E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson
12

Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Dec 26, 2015

Download

Documents

Pamela Simmons
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Slide titleIn CAPITALS

50 pt

Slide subtitle 32 pt

E2E IMS Interoperability Test Environment

Ali Soujeh

Senior Specialist, Interoperability

Ericsson

Page 2: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-042

Outline

E2E Interoperability a key element E2E IMS Interoperability a necessity Success criteria for E2E IMS Interoperability E2E IMS IOT Conditions E2E IMS IOT Network E2E IMS IOT and ETSI E2E IMS IOT and Ericsson Conclusion

Page 3: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-043

Access, core Network Access, core Network

E2E Interoperability a key element

User A1

Operator A

User A2 User B2

Operator B

User B1

UNI UNINNI

• With the diversity kept, it’s working thanks to extensive e2e interoperability efforts carried out by the industry.

• The only way to keep the diversity and keep the operational excellence in the multi-vendor, multi-operator environment is e2e interoperability.

operator unique services

IMS Network IMS Network

Standardized E2E services

operator unique services

Standardized E2E services

Page 4: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-044

E2E IMS Interoperability a necessity

Conformance and Protocol testing initiatives are necessary but not enough:

– Issues related to the E2E perspective is not detected in conformance testing.

– In reality, deployment environment of IMS is much more complicated than the simple conformance and protocol testing environment.

– New and standardized services are network agnostics, but dependency on legacy systems as the connectivity layer is ignored in conformance and protocol testing.

E2E IMS Interoperability is a quality assurance:– Prove of the concept in reality, validation and improvements of the

specifications.– IMS standardization work is incomplete as long as the E2E

Interoperability testing is not made a natural part of the standardization effort.

– Bi-lateral testing between companies on a continuous basis, involves normally only a small part of the players in the ecosystem, though the major ones.

– Multi-lateral E2E IMS Interoperability is a highly appreciated opportunity for the small players of the ecosystem.

Page 5: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-045

Success Criteria for E2E IMS IOT

E2E IMS Interoperability MUST be industry driven:– Only the industry can clearly define the boundaries.– Non industry driven activities tends to be never ending, costly,

fragmented, unstructured…– Quicker consensus within the industry. Standards shall not create

moving targets and keep changing for ever.– Not using the extensive testing experience within the industry is waste of

capital.– Re use of deliverables within the industry, reduces testing costs and

enriches testing. Giving the developers access to Standardized Interoperability Test Specifications, Trouble Reports and Test Tools ensures high quality testing within the industry and minimizes in the filed issues.

E2E IMS Interoperability MUST be done in a real network Environment:– No simulator is as real as a real network element and component.– Capturing integration issues for new standardized IMS services will ease

deployment.– Hand over, Radio shadow, Roaming ... Are all scenarios requiring a real

network.

Page 6: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-046

Success Criteria for E2E IMS IOT, Contd.

E2E IMS Interoperability MUST be performed in different network environments:

– Different Networks imply different capabilities and limitations.– Differences in Delays, QoS, Radio network dimensioning, traffic

modeling etc...have impacts on the E2E perspective. E2E IMS Interoperability MUST involve all member categories of the

ecosystem:– Service performance, availability and usability is not only a server side

issue, but also a client side.– Involvement of the test tool industry will create alignment possibility.– Operators involvement will give the possibility to run E2E interoperability

in different network environments and will give an insight about the future integrations issues.

Any serious E2E Interoperability testing initiative MUST guarantee confidentiality of the results:

– The aim is to resolve E2E interoperability issues before products are reached to the market. In other words Products can improve, the results are just a snapshot of a products life cycle.

– Using the results as marketing tools may not be fare!

Page 7: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-047

E2E IMS IOT Conditions

The industry is geographically distributed all over the world:– Travel obstacles and Entry visa barriers – Language barriers– Culture differences

Different markets, different needs:– Statistics from different testing initiatives confirms a clear relation

between geography and participation level.– Companies participation frequency in testing events is market

dependent.

Test environment in America, Asia and Europe– Major markets– Existence of suitable test environments– Differences in deployment conditions

Page 8: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-048

E2E IMS IOT Network

Running a network is a costly business.– Joint activity with other initiatives such as OMA TestFests for IMS based

enablers will: Increase participation Minimizes the cost for the organizer(s) Provides the best problem detection occasions, due to presence of

different service enablers and implementations– Maintaining network components from different vendors requires exensive

knowledge updates. That might be a reason for considering: Permanent test sites Connectivity to already existing test sites

Page 9: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-049

E2E IMS IOT and ETSI

ETSI is the most suitable standardization body to organize the activity– Extensive experience from organizing such initiatives– Broad member base, opening the door for involving almost the entire

industry– Capability in creation of short feedback path, shortening

specification updates and initiating specification improvements– A trusted organization capable of keeping confidentiality of the results– Well known and respected standardization body

Page 10: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-0410

E2E IMS IOT and Ericsson

Ericsson as one of the major players in the market, takes it’s responsibility and provides the necessary support

– We support such initiatives in form of: Hosting events Providing access to necessary network components Supporting operators, institutes who offer to host events

– Ericsson’s support to all recent latest testing events, has proven that we are best in class and play our role seriously!

Page 11: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-0411

Conclusion E2E IMS Interoperability testing is a key element in ensuring

operational excellence in a multi-vendor and multi-operator environment.

We as Ericsson believe that ETSI, as one of the most respected standardization bodies has an important role to play. ETSI has the capacity to establish the necessary ecosystem, define the boundaries, organize the activity and drive it.

We as Ericsson therefore would like to see a Task Force Team, established by ETSI, with the mission to aggressively take the stand and move the establishment task of the ecosystem, definition of the scope and organizing the activity forward.

Of course as ETSI member, we will be the first company to step forward, participate in and support such a task force team in it’s mission.

In addition we would like to see a time line for the task force team to be established, for the ecosystem to be defined and for the activity to get started.

Page 12: Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example.

Slide title 40 pt

Slide subtitle 24 pt

Text 24 pt

Bullets level 2-520 pt

© Ericsson AB 2005 E2E IMS Interoperability Environment 2006-02-0412