Smart Assemblies A quick overview of Timberline Smart Assemblies By David Nicholson [email protected] A configurable Bill of Materials (BOM)
30

Smart Assemblies

May 31, 2015

Download

Documents

David Nicholson

An overview of Timberline Estimating Smart Assemblies
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Smart Assemblies

Smart Assemblies

A quick overview of Timberline Smart Assemblies

By David [email protected]

A configurable Bill of Materials (BOM)

Page 2: Smart Assemblies

An Assembly

Page 3: Smart Assemblies

An Assembly Consist of

• Items– Fixed quantity per As (Mobilization) – A Custom Calculation (Demolition)– A stored Formula (Item Tables)

• Item Tables– One Dimension– Two Dimension

• Select at Takeoff

Page 4: Smart Assemblies

Assembly Elements

Items

Item Tables

Fixed quantity

Custom Calculatio

n

Stored Formulas

Select at Takeoff

Page 5: Smart Assemblies

Other Options

• An Assembly Unit of Measure (UOM)– SF– EA– Etc

• An Assembly Calculation Formula– A variable– A formula

Page 6: Smart Assemblies

One Dimensional Item Table

A Variable, Formula, or Formula Table

Numeric Values Only

Any formula in this field

overrides the Assembly Formula

Item or Phase

Description

Page 7: Smart Assemblies

Two Dimensional Item Table

A Formula, Variable, or

Formula Table

Numeric Values Only

A Formula Table, Formula, or

Variable

Item

Phase

Page 8: Smart Assemblies

Item Table Constraints

• All values must be numeric• Values must be sequential• Limited Maximum Combination of Rows &

Columns• An Assembly Cannot Call another Assembly

Page 9: Smart Assemblies

Formula Options

• Variables

• Functions

• Formulas

• Formula Tables

A formula can use any combination of these functions

Page 10: Smart Assemblies

Formula Creation

Enter Formula Here – If you can create an Excel Formula, you can create a Timberline Formula!

Be Consistent with Naming

Structure

Page 11: Smart Assemblies

VariablesNumeric Values Only

Creativity In

Simplicity

Page 12: Smart Assemblies

A Sample Formula with all Functions

Variables in Blue

Formulas in Green

Formula Tables in

Purple

Names are Case Sensitive

Functions in Black

Page 13: Smart Assemblies

Formula Tables

• Are Similar to Item Tables– One Dimensional– Two Dimensional– Can Use Formulas, Variables, or other

Formula Tables

• Returns Numeric Values Only– Creativity Required– Very Powerful tool

Page 14: Smart Assemblies

Formula Table

Variable, Formula, or Formula Table

Variable, Formula, or Formula Table

Returns a Numeric Value, Variable,

Formula, or Formula Table

Page 15: Smart Assemblies

Formula Table in Action

Returns the minimum stud size allowed in a 14’ high wall with double studs at 24” o/c in an exterior wall

Page 16: Smart Assemblies

Why the effort

• Reduced Errors

• Miscellaneous accessories/connectors selected based on previous selection

• Increased Accuracy

• Decreased Takeoff Time

• Easily Changed

• More Details

Page 17: Smart Assemblies

Reduced Errors

• Prompts– Select Items Tables base on Construction

Parameters– Include an item that can be calculated on

this pass– Select from brand or style options

• Warnings– Invalid entry or selection provides

warnings

Page 18: Smart Assemblies

Reduced Errors

This Prompt varies based on previous

Selection

Your Choice to Include or Exclude

This also drive the Anchor Bolt required

for the Selected Hold-Down

Page 19: Smart Assemblies

Hold-down Anchor Bolts

Selection Based on the Hold-down device required

Page 20: Smart Assemblies

How is this Accomplished

This Formula Table Calls other Formula Tables Based

on the Series Selected

Page 21: Smart Assemblies

Assembly Calculations

Assembly Calculations

Assembly Formula must be included in

all assembly quantity

Calculations

Page 22: Smart Assemblies

Wall Assembly Calculation Formula

Assembly Formula must be included in all assembly quantity Calculations

Prompts are the first in the Assembly

Takeoff

Page 23: Smart Assemblies

Included Assembly Calculation

The Assembly Calculation

Page 24: Smart Assemblies

The Assembly Takeoff

Variable Help

Variable Prompts

Change an Estimate with Replace PassMultiple

Passes

Include items that can be

calculated from the dimensions

entered

Page 25: Smart Assemblies

Accuracy

• Calculate variable dimensions– Window Header Length based on

• Window Materials– Wood– Vinyl– Aluminum

• Mull Type– Single– Double– Triple

• # of Jack Studs

Page 26: Smart Assemblies

Jack Stud Requirements

• Most Structural Plans have the # of Jack Studs by width by floor

• Create a formula table that reflects those requirements

• Modify as need for each project

• No need to constantly refer to the table

• Creates a basis for conceptual estimates

Page 27: Smart Assemblies

Jack Studs By Width & Floor

5’ will fined the next Value in the table

3 required

Page 28: Smart Assemblies

Header Length

Header CalculationRough Opening +( (# Jack Studs * 2 Sides)* Stud Width)

(36+ 2+ ( 3 * 2) * .125) / 12

Page 29: Smart Assemblies

Material Length Required

Thus a 3’ door would require a 5’ Header

Item Description

Item Calculation

Override Formula

Divide the

quantity by the yield

Use the most cost effective

item16’ cost less per

lf than 12’ etc

Page 30: Smart Assemblies

The Conclusion

• In the Downtime is a great time to improve existing processes

• The economy will be back– Will you be ready?– Are your people ready?

• Contact me– I can evaluate your processes– I can get you more efficient than your

competitors