0104-00-22537.002 - 14 - September 2001 Aug2001 slide tour report.doc Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track - Backslope Inspection Date: June 12, 2001 Inspection By: Alberta Transportation Staff (see attached list of attendees) EBA Staff (Karl Li and Tony Ruban) 1.0 BACKGROUND Refer to EBA 2000 Report for site conditions and details of risk assessment. Instrumentation was not installed at this site. This site is located approximately 1.2 km south of Sheep Creek. 2.0 OBSERVATIONS The slide has deteriorated from a planar slide of 0.5 to 1 m depth (1999 to 2000) to a shallow semi-circular slide with the deepest zone of movement estimated at an approximate 3 m depth. The deterioration was due to erosion resulting from the past 2 years of runoff infiltration and groundwater seepage. This area is designated the centre slide . Two more shallow slippage slides developed on the north and south sides (approximately 40 to 70 m distance) of the centre slide. The newly developed slides developed during the past year and were not noted in the 2000 inspection. These new slides are designated the north slide and south slide . The backslope of this major cut was constructed with intermediate benches and swales along the benches. The swales are lined with tarpaulin woven geotextile to function as a liner. However, deterioration of this liner was observed. Breaches in the swales and seepage flow from several swales was noted to cause rilling erosion down the slope. Seepage flow of groundwater exiting from this cut slope was observed. As described in the previous report, the above slope distress and deterioration of previously installed surface/subsurface drain system (original construction in mid 1980's) is more apparent during this 2001 slope inspection. The subsurface drainage system includes "french drains, finger drains, sheet drain system" comprising granular material encapsulated and/or underlain with non-woven geotextile. Due to deterioration of the planar slide (centre slide) to a deeper depth, it was recognized that: The use of bioengineering cannot be fully effective for such slide depth (3 m) movement. For effective remediation should rebuild slope with granular material with a toe bench and perforated pipe system to be carried out at toe of slope. Clean out of the slide material will be required. The backslope cut is significant (approximately 2H:1V slope at 40 to 50 m height at maximum) with intermediate benches. Any disturbance of the existing drainage system by equipment may cause further damage and deterioration to the existing slope. The feasibility of rebuilding of slope from the toe area was discussed with the
11

Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

Jun 24, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

0104-00-22537.002 - 14 - September 2001

Aug2001 slide tour report.doc

Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track - BackslopeInspection Date: June 12, 2001Inspection By: Alberta Transportation Staff (see attached list of attendees)

EBA Staff (Karl Li and Tony Ruban)

1.0 BACKGROUNDRefer to EBA 2000 Report for site conditions and details of risk assessment.Instrumentation was not installed at this site. This site is located approximately 1.2 kmsouth of Sheep Creek.

2.0 OBSERVATIONS• The slide has deteriorated from a planar slide of 0.5 to 1 m depth (1999 to 2000) to

a shallow semi-circular slide with the deepest zone of movement estimated at anapproximate 3 m depth. The deterioration was due to erosion resulting from thepast 2 years of runoff infiltration and groundwater seepage. This area is designatedthe centre slide .

• Two more shallow slippage slides developed on the north and south sides(approximately 40 to 70 m distance) of the centre slide. The newly developedslides developed during the past year and were not noted in the 2000 inspection.These new slides are designated the north slide and south slide .

• The backslope of this major cut was constructed with intermediate benches andswales along the benches. The swales are lined with tarpaulin woven geotextile tofunction as a liner. However, deterioration of this liner was observed. Breaches inthe swales and seepage flow from several swales was noted to cause rilling erosiondown the slope.

• Seepage flow of groundwater exiting from this cut slope was observed.• As described in the previous report, the above slope distress and deterioration of

previously installed surface/subsurface drain system (original construction in mid1980's) is more apparent during this 2001 slope inspection. The subsurfacedrainage system includes "french drains, finger drains, sheet drain system"comprising granular material encapsulated and/or underlain with non-wovengeotextile.

• Due to deterioration of the planar slide (centre slide) to a deeper depth, it wasrecognized that:• The use of bioengineering cannot be fully effective for such slide depth (3 m)

movement.• For effective remediation should rebuild slope with granular material with a toe

bench and perforated pipe system to be carried out at toe of slope. Clean out ofthe slide material will be required.

• The backslope cut is significant (approximately 2H:1V slope at 40 to 50 mheight at maximum) with intermediate benches.

• Any disturbance of the existing drainage system by equipment may causefurther damage and deterioration to the existing slope.

