ED 220 657 AUTHOR TITLE INSTITUTION PUB DATE NOTE AVAILABLE FROM JOURNAL CIT' EDRS'PRICE DESCRIPTOliS DOCUMENT RESUME CE 033 555 Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE National Cehtre for-Research and Development, Payneham (Australia). Aug 82 - 128p. TAFE National Centre f or Research and Development, 296 Payneham Road, Payneham, South Australia 5070 ($2.00). TAFE Projecta in Progress; nl Aug 1982 MF01/PC06 Plus Postage. - ,*Educational Development; *Educational Research; Foreign Countries; Postsecondary Education; *Program ,Content; *Program Descriptions; Secondary Edubation; Technical Education; *Vocational Education IDENTIFIERS *Australia ABSTRACT This publication contains a listing of educational ' research'and development projects, currently in progress in Australia, which is the,first of a planned twice-yearly listing of projects in progress.: Projects are listed by territories and'are indexed by author and by subject. Information supplied for each project includes a reference number, project title, contact persoh, contact address, -project status, proposed completion date, estimated co§t, ahpi a short desdription of the project. The projects cover alrfields of .education. A sample of subjects include the following{ language needs of migrants in Darwin; development of external studies-materials; computer-based screening and diagnostic testing system; a review of the carpentry and joinery course; assessing community needssfor further education; training for teachers in the instrdctional systems model ol curriculum development; associate diploma in coal mining; a case study of a Peninsula Comdunity College foundation course; guidelines for curricialum writers; and an ocdupativnpl analysis of the printing trade.) A list of persons who can be contacted for information in subject or geographical areas is included in the e pu8lication. (KC) ********************************************************************** * ReproductIons suPplied by EDRS are the best that can be made * i from the original document. * t**************-********************************************************
128
Embed
Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ED 220 657
AUTHORTITLEINSTITUTION
PUB DATENOTEAVAILABLE FROM
JOURNAL CIT'
EDRS'PRICEDESCRIPTOliS
DOCUMENT RESUME
CE 033 555
Skott, Diana, Crp.TAFE Projects in Progress. No. 1.TAFE National Cehtre for-Research and Development,Payneham (Australia).Aug 82 -
128p.TAFE National Centre for Research and Development,296 Payneham Road, Payneham, South Australia 5070($2.00).TAFE Projecta in Progress; nl Aug 1982
ABSTRACTThis publication contains a listing of educational '
research'and development projects, currently in progress in Australia,which is the,first of a planned twice-yearly listing of projects inprogress.: Projects are listed by territories and'are indexed byauthor and by subject. Information supplied for each project includesa reference number, project title, contact persoh, contact address,-project status, proposed completion date, estimated co§t, ahpi a shortdesdription of the project. The projects cover alrfields of.education. A sample of subjects include the following{ language needsof migrants in Darwin; development of external studies-materials;computer-based screening and diagnostic testing system; a review ofthe carpentry and joinery course; assessing community needssforfurther education; training for teachers in the instrdctional systemsmodel ol curriculum development; associate diploma in coal mining; acase study of a Peninsula Comdunity College foundation course;guidelines for curricialum writers; and an ocdupativnpl analysis ofthe printing trade.) A list of persons who can be contacted forinformation in subject or geographical areas is included in the
epu8lication. (KC)
*********************************************************************** ReproductIons suPplied by EDRS are the best that can be made *
Mr Graham VertiganCo-ordinator of services and courses 41Division of Further EducationEquiq House110 Murray StreeeHOBART 7000
/1COURSE COORDINATORS
Tasmania College of Hospitality
Baker/Pastry CookButcheryCookeryFood and Beverage.
r- Hobart Technical College
BricklayingEstate kgencyGlass Reinforced Plastics/PlasteringiTiling'Health SurveyingH.V.A.C.National Parks and Rangers,Paint./Decor./GlazingPolice and Transport AdministrationprintingPhotography Afr.
.64
RadiographyRefrigerationWood Machining
Burnie Community College
Agriculture.Instrument Mechanic
11,.st Coast Commnitv Colleke
Mining Eng./Mine Suveyi ''s
6
be eontcted for4
Mr F PfisterMr G FaganMr H Stauffer %
Mr P Roulesfbn
,
Mr LMr DMr.BMr HMr CMr pMr NMr DMr MMr FMr GMr D
Wiggins
Murphy (Acting)HuxleyMullerBishop.
BurrowsLaLhamvon Bertouch'LongStronachRowleY
MitchellBell
Mr R BrownMr D Anderson
Mr J,Cornish
1
STATE COORDINATORS
Hobart Technical College!.
Building/Architecture .:- it A Gardner
Business Studies lir A Bond
Cabinet Making Mr D SherwoodChemical/Lab. Technology Mr J AshtonCivil Engdurvey Dvaftihg Mr R Marshall
,Commerce SecAtarial . ,Mr I Tongs
Diesel Fitting5:2'
Mr G Davis
Electrical Engineering/Electronics and- . *
COmmunications Mr T"DavisonFashion t Mrs A TiffinHairdressing Mr K Donovan
. Mech./Marine and Aero Engineering Mr R Alexander
Metal FAbrict4tio.n. Mr M Fox'Motor Mechanics ". Mr A Yeoland
Panel Beat./Veh Pairp ' Mr T RoperRadio/TV/Indusi. Electronics Mr E BaynesSheetmetal ' Mr J Wiltshire'
Small F.ngines Mr R Fo'ster
. Welfare' Mr R Snashall
CONTACT' PERSONS.
-
Launceston Community College
Art . Mr A ChaffeyAuto Electrician Mr M ScolyerCarpentry and'vloinery Mr A.Gray
Child Care Mrs H MurrellElectrical Mechanics Mr J Simmons
Horticulture Al''T Barbour
Library Techniclan Mrs R Talbot,
Plumbing Mr I Goodluck
Alanvale Community, College.
and'Hachining Mr I Burrows
gygnsLAND
OFFICERS RESPONSIBLE FUR CURRICULUM PLANNING DEVELOPMENT ANDREVIEW
TAFEC Fields Of Study - Officer(s)
Applied Science Alan Bowen
Art and DesIgn Bryan EatonBuilding Alan Bowentrusiness Studies Bryan EatonEngineering Alan BowenRural and Horttcult.ire,, AlakBowenM130, Bryan Elton
Applied Science David Haworth 219 9444Chief Educ.Officer
Art and Design Tub Salasoo Acting 219 9457Mr- C.E.O.
Building Tiiu Salasoo A/C.E,0 INBusiness Studies Tiiu Salasoo A/C.E,0Enginapring David Haworth C.E.0Rural and Horticultural Tiiu Salasoo A/C.L.0Para..medlcal David Haworth C.E.O.General Studies David Haworth C.E.0 kirf
4
Other Course Categories
Transition EducatiOn Paul Wer Head Trans.. 219 932Ed.Anit
Access (disabled, disadvant-Fred Rob A/C.E.s0.aged, ethnic, women's (Special Groups)
219 9477,
etc.) 'Jenni Neary Coordinator 21.9 9341
.of Women's ProgramsKeithCampbell Head 219 9661
0 Aboriginal Ed. Unit
Curriculum Policy and Practice
Overal1 curriculum poliey Dr S Humphrey, Assistantand practice Dir. (Curr. Assessment)
Curriculumevaluation and Caof Hawke A/C.E.O.research
219 9386
Methodology Ad media Alan Craig C.E.O. , 219 9358Ron King O.I.C. Ed. 219 9403Resources Branch.
WESTERN AUSTRALIA
CONTACT PERSONS
OFFICERS RESPONSIBLE FOR CURRICULUM PLANNING DEVELOPMENT ANDREVIEW
Phone No..TAFEC Fieldt Of Study Officer(s)
Applied Science Supt. K Brehaut 420 4090Art and Design.- Supt. R Hprner 420 4098Building Supt. J Baker 420 4097Bugiriess Stuclies Aupt. R HornerEngineering Supt. I Kauler 420 4100Rural and HorticultuPal Supts. K Wdterhouse & 420 4935
K Brehaut 42? 4096Para-medical Supt. K BrehautIndustrial Services %Supt. C Burking. 420 4102General Studies Supt. F Whitmore 420 4104
Other Course'Categories
Transition Education Supt. F WhitmoreB Brand S.E.O. 420 4201
Access (disabled; disadvIntT Supt. F Whitmore'age-dosethnic, women's programs etc.)
Aboriginal Access R Cain S.E.O. 420 4083Adult Literacy Supt. F Whitmore
M Lynch E.O. 420 4141Migrant Educ-ation L Drake-Brockman 420 4089
Officer in Chgrge
Curriculum Policy And PracticeA
Overall curriculum policy R T,.orogood 420 5088and practice 9irector of Studies and
T Goode S.E.O. 420 4109Curriculum evaluation and R Thorogood and T Goode
researchMethodology and Media R Thorogood ane f Goode
SOUTH AUSIRALIA
oFFicas REsEctism& FOR DINRICULUM PLANNING DEVELOPMENT ANDREVIEW
TAFEC Fields Of Study
loplied Science'Art and DesignBuildingBusiness StudiesEngineeringRural and Horticultural'music
Para-medicalIndustrial, Services
Atrcraft/marinetlothing, textiles,
footwear'
Officer4)
David FurberJohn MitchellJohn McCarthyColin ThornJohn McCarthyColin ThornJohn MitchellJohn McCarthy
John McCarthy
John Mitchell
Phone No.
227 4667227 4222227 4621227 4199
_
A
Food processingPrintingWatch and clook making
Personal ServicesFood presentation,waitingHairdressingLibr:ary
Home eoonomics/Physical Education
General Studies
Other Course Categories
Transition EducationAccess .(disabled, disadvant-
aged groups, ethnic,women's programs etc).
Curriculum Policy And Practice
Overall curriculum policyand practice
Curriculum evaluation andresearoh
Methodology and media
VICTORIA 4
CONTACT PARSONS
Colin Thorn:John Mitchell
John McCarthy
Colin ThornJohn MitchellJohn MitohellJohn MitchellJohn MitchellJVin Mitohell
Roger: MAthers
John Mitchell
Rogqr Mather*
Dean KuhlJohn MitchellBrian Kenworthy
r
227 4199
Is A
227 4928
227 3295
OFFICERS RESPONSIBLE FOR CURRICULUM PLANNING DEVELOPMENT ANDREVIEr
TAFEC Fields Of Study
Applied Science
Art and DesignBuilding .
Business StudiesHpral and HorticulturalMusicPara-medicalIndustrial ServicesPersonal ServicesGeneral Studies
Othe? Course CategoriesA
Transition EducationAccess (disabled, disadvant-
aged, etbnic, women'sprograms etc4
Officer(s)
Alan DanielPeter CoughlinKeith HancockAlan SilverPeter EsdalePeter Co ghlinAlan DanielPat HadenPat HadenGraham Stevenson
Mr Mike SmithTAFE Manp.ement Unit021 Coppin Grove
HAWTHORN 3122
Phona.No.
783 957088 8551
569 0421555 0044'810 1722
88926)
329 7288ext 16
Curriculum Policy And Practice
Overall curriculum policyand practice
Curriculum evaluation andresearch
Methodology and media
AUSTRALIAN CAPITAL TERRITORY
CONTACT PERSONS
Mr P Cutter
General Manager ProgramsTAFE Management Unit21 Coppin GroveHAWTHORN 3122
DirectorOffice of ACT Further EducationP 0 Box 826RODEN ACT 2606
ATransition Education Ms J Chapman 89 7455Adult Migrant Education
f aMr 3"mungoven 30 /028
Roden TAFE ColleneP 0 Box 666 ,
WOOER ACT 2606
Business studies M Flanagan 83 4602.1. Denton, 83 4589
Secretarial Macathlan 83 4603Engineering
Automotive Painting W Roberts 80 6177Panel Beating L Robinson 80 61Z7
Rural and Horticulttral
Hortieulture P Unger 88 4877Agriculture L Fletcher 88 4877
. Turf Management M Clune 88 4877Industrial Services
Fashion J Sapieha 83 4592Personal Services M Moore 83 4612
Home Science J Coburn 83 4604General Studies M More
Curriculum Policy And Practice
Overall"curriculum policy C Hughesarid practice
83 4553
Curriculum evaluatioh andresearch
K'Birkin6 83 4679
Methodology and media A Barr '83s^%
M680
.
1
s
+.,
1
C..
ol
3
lit
4
44
PROJECTSIR°
PgOORESS
A
IIORTHER,11 TERRITOR T
/
A
NORTHER? 'ERRITORT
Reference number: I
Project title: Survey of language needs of migrantsDarwin
Contact person: Principal, Adult Misrant Educeatloh Centre
Contact address: PO Box 4821DARWIN 5794
Project status: 3/4 completed
Proposed completion date: May 1982
Eitimateil coat of project: $11,000 - $40,000
in
ReMarkE Department of Immigration bld Ethnic Affairs-fundedsurvey of language need:: of migrants in Darwin.Involved Timorese (including Portuguese and Chinesespeakers), Italians and Greeks. Followed from Galballyrecommendations.
Reference number: 2; NT: Filo 81/124
Project title: Evaluation of Aboriginal Adult Education inthe NT
Contaet person: John Weatherhead
Contact address: Department of EducationPO Box 4821DARWIN 5794
Project status: Planned
proposed completion date: End 1983
Estimated cost of project: $11,000 - $40,000
Remarks: Tertiery Education Commission-funded study of the roleana effectiveness of adult educators in Aboriginalcommunities in the Northern Territory.
Reference number:
Project title:
Contact'person:
Contact address:
3; NT: File 82/790
Itgleof TAPE teachers in the Northern
John Weatherhead-
prgmtnlof Education
DARWIN 5794
project,status: Planned
Proposed completion date: End 1982
Estimated cost of project: less than $2,000
Remarks: This is a simplified replication in the NT of a morecomplex study carried out in 1980 in WA by a team fromWAIT and reported in Education Deparcment of WesternAustralia's cooperative research series No 4, The TAFEProject, by Oaite, Ryan et aa. 1980. This stOR7 UTITalso examine the need for technologicaI updating andretraining Of TAFE staff.
n
14.
CN
NORTHERN TERRITORY
Reference number: 4
Project title: Evaluation of Batchelor College program
Contact person: Principal, Batchelor College
Contact address: Ratchelor CollegeBATCHELOR 5791
Project status: Planned
Proposed completion date: End 1982
Estimated cost of project: $11,000 - $40,000
Remarks: This study is funded by TEC recurrent grants and isintended to provide developmental information for theCollege
Reference number: 5
Project title: Development of external studies materials
Contact person: H. V. Osborne
Contact address: Batchelor CollegeBATChELOR
Projeot status: 1/2 completed
Proposed 2211121211211 date: November 1982
Estimated cost of project: $11,000 - $40,000
Remarks: To provide appropriate support materials for the firstyear of a Remote Area Teacher Education course inAboriginal Communities of the NT.
9-
N.
.....
Reference number: 6
Project title: Computer based screening and diagnostictesting system
Contact person: me Malcolm
Contact address: Division of FurehZr Educationc/- Curriculum Centre57 Brisbane Street .HOBART 7000
Project status: 3/4 completed
Proposed completion date: December 1982
Estimated cost of RE11121: WOW - $40,000bp.
