Top Banner
Slide 1 Uganda Investment Forum Tullow: Investing in Uganda
14

Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Dec 30, 2015

Download

Documents

Antonia Clarke
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 1Uganda Investment Forum

Tullow: Investing in Uganda

Page 2: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 2Uganda Investment Forum

- $2.75bn debt facilities

- $2.1bn equity placings

- Uganda transactions

- Jubilee Phase 1 first oil Nov/Dec 2010

- Ghana: Jubilee discovery& fast track development

- Uganda: commercialisation, pre-emption & farmdown

- Growing, high impact exploration portfolio

Creating stakeholder value from global options

Underpinned by financial strategy

• Strong, well funded balance sheet to enable growth

- Debt and equity funding

- Portfolio management

• Significant future operational cash flow

Consistent and repeatable strategy

• Sustainable long term growth

• Balance exploration, major projects & funding

• Safety, environment, stakeholders & people

Page 3: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 3Uganda Investment Forum

82% global exploration success rate in 1H 2010

French Guiana

94 of 2,494 sqkm 3D

171 km 2D

2,494 sqkm 3D PSDM

171 km 2D PSDM

2,424 sqkm3D PSDM

Netherlands Gabon – 2 wells

1,512 sqkm 3D PSDM

678 km 2D PSDM

OMOC-N-1 Noix de Coco-1

3,600 sqkm3D PSDM

Sierra Leone

2,307 sqkm 3D

2,307 sqkm 3D PSDM

Côte d’Ivoire

Guyana

1,889 sqkm3D PSDM

Tweneboa-2

Ghana – 4 wells

Dahoma-1

Mahogany-5 Owo-1

1600 sqkm 3D PSDM

600 sqkm 3D PSTM87% success rate in 2009

77% success rate in 2008

Seismic DrillingAcquisition

Processing

Offshore

Onshore

48 km of 2D PSDM

Pakistan – 1 well

Shekhan-1

Tanzania -1 well

973 km 2D PSTM

Likonde-1

Madagascar

720 km 2D PSTM

Uganda – 9 wells

Kasamene-2 Kasamene-3 Kasamene-3A Nizizi-3 Nsoga-5

124 km 2D AWD

97 of 145 km 2D

Low frequency passive project

221 km 2D PSTM

50 sqkm 3D PSTM

Ngiri-2 Mpyo-1 Kigogole-2 Kigogole-5

Page 4: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 4Uganda Investment Forum

Tullow invests in 26 countries: 18 in Africa, 3 in East Africa

Page 5: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 5Uganda Investment Forum

History of oil exploration in Uganda

• Basin potential identified through regional geology

• One previous well in 1938 intersected oil shows, but not attractive to oil companies

• Area licensed to Petrofina in 1990s but no activity

Lake Albert

Western arm

Eastern arm

In late 1990s, Tullow Oil* reignited the Ugandan Oil

industry and began a focused exploration

campaign along the shores of Lake Albert

* as Energy Africa

Page 6: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 6Uganda Investment Forum

Milestone volume achieved• 1 Bbo discovered (P50); over 1.5 Bbo yet to find (P50)

• 35 out of 36 wells successful (9 drilled in 2010)

• Accelerated basin-wide E&A commenced

High impact exploration success continues• Block 1 exploration re-commenced in August

• Mpyo-1 well is a material new oil discovery

• Jobi extensions to be drilled over coming months

Appraisal wells ahead of expectations • Three Kasamene wells confirm excellent quality reservoir

• Nzizi appraisal proves viability for gas-to-power

• Ngiri-2 proves up resources over 100 million barrels

• Kigogole-Nsoga - appraisal has proved up a significant field

Uganda - 1 billion barrels of oil discovered to date

Discovered Resources

Prospective Resources

>2.5bn boe

Ugandan Resources (P50)

Page 7: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 7Uganda Investment Forum

Global Daily Oil Production

0

2000

4000

6000

8000

10000

Saudi

Arabi

a:

China

:

Venez

uela

:Ira

q:

Brazil

:

Qat

ar:

Om

an:

Ecuad

or:

Vietn

am:

Gab

on:

Chad:

Ger

man

y:

Japa

n:

Ukrai

ne:

Franc

e:

Papua

New

Guin

ea:

Belar

us:

Austri

a:

Virgin

Islan

ds:

Serbi

a an

d M

onte

negr

o:

Belgiu

m:

Finlan

d:

Eston

ia:

Sweden

:

Switzer

land

:

Mon

golia:

Tajikis

tan:

