Sligo County Council in Sligo County Council in Partnership with the Partnership with the Federation of Group Water Federation of Group Water Supply Schemes. Supply Schemes. ‘ ‘ Progress on the construction of Progress on the construction of the group water supply bundles in the group water supply bundles in Sligo’ Sligo’ Pat Pat Doyle ,Project Engineer. Doyle ,Project Engineer. 8 June 06 8 June 06
38
Embed
Sligo County Council in Partnership with the Federation of Group Water Supply Schemes. ‘ Progress on the construction of the group water supply bundles.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Sligo County Council in Sligo County Council in Partnership with the Partnership with the
Federation of Group Water Federation of Group Water Supply Schemes.Supply Schemes.
‘ ‘ Progress on the construction of Progress on the construction of the group water supply bundles the group water supply bundles in Sligo’in Sligo’
Pat Doyle ,Project Pat Doyle ,Project Engineer.Engineer.
CONTRACT SIGNED ON APRIL 11 2005CONTRACT SIGNED ON APRIL 11 2005 CONTRACT PERIOD 12 MONTHSCONTRACT PERIOD 12 MONTHSThe contractor will maintain these plants for 20years.The contractor will maintain these plants for 20years.
CONTRACTOR --TREATMENT SYSTEMS LTD. KilkennyCONTRACTOR --TREATMENT SYSTEMS LTD. Kilkenny
Easkey
Lough Easkey
Lough Talt
Lough GillSligo
Grange
Lough Na Labe
6
1
5
42
3
North West Group1. Drum East (250 Houses)2. Benbulben (53 Houses)3. Ballintrillick (112 Houses)4. Castletown (58 Houses)5. Keelogyboy (92 Houses)6. Beltra (81 Houses)
Construction processConstruction process Once the contractor was appointed ,they ware Once the contractor was appointed ,they ware
allowed a specific period to prepare the allowed a specific period to prepare the design.This design was then submitted to the design.This design was then submitted to the clients rep. for consideration and approval. clients rep. for consideration and approval. (CONSTRUCTION DOCUMENT REVIEW)(CONSTRUCTION DOCUMENT REVIEW)
Drawings were made available for part 8 Drawings were made available for part 8 planning to co. co.planning to co. co.
Once the process of design was Once the process of design was agreed ,drawings were issued to the project agreed ,drawings were issued to the project engineer for recording and comment as work engineer for recording and comment as work progressed.progressed.
PROGRESSPROGRESS DESIGN COMMENCED IN NOVEMBER DESIGN COMMENCED IN NOVEMBER
2004 2004 PART 8 PLANNINGPART 8 PLANNING CONTRACT SIGNED ON APRIL 11 2005CONTRACT SIGNED ON APRIL 11 2005 PROJECT PROGRAMME PROJECT PROGRAMME PAYMENT PROFILE SUBMITTEDPAYMENT PROFILE SUBMITTED CIVIL CONSTRUCTION COMMENCED IN CIVIL CONSTRUCTION COMMENCED IN
AUGUST 2005AUGUST 2005 MECHANICAL CONSTRUCTION BEGAN MECHANICAL CONSTRUCTION BEGAN
IN DECEMBER2005IN DECEMBER2005 PROCESS PROVING MAY/JUNE 2006PROCESS PROVING MAY/JUNE 2006
BENBULBIN T.PLANTBENBULBIN T.PLANT
Replacement of existing reservoir at Ballintrillick GWSReplacement of existing reservoir at Ballintrillick GWSN. SligoN. Sligo
Newly replaced reservoir and treatment plantNewly replaced reservoir and treatment plant Ballintrillick GWS N. Sligo Ballintrillick GWS N. Sligo
Design demandDesign demand Design year = 2005.Design year = 2005. Design period = 20years.Design period = 20years. Per Capita Consumption (PCC) = 180 litres Per Capita Consumption (PCC) = 180 litres
per person per day consistent with the per person per day consistent with the Department of Environment Department of Environment
and Local Government guideline figures for and Local Government guideline figures for GWSsGWSs
Agricultural Demand = 814 litres per Agricultural Demand = 814 litres per connection, based upon W.S Atkins National connection, based upon W.S Atkins National
Water Study Report, 2000.Water Study Report, 2000. Other connections = 1000 litres per Other connections = 1000 litres per
connection assumed.connection assumed.
PRESSURE VESSEL AND INSTRUMENT PANELPRESSURE VESSEL AND INSTRUMENT PANEL
Working closely with the employers Working closely with the employers representative and main line staff to representative and main line staff to help deliver projects.help deliver projects.