Remarks: To preftide a testing/screening device for students whoare entering TAPE. This screening will identifystudents wlio will be requiring assistance withmathematics and reading-in order to cope with collegecourses. The computer programs also _provide adiaghostic service to indicate-the nAture of the help,they need. Materials include test booklets,administratfVe handbooks, ansWer sheets and computersoftware. While the scheme provides for ,pre-coersemass testing of students, tests also can be usedindependently by teachers at any time throughout theyear. ,
,Reference number: 7
Project title: A review of.the Carpentry and Joipery comma
Contact person: , Mr Jim Walsh
Contact address: School of Wood Working TradesHobart Technical College75 Campbell StreetHOBART
Project status:. 1/2 completed
Estimated cost of project: $11,000 - $40,000
Remarks: To review the Carpentry and Joinery curriculum in orderto make the relationship between the learning programand the job mors-mxplio--A-sample of employers and
. tradesmen in the carpentry and joineri-trade in eachState was surveyed to determine what they consideredwere the essential duties and tasks of the trade. Inresponse to the survey rindings a new training modewas instituted. Training obiectives and learningprograms have been completed or 12 weeks of the 18week apprenticeship course. lbe new syllabus is beingAeveloped on the processes and techniques of theinstructional systems model.
Reference number:
Project title\
Contact pereon:
Contact address:
Project status:
8
Participation of 1981 grade 10 students inrurther education
Peter Hoult -
Research BranchEducation Department of TasmaniaPO Box 1698HOBART 7001
1/4 completed
TASMINIA
ProOosed completion date: End 1982
kRemarks: The phase in pro reaa is an analysis of the Further
Edpcation partic pation of the Grade 10 cohort from1981 Asing a samp e Of eight urban or semi-urban highschools which demonstrate neither disadvantage noradvantage on a socio - economic index.
Reference number: 9
Project title: An analysis of evaluation aethodologies forTAPE progrvas
Contact person: Mrs Helen Hocking
4 Contact address: Research Branch4 Education Department of Tasmania
116 Bathurst StreetHOBART 7000
Project,statu;: 1/4 completed
,Proposed completion date: December 1982
Remarks: The project encompasses a 'survey of the recent andcurrent evaluation skelho4s adopted in TAFE inAustralia. ,As well as Tome assessment of the sCopeadopted compared wits the range of evaluationstrategies available, the study will analyse thepurposes and uses by management. A paper 'directedprincipally towards administrators is planned.
Methodology: Collection of reports, discussion withTAFE staff throughout Australia on issues in evaluationin the TUE context. +
Reference number:
Project title:
Contact ,person:
Contact address:
JO
A demonstration and experimental facility totest solar collectors outdoors
Mr Chris Bishop
Plumbing DepartmentClaremont Community Collegec/- Hobart Technical College75 Campbell street -HOBART 7000
Project status: 3/4 completed
Estimated cost of project: $11,000 - $40,000
Remarks: The alp of this project is to monitor the thermalperformance characteristics of soldr collectors underTasmanian conditions. It is also to be used as aneducation facility for the teaching-of solar orientatedcourses run by Phe Division of Further Education.Syllabi have been prepared for these courses. Theproject also aims to provide information regardinginstallation and maintenance of solar collectors underTasmanian conditions.
Audio/visual material: 3/4 Sony + 1/2" Philips colour videotapeentitled "The Air Conditioning and-SolarTest Rigs at Claremont, Tasmania". '21minutes. This hils been produced.
8
%.
Reference humbert
PrOject title:
.Contact persons:
Contact address:
Project status:
' TASMANIA
11
'Assessing conaumity needs for furthereducstfon: A paricipative approach
Mrs Paddef Mrs Helen Hocking
Researc RkanchEducatioeftpartment of TasmanSa116 Bathurst StreetHOBART 7000
1/2 completed
Proposed completion date: December ,1982
Estimated cost of project:. $2,000 $10,000
Remarks: The project seeks to use eci5ting community groups toassess needs and means of provision in such a way thatnon-participants might be encouraged to return toeducation. The project Will explore theoretical andphilosophical problems related to community basedcontinuing education as well as practical analysis offorma of provision. it will document needs ofcommunity groups in a disadvantaged area (e.g. high
,migrant, low SES area). ,
Reference number:
Project title:
Contact person:
Contact address;
12.
Training'. for TAFEinstructional eystemsdevelopment
Mr Frank McMahon
Division of Further EducationEquity House110 Murray StreetHOBART 7000 (
teachers in themodel of curriculum
.Project status: 1/2 completed
Estimated cost of pr:ojects $11,000 - $40,000
Remarks: To provide appropriate training for TAFE teachers andservice persconel in the Instructional Systems Model ofVocational Curriculum Development. This project willtake the form of shdrt courses to enable teachers tobecome proficient in curriculum development activities.This is necessary because of' the need to reviewexisting courses, especially in the light oftechnological advance. This project is on-going until
4 demand is satisfied.
Reference number:
project title:
Contact person:
Contact address:
Project status:
13
Researoh and evaluation skills 'for TAFEOfficers
Mr Frank McMahon
Division of Further EducationEquity House110 Murray StreetHOBART 7000
Planned,
Estimated cost of project: $11,000 - $40,000
'Minn
Remarks: A purpose built programme designed to improve researchand evaluation skills for practising TAFE teachers andappropriate Head Office staff.
Refdrence number:
Project titles
Contact person:
Contact address:
14
Industrial Release Program
Mr Frank McMahon
Division Further EducationEquity House110 Murray StreetHOBART 7000.
Project status: Planned
proomd completion date:
Estimated cost
Remarks: 1.
2.
3.
of project:
1982 +
over $40,000
To provide a range of activities to help teachersupgrade their technical competence.To provide for teacher replacement so thatcolleges will be encouraged to release staff.To enable teachers to return to industry for shortperiods.
Contact person: Mr. D. Manterfield, Head of Engineeringa
Contact address: Devon Community College, TAFE SectionPO Box 396DEVONPORT 7310
Project status: Planned0
Estimated cost of project: $2,000 - 410,000
Remarks: To prepare and pilot self-paced learning courses in thesubjects of Engineering Drawing 1 & 2 at the DevonCommunity College (TAFE Campus). The Program isteacher developed akong the lines of the Keller (PS1)learning theory model.4
Reference number:-
Project title:
Contact person:
Contact address:
!!:2..lect
16
A demonstnation and expehmental watercollection (water storage, water distribu=tion) solar system for fpace heating
Remarks: This system provisles a working demonstration of solarhea us/og a concrete floor as the thermal store whichwi I show the potential and limits of using solar fortp ce heating. .
Reference number:
Project title:
Contact person:
Contact address:
-17r-1AS: H1'/14/82-
The :use and effectiveneas of videotapes inteaching
Bea Kerrie Haines
Hobart Technical College Library75 Campbell Street -HOBAaT 7000
Project states: Planned
Estimated cost of project: 82,000 - $10,000
Re:pal-Ks: To research the nature and extent of instruction usingvideo systems_by TAPE-teachers. To develop methods orimproving TAFE-teaChers' use of video programs in theclassroom:---A report written by an interstateconsultant will,be prepared.
Contact address: Hobart Tech College Curriculum Centre75 Campbell Street 57 drisbane StreetHOBART 7000 HOBART 7000
Project status: 1/2 completed
Estimated cost of project: $11,000 - $40,000
Remarks; In recent years a numLer of trade areas have beenundergoing radical changes due to the introduction ofnew technology, consequently manufacturers and serviceorganisations have found the need for their apprenticesand servicemen to receive appropriate training. It wasbecause TAPE had no appropriate courses to offer inthis area that the sublission was made.
The submission (electrical/electrod,c trades) proposeda two-year program in which research and planning tothe initial stage of producing a detailed operativeproposal for imp1ementation is completed in the firstyear followed by a limited trial, evaluation andteacher development ptogram in the second year.
In broad terms the program of work for 1981 comprisedthree stages. The first stage involved collectingfacts, figures and opinions, the second stage involvedanalysing the skills required by competent servicemenand the third stage involved preparing performanceobjectives, learning units, syllabi, lists of teachingaids, teaching times, etc, to enable limited trialsand evaluation to commence in 1982. The work- is nowsufficiently advanced for limited trials and evaluationto commence.
To provide teachers with the opportunity and resourcesto prepare teaching materials for the 'Pattern Making'subject in the Clothing Course. In particular, theRundschase pattern'making method would be introducedand student reference book will be developed.
Reference numbeF: 20
Project title:
Contact person:
Contact address:
- Project status: '
Estimated cost of
Remarks:
resource materials for the Bakery Course
Mr Fred Pfister .
School ofilospitalityDrysdale House59 Collins StreetHOBART 7000
Planned
project: $24100 - $10,000
To provide teachers with the opportunity and resourcesto prepare teaching materials for the Bakery Course.A series of self-instructional booklets Aill bedeveloped.
Reference number: 21; TAS: LT 8/82
Project title: Study skills for small group (LCC TAPE)
Contact person: R A Sutherland
Contact address: Student ServicesLaunceston Community College (TAFE Seciion)Paterson StreetLAUNCESTON 7250
Project status: Planned
Estimated cost of project: $2,000 - $10,000
Remarks: To trial a study skills development program with smallgroups of TAFE students at the Launceston CommunityCollege. To develop a core curriculum of study skills.To produce an evaluative report.
- --
Reference number: 22
project title: TAPE needs in the Scottsdale region
ntact Rerson: Barry Nation
Contact address!, Launceston Community Calloco (TAFE ,ertion)Automotive DepartmontPaterson 3treet"AUNC83CON 7250
12
TISHANIA
Project atatus: Planned
EatiMated cost bf project: $2,000 - 10,000
Remarka: To determine the educational/training needs in theScottsdale region by conducting a research study whichwill'gather information by interviews with a aample ofemployers. The information gathered will assist theLaunceston Community College 4plan for'future coursedevelopment.
,
Reference number:
projeCt title:
Contact person:
Contact address:
23
Ana1y3i34af skills
.Graeme Vertigmn
Division of Further EducationEquity House110 Murray StreetHOBART 7000 .
Project status: Planned
Estimated
Remarks:
coat of project: $11,000 - $40,000
To undertake a aubstantial industry review of the woodmachining trade and requirements of employers. Thesurvey and report would he preliminary to a review ofthe Wood Machining Syllabus. It is being undertaken inconjunction with the Tasmanian Timber Industry TrainingCommittee.
Reference number: 24
Project title: Burnie Community College - Online Catalogue
Contact persons: Ma Judith nabs; MS Mary-Anne Banks
Contact address: Diviaion of Further EducationEquity House110 Murray StreetHOBART 7000
Project status: 1/4 completed
Estimated cost orproject: $2,000 - $10,000
Remarks: To develop and implement a computerised catalogue foruse by TAFE teachers and students. The catalogue willbe able to produce bibliographies-for teachers, providean interface with a circdlation system'and form thebasi s. for a union catalogue for Tasmanian colleges.
Reference number:
Project title:
Contact person:
Contact address:
Project status:
Estimated cost of
25
Resource aanagement projects
Ms Judith Timbs
Division of Further EducationEquity House110 Murray StreetHOBART 7000
1/14 completed
project.: $11,000 $40,000
TAZMAXIA
Remarks': There aro a series of projects which ire assistingteachers :o organiae their teaching learning resourcesfor use. The projects art currently beineconduoted inseveral colleges in the following departments -Plumbing, Commerce, Electrical Trades, Automotive andBuilding Tradesr Evaluative reports for all projectswill be written.
Division of Further Educationuity House110 Murray Street
HOBART 7000,
Planned
Estimated cost of project: $2,000 $10,000
Remarks: CIRSYS is a computerised ciroulation system developedby the State Library an'd modified oy the EducationDepartment fcr use with schools and colleges. A trial
\ project was conducted at Launceston Community College, and as a result of the successful use of this system,
CIRSYS has now been extended for use to other colleges.It is currently being implemented at Pobart TechnicalCodlege.
Reference number:
Project title:
Contadt person:
Contact address:
Project status:
Proposed completion
27
Reviewof course and syllabus content of dataprocessing coursea
Mr J Chawla
Burnie Community CollegeTechnical StudiesPO Box 841BURNIE 7320
1/4 completed
date: December 1982
Estimated cost of project: $11,000 - $40,000
/Relaarks: This project involves three Business Studies teachersfrom three Tasmanian Technical Colleges participating .in a joint review ofj.b.currerit data peocessing courseand syllabus. A w curriculum to bp operational atthe beginning of 1983 is a planned outcome of thereview.
.
Reference number: 28 -
Project title: Business Studies Course review
Contact ppraon: Mr Keith Stacey
Contact address: School of Business StudiesHobart Technical.College
48Campbell StrMet
BABT 7000
Project status: 1/4 completed
14
fa
TASMANIA
Proposed completion date: December 1982,
Estimatem coSt of project: $2,000 - $10,000
Remarks: The project aiMs to iden ify the vocational skillsrequired by Business S udles graduates. It iscurrently collecting data y surveying employers, pastgraduates and current stu nts. The projeot also aimsto develop a joint Tasanin and Victorian data base ofcurriculum guidelines and materials as a source Correviewing teaching methods.
Reference number:
Project title:
Contact person:
Contact address:
Project status:
29
Computer augmented aoconntancy, ,
lir Andrew Bond
School of Business StudiesHobart TeohnicalCollege75 Campbell StreetHOBART 7000
Planned
Proposed completion date:
Estimatedlcost of project:,
Remarks: An update of,traditional accounting methods to reflectthe current impact of computers -Pit his field. Anoutcome of the review will be the rewr
To develop an overall understanding of existingteaching and learning in colleges of TAFE.To establish whether existing teaching and'learn,-ing in colleges of TAFE are consiatent with theobjectives determined by Curriculum Branch
Reference number: 39; QLD: D82/8
?reject title: Participation in National Project -Classification of TAPE Courses
Remarks: It is the focus of the current study into theclassification of TAFE courses throughout Australia toassess the feasibility of using the educationalobjectives of those courses as classificatory criteria.
Reference number: 40; OLD: A80/60
Project title: Resource unit on learning and :study
Contact person: John Seery
21 20
Contact address:
QUEDISLA16
TAFE Currioulum Branch'Department of Education Queensland41 Merivale StreetSOUTH BRISBAUE 4101
Project status: 1/4 completed
Proposed, completion date: Stage 1. 1982
Remarks: The aim of this project is to produce a series ofpackages on elements of Learning and Study for use by
, all student* in TAFE Colleges., The packages will bedeveloped in five stages with the first stage focussing-upon-Traded. PaoMge-conteatlyttl-inoludamtutly ktrlsard habits, examination techhAte, schematic interpre-tation reading and writing skills, oral communication,etc.
Audio/visual material: Audio cassette/Video. Duration not yetfinalised.
Reference number:
Project title:
Contact person:
Contact address:
Project status:
41; QLD: D82/6
Inveatigation and identification of attritionrates ln TAPE part-tiae courses
A1
John Seery
TAFE Curriculum BranchDepartment of Education Queensland41 Merivale StreetSOUTH 1SRISBAf3 4104
Planned
Proposed completion date: 1982
Remarks: The aim of this projdotsis to ascertain the reasonsstudents are dropping out of part-time courses Thecourses will be broken down into categories and eachwill be looked at in turn. The findings will beproduced in a report format.