00

0's

bb

ls/d

ay

Uganda prepares to join World’s Oil Producers

Uganda

Uganda could be among the top 50 producers in the world and

top 10 producers in Africa

Global oil production ~ 82 million bbls/day

Page 8: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 8Uganda Investment Forum

Uganda – Block 2 Development (Phase 1)

Extended Well Tests• On track for delivery by end 2010

• EWT equipment is in country, construction in 2H 2010

• Crude sales agreements to local industry progressing

• EWT data will guide Kasamene and future developments

Nzizi Gas Field development (IPP)• 50 MW Power Plant planned for Hoima Region

• Nzizi-3 well confirmed expected gas volumes

• FEED studies nearing completion

• First gas and power remains on-track for late 2011

Kasamene Field Development• Successful Kasamene-2 & 3 appraisal wells

• Results support development concept and volumes

• FEED studies optimised to minimise environmental footprint

• First oil end 2011

• Development focused on local and regional needs

Kasamene

Nzizi

Road

Integrated Power Project

(IPP) -Nzizi

Gravel road upgrade to Hoima for trucking

Kasamene Central

Processing Facility

Page 9: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 9Uganda Investment Forum

Significant progress commercialising Ugandan resources

• E&A activity delivering material resources (9 successful wells YTD)

• Tullow: CNOOC: Total (1/3:1/3:1/3) partnership agreed with GoU

• Heritage Oil assets in Blocks 1&3A acquired

• Finalisation of acquisition and farm-down awaiting Heritage Oil CGT dispute resolution

• Nzizi/Kasamene developments and basin-wide development plan well advanced

Block 1/2/3A partnership will now target

Accelerated exploration and appraisal programme Ongoing

Commitment to offshore drilling infrastructure 2H 2010

Deliver JV basin-wide development plan 1H 2011

First commercial gas production – Nzizi Field Q4 2011

First commercial oil production – Kasamene Field Q4 2011

First locally refined oil products 2014

Greater than 200,000 bopd and export pipeline 2014/2015

Page 10: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 10Uganda Investment Forum

Development of Local Skills & Employment Opportunities

• Currently 800 jobs in the field and 100 in Kampala

• It is estimated that the industry will create 10,000 jobs

• Ugandan entrepreneurs must step up to the challenge of establishing oilfield service companies

• Training must be made available (through public and private ventures) so that all Ugandans can participate

• White collar workers- Technical: Qualified engineers, geologists etc- Business: Lawyers, accountants, managers etc

• Artisans (Technicians)- Pipefitters, welders, masons, carpenters- Drillers, Operators

• Labourers - Rig workers, security guards, helpers

Development of Local Content capabilities, appropriate for all levels of the industry, is key to the success of the industry

Page 11: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 11Uganda Investment Forum

Social Enterprise Approach and Strategy

• Focus on long-term integrated and sustainable social and community investments

• Oil and gas resources act as a catalyst for socio-economic opportunities and economic development – Creating Shared Prosperity

• Focus on creating a culture which encourages:

- Enterprise Development - strong links to developing local

content in supply chain

- Access to good health

- Education - including building capacity for the oil

and gas industry

- Environment

• Relevant to business strategy and makes a difference to real local needs

Page 12: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 12Uganda Investment Forum

Tullow will continue to invest in Uganda

• Uganda is at the dawn of its oil era

• Exploration activity has been exceptionally successful

• Tullow has invested >$2.5 Billion

• Tullow/Total/CNOOC about to start $10 Billion new investment

• Government revenues from oil production will exceed $50 Billion

• Creating major opportunities for new and existing businesses in Uganda

• Building a highly effective organisation to deliver the business

• Encouraging & supporting regulatory capacity for a new industry

• Developing a business and in-country infrastructure for the long-term

• Development planning is well underway, but there is a lot still to do

• Successful and collaborative partnerships will be a key success factor

• We have a strong platform for future growth in Uganda

Page 13: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 13Uganda Investment Forum

Conclusion

We are here because it makes sense to be here

there's a compelling business case

we intend to stay and we intend to grow

We are optimistic that Uganda will build its

capacity to join the World’s Oil Producers

Page 14: Slide 1 Uganda Investment Forum Tullow: Investing in Uganda.

Slide 14Uganda Investment Forum

Tullow Oil plc3rd Floor, Building 11

Chiswick Park, 566 Chiswick High RoadLondon, W4 5YS

Tel: +44 20 8996 1000Fax: +44 20 8994 5332

Investor Relations ContactChris Perry: [email protected]