Employers requirementsEmployers requirements
To Provide for the Construction of a To Provide for the Construction of a new Water Treatment Works in new Water Treatment Works in Accordance with the EU (Drinking Accordance with the EU (Drinking Water) Regulations, 2000 S.I. No439Water) Regulations, 2000 S.I. No439
To ensure compliance with the To ensure compliance with the maximum admissible concentrations maximum admissible concentrations (MAC) for colour, manganese and iron (MAC) for colour, manganese and iron and to eliminate the threat from and to eliminate the threat from concentrations of trihalomethanes concentrations of trihalomethanes (THMs) (THMs)
Table 3.3.4:- Estimated Unaccounted For Water (UFW) - 2005
GWSTheor.
DomesticTheor.Agric.
Theor.Other
2005 Total Theor.Demands
2005 ExistingConsumption
Estimated 2005UFW
Estimated 2005
UFW
Unit m3/day m3/day m3/day m3/day m3/day m3/day %
Geevagh/High. 280 383 11 674 1,023 349 52
Keash 78 92 0 170 227 57 34
Culfadda 108 81 2 192 273 81 42
Corrick 70 20 2 93 70 0 0
Castlebaldwin 184 125 22 331 450 119 36
Doongeela 12 11 3 26 12 0 0
SUMMARY OF DUTIESSUMMARY OF DUTIES circularlL7/04circularlL7/04
1.1 To supervise the construction, completion 1.1 To supervise the construction, completion and maintenance of the contract works on the and maintenance of the contract works on the scheme to ensure that they are executed fully scheme to ensure that they are executed fully in accordance with the Contract Documents. in accordance with the Contract Documents.
1.2 To ensure that all materials used in the 1.2 To ensure that all materials used in the works are in accordance with the works are in accordance with the Specification. Specification.
1.3 To execute or supervise tests carried out 1.3 To execute or supervise tests carried out on site and to inspect materials and on site and to inspect materials and manufacture at source other than that which manufacture at source other than that which may be carried out by the Consulting may be carried out by the Consulting Engineer's Head Office Staff. Engineer's Head Office Staff.
Duties continued. Duties continued. To record and check the progress of the work To record and check the progress of the work
against the programme including regular monthly against the programme including regular monthly updating of the programme and of the cash flow updating of the programme and of the cash flow statementsstatements . .
To keep a comprehensive diary constituting a To keep a comprehensive diary constituting a detailed history of the work of construction and of detailed history of the work of construction and of significant happenings at the site and submit significant happenings at the site and submit regular progress reports to the Consulting regular progress reports to the Consulting Engineer. Engineer.
To record with particular detail information To record with particular detail information relating to delays, adverse physical conditions, relating to delays, adverse physical conditions, disputes with landowners, and all Contractor's disputes with landowners, and all Contractor's plant and labour and all Sub-Contractors' plant and plant and labour and all Sub-Contractors' plant and labour . labour .
To measure in agreement with the Contractor's To measure in agreement with the Contractor's staff on a monthly basis.staff on a monthly basis.
To check all interim valuations and submit report To check all interim valuations and submit report to employers representative with to employers representative with recommendation.recommendation.
attend regular measurement meetings with attend regular measurement meetings with Consulting Engineer where any difficulties with Consulting Engineer where any difficulties with interim measurement are to be discussed. interim measurement are to be discussed.
examine in detail any claims submitted by the examine in detail any claims submitted by the Contractor and to make written reports on same. Contractor and to make written reports on same.
Ensure compliance with Safety , Health and Ensure compliance with Safety , Health and Welfare at Work .Welfare at Work .
for regular photographic records of the progress for regular photographic records of the progress of the works of the works
To carry out inspections at regular intervals To carry out inspections at regular intervals to ensure that the Contractors are meeting to ensure that the Contractors are meeting their obligations with regard to the payment their obligations with regard to the payment of P .A. Y .E., P .R.S.I., and Pension of P .A. Y .E., P .R.S.I., and Pension Fund/Sick Pay Contributions on behalf of their Fund/Sick Pay Contributions on behalf of their employees.employees.
Surveillance of testing and commissioning Surveillance of testing and commissioning during process proving period.during process proving period.
To assist in the preparation of all Final To assist in the preparation of all Final AccountsAccounts
Assist with reporting on the PMSAssist with reporting on the PMS
Acrobat Document
Benbulbin GWS new reservoir and treatment plant,Benbulbin GWS new reservoir and treatment plant, N. Sligo N. Sligo