

� Managing exceptions to the defined work processes

Page 29: Smart Plant Enterprise 2010

� This is a vision we believe in!

� And although we face many challenges….

If you start such a project and want to succeed:

LAST WORDS…..

SmartPlant Enterprise – Experience The Power

� Be prepared to stick your head out

� Be ready for a ’fight’!

� Never give up!!

November 23, 2010 – 29 –

Page 30: Smart Plant Enterprise 2010

”ONE TEAM-ONE SYSTEM”ALL WINNERS

SmartPlant Enterprise – Experience The PowerNovember 23, 2010 – 30 –

www.grenlandgroup.com Thank youTonia Pedersen / Terje ØrbeckGrenland Group