• The feasibility of rebuilding of slope from the toe area was discussed with the

Page 2: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

0104-00-22537.002 - 15 - September 2001

Aug2001 slide tour report.doc

local maintenance contractor to be feasible. This will limit the pragmaticremediation to the toe area and will not cause disturbance to the upper portionsof the slope.

• It was recognized that:• A survey of the slope should be carried out for the lower slope to delineate the

distress area. This should include the north, centre and south slides as well asthe rills down the lst bench. The survey will provide mapping of the distressarea and allow the design of remediation and construction management.

• Bioengineering designs may be viable along the rills down the slope and otherselective shallow slippage areas.

• Design remediation with granular material, finger drains, and toe berms will bethe main remedial strategy for the north, centre and south slides.

• It was recognized that:• Deterioration of the existing excavation backslope and shallow sliding

movement along the general area in the vicinity is starting to happen. Regularmaintenance clean out of ditches is required in the event of debris flow intoditches.

3.0 RISK ASSESSMENTPF (5) * CF (4) = 20Risk rating has not changed from that assessed in January 2001 Inspection Report.Any current additional comments are provided in the 2001 Spring InstrumentationMonitoring Report.

Note:This Risk Assessment rating is based on scheme proposed by AT in 2000.

Probability Factor (PF):Consequence Factor (CF):

1 to 20 scale1 to 20 scale

4.0 ACTIONS• It is recommended to undertake a review regarding the urgency to design remedial

works for this backslope as the area is showing signs of deterioration. For thisbackslope, it is believed that a combination of selective drainage reconstruction(finger drains) together with granular berm construction along the lower bench isfeasible.

• As discussed in earlier reports, the stability of this steep backslope (with the presentstate of deterioration of previous shallow drainage installation) can be improved,however, remediation will be very difficult and labor intensive. Remediation of theupper portion of this vast backslope is not considered practical because of lowconsequence of shallow failures and high costs in repairs. Repair efforts should beconcentrated at the lower portion of the slope close to highway level.

• It is reminded that the present semi-circular slide was the result of site deteriorationfrom a shallow planar slide (0.5 to 1 m thick) over a duration of 2 years. It is

Page 3: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

0104-00-22537.002 - 16 - September 2001

Aug2001 slide tour report.doc

advised that the above course of actions be delayed no further and undertaken priorto further deterioration of the site and retrogression of the instability further uphill.

Page 4: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

22537d34a.cdr

October, 20010104-00-22537.002Site GP6a, GP6b - Slides SouthofSheepCreek

Highway 40:38

Figure 11993 Aerial Photograph

N

Page 5: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

Hwy 40:36 (GP 6a)Sheep Creek - Railway Track - Backslope

Issues:• Backslope shallow (to medium) depth failure• Deterioration from shallow depth to deeper

failure• Deterioration of existing drainage (perforated

pipe system)• Deterioration of adjacent slopes

Page 6: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

Hwy 40:36 (GP 6a)Sheep Creek - Railway Track - Backslope

Solution: design to be submittedCosts

•Granular berming and reconstructionof slope

•30,000 •5,000 +15,000

Construction Engineering Design Project Mgmt

Totals: 30,000 20,000

Page 7: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

GP 6a (Sheet 1 of 5)Hwy 40:36

Sheep Creek Backslope

0104-00-22537.002 June, 2001Regional Geotechnical Assignment

Grande Prairie Area

Page 8: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

GP 6a (Sheet 2 of 5)Hwy 40:36

Sheep Creek Backslope

0104-00-22537.002 June, 2001Regional Geotechnical Assignment

Grande Prairie Area

Page 9: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

GP 6a (Sheet 3 of 5)Hwy 40:36

Sheep Creek Backslope

0104-00-22537.002 June, 2001Regional Geotechnical Assignment

Grande Prairie Area

Page 10: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

GP 6a (Sheet 4 of 5)Hwy 40:36

Sheep Creek Backslope

0104-00-22537.002 June, 2001Regional Geotechnical Assignment

Grande Prairie Area

Page 11: Slide Name: (GP 6a) Hwy 40:36 Sheep Creek - Railway Track ...€¦ · Hwy 40:36 (GP 6a) Sheep Creek - Railway Track - Backslope Solution: design to be submitted Costs •Granular

GP 6a (Sheet 5 of 5)Hwy 40:36

Sheep Creek Backslope

0104-00-22537.002 June, 2001Regional Geotechnical Assignment

Grande Prairie Area