Reference number:
Project title:
Contact person:
Contact address:
project status:
PropoSed completion
Remarks:
42; QLD: 80/21
An Evaluation of a Pre-vocationalUrban Horticulture
KieIy
TPFE Curriculum BranchDepartment of Education Queensland41 Merivale StreetSOUTH BR/SBAHE 1101
3/4 completed
date: Fpb 1982
A,
Course in
To determine how effectively the Pre-Vocational UrbanHorticulture (Operator.) Course achieved the statedCOUr3e objectives.
Referenoe number:
Project title:
Contact"person:
43; QLD: A79/61
Processing or results from Distance EducationSurvey
Aim to produce a syllabus document. Course is designedfor students from special sohools: to provideopportunities to learn trade tasks, trade measurement,'language, interaction with workers. Work experience isincluded.
Remarks: Aim to produce a syllabus document for a course whichgives access to TAFS courses by giving students tuitionin subjects at an introductory level.
Reference number:
Project title:
Contact perlon:
Contact addre33:
Project status:
Proposed completion
Remarks: Existingsyllabus.
53; QLD: A81/19
Review of Work-Related Liberal Studies Pre-vocational Courses
Remarks: To develop syllabi for Post Trades Courses of thePrinting Industry. This is particularly necessaryfollowing the reclassification of trades for thePrinting Industry.
Reference number:
Project title:
Contact person:
Contact address:
57; QLD: A81112
Fruit, Vegetable and Cut Flowers IndustryCourse
Mr Kerry Kreis
Curriculum BranchDivision of TAeE41 Merivale StPeetSOUTH BRISBANE 4101
Project status: 3/4 complete&
Proposed completion date: June 1982
Remarks: To develop a suitable part-time course to meet theneeds of personnel employed in the growing, transport,marketing, wholesaling And retailing areas of theindustry.
----------
Reference number: 58; QLD: A82/2
Project title: Investigation of the leducational needs ofhospital personnel from domestics and ward-aides to middle-level management.
c9Aact MEM): Mr Kerry Kreis
contact addres,!: Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE 4101
project, ItAtu2: Planned
3 3 -
Propelea completion date: Dec.1982
Reference number: 59; QLD: A82/4
prolect title: Hotel and Catering Certificate Course
Contact person: Mr Kerry Kreis
Contact address: Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRIsun
Project status: 0/4 completed,
Pralosed completion date: September 1982
Remarks: To de,elop a Certificate level course for the Hotel andCatering Industry as a logical extension of theexisting Practices course.
.
4
Reference number: 60; OLD: A81/27
Project title: Review of CH009 Pre-vocational course inCatering and Hospitality Practices
0
Ceniaet address: Currieulum.BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE4101
Project status: 1/4 completed
Remarks: To determine the suitability of existing'strInds of thecourse and if necessary to develop appropriatereplacement or additional strands.
lieference number: 61; QLD: A82/7
Loilsr, title:
Contact person:
Contact address:
Project'status:
Combined Breadbaking and Pa8trycookin4k TradeSyllabus
Mr Kerry kreis
Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRkSBANE 4101
Planned
Remarks: The industry has indicated its decision to have acombined course to the Industry and Commerce TrainingCommission.
Reference number:
Project tiile:
Conbact person:
Contact address:
ProJect status:
62; OLD: A8216
Advanced Woed Processing Course
Mr Kerry Kreis -
Curriculum BranchDivision of TAFE '
41 Merivele StreetSOUTH BRISBANE 4101
Planned
27 34
QUEENSLAND
Remarks: To develop a course to logically Sollow the elistingIntroduction to Word Processing Course.
,
Referen0 number:
Project title:
Contact person:
Contact addregs:
---
Project status:
Proposed completio
63; OLD: A80/61
Major Review of Management and CommerceCerti4cate Courses
Mr Kerry Kreis:
Curriculum BranchDivision of TAPE.
Merivale StreetSOUTH BRISBANE 4101
Planned
n date: September 83
Remarks: To review two related major courses which haveoffered for over five years.
been
Reference number:
Project title:
64; OLD: A79/25
Monitoring of fre-vocationalBusiness Stddies
Course in
.44,
Contact person:
Cohtactoaddress:
Zrolest status:
Mt Kerry Kreis
Curriculum BranchDivision of TAPE41 Merivale-StreetSOUTH BRISBANE 4101
1/2 completed
Remarks: The Pre-Vocational Course :n Business Studies was firstpiloted at the Bald Hills College-in 1981. In 1982Bald Hills and Toowoomba Colleges are continuing thepilot.
Reference number:.
Project title:
Contact person:
Contact address:
Project status:
65; QLD: A80/8
Projection paper for TAPE Courses in theTourism and Hospitality Industry
At Kerry Kreis
CurriculumAranchDivision of TAPE41 Merivale StreetSOUTH BRISBANE 4101
3/4 completed
Reference number:
Project title:
Etr5on:
contact address:
trejmt
66
Course for selected skills for school-leaverswho successfully completed a CommercialCourse at secondary school
Pam Hartley
,t)irriculqm AranehDivision or rAFE41 MerivalP StreetS9111i PRIIBANE 4101
Remarks: To develop a UG3 level course leading to the award ofAssociate Diploma in Real Estate Valuation. Thiscourse will replace an existing certificate coursepresented by TAFE. This course will be offered subjectto obtaining prior approval of the Bgard of AdirantedEducation (Queensland). An internal \part-time courseat this level has been approved.
Reference number:
Project title:
Contact person:
Contact address:
69; QLD: A81/23 and A80/39
Review/development of coursea for Rpal EstatePractices
Remarks: To review the course currently offered to those seekingto obtain a Real Estate Agents Licence. The require-ments and courae needs for Saiespersons and BranchManagers will also be considered inithe review.
-Remarks:. The_revision_of ad_courne. syllabi to conform to thenew Marine Regulations in line with Uniferm-ShiPpingLaws Code will take into consideration the nationalcore curriculum developed by the Australian MaritimeConference. ,
A survey of industry followed by meetings with IndustryAssociations, TAFE college staff and curriculum staffhas resulted in a recommendation that a 3rd Stage bedeveloped for the Signwriting Trade Course.
A submission to the Industry and Commerce TrainingCommission has requested a change to the Industry andCommerce Training Act.
Remarks: The course will provide additional time in numeracy andIkteracy as well as developing vocational skillsrequIFFd for a graph1W-ET57UCCupat1onr.
Contaot person:
Contact address:
Reference number:
Project title:
Contact person:
CPP:aeoccstted:IdaortmFle:tiOn
75; QLD: A80/37
Revision of Post Trade Courses forSignwriting and Screen Printing
Contact address: Curriculum BranohDivision of TAFE41 Herivale StreetSOUTH BRISBANE 4101
prolect status: 3/4 completed
Proposed completion date: 14/5/82E
Remarks: Development of skills in machining techniques to a pre-employment level of skills to equip students with theskills necessary to enable them to become employed infour industry areas: Clothing industry, Furniture andupholstery industries, Canvas industry and the FootWearindustry.
31
3s
QUEENSLAND
Reference number: 77; OLD: A82/9
Projeot, title:
Contact person:
Contact address:
IhroJect status:
%.
,
Personal Development Course Tor Aboriginesand Inlanders in the Public Service
Roaamond Nutting
Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE 4101
3/4 completed
prop_ciscA completion date; June 1982
Remarks: To equip students with,the personal and jobneeded to compete for employment on the openmarket.
skillslabour
Reference number:
Project title:
Contact person:
Contact address:
Project status:
78; QLD: A82/8
Reviaion of Butchery Trade Course
J Weller
Curriculum BranchDivision of TAFE'41 Merivale StreetSOUTH BRISBANE 4101
1/2 completed
Proposed completion date: September 1982
Remarks: The aim of ths project is to produce a reviaed coursefor teaching trade skilla to apprentice butchers in
' Queensland.
Reference number:
Project title:
Contact person:
Contact address:
79
Materials Handling Course
Mr Kerry Kreia
Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE 4101
Project status; 1/4 completed
Remarks: The development of an additional subject in thematerials handling area and the inclusion of amaterials handling endorsement in the ManagementCertificate Course.
Reference number: 80; QLD: C39
Project title: CN816 Independent Business Owner's ManagementCourse - Builders
Remarks: To provide a specialist stream namely "Builders" to theexisting Independent Business Owner's ManagementCourse.
Reference number:
Project eitle:
,Contact person:
Contaot address:
81; OLD: C53 0
Shop, Office Fitting and Furniture InddstryPre-vocational Course
K Keene
Division of TAFETAFE Curriculum Branch41 Herivale StreetSOUtH BRISBANE 4101
Project status: Investigation
Remarks: Investigations are being carrled out into industryrequirements with respect to the pre-employmenttraining in shop and office fitting and furnituremanufacturing industries.
Reference number:
Project title:
Contact person:
Contact address:
.82; OLD: C50
CW007 Pre-Vocatiouml Course in Engineer-ing/Construction
H K Keene
Division of TAFETAFE Curriculum Branch41 Merivile StreetSOUTH BRISBANE 4111
Project status: 3/4 completed
Proposed completion date: July 1982
Remarks: This course is designed to enhance the employmentopportunities of 'at risk' students.
Reference number:
Project title;
Contact person:
Contact address:
Proiect status:
83; QLD: C8
CN339 Woodmachining (Master Craftsman)
H K Keene
, Division of TAFETAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101
3/4 completed
Proposed completion date: October 1982
Remarks: This course is an update of the existing Advanced TradeCourse - Woodmachining. The designation "MasterCraftsman" is in line with the new classification ofTAFE courses in Queensland.
Reference number:
Project title:
Contact person:
84; QLD: C51
Appendix 4, to the Building Act i975-79
M K Keene
334 0
Contact address:
17/201SAID
Division of TAPETAPE CurriJulum Branch41 Merivale StreetSOUTH BRISBANE 4101
Project status: ' Planned
Proposed completion date: Auguat 1982
Remarks: To provide a service to industry onand implementation of Appendixdwelling construction.
the interpretation4 in relation to
Reference number:
Project titles' ak
Contuct person:
Contact address:
,85; CILD: C52.
Certificate of Management 'Timber
M K Keene
Division of TAPETAFg Curriculum Branch41 Merivale Streetsoma BRISBANE 4101.
Project status: InvestigatiNn
Proposed completion date: fctober.1982
Remarkai A akills analysis has been completed. It is proposedto develop a course to provide entry and exit points atVari01.13 levels of achievement to suit the needs oflower.and middle management personnel employed in thetimber industry.
Rvference number: 86
Project titles Hastercraftsman Certificate in OpticalMechanics
The aim is to train optical mechanics to assist inoptical dispensing and to also provide for anescalation of high level skills which are now evidentin this
Remarks': To develop a course which will provide graduates of thePractices Course in Urban Horticulture with theopportunity of expanding their knowledge, increasing
4.1
their depth of :Wills in specific areas and increasing' their superviaion and management expertise.
Remarks: To design a course which will deal with the production,ti.ansport, storage, wholesale and retail marketing of arange of produce including: flowee,s, fruit, vegetables.
Remarks: To develop courses which will satisfy the need anddemand for full time training courses in rural areas.These courses can provide transition from school towork and also a transition from city to rural living.
A total review of existing courses to satisfy thechanging needs of industry, the regulatory requirementsof the State Department of Primary Industries and thenational accreditation by the State Directors ofDairying.
Remarks: A need exists to train persons in the 4hove field.Most large swimming pool plants come under the controlof the Local Government Department in conjunction withthe Health Department.
Remarks: A need exists to trainepersons in the above field.There is a growing concern that plant operation ingeneral should be looked at from a National level with
Remarks: The revision of this course provides for the creationand addition of multi-discipline drafting strandcompiled from subjects from the specialist strands.4 The revision also provides for a substitution ofphysics subjects; the addition of civil draftingelectives and the minimization of pre-requisites.
Remarks: This new Practices Award Course is to enable studentsto gain "Hands On" drafting skills. The nuoleus of thecourse is comprised of the practical drafting subject,.of CN541 Certificate Course in Drafting Studies.
Remarks: The syllabus for this Apprenticeship course has beenrewritten in objective form, awaiting further advice onthe possibility of a change-in legislation to allow anincrease in time for Stage 2 of this course. Anotherconsideration which may influence this course syllabuswill be the National Core Curriculum being developed bya Task Force of State/Territory TAFE Authorities. Theinitial Task force meeting has been held in Melbournein April and the next meeting will be held in Brisbanein July 1982.
Reference number:
Project title:
Contact perions:
Contact address:
Project status:
Proposed completion
98v QLD: B85
CN420 Associate Diploma in Electrical andElectronic Engineering
Remarks: This course wai. designed to provide an educationalprogramme for those who wish to work as EngineeringAssoci.tes. Although the Board of Advanced Educationhas accredited this course at UG3, minor modificationsto its structure and syllabus content are needed.
Remarks: This course is being developed to meet the needs of theelectrical and mining industry in Queensland forelectrical cable joivters. The court: will only beavailable by corresponaenci;
99; QLDi B74
CH8O5 Electrical Jointers
Jleference number: 100; QLD: B113
Project title: 01007 Pre Vocational Course in Engineer-ing/Construction
Remarks: This course is being developed to meet the diverseneeds of a wide range of industries which employtechnical assistants. It is expected that this coursewill be appropriate for persons who have not been'able
, to secure an apprenticeship. Preliminary/ investigations are being carried out to determine the
needs and demands of students who would undertake thipprogramme of study.
4,38
Reference number: 102; OLD0107
Project title: Maateroraftsman Certificate in Refrtgetagionand Airoonditioning
Remarks: This post apprenticoahip course is being developed tomeet a need for advanoed and apeeifio knowledge andskills in the fields of refrigeration and airoonditioning. A preliminary meeting has been held withstaff at Yeronga College of TAFE to establish areas ofinterest to the industry. Meetings are planned withindustry to establish speoifio needs and desired levelof training.
Referenoe number:
Project title:
Contaot person:
Contaot address:
103; QCD: 8101
C11413 fellowabip Certificate in Electricaland Electronic Engineering.
Remarks: This course is being developed to meet the requirementaof either a 1st Claes or Limited Mine Manager'sCertificate of Competency in Queensland. It isexpected that this course will be accredited at 003.
Remarks: This course io being developed to meet the requirementsof a 2nd Class Coal Mine Manager's Certificate ofCompetency of the Board Of Examiners or the Departmentof Mineo.
Reference number: 106; QLD: R100
Project title: Mpoltercraftsman Certifioate in ElectricalEngineering
Remarks: This program is being developed for those who havecompleted their apprentioeship otudieo but mash toextend their knowledge and skills into specialistareas, to acquire skills as apprentice trainers and inbusiness operation.
This practices course deals with boat and ship designand conotruotion and boat yard operation. It isdesigned for boat building and shipbuilding tradesmen,othei industries and also for members of the public.
Remarks:
Reference number: 108; OLD: 850
Project title: C1859 Service Course in Fluid Power
Contact person: R.G. Partridge
Contact address: TOE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101
Project status: Planned
Proposed completion date: June 1982
Remqrkl: This service course is being revised to enable theoffering of an elective subjeot that is specifically
mining) of fluid.power systems.related to the mobile application (agriculture, marine,
4.40
,Reference number:
Project title:
Contact person:
Contact address:
project status:
QUEEEELAK;
109; QLD: 1371
CH759 Fellowship Certificate/AssociateDiploma in Nechamiml Engimering
Remarks: This )rogramme provides for accelPrated trlining inapprenticeships for bollermaking, rIttino
14 1
machining, fitting (diesel and heavy earthmovingequipment) and electrical fitting. 9
Reference number:
Project title:
Contact person:
Contact address:
113; OLD: B85
C11807 Air Coiditioning and Refrigeration(Service Course)
R.Oxenford
TAPE Curt'1ou.1 m Branch41 Merivale StreetSOUTH BRISBANE 4101
Project status: 3/4 completed
Proposed completion date: July 1982
iemarks: The revision of this service course involves theaddition of a new subject intended to provide a basicunderstanding of the air conditioning industry andoperation to non-tradesmen employed in this area.
Remarks: This apprenticeship course is being revised to providefor further refinement in specialist areas. Apreliminary survey has been conducted involving staff,students and employers concerned with the pilotmachining stream conducted at Toowoomba College ofTAFE. A" further survey is to be conducted inJuly/August 1982.
Reference number: 115; OLD: B111
Project title: C11815 Service Course.in Illumination
Remarks: Advanced subjects are being included in this .servicecourse so that persons who have reached "TechnicalAssociate" level may achieve membership 'tatus of theIlluminating Engineers Society of Australia.
Remarks: This course is designed to provide an educationalprogramme for geology teohnicians in both laboratoryand,exploration w6rk. Revisions are being made to thecourse to ensure that it meets the needs of industryand government departments.
Heference number: 117: QLD: 8106'
Project title: Maetercriftsann Certificate in AutomotiveEngineering
Remarks: Thia post apprentioeship course is to be designed tomeet the needa\for advanced specific knoyledge andskills in the fields of motor mechanic light vehicleand motor mechanic heavy commercial vehiole. It villalso provide skilla in training apprentioes and insmall business operation.
Remarks: This post apprenticeship course is being modified toinclude specialist knowledge and skills in suapensionsand steering for the motor mechanic.
Reference number:
Project title:
Contact plagn:
Coitact address:
119; OLD:.8100
CM166 Mechanic (Motor Mowers and Agridulturaland Industrial Engines)
Remarks: This new apprenticeship course is designed to provideskills for the motor mower etc. repair industry needs.A skills analysis session has been conducted withrepresentatives from industry and further developmentis awaiting approval.
Remarks: This apprenticeship course is being revised to provideskills current to the light marine industryJneeds. Askills analysis session has been conducted withrepresentatives from industry and further developmentis awaiting approval.
Remarks: This apprenticeship course is being revised to provideskills relative to the motor cycle repair industryneeds. A skills analysis session has been conductedwith representatives from industry and furtherdevelopment is awaiting approval.
Rzmarks:. This apprenticeship course 13 being revised to provideSkills for the apprentice moulder current to thefoundry industry needs. A skills analysis Session has',gen conducteq with representatives from industry anddevelopment of the syllsbus is proceeding.
,Remarks: This apprenticeship oourso is being revised to provideskills relative to the aircraft industry needs. Askills analyis session has been conducted withrepresentatives from industry and development of thesyllabus is proceeding.
This apprenticeship course is being revised to provideskills relative to industry's needs. It provides foran increase in time for the training of the Stage 3apprentice as well as elective streaming into the lightvehicle area or heavy commercial vehicle area.
Reference number:
Project title:
Contaot person:
Contact address:
Project status:
Proposed completion
125;. ULD: B69
CN122 Fitting, Diesel and Heavy EarthmovingEquipment
Remarks: The regsion of this apprenticeship course is to ensurean educational programme relevent to the needa of theearthmoving and agricultural machinery repair industry.
"..
45
5,2
:71
NEW SOUTH WALES
4753
ION SOOTH VILES
Reference number: 126
project title: Review of Central Meat Region
Contact person: Boner Bachmann (02) 219 9456
Contact address: Educational Planning BranchDepartment of Technical and Further Education
NINIT 2003
project. status: 3/4 completed
Proposed completion date: July 1982
Estimated coat of project: $2,000 - $10,000
Reference number:
project title:
Contact person:
-Contact address:
Project status:
127
Review of Bunter Region
Bruce Toms (02) 21§ 9302
Educational Planning BranchDepartment of Technical and Further Education
RWR227 2001
3/4 completed
Proposd completion date: July 1982
Estimated cost of project.: $2,000 - $10,000
Reference number:
Project title:
Conta9t person:
Contact address:
128
Sydney South and South Meat
Ian Kerr (02) 219 9338
Educational Planning BranchDepartment of Technical and Further Education
HAYMARKET 2001
Project status: 1/2 completed
Proposed completion date: JUly 1982
Estimated cost of project: $11,000 - $40,000
Reference number: .129
Project title:
Contact pereon:
Contact addreis:
Review of Metal Fabrication needs
Jenny Carr (02) 215 9302
Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001
,Project status: Planned
Pronosed completion date: December 1982
Estimated cost Of project: $2,000 - $10,000
119
a
Reference number: 130
project title: Review of Toolmaking trade
Contact peFson: Honor Bachmann (02) 219 9456
Contact address: Educational PlarthiWWanorDepartment of Technical and Further Education
WMPAVIT 2001
Projeot status: Planned
Proposed completion date: December 1982
Estimated cost of proJects $2,000 - $10,000
Reference number: 131
Project title: Review of Fitting and Haohining trade
Contact person: Honor Boehm= (02) 219 9456
Contact address: Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001
Project status:
Propose, completion
Estimated cost of project:
Planned
date: December 1982
$2,000 - $10,000
Reference number:
Project title:
Contact person:
Contact address:
132
Required planning data for 1982 -metropolitan and country areas
Ian Kerr (02) 219 9338
Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001
project status: 1/2 completeA
Proposed completion date: September 1982
Estimated cost of project: $11,000 - $40,000
Reference numbers
Project title:
Contact person:
Contact address:
133
Review of Plumbing and Sheetmetal
Margaret Putt (02) 219 9425
Educational Planning BranchDepartment of Technical and Further Education
nicalT 2001
Project status: 1/2 completed
proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
t-o 50
101 SOUTH WI=
Referenoe number: 134
Pro!ect title: Illmwarra report
Contact person: Bruce Tons (02) 219 9302
Contact address: Educational Planning BranchDepartment of Technical and Further Education
MX& 2001
-Project status: 3/4 completed
Proposed completion date: July 1982
Estimated cost of project: $2,000 - $10,000
Reference number: 135
Project title: A review of the western corridor of Sydney
Contact person:
Contact address:
Project status:
Proposed completion
Estimated cost of project:
tan Kerr (02) 219 9338
Educational Planning BranchDepartment of Technical and Further EducationBox K638MYMARKET 2001
3/4 completed
date: July 1982
$2,000 - $10,000
Reference number:
Project title:
Contact person:
Contact address:
136
Survey of Pre-apprentice courses/students1981
Ann Montague (02) 219 9301
Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001
Project status: 1/4 completed
Proposed completion date: December 1982
Estimated cost of prolect: $2,000 - $10,000
Reference number:
Project title:
Contact person:
Contact address:
tE21221 status:
137
Evmluation of full-time Secretarial Studiescoursea/students
Ann Mbotagne (02) 219 9301
Educntional Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001
1/4 completed
Proposed completion date: December 1982
Estimated cost of project: $11,000 - $40,000
51 5 6
Reference n4mber:
Project title:
Contact peron:
Contact addr.ss:
EW SOUTR MAUS
138
Review of Pre-apprenticeship 1980
Margaret Putt (og) 219 9425
Educational PlannirA BranchDepartment of Technical and Farther Education
WANT 2001
Project atatus: 3/4 completed
Proposed completion date: July 1982
Estimated coat of project: $11,000 - $40,000
7Reference number:
Praject title:
Contact person:
Contact addreas:
Project atatus:
139
Needs ror TAPE facilitica for coalnining
un Kerr (02) 219 9338
Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001
1/2 completed
Proposed completion date: 1983
Estimated cost of project: $11,000 - $40,000
Reference number:
Project title:
Contact person:
Contact address:
140
Australia-wide review of library resourcecentre provision in TAPE
Gaye Stinson (02) 219 9425
Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001
-roject atatus: Planned
Proposed completion date: December 1982
Estimated cost of prolect: $11,000 - $40,000
Reference numbez:
Project title:
Contact person:
Contact address:
141
Automotive and Aircraft Engineering Trades:item banking
Bob Smith (02) 219 9421
Curriculum Reaearch BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2000
Project atatus: 1/4 completed
proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
52
I
Reference number:
project title:
Contact person:
Contact address:
KEW SOUTH WALES
142
Review of Drafting and Tracing coursen
Ron Neilson (02) 219 9437
Curriculum Research BranchRegartmeg3gf Technical ard Further Education
HAYMMET 2000
Project status: 1/2 completed
Proposed completion date: September 1982
Estimated cost of project: $2,000 - $10,000
Reference number:
italta title:
Contact person:
Contact address:
Project status:
Pro osed completion
143
Development of a third clans welding coursefor intellectually handicapped persona
Fred RoPP (02) 219 9477
Curriculum Researeh BranchDepartment of Technical and Further EducaGionP 0 Box K638HAYMARKET 2000
1/4 completed
date: September 1982
Estimated cost of project:
Reference number:
Project title:
Contact person:
Contact address:
Project status:
$2,000 - $10,000
144
Revision of Pladt Mechanics
David Haworth (02) 219 9444
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box 1(638HAYMARKET 2000
1/4 completed
Proposed completion date: September 1982
pE molest: $2,000 - $10,000
Reference number:
Proleet title:
Contact person:
Contact address:
project status:
145
Curriculum developtsent of courses forphysically handicapped persona: SummerlandHowse with No Steps
Fred Ropp (02) 219 9477
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Planned
Proposed completion date: December 1982
Estimated cost ot proiect: $2,000 - $10,000
53
KEW SOUTH VALES
Reference number: 146_
Project title:
Contact person:
Contact address:
Industrial Relations Training for Apprentices
144 Grannall (02) 219 9417
urriculum Research Branchpartment of Technical and Further Education
P 0 Box K638HAYMARKET 2000
Project status: Planned
Proposed completion date: September 1982
Estimated cost of projeot: $2,000 - $10,000
Reference number:
Project title:
Contact person:
Contact address:
Project status:
147
Curriculum development of Industrial MachineSewing for intellectually handicapped persons
Fred Ropp (02) 219 9477
Curriculum Research BranchDepartment oflechnical and Further EducationP 0 Box K638'HAYMARKET 2000
1/4 completed
proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Reference number:
Project title:
Contact person:
ContaCt address:
Rroject status:
148
Simulation of an Office
Ann MacCann (02) 219 9423
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
1/2 completed
Proposed completion date: September 1982
Estimated cost of project: $2,000 - $10,000
Reference number:
Projedt title:
Contaot person:
Contact address:
talast status:
149
Secretarial Studies Review
Margaret Heys
Curriculim Services DivisionNSW Department of TAPE
'Waal* 2000
1/4 completed
Prorosed completion date: July 1983
Estimated cost of project: over $40,000
5 4
NEW SOUTH WALES
Remarks: To evaluate present courses particularly in the light--of-teohnologival change a:Abe 611111WiWrole of women.IndUatry survey will provide information on employers'requirementa, whilst surveys of past students providesinformation from the employees' poiqt of view.Curriculum development will follow in 1983. Nationalconference is hoped for.
Reference number: 150
ProJeot title; Revision of Textiles Bigher Certificate.Course: rewriting of ayllabus
Contact person: Ron Anderson (02) 219 9417
Contact address: Currioulum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Project status: Planned
Proposed completion Atet Dece4er 1982
Estimated cost of project: $2,000 - $10,000
Reference number:
Project title:
Contact person:
Contact address:
Project status:
151
Sheep and Wool cOure: assessment offieldwork
Goof Hawke (02) 219 9386
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Planned
Proposed completion date:
Estimated cost of project:
December 1982
$2,000 - ;loom
Reference number:
Project title:
Contact person:
Contact address:
152
Use of computers in Fara Technology
Paul Brady (02) 219 9461
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box 1(638HAYMARKET 2000
project status: Planned
Proposed completion date: July 1982
Estimated cost of project: less than $2,000
Reference number:
Project title:
Contact person:
153
Review of Sheetmetal Trade course
Vivienne Soo (02) 219 9539
55 6 t)
NW SOUTH MEd
Contact address: Curriculum-Research Branch# Department of Technical and Further Education
P 0 Box K638HAYMARKET 2000
Project status: 3/4 completed
Proposed completion date: December 19829
Estimated oost of project: $11,000 - $40,000
Reference nueJer:
Projeot title:
Contact person:
Contact address:'
Project status:
154
Development of a teaching/learning approachfor Mechanical Technology 1
Margaret Ruth (02) 219 9321
Curriculum Research BranchDepartment4of Technical and Further EducationP 0 Box K638HAYMARKET 2000
1/4 completed
Proposed completion date:
Estimated cost of project:
December 1982
$2,000 - $10,000
Reference number:
Project title:
Contact person:
Contact address:
Project status:
155
Home Science Ccrtificate course
Ron Anderson (02) 219 9417
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
1/4 e'clAtted
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Reference number:
P-oject
Contact person:
Contact address:
project status:
proposed completion
Estimated cost of project: $2,000 - $10,000
156
Review of Photography course
Tony Anderson (02) 219 9437
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
3/4 completed
'July 1982
Befe_see number:
Prc,ject title:
Con t
157'
1..-.
Mathematics 1: sylla a development forBielogy/Pathology Technic ens course
!t, ETAT): Bob Ellis (02) 219 9321
61 56
NEW SOUTH VALES
Contant addrenst____Curricalum_Research_BranchDepartment of Technical and FUrther EducationP 0110x 1(638HAYMARKET 2000
Project status: 114 completed
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10;000
Reference number: 158
Project title: Life Oriented Studies: subject review
Contact-person: Margot Pearson (02) 119 9475
Contact address: Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box 1(638HAYMARKET 2000
Contact address: Curriculum Research BranchDepartment of Technical and Further-EducationP 0 Box 1(638HAYMARKET 2000
Proje status:4,2
1/4 completedt
P.,..opos d completion date: December 1582
Estimated coit of project: $2,000 - $10,000
Reference number: 162 ,
Project itle: Teachers guide tib Fitting and Machining(Stage 1)
Contact rson: Bob Ellie (02) 219 9520
Contact a cfress: Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Project status: 1/2 completed
Proposed completion date: December 1982
Estimated cost of project: " $2,000 - $10,000
Reference number: 163
Project title: Fitting and Machining: item banking
Contact person: Goof Hawke (02) 219 9386
Contact address: Curriculum Research BranchDepartment 9f Technical and Further EducationP 0 Box K638HAYMARKET 2000
project status: 1/2 completed
Proposed spepletion date: December 1982to
Estimated Coet of project: $2,000 - $10,000
Rrference number:
Pr0j,2ct title:
toptact erson:
y-±ptlft address:
Pr°11't ;1,1_qq.1:
!9J.121q.i9
21.
164
Review of Refrigeration Mechanics course
Vivienne Soo (02) 219 9539
Curriculum Research BranchDepartment of Technical and Further PlcationP 0 Box K638HAYMARKET 000
1/2 completed
p otv i December 1982
ecl: $11,000 - $40,000
6 ts 58
NEW SOUTH VILLES
Reference numbers 165
tEalE2t-titlot Review of Fitting-and-Machining-
Contact person: Vivienne Soo (02) 219 9539
Contactaddress: Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Project status: 3/4 completed
Proposed completion date: December 1982
Estimated cost of project: over $110,000
Reference number:
Project title:
Contact person:.
Contact address:
project status:
166
Computer Service Technology
Ron Neilson (02) 219 9437
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
1/4 completed
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Reference number: 167
Project title:
Contact person:
Contact address:
\Project status:
OReview of Electronic and Electrical Engineer-ing Certificates and syllabus deveiopment
Ron Neilson (02) 219 9437
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
3/4 completed
Proposed completion date: September 1982
Estimated cost of project: over $40,000
Reference number:
project title:
Contact Lerson:
Contact address:
Project status:
168
Coalnining courses (including AssociateDiplom new course)
David Haworth (02) 219 9444
Curriculum Research BranchDepartment of Technical and rurther EdurationP 0 Box K638HAYMARXET 2000
Planned
Proposed completion date: September 1982
Estimated cost of project: less than $2,000
59 6
Reference number:
Project title:
Cbntact person:1------tigontact address:
Project status:
KEW SOUTH WALES
169
Chemistry Certificate review
Bruce Meldrum (02) 219 9455
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Planned
Proposad completion date:
Estimated cost of project:
July 1983
$2,000- $10,000
Reference number: 170
Project title: Metallurgy course review
Contact person:
Contact address:
Project status:
Paul Gordon-Saith (02) 219
Currioulum Research BranchDepartment of Technical andP 0 Box K638HAYMARKET 2000
1/2 completed
Proposed completion date:
Estimated cost of project:
number:
title:
Contact person:
Contact address:
Project status:
Proposed completion
December 1982
$2,000 - $10,000
9471
Further Education
171,
Metal Finishing Certificate tElectrolyticFinishing) review
Vivienne Soo (02) 219 9539
Curri-ulum Research BranchDepartment of Technical and Further EducationP 0 Box K6q8HAYMARKET 2000
1/2 completed
date: December 1982
Estimated cost of project: $11,000 - $40,000
Rrene
Contact person:
Contact address:
172
Review of Food Teohnology course and syllabusdevelopment
Bruce Moldrum (02) 219 9455
Curriculum Research BranchDepartm4ht of Technifml lnd F,rther E,!vrtAtionP 0 Blx K638HAYMARKET /000
3/4 ,cmpi-.p4
fn?P')3,P1:).-..mber 118,
,r 3",000 - $10,0nq
6')
Referenae numbers
prolt04 title:
Contact person:
Contact address:
10tW SOUTH WALES
173
Sighwriting and Painting and Decorating majorre/15110 _
Paul Gordon,Saith (02) 219 9471'
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Project status: 1/2 completed
Proposed completion date: December 1982
Estimated cost of proje.ct: $2,000 - $10,000
Reference number:
Project title:
Contact person:
Contact address:
174
.Applied Heat andl,Fluids; item banking
David Matheson (02) 219 9388 -
Curriculum Research BranchDepartment of Technical and FurtherP 0 Box K638HAYMARKET 2000
project status: 1/4completed
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
EducationAs.
Reference number:
Project title:
Contact person:
Contact address:
Project status:
175
-Review of Cabinetmaking courses
Paul Gordon-Smith (02) 219 9471
Curricultip Research BranchDepartment or Technical and Further EducationP 0 Box K638HAYMARKET 2000
1/2 completed
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000IP
RPC:otonejtEE7p:::::
Contact addre33:
project status:
176
Approach to teaching Communication in theSchool of Business and Administrative Studies
Margot Pearson (02) 219 9475
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Planned
Proposed completion date:
Estimated cost of project:
December 1982
$2,000 - $10,000
61
MEW SOUTH.WALES
Ileference number: 1/7
ProJeat title: Examination of'the changea to the CompaniesAct
Contact person: Ron Anderson (02) 219 9417
Contact address: Curriculum Research Branch. , Deartment of Technical and Further Education
P 0 Box K638HAYMARKET 2000
Project status: , 1/4 completed
Proposed completion date: July 1982
Estimated cost of project: .$2,000 - $10,000
Reference number)
Project title:
Contact perbon:
Contact address:
Project status:
178
Evaluation of the Real Estate and StrataProperty Management coursest
Ron Anderson (02) 219 9417
Curriculum Research BtanchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
1/4 completed ,
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,009
-e-
Reference number:
Project title: Reviaion or Accounting coursea
Contact person: Ron Anderson (02) 219 9417
Contact address: Curriculum Research BranchDegartment of Technical and Furtfier Education
EAYMARM632000
Project status: Planned
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
179
Reference mimber: 180
Project title: Review of Insurance bourses
Contact person: Fain Anderson (02) 219 9417
Contact address: Curriculum Research BranchIii,egagtmen.3Fif Technical and Further Education
HAYMARKET 2000
pmi.e_pa status: 1/2 completed
Proposed comeletion date: September 982
Estimated cost or project: $2,000 - $10,000
62
KEW 'SOUTH MAIM
Reference number: 181
Project titles Review of Transport Administration Courses
-Contact persons_ Ren_knderson (02) 219 9417
Contact address: Curriculum Research Branchilegaggeg3gf Trchnical and Further Education
HAYMARKET 2000
Project status: 3/4 completed
,Proposed.completion.dates July 1982
Estimated cost of project: $2,000 - $10,000
Reference number: 182
Project title: Review of Travel and Tourism courses
Contact person: Paul Brady (02) 219 9461
Contact address: CurriculuraReseach BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Project status: 1/2 completed
Proposed cdmpletion date: July 1982
Estimated cost of project: $2,600 - $10,000
Reference number:
Project title:
Contact person:
Contact address:
project status:
183
Review of Welfare Wore Certificate course
Les Oorloff (02) 219 9334
Curricukum Research BranchDepartment of TeOhnical and Furtner EduaationP 0 Box K638HAYMARKET 2000
1/2 completed
Proposed completion date: December 1982
Estimated cost of project: $11,000 - $40,00
Reference number:
Project title:
Contact person:
Contact address:
184
Chiropody/Podiatry Technicians course reviewand syllabus development
David Haworth (02) 219 9444
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000
Froject status: 3/4 completed
propond completion date: July 1982
Estimated cost of project: $11,000 - $40,000
63
Reference number:
project title:
Contact person:
Contact address:
project status:
Proposed completion
185
Biology/Pathology Technicians coursessyllabus development
David Haworth "(02) 219 9444
Curriculum Research BranchDepartment'of Technical and Further EducationP 0 Box K638HAYMARKET ?000
3/4 completed
data: July 1982
Estimated cost of project: over $40,000
Reference number:
Project title:
Contact person:
Contact address:
project .tatus:
.Proposed completion
Eatimated cost of
Reference number:
Project title:
Contact person:
Contact address:
186
Review of Animal Care courses
Bruce Heldrum (02) 219 9455
Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box 1(638HAYMARKET 2000
3/4 completed
date: July 1982
21:21e21: $11,000 - $40,000
---
187; NSW: 82/S47/14037
Ceramics resources development project
Ian Tudor (02) 219 9543
EducAtional Resources BranchDepartment of Technical and Further EducationBoxHAUXIT 2000
Project status: Planned
froposed completion date: 1983
Estimated cost of project: $2,000 - $10,000
Remarks: To demonstrate a field trip: involving geologicalmaterials survey: use of local materials, ciav et-;building of a kiln for firing from local materials.
Audlo/visual material: Film
Reference number:
froject title:
Contact person'
Cont.,ct address:
P:29.1ect ststuj:
188; NSW: 80/S204/41486
Jewellery trades: course resource materxals
Ian Tudor _(02) 219 9543
Educational Resources branchDepartment of Techni,11 and Further Ed.1,4tonbox K6)8HAYMARKET '000
/17 ,ompleted
NEN SOUTH VALES
Proposed completion date: December 1982
Estimated coat of project: $2,000 - $10,000
Remarks: A demonstration type of videotape developed out of adetailed skills analysis of trade practices inpreparing forms from precious metals.
Audio/visual material: Video
Reference number: 189; NSW: 81/S61/61305
Project title: Re"S;urces on areas of Child Care Placement
Contact person: Andrew Chodkiewioz (02) 219 9543
Contact address: Educational Resources BranchDepartment of Technical and Further Education
=AT 2000
Project status: 1/2 completed.
Proposed completion date: December 1982
Estimated cost of project: less than42,000
Remarks: Actual instances. Care patterns include day care andlong placement.
Audio/visual material:. Video
Reference number:
Project title:
Contact person:
Contact address:
Project status:
190; NSW: 81/S211/61210
Preparation'of resources for Floral Art
Ian Tuder (02) 219 9543
Educational Resources BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2000
1/2 completed
Proposed completion date: December 1982
Estimated cost of project: less than $2,000
Remarks: To provide slide materials and notes for teachers ofFloral Art, whose work needs to be distinguished fromthat of teachers or Commercial Floristry.
Audio/visual material: Slide sets
Reference number:
Project title:
Contact pe:son:
Contact adCresa:
191; NSW: 81/561/60369
Workshop techniques: Metal Fabrication
Margaret Rush (02) 219 9321
Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000
Project status: 1/2 completed
proposed completion date: December 1982
Estimated cost of project: less than $2,000
65 7 0
NEU SOUTH WALES
Remarko: The subject of workshop technique, in Metal Fabricationia undergoing methodological examination. Resourcematerialo are envisaged ao an outcome when the firotphaoe lo complete.
Audio/vioual material: Diagrams
Reference number:
Project title:
Contact peraon:
Contact address:
192; NSW: 80/S201/41624
Feasibility study of requirements for tuitionof students in isolated areas
James Owen (02) 219 9358
Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000
1/2 completed
date: December 1982
Project status:
Proposed completion
Estimated coot Of project:
Remark,:
$2,000 - $10,000
Analyois and organioation of written and other reoourcematerials to aosiot with the teaching of oubject 1127A-Radiographic Teoting in the School or Chemiotry andMetallurgy.
Audio/vioual material: Various
Reference number:
Project title:
Contaot Eproon:
Contact addreoo:
193; NSW: 80/S61/40363
Development of resource materials for thoSchool of Hairdressing
Stewart Barnett (02) 219 9660
Educational Resources BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2000
Project otatuo: 1/4 completed
Propooed completion date: December 1982
Eotimated coot of project: $2,000 - $10,000
Audio/vioual material: Videocaooette, 20 min, 3/4" U Matic.Three videotape, to illuotrate eoaentialskill proceooes have been planned. Thioitem will illuotrate the okills of BaoicFace Shaving, following a akillsanalyoio.
Reference number:
Project title:
Contact peraon:
Contact addreos:
Project otatuo:
194; NSW: 81/S61/60070
Design and development of student-centredlearning kits in Library Technology
Trevor Wilson (02) 219 9308'
Educational Resources BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2000
1/2 completed
66
NEW SOOTH WALES
Propoaed completion date: December 1982
Estimated coct of project: lesa than $2,000
Remarka: To develop student-centred resource materiala for theLibrary Techniciana course in areaa auch aa the cardcatalogue, bibliographic aearching, etc. (WorkboOka)
Reference number:
Project title:
Contact peraon:
Contact addreaa:
195; NSW: 82/S47/14470
Directed private study material forCertificate Entrance Sciecce
Jamea Owen (02) 219 9358
Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000
Project atatua: Planned
Propoaed completion date: December 1982
Estimated coat of project: $2,000 - $10,000
Remarks: To develop modulea in basic concept areaa for Certifi-cate Entrance Science to enable atudenta with aomebackground in Science to attempt the final examinationafter a aemeater of atudy.
Reference number:
Project title:
Contact peraon:
Contact addreaa:
Project atatua:
Propoaed completion
196; NSW: 82/S113/14387
Reaource aateriala for the teaching of theRefrigeration Mechanida Trade Course Stage 1
Examination of teaching methodology inteaching of the firat atage aubjectaRefrigeration Mechanica Trade Courae.
Education
relation to thein the reviaed
Reference number:
Project title:
Contact person:
Contact addreaa:
197; NSW: 82/S47/14398
Development of a teachers' guide kit, inbagineering Trades
Alan Craig (02) 219 9358
Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000
Project atatua: Planned
Proposed completion date: December 1982
Eatimated coat of project.: leaa than $2,000
67
Reference number:
Project title:
Contact person:
Contact address:
NEW SOUTH WALES
198; NSW: 82/S47/14397
Development of drawing examinee for theLocksmiths' Trade Couree
Margaret Rush (02) 219 9321
Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000
Project status: Planned
Proposal completion date: December 1982
Eatimated cost of project: less than $2,000
Remarks: To develop exercise materials appropriate for Stage 1
Drawing in the Locksmiths' Trade course
Audio/visual material: Diagrams
Reference number:
Project title:
Contact person:
Contact addrese:
199
Mount Druitt Evaluative Studiee
Greg Woodburne (02) 211 5766
Camel HouseBulwarra RoadULTIMO 2007
Project status:. 3/4 completed
Proposed dbmpletion date: June 1982
Estimated cost of project: over $40,000
Reference number:.
Project title:
Contact person:
Contact aUtress:
Project status:
Proposed completion
Estimated
Remarks:
200; NSW: 82/S47/14485
Direct Pattern-Making in Fashion
Trevor Wilson (02) 219 9308
Educational Research BranchDepartment of Technical and Further Education
MMINET 2000
Planned
date: December 1982
cost of project: $2,000 - $10,000
To develop material providing iupport to the learningof generalised sets of principles which will makestudents more adaptable to circumstances found incommercial settings.
Audio/visual material: Video
Reference number:
Project title:
Contact person:
201
National Course Claesification andNomenclature
Perce Butterworth (02) 219 9407
1,i68
Contact addresa: Level 9rDepartment or Technical and Further EducationBox K638HAYMARKET 2001
\ projeci status: 3/4 completed
Proposed completion date; July 1982
Estimated cost of projeCt: over $40,000
I
-I
.
7 I i
k
.,
WESTERN RUST [IRWIN
,
I.
i
WESTERN AUSTRALIA
Reference number: 102; WA: CRF 6/82
Projeot titlel Certificate and Diploma in Real RotateManagement
Contact person: T. McDonald
Contact address: Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH -0
projeot status: 1/2 c aeted
Proposed compIetion.odel: December 1982
Estimated cost of project: $11,000 - $40,000
Remarks: Revision of courses and subjects. Provision of shortcourses.
Reference number: 20; WA: CRF 3/82
project title: Carpentry and Joinery
Contact person: J. Isherwood
Contact address: Technical Education Division151 Royal StreetEAST PERTH
project, status: 1/2 completed
Proposed completion date: December 1982
Estimated cost of project: $11,000 - $40,000
Remarks: National common core curriculum syllabi and teachingguides. Core notes for various modulea.
Reference number: 204; NA: 2478/82
Prbject title: Word Processing Systems
Contact person: T. McDonald
Contact address:
Project status:
Oirriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
complete
Proposed completion date: May 1982
Estimated cost of project: less than $2,000
Remarks: The planning, definition, design, installation andmaintenance of a Nord Processing System for CurrieulumResearch and Development.
Reference number: 205; WA: 2475/82
Projcct title: Relevelopment of all Management Courses andSubjects
Contact person: T. McDonald
71 70'
WE=111 ADSTRALIA
Contact address: Curriculum Research and DevelopmentTeohnical Education Division151 Royal StreetEAST PERTH
Project status: 1/2 completed
Proposed completion date: December 1982
Estimaied cost of project: $11,000 - $40,000
Remarks: Redevelopment of all subjects and courses in theManagement Study area', TE 78's - 80's.
:erfoejre::c:irr:
Contact peraon:
Contact address:e4r&al E ucaVion 112vis2on151 Royal StreetEAST PERTH
Project status: 3/4-comp1ete
Estimated cost of project: $2,000 - $10,000
Remarks: Survey of Industry. Modularization of courses.Provision of short courses.
206; WA: 2474/82
Apparel Design and Manufacture Certificateand Diploma
J.R. Par-y
fur ulum gese ch d D velopment
Reference number:
Pro ct
Con
title:
pers,u2:
Co act address:
Project status:
207; WA: 2470/82
Furniture Tradea review
R. La Planohe
Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
1/4 completed
proposed completion date: December 1982
Estimated co,L ,f project: $11,000 - $40,000
Remarks: Stages 1, 2 and 3 of: Cabinet Making, Wood Machining,Timber Machining, Chair Making, French Polishing,Upholstery.
Reference number: 208; WA: 2468/82
Prglect title:
Contact attlon:
Contact addreas;
Refrigeration and Airoonditioning Stage 3.Short intensive courses
J. Stanley
Perth Technical College. (Annex)St Georges TerracePERTH
Prt!leot statul: 1/? completed
pruEo,sed compietion date: November 1982
F3t1mated c03t of uoject: le33 than $2,000
72
Remarkss
WESTISRA AUSTRALIA
To produce a complete set of updated practical projectsend assessment sheets in file format for stage 3apprentices.
Reference number:
project title:
Contact persOns:
Contact address:
Prolect status:
209; WA: 2466/82
Panel Heating and Spray Painting/Self-pacedlearning programs
I. Paisley and D. Hay
Currieululm Research and DevelopmentTAFE151 Royal StreetEAST PERTH
1/2 completed
Proposed completion date: December 1982
Estimated cost of project: over $40,000
Remarks: To pilot self paced individualised instruction in stage3 of the Panelbeating and Spraypainting Apprenticeshipcourses.
Curricuium Research and DevelopmentTechnical EdUtation Division151 Royal StreetEAST PERTH
1/2 completed
date: December 1982
Estimated cost of preJect: over $40,000
Remarks: Preparation of resource materials for the modularisedcourses in the electrical and associated trades.
Reference number:
project title:
Contact person:
Contac, address:
project status:
211; WA: 2464/82
Pre-Apprentice and Apprentice Courses: Elec-trical Fitting/Installing; Instrument Fit-ting; Radio and TV servicing
R. Hayward
Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
1/2 completed
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Remarks: Overview, develop, implement and monitor apprenticecourses in Electrical Fitting, Installing, Radio TVInstrument Fitting, Post-Trade and Pre-Apprentice andother related areas.
Reference number:
Project title:
Contact person:
Contact address:
Project status:
Propo;ed completion
Wbolftan AtAinALLA
212; WA: 2462/82
Meat Apprentices (Butchers) Course Stage
T. McDonald
Curriculum Research and DevelopmentTechnical Edueation Division151 Royal StreetEAST PERTH
1/2 completed
date: December 1982
Estimated cost of project: $?,000 - $10,000
Remarks:
1
To update Stages 1 and 2 of the Meat Apprentices Course- to raise standards to those of Commonwealth and tofurther raise quality by providing post-apprenticeshipcourses.
Curriculum Research .nd DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
Project status: 1/2 completed
Propoaed completion date: December 1982
Estimated cost of project: less than $2,00
Remarks: To conduct a series of needs analysis surveys V33Search Conferences in the major Agricultural areas ofWestern Australia. To Aentify far each area communitygoils for agricultural training. Establish the mostlikely (to all concerned) means of achieving thele(training) goal,.
7 4
Reference number:
Projeot title:
Contact person:
Contact address:
Project status:
Amami 22E2121122
z.ai1.nsi ALOJAAALAA
215; WA: 2402/82
Needs of oomputing industry - Research1roject/Survey
T.W. Goode
Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
1/4 completed
date: May 1982
Estimated cost of project: $11,000
Remarks: Report to be produced.
$40,000
Reference number:
project title:
Contact person:
Contact address:
Project status:
216; WA: 2405/82 :
Laboratory Programa for Eleetri-al.Engineering I D
B. Sargent "
Thornlie Technical CollegeHurslem DriveTHORNLIE
1/4 completed
Proposed completion date: July 1982
Estimated cost of project,: less than $2000
Remarks: Preparation of laboratory programs for Electrical'------- Engineering I D Stage 2.
Reference number:
Project title:
Contact person:
Contact address:
Project status:
217; WA: 2422/82
Pitting and Machining Apprenticeship/Examquestions and answers
L Boetelran
Curricllum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
1/2 completed
Estimated cost of project: $11,000 - $40,000
Remarks: To develop exam questions for block release allstages and key answers for exam questions.
Reference number:
Project title:
Contact person:
Contact address:
project status:
218; WA: 2424781
Fitting and Machinery/Self paced learningpackages
Bob Randall
Hunbury Technical CollegeRobertson DriveHUNBURY
1/4 completed
15
WW115MA AUZAKAL1A
-
Proposed completion date: December 1982
Estimated oost of projeot: $2,000 - $10,000
Remarks: ilevelop self.paced learning in hydraulics for thefitting and machining area.
Reference number: 219; WAn 2426/82
Project title: Sheetmetal/Apprentice, Pre-Apprenticeship,Post Zrade Short Courses
Contact person: D. Tookinsonr
Contact address: Curriculum Research and DevelopmentTnchnical Education Division1,1 Royal StreetEAST PERTH
Project status: 1/4 completed
Proposed completion date: December 1982
Estimated cost or Eroject: $11,000 - $40,000
Remarks: 1. Develop four nhort courses for Sheetmetal Work.2. Review the pre-apprentideship course.3. Complete the apprenticeship course (commenced in
1981)
Reference number: 220; WA: 2428/82
Project title: Metal Construotion/Welding
Contact person: L. Pyke
Contact address: Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
Curriculum Researen and DevelopmentTechnical Education Division151 Royal StreetEAST pERTH
1/2 completed
project: $11,000 $40,000
Remarks: Review of Certificate in BuiLding Construction.Development of Short Courses.
(j 7 6
Beference number:
Projeot title:
Contact person:
Contact address:
VESTERNIUSTRIL/A
222;* WA: 2431/82
Quantities 2B C.A.I.
T. McDonald
Curriculum4Besearch and DeielopmentTechnical Education Division151 Royal StreetEAST PERTH
project status: \,1/2-completed
Proposed completion dae: August 1982
Estimated cost of project: $2,000 - $10,000
Remarks: Develop Computer Asaisted Instruction for Quantitieswhich is a subject in the Diploma of Building.
Reference number:
project title:
Contact person:
Contact 'address:
Project status:
223; WA: 2432/4
Certificate and DiAloaa in HospitalityOperation."
Dr. E. von forger
Curriculum Research and DevelopmentTechnical Educatilon Division151 Royal StreetEAST PERTH
, 3/4 complete
Proposed completion date: August 1982
Estimated cost of proAct: $2,000 - $10,000
Remarks: Reformulate the Certificate and Diploma in Catering andHotel Management following the requirements of industryto the Certificate/Diploma in Catering and HotelOperation.
Devefop short couraes as an essential part of theCertificate and Diploma courses.
Reference number: 224; WA: 2433 and 2434/82
Project title: Commercial Studieta
Contact ppraqp: Hrs. J. Sweet'
Contact address: Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
EmItsi. status: 3/4 completed
ProPosed comoletion date: December,1982
Estimated
Remarks:
cost of project: over $40,0o0
Res,tructuring of Commercial Studies Ceurses. Designspecifications for written and audio-yisual self-pacedlearning modules for word-processing, auto-keyboarding. Modules for Typing 1, 2, 3. Modules forOffice Practice 1 & 2.
1 7
Reference number:
Project title:
Contact person:
Contact address:
Project status:
!MUM LOSTRALTA
225; WA: 2435/82
Mon-Dentruotive Testing/Sew CertificnteCourae
T. McDonald
Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
3/4 complete
Proposed completion date: Hay 1982
Estimated cost of project: less than $2,000
Remarks: Attend the NAT course and prepare notes after attendingthe course for the new Certificate in Non-DestructiveTesting.
i .0+Reference number:
Project title:
Contact person:
Contacc address:
226; WA: 2451/82
Woolclassing - Owner Classer
M. Jefferson
Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH
Project status: 1/2 completed
Proposed .c,ompletioq date: June 1982
Estimated cost of project: less than $2,000
Remarks: To enable documentation of the newly developed Owner-Classer coarse in current standard TE 76-80 format.
Reference number: 227; WA: CRF 5/82
project title:
Contact 22112D:
Contact address:
Project status:
Proposed completion
Fitting and Machining
L. Pike
2urriculum Resemrch and De-elopmentTechnical Education Division151 Roxal StreetEAST PL74TH
3/4 complete
date: May 1982
Estimated cost of project: leas than $?,0°0
Remarks: Development of training .,xercilos Nr comp..t.r lAststelpr,,grivting for Nr maohine tolls.
78
SOUTH AURTRALIA
8 .i79
Reference number:
Project title:
Contact person:
Centact address:
SOOTH AUSTRALIA
228
Footwear Industrial Sewing Machinist Course
Doug Newlyn
Marleston College of Technical andFurther EducationWest Beach RoadMARLESTON
Project statue: 3/4 completed
Proposed completion date: October 1982
Remarks: This course 18 designed to train footwear industrialsewing machinists on 4 basic skills, to meet the demandindicated by the footwear industry.
The trainees will be taught the skills and knowledge ofall types of leathers and synthetics for sewing in thefootwear industry.
Audio/visual material: 5 videos are being produced by theKilkenny Open College. These videos aredesigned to co-ordinate with thesyllabus for training induetrial sewingMachinists.
Reference number: 229
Project title: Footwear machinists' training needs
Contact persons: D. Newlyn and D. H. Kuhl
Contact rddrese: Department of Technical and Further Education31 Flindere StreetADELAIDE 5000
Project atatus: 3/4 completed
Proposed completion date: July 1982
Remarks: To prepare a case for funding under Commonwealth grant.
Reference number:
Project title:
Contact persons:
Contact address:
Project status:
Proposed completion
230
Analysis of the wine industry and sone alliedcomponenta of it along with a general des-cription of the nature and flizto ol the educa-tion/training need
R. Fielke: D.H. Kuhl
Department of Technical and Further Education31 Flinders StreetADELAIDE 5000
3/4 completed
date: late 1982
Remarks: Project document in preparation
Reference number:
Project title:
231
Analysis of industry and occupation compon-ents of the carpentry and joinery and alliedvwations - relevance to ex'ating cournes
81
Contact persons:
Contact address:
Project status:
SOUTH AUSTRALIA
D.H. Kuhl, A. Lothian, D. WAIliams;K. Parklmon
Principal Education OfficerResearch BranchDepartment ot Technical and Further Education31 Flinders StreetADELAIDE 5000
3/4 completed
Proposed completidn date: July 1982
Remarks: Project document in preparation.
Reference number:
Project title:
Contact persons:
Contact address:
Project status:
Proposed completion
232
Survey of furnishing tradea industry trainingrequirements for Cabinetmaking
G. LeDuff, A. Walls
Principal Education OfficerResearch BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
3/4 completed
date: late 1982
Remarks: Project document completed. Research publicationspreparation.
in
Reference number:
Project title:
Contact person:
Contact address:
Project status:
233
Evaluation of the Vocational PreparationProgramme 1981
D.L. Hailstone
Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
3/4 completed
Proposed completion date: June 1982
Remarks: lne project represents an evaluation of the VocationalPreparation Programme of courses conducted by the SADepartment of TAFE in 1981. Vocational Preparationcourses were funded under the CommonwePlth's School-to-Work Transition Programme and represer's one componentof the Department's range of 1981 Transition Educationofferings.
Reference number:
Project title:
Contact person:
Contact address:
234
Evaluation or 1981 pre-vocational (Metal andElectrical trades) programme
J. S. Grosvenor
Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: 3/4 completed
Co82
SOUTH AUSTRALIA
Erosaled completion date: 31 July 1982
Remarks: Final evaluation report is in preparation.
Reference number: 235
Project title: A case study evaluation of the Eyre PeninsulaCommunity College Foundation Course
Contact person: J.S. Grosvenor
Contact address: Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: 3/4 completed
Proposed completion date: 31 July 1982
Remarks: Final evaluation report is In preparation.
Reference number: 236
Project title: Drawing skills for fitting and machiningapprentices (basic trade)
Contact persons: perry Raymond; Dean Kuhl; John McCarthy
Contact address: Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: 1/4 completed
Proposed completion date: Stage 1, December 1992; Stage 2December 1983.
Remarks: Stage 1: to survey industry with the purpose of deter-mining the drawing skills/requirements of an occupa-tional group under the broad heading "fitters andmachinists".
Stage 2: (1) to develop materials as a result of thesurvey(2) to construct a drawing ability test(3) to develop modules in different areas e.g. tool-making, jigs and fixtures etc.
Contact person:
Contact address:
Project status:
237
Evaluation of the Cost and Social and Educa-tional Effectiveness of Alternative Attend-ance Requirements for Country Apprentices
K.S. Seidel
Re,earch BranohDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
1/2 completed
Proposed completion dale: August 1982
Estimated cost of project: $11,000 - $40,000
83
SOUTH AUSTRALIA
Remarks: To evaluate the SOCIAL, FINANCIAL and EDUCATIONAL COSTSandsBENEFITS of alternative attendance requirements ofcountry apprentices.
The primary emphasis is placed on a comparison of localcountry/regional trade training with metropolitanprovision of trade training for country apprentices. Acomparison of day and block release forms a secondaryresearch emphasis. Data from surveys of countryapprentices, employers and parents is presented andanalysed. The Riverland and South East regions ofSouth Australia were used as study regions for thisstudy.
Reference number:
Project title:
Contact person:
Contact address:
238; SA: FE 2007/78, FE 1175/81
Evaluation of the implementation of theNational Cosson Core Course in Flushing, Gas-fitting and Drainage
Mr K. Poole
Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Prolect status: 1/2 to 3/4 cOmpleted
Proposed completion date: January 1983
Estimated cost of project: $11,000 - $40,000
Remarks: This is a CTEC funded project. An evaluatinn is beingcarried cut to determine the processes used to developand implement the National Common Core Course inPlumbing throughout Australia. A repbrt will bedeveloped which will cover both State and Nationalfindings.
Reference number:
Project title: c
Contact person:
Contact address:
239
Review of Architectural and Buildings StudiesTehnician Certificate Couraes
Mr G. LeDuff
Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: , 1/4 completed
Proposed completion date: December 1982
Remarks: Research report to be prepared. Aims:(1) to identify client group;(2) verify the education and training needs and
demands;(3) verify that the graduates from the two Certificate
Courses are suitably trained;(4) verify 'the quality of the educational programmes
of each course;(5) to make lerricllem changes on the basis of the
findings;(6) prepare full accreditation documentation.
SOUTH it.STRALLA
Reference number: 240
Project, title: Port Augusta College of Technical and FurtherEducation: An Educational Needs Analysis
Contact'person: Mr B.J. Nerd
Contact,address: Research BranchDepartment of Technical and Further Education31,Flinders StreetADELAIDE 5000
Pro 4e:et status: 3/4 completed
Proposed completion date: July 1982
Eltimated cost of proJect: $2,000 - $10,000
Rtmarks: To investigate the level and nature of need for furthereducation in the Port Augusta region includingindustry, commerce and the general population.
The present college faoilities are known to havedeficiencies and this study i3 aimed at providing acomprehensively researched data base for decisionmaking and possible deoign of new facilities. Accountis to be taken of other colleges in the Iron TriangleRegion and a variety of options will be examined.
Reference number: 241
Project title: Statewide Co-ordinators
Contact person: Roger Hatboro
Contact addreeo: SuperintendentCurriculum Development Branch \
Department of Technical and Furtper Education31 Flinders StreetADELAIDE 5000
Estimated cost of project: over $40,000
Remarks: Appointment of college staff to accept re ponsibilityfor curriculum development in specified are 3 of study.Equivalent to 6 people full time at deputy head/seniorlecturer level.
Reference number:
project title:
Contact person:
Contact address:
Project status:
242
Equal Opportunity-Disabled
Dick Willing
Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Planned
Estimated cost of project: $2,000 - $10,000
Remarks: Preparation of a bridging course to allow the dilahledto enter main stream TAFE courses. Priortty 4.
85
8,J
c::* I
,Reference number:
ProJeot title:
Contact person:
Contact address:
Project status: ,
SOUTH Atonal'.
243
Equal Opportunity - Multicultural
Diok Willing
Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Planned
Estimated cost of project: $2,000 - $10,000
Remarks: Development of acce.s courses for persons from non-English speaking backgrounds to enrol in mainstreamTAFE courses. Priority 4.
Reference number: 244
project title: Home Economics
Contact person: Dick Willing
Contact address: Curriculum Development Branch .Department of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: 3/4 completed
Estimated cost of project: $2,CJ0 - $10,000
Remarks: Development and review of courses. Preparation ofdocumentation for nee certificate.
Pojerrele
Contact person:
Contact address:
24c
Residential Care/Special Care
Dick Willing
Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Preject status: 1/4 completed
Proposed completion date: December 1982
Estimated cost of pro,lect: $2,000 - $10,000
Remarks:Wiedleneln&raen dCerT:teivf :awt e ol;riaoristayn 7 rkcionug r Z7t1;the Disabled Priority 1; Occupational TherapistsPriority 4; NCCC Child Care Priority 4.
Reference number:
Project title:
Contact person:
Conte:A addr,ns:
Proje_et status:
_
246
Hairdressing Project
Dick Willing
Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Planned
86
SOUTH AUSTRALIA
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Remarks: Revise basic trade curriculum and integrate with in-dustry. Raist, 'Log Book' for student/college/industry.Review advanced certificate. Priority 2.
Reference number: 247
Project title:
Contact persons:
Contact
,Travel and Tourism Course Review
David Furber; Lee Lechlietner
address: Head OfficeCurriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: Planned
Proposed completion date: June 1983
Estimated cost of project: $4,000
Remarks: To develop advanced modules/courier in Travel andTourism to meet the needs of-the industry (the traveloperations certificate recently underwent a majorreview). Priority 2.
Reference number:
Project title:
Contact person:
Contact address:
248
Clothing and Textiles Certificates
Dick Milling
Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: 1/4 completed
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Remarks: Revision and production of curriculum documentatton forTAFE 4 Awards; TAFE 3 Fashion and TAFE 3 Non-industrial; TAFE 2 Design, Construc,ion andMerchandising.
Head OfficeCurriculum Development BranchDepartment of Technical and Fucther Edu,1110n31 Flinders StreetADELAIDE 5000
Project status: 1/? completed
Proposed compLetion date: December 198
Eitimated cost of prplect: 41,000
879
SOUTH AUSTRALIA
Remarks: To develop, through consultation with colleges and the
rural community, revised procedures for the approval -accreditation of courses to meet the diverse needs offarmers.
Reference numbe:
Project title:
Contact person:
Contact address:
Frolect status:
250
National Core Curriculum - Timber Studies
Robert Hodge
Head OfficeCurriculum Development BranchDepartment of Technical ane Further Education31 Flinders StreetADELAIDE 5000
Planned
E.?timated cost of project: $5,000
Remarks: 1.
2.
Preparation of a proposal for the development of anational core cureiculum in Timber Studies.Involvement of State Repretentative on NationalTask Force. Priority 2.
Reference numbtr:
EIM29 z
Contact address:
251
Wool Courses Review
Robert Hodge
HeadNOfficeCurriculum Development BranchDepartment or Technical and Further Education31 Flinders StreetADELAIDE 5000
Proje.:t status: Planned
Pr922sed completion date: June 1983
Estimated cost of project: $4,500
kemarks: Review ,>f departmr...t's wool courses and developm-nt,where appropriate, or new courses to meet indu try
needs. Priority 2.
ft,frence number: 252
Proltrot title:
, Int AO t person:
att 3,1.1re?,n:
Horticulture (Amenity) Review
Robert Hodge
Head Officerurrt.hlum Development BranchDepartment of Technical and Further Education11 Flinders Street4DPLA1DE c(100
Planned
t'r I ,erp:et c i Op;
)fDecember 1082
$4,500
4,mtrkl: T vew tne current course offering in horticultureht.,1 of re,ent investigation into industry
Priority
88
Reference number:
EroAect title:
Contact person:
Contact address:
Project status:
Proposed completion
SMITH AUSTRALIA
253
Pastoral Studies Review
Robert Hodge
Head OfficeCurriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Planned
date: December 1982
Estimated cost of project: $4,750
Remarks: Development of certificate and other courses to meetthe needs of the industry. Proposed course structureshave been endorsed by the Rural Studies CurriculumCommittee. Development of course curricula isconditional on the appointment of a Rural Studies Co-ordinator at Port Augusta College of TAFE. Priority 2.
-
Reference number:
Project title:
Contact person:
Contact address:
-
254
Winery Cellar Procedures CertificateEvaluation
Robert Hodge
Head OfficeCurriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Estimated cost of project: $200
Remarks: To monitor and evaluate he presentation of the WtneryCellar procedures course at huriootpa. (This is a newcourse, recently approved, to meet the local needs ofthe Wine industry). Committed.
Reference number: 255
troj221 title: Mining Industry Courses - Review
Contact persons: David Furber; Bruce Brawny
Contact address: Head OfficeCurriculum Development BranchDepartment of Technical and Further Educ:tion31 Flinders StreetADELAIDE 5000
P12,1fel statql: Planned
Proposed cogpletion date: December 1982
Estimated cost of project: $4,000
Remarks: To develop a series of courses as a career pattern.Study programme in geology, surveying, drafting andisaooiated areas to meet the needs of the minintinduatry. Priority 2.
--------------
89
SOUTH AUSTRALIA
Reference number: 256
Project title: Maritime Studies
Contact person: J. McCarthy
Contact address: Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: Planned
proposed completion date: Edd 1982
Estimated cost of project: $3,000
Remarks: Develop content of Maritime Studies Programme.
Reference number: 257
prollst title: HCCC Automotive Mechanics
Contact persons: A.P. Pox; D. Furher
Contact address: O'Halloran Hill College of Technical andFurther EducationMajors RoadO'HALLORAN H/LL 5158
Project status: 1/4 completed
Proposed completion date: End 1982
Estimated cost of project: $1,500
Remarks: Development of NCCC for Automotive Mechanic B/TCourses.
Reference number:
Project title:
Contact persons:
Contact address:
Project status:
258
Panel Beating B/T
B. Chapman; J. McCarthy
Croydon Park College of Technical andFurther EducationGoodall AvenueCROYDON PARK 5008
1/4 completed
Proposed completion date:
Estimated cost of project:
End 1982
less than $2,000
Remarks: Development of modular course based uponTechnical College, Victoria, model.
Reference number:
Project title:
Contact person:
Contact address:
Richmond
259
Review of Automotive Trades Courses
A.P. Rhodes
Currkeuldm novolopment Branch -
0epartment of Technical and Further Education31 Flinder.) StreetADFLAIDE WY)
90
SOUTH AUSTRALIA
Proposed eompletion date: Mid 1983
Estimated coat of project: $9,000
Remarks: Investigation of a broad-based approach to tradecourses allied to Automotive Mechanics.
Reference number:
Project title:
Contact persona:
Contact address:
?mit* status:
260
Automotive Mechanic B/T
A. Fox; J. McCarthy
O'Halloran Hill College of Technical andFurther EducationMajors R)adO'HALLOhA HILL 5158
3/4 completed
Proposed completion date: End 1982
Estimated cost or project: $1,500
Remarks: Completion of materials and content development foradditional 80 hours.
Reference number: 261
Project title: Electronic B/T
Contact person: D. Murphy
Contact address: hegency Park Community CollegeCorner Regency Road & Days RoadREGENCY PARK 5010
Project status: 1/4 completed
Proposed completion date: Mid 1983
Estimated cost or project: $3,000
Remarks: Survey industry; develop content in lightPrepare documentation for accreditation.
Reference number: 262
Project title: Instrument Mechanic B/T
Contact amp: D. Biggs
.Contact address: Regency Park Community CollegeCorner Regency Road & Days Road.REGENCY PARK 5010
!!_r_o_11.q.1 112121: 1/2 completed
or survey.
Proposed completion date: End 1982
Est,mated cost or proJect: $600
Rem.Irkl: Develop content or BIT course. PreparA documentation.
91
SOUTH AUSTRALIA
Reference nemer: 263
Project title: HdCC Electrical B/T
Contact person: R.L. Windsor
Contact address: Regency Park Community CollegeCorner Regency Road and Days RoadREGENCY PARK 5010
Project status: 1/4 completed
Proposed completion date: End 1982
Eatimated cost of,proleet: $2,200
Remarks: Survey Electrical Industry in SA as part of NationalProject.
Reference number: 264
Project title: Refrigeration B/T
Contact person: A.P. Rhodes
Contact address: Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: 1/2 completed
Proposed completion date: End 1982
Estimated cost of project: $5,000
Remarks: Develop content; prepare documentation for approval andaccreditation.
Reference number:
Project title:
Contact persons:
Contact address:
265
Teehoological Change
J.McCarthy; C. Paton
Regency Park Community CollegeSchool of Mechanical EngineeringCorner Regency Road and Days RoadREGENCY yARK 5010
Proiect status: Planned
Est.mated cost of project: $2,800
qema,ks: Development of CAD/CAM materialEngineering Technical Courses.
f-"orerce number:
Project title:
Contact person:
Contac2t addmsa:
Project statul:
Proposed cospietion
for Mechanical
266
Pitting and Machining B/T
P. Ihtraond
Panorama Community CollegeSchool of Technical gtudies621 Goodwood RoadPANORAMA
1/4 completed
date: End 1982
N
tr(1
9 2
SOUTH ACISTRALIA
Estimated cost of project: less than $2,000
Remanks: Development of engineering drawingupon industry requirement.
component, based
Reference number: 267
Project title: NCCC Metal Fabrication
Contact persons': R. Kemp; J. McCarthy; D. Furber
Contact address: Elizabeth Community CollegeSchool of Technical StudiesWoodford RoadELIZABETH 5412
Project status: 1/2 completed
Proposed completion date: End 1982
Estimated cost of liroject: $1,500
Remarks: 4tve1opment of MCCC for Metal F:abricabion B/T course.
tReference nUmber:4 268
Project title:
Contact persons:
Contact address:
4
National Core Curriculum COmmittee,Sheetmetal
N. Fyffe; J. McCarthy; D. Furber
Regency Park Community CollegeSchool of PlumbingCorner Regency Road and Dam RoadREGENCY PARKe 5010
Project status: 1/2 completed.
Pr:oposed completion date: End 1982
Estimated cost of project: $1,500
Remailcs: Devolopmtnt,of Nationa'l Common Core Curriculum forSheetmstal B/T Courses.
Referenct number:
Project title:
Contact 'persons:
Contact address:
ZL9
Shectmetal Basic Trade
A.P. Rhoden; J. Corbett
A.P.4,Rhodes Curriculum Development BranchSouth Australian Department of Technical andFurther Education31 Flinders StreetADELAIDE 5000
J. CorbettRegency Park Community CrillegeSchool of PlumbingCorner Regency toad andREGENCY PARK 5010
Frojeot status:' 1/4 completed
Estimated cost of project: $2,500
Remark:: Preparation of resouf.ce materials.
.4
Days Road
ad
4,
Reference number:
Project titles'
, Contact person:
Contact address:
4roject status:
SWTH AUSTRALIA
270
National Core CUrriculum - Accounting MakForce
Colin Thorn
Training arid Development Centre46 Greenhill RoadWAYVILLE 5934
Planned '
Proposed completion date:
Estimated cost ef prOject:
'ReMarks: To enable Departmental lecturers in accounting toassist in the development of a national curriculum inaccounting.
June 1983
$1,000
Reference number: 271
Project title: National Core CurriculuM - National Standards
Contact person: Bob Williams
Contact address: Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
Project status: 3/4 completed
Proposed completion date: .31/12/82
Estimated cost of pgject:
Remarks:, To produce draft national standard in.the testing ofshorthand and typing speeds. Costs: travel/accommoda-tion. Committed.
$700
Reference number:
Project title:
Contact person:
Contact address:
Project-status:
272
National Core Curriculum - Business StudiesConsultative Committee
Colin Thorn
Training and Development Centre46 Greenhill ROPiWAYVILLE 5034, .
.Continuing
Proposed completion date:" Ongoing
Estimated cost of project: $1,000
Remarks: To act as State.,representative on a Natijnal Task Forceinvolved in the development of National Core CuOriculain the Business Studies area. Committed.
Reference number: 273
Project title: - National Core Curriculum Committee, Plumbing
Contact person$: Dr. 1); Atkinson; Poole
3 9 4
6
______7 Regdnoy Park Community CollegeSchool of PlumbingCorner Regency Road and Days RoadREOEHOls PARK 5010
Estithted cost of prolest:
Contact address:
eustagn
Reference number:
Project title:
Contact person:
Contact address:-
Project status:
Proposed completicn
274. .
Business Certificate Accounting Review
Bob Williaam
Curriculum Development BranchSouth Australian Department ofand Further Education31 Flinders StreetADELAIDE 5000 .
%
Technical
1/4 completed
date: 30/6/83
Estimated.cost of project: '$1,200
Remarks: To continue rewrite of Accounting Courses in the lightof review by B. Craig, National Core Curriculum andreview of Acoouhting Coursed by DIAE/ICTC workingparty. Committed.
Reference number:
Project title:
Contact persons:
Contact address:
Project status:
Estimated cost of
275
National Core Currieulua Building StudiesCossittee
J. McCarthy, V. Kangur
Curriculum DevAlopment Branch/South Australian Department ofand Further Education31 Flinders StreetADELAIDE 5000
Ongoing
project: $1,500
Technical
Remarks: Planning development of core curricula in BuildingStudies area.
Reference number:
Prolact title:
Con/act persons:
Contact addresses:
Prolect statusr
276
Revision of Boatbuilding B/T Course
V. Kangur; J. Antbonr
V. Kangur Curriculum Development BranchSouth Australian Department of Tecnnical'and Further Education31 Flinders StreetADELAIDE 5000
J. Anthony Marleston College of Technical -and ?Other Education .254 West Beach RoadMARLESTON 5033
J. McCarthy Curriculum Development BranchSouth Australian Department of Technicaland Further EducWon31 Flinders Stree5ADELAIDE 5000
.o.G. Sawyer Gilles Plains Community College.Blacks RoadGILLES PLAINS 5086
G. Leduff Research BranchSouth Australian Departmentand Further Education31 Flinders StreetADELAIDE 5000
1/2tompleted
proposed completion date: Mid 1983
Estimated'cost of project: $3,000
Remarks:
of Technical
Survey industry to determine relevance of Building TCand Architectural TC courses. Review existing coursesin the light of survey findings; prepare curriculumdocumentation for accreditation purposes.
Reference number:
Project title:
Contact person:
Contact address:
Project status:
278
Commercial Art
Dick Willing
Curriculum Developmedt-BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000
3/4 completed
Proposed cOmpletion date: December 1982
Esiimated cost of project: less than $2,000
Remarks: Development and review. PriO944' 1.
Reference number:
Project title:
Contact person:
Contact address:
Project status:
279
Protocols for C D
Dick Willing
Curriculum Development BranchDepartment of Technical and Farther31 Flinders StreetADELAIDE 5000
Planned
96
Education
SOUTH AUSTRALIA
4
Remarks: Conversion of the new c]ligfication project (TAFEC-
funded) to a book of protocols for thb Development,sofTAFE curricula.
Reference number:
ProSeot title:
Contact person:
Contact a4dress:
Projeot'status:
280
Deelared vocations yithout coursee
Jeanie Armitage
Curriculum Development BimnchSouth Australian Department of Technicaland Further Education31 Flinders StreetADELAIDE 5000
Planned
Estimated cost ofe,project:
iemarks:
leis than $2,000
To review existing basic trade courses to determinewhether selected units could be "repackaged" to provideappropr.iate courses for the declared vocations.
Reference number:
Project title:
Contact person:
Contdct address:
281'
Curriculum Delegations and
Alby Rhode3
Approvalik4c,
Curriculum Development BranchSouth Australian Department of Technicaland Further Education31 Flinders Street '
ADELAIDE 5000
project status: 1/4 completed
Estimated cost of project:
Remarks: Revise bbe delegaCions to head offiRe'and co llegeprincipals and staff ooncerning approval andaccreditation of courses.
less thak $2,000
Re:erence number:
Project title:
Contact person:
Contact address:
Project status:
282
Common firat.year automotive basic trade
Alby Rheees
Curriculum Development BranchSouth Aqstralian Department of Technicaland Further Education'31 Flinders StreetADELAIDE 5000
Planned
Estimated cost of prolect: les3 VI/in $2,000
Remarks: To determine the feasibility of havi!ngyear basic automotive course..
'
a common firsi
Refereuce number: 283
Project title: Credit Point Syetem
Contact person: David Furber
a
\
Contact address:, -Curriculum Development BranchSouth Australian Department of Technicaland Furthyr Education31 Flinders StreetADELAIDE 5000
Project status: 1/2 completed
.m.
Estimated
Remarks:
cost of projeck: less than $2,000
Establish a credit pqtnt system for all Onusualsubjects to enable fleklble approaches to structuringCourses.
Reference number: 284
Project title: Classification und Mornolature
Contact person: Reser Mathers -
Contact address: Curriculum Development_BranchDepartment of Technical and Further Education31 Rlinders Street ...
ADELAIDE 5000,
Project ateltul: 1/2 completed
Estimated cost of project,: ,6as than $2,000
Remarks: Establishment of a S.A. classification system forDeparpoental awards, and appropriate nomenclature foreach level of classification.
Reference number:
PrOject title:
Contact person:
Contact address:
Project statur.:
Estimated cgst of
Remarks:
285
Curriculum Documentation Guidelines
John Mitohdll
Curriculum Development BranchDepartment of Technical and Further Educafton31 Flinders StreetADELAIDE 5000
3%4 completed
prqject: less than $2,000
Development of standard format and procedures for allcurriculum documentation for- submission for approvaland accreditation.
.
Reference number:
Project title:
Contact 011122:
Contact address:
ProJect status:
286 $t*
Redocumentation of Departmental Awards
John Mitchell,
Curriculum Development BranchDepartment of Technical and Further ucation31 Flinders StreetADELAIDE 5000
1/4 completed
Proposed completion date: End of 1984
Estimated cost of project: $11,000 - $40,000
98
. b
-77
Remarks:
SOOTH tUSTAILLIA
00,
Preparation of a curricUlum document in standard formatfor all Departmental awards.
Reference number:
Projeot title:
Contaot person:
Contact address:
Project status:
ProPosed comabtion date:..
Estiaated cost of project: lase than $2,000
Remarks:' Preparation'of gufdes for use by ataff who are involgedin curriculum Asrojects. Essentially "how to db it"assistance.
Together with the local curriculum model, glosaary oftermA, description of curriculum! "products".
287
Curriculum guides '
John Mitchell
Curriodlum Development BrangDepartment of Tgnhnical and Furthsr Education '31 Flinders Street
$ ADELAIDE 5000
1/4 completed
End 1982
,
Reference number: 288
Project title: Aeoreditattom Board
".
Contact person: Roger Hathevs
Contact address: Curriculum Development BranchDepartment of Technical ahd FerthEducation31 Flinders StreetADEbAIDE 5000 ,
Project status: , Planned
Estimated cost of projeCt: $2,000 - $10,600
Remarksi Establishment of AccreAtation Board for acoreditatiohof Departmental awards.
S
t
d
6
4
,
%
9
-^.......n.
I.
/
,
1'
)
VI ORIA
1 Odi
I
,-,
or
.,... .
'or
N
e-
1.
I
..
t.
vo
..^1
.
V/CTORIA
Referenge nurbert
P;.oject title:
Contact person:
Contact address:
289
.' Set and Property Design yechngoianCertificate
G. SaiCh.
MeitOurtill College of Dectration>SW-Lt. Lonsdale Street
MELBOURNE 3000
Pi.o act status: Planned'
..
Pro osed Completion date: Unknown, still in the initialplanning stage
$2,00a - $10000 .Es(imated cost of projects°
Remarks: AIM: To train assistants,in Set & Property Dergn.MATERIALS: Still under investigation and wi I depend
.on industry needs.
Reference number:
Project titles'
Contact person:,
Contact address:
Project status:
290
Module rewrite: Signwriting
Brian O'Leary'
Melbourne College Of Decoratiai528 Lt. Lonsdale StreetMELBOURNE 3000
1/2 completed.
proposed completion date: 1983
Estimated cost of project: $11,000 - $40,000
Remarks: To produoe a aet of 24 modules and relesmnt supportmaterials aS teaching aids for the instruction ofSignwriting Apprentices.
abAudio/Visual material: Film, video and slide programs.
Approximately 1/2hour. A numher or A/xitems have.been and'are constantly beingproduced in relation to the trade
. t modules.
Reference number: 291
Project title& Module rewrite: Painting and Decorating
ConLet person: Robert Barden
Contact address: Melbourne College of Decoration528 Lt. Lonsdale StreetMELBOURNE 3000
Project status: 3/4 comiketed
Proposed completion date: 1983
Estimated cost of project: $11,006 - $40,000
Remarkh: To produce a set of 20 modules plus 9 electives 4ndrelevant support material for the instruction ofPainting & Decorating Apprentices.
a
Audio/visual material: Film, Video and'slide programme.'"Approximately 1/2 hour. A number of A/Vitems have been and are eonitantlyproduced in relation to th tr44P.modules.
Reference number:
Project title:
Contact person:
'Contact address:
Ploject seatus:
"^TICTORL1L
292
Literaoy, lumeracy and Apprentices.
Co-ordinator, Compensatory Education Otkit,Swinburne Technical College
Remarks: An on-going research program which examines issuesrelated to literacy and numeracy skills in tradeapprentices and instructional materials designed forthem. Findings of.the research are publishedperiodically in reports, conference papers and journalarticles. All documents are available from the contactperson listed above.
Reference number:
Project title:
Contact,persoo:
Contact address:
Project status:
Proposed, completion date$4 December 1982
Estimated cost of project: less than $2,000
Remarks: The project is intended to result in the pro uction ofa booklet containing notes, drawings references, etc.for use by students in mechanical design.
293
Development and compilation of gauge draftingnotes for students in cot mechanical design
Remarks: The pi'oject will result in the production of a newstudent workbook of approximately 200-pages. It willcontain--notes, glosbar9 'of terms, practice testquestions and exercises. The workbook will be trialledin 1983 and revised as necessary.
104
417
Reference number:
Project title:
Contact person:
Contact address:
Project status:
Proposed completion
VICTORIA
295
Analysis of visual teachinfiVlearning trendsat Swinburne Teohnical College
Remarks: A questionnaire was developed and utilized imorder tomeasure the opinions and knowledge of teaching staffabout the effectiveness and usefulness of Variousvisual instructional media, and about the nature oflearning fia visual information.
Based on the responses to this qbesteonnaire, a reportwili Oe prepared which identifies preferred visualmedia and indicates areas in which in-service trainingin visual technology and/or principLes of visuallearning and teacbing might be appropriate. .
Reference number: 296
Project title: Planning of new polar 4fiergy:techniciancourse
Contact person: Head of Departmea, Plumbing and MechanicalServices
o Remarks: This project will result in the production of teachingmaterials in solar energy. The materials will includeprint items (notes, references etc) and audio-visualitems (i.e. wall obarts, slides, video programs, OHPtransparencies, and colour photographic prints).
Audio/visUal material: Video (U-matic), slides (35mm), wallcharts, OHP transparencies.
Reference number:
Proiect title:
Contact pe'rson:
Contact address:
tE2..ta.
Proposed completion
Estimated cost of =jest:
297
Development of introductory courses egachool laboratory technicians
Remarks: This project will produce a task ana:ysis of thelaboratory. technician job, behavioural objectives foreach task and listings of content of topics. Alsosuggested learning activities and resources for eachobjective. The new course will be trialled andevaluated, and a report will be prepared. .
Reference number:
Project title:
Contact persons:
Contact address:
Project status:
298
OccUpationeh analysie of printing trades
I. Haysom, Head of Gtudy (Printing); F.'Wall, Executive Officer (Printing StandingCommittee)
Melbourne College of Printing and
CTICItii:egg:rry StreetNORTH MELBOURNE 3051
1/2 completed
Estimated cost of project: 13$2:700"- 1$91:2,000
Proposed completion date:
Remarks: To determine training needs of binding and finishing,to prodcce survey document, conduct survey and peesentreport.
Reference number:
?roject title:
299
Occupational Analysfa of Priniing4
Contact persons: I. Haysom; F. Wall
Contact address: Melbourne College of Printing andGraphic Arts603 Queensberry StreetNORTH MELBOURNE 3061
Project statils: 1/4 comp16ted-
Propose4 completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Trades
Remarks: To Oetermine training needs of graphic reproduction, toproduce s.urvey document, conduct survey and presentreport.
Reference nusiber:
Project title:4.
Contact persons:
Contact address:
Eriplest status:
300
Occupational AnalySia of Printigg Trades
I. Haysom; F. Wall
Melbourne College of Printing andGraphic Arts603 Queensberry StreetNORTH MELBOURNE 3051
1/4 completed
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Remarks: To determinr training needs of composing, to producesurvey locument, conduct survey'snd present report.
0.
3
106
L
VICTORIA
Reference number: 301
Project titAo: Occupational Analysia of Printing Trades
Contact persona: I. Raysoni F. lia4
Contact address: Melbourne College of Printing andGraphic Arts603 Queensberry StreetNORTH MELBOURNE 3051
Project status: 1/2 completed
Proposed completion date: December 1982
Estimated co8 4 of project.: $2,000 - $10,000
1 -
amarks: To latermine training needs of screen,printing, topro uce survey document, conduct surve, and presentreport.
Reference number:
Project title:
Contact persons:
Contact address:
Project status:
PropoAd completion
302
Mati-cultural task force
Iva Stepan, Hope Kynoch, Macre Swann, MikeBurp^
Moorabbin College of TAFEHerne CloseMOORABBIN 3189
1/4 completed
date: December 1982 - June 1983
Eatimated cost of project: $11,000 - $40,000
Remarks: 1. Access of more multi-cultural groupo into TAFCColleges and*Moorabbin in particular.2. Need for all teachers to develop strategies foreffective teaching in a polyethnic classroom withintheir own subjct areas.
1. A survey of students to determine factors leadingto success/failure of the students.2. Action based research Stream 1-63. Policy guidelines for 1983 and beyond.
Reference number:
Froject title:
Contact person:
Contact address:
Project status:
303
Self-paced learning programscate of Woolclassing
Peter /Wadden
Nangaratta College of TAFP 0 Box 237'NANGARATTA 3677
1/4 completed
fm, tte Certifi-
Proposed completion date: On-going
Estimated cost of project: over $40,000
Remarke: To initially produce supportive learning units, then toreview, rewrite and validate the matirials on anongoing basis. Overall, Nangaratta is worxing with thehead of study and project team to produce learningresources which will allow the oertificate ofwoolclassing to become fully self-paced in a few years.
107
VICTORIA
Audio/visual material: Medium and duration vary as demanded bythe topic. MG.dia may be slide/tape,audio tape, video, paper base, etc, butall requiring interactive responses.Self correcting where possible.
*Please note - at the moment materials are being trialled at 6pilot denttes and are not available on a state-wide basis tillevaluation is completed.
Reference number:
Project title:
Contact persons:
Contact address:
LE2j22/ status:
Proposed complet3cn
304
Needs of Disabled children
Graham Stevenson; Coralie Mathews
Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL
1/2 completed
date: December 1982
Estimated cost of project: $2,000 - $10,000
Remarks: To evaluate and analyse the needs and skills requiredin the care of children w!th disabilities (physical andmental). To implement a course for untraned workersin this field and parents of disabled children.
Reference number: 305
Project title: Self-paced Learning Programs for GarmentConatruction
Contact person: Helen Gardner
Contact address: Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL 3128
tElimi. status: Planned
Proposed completion date: December 1982
Estimated cost of project: $2,000 - $10,000
Remarks: To provide for individual students to progress at their:own rate in Garment Construction.
Reference number: °306
Project title:
Contact persons:
Contact address:
Project status:
Horse Husbandry Course
Peter Esdale; Frank Toman
Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL 3128
1/4 completed
proposed Completion date: December 1983
Estimated cost of project: $11,000 - $40,000
Remarks:, Development of a curriculum for a Horse HusbandryCourse to train people employed in horse husbandry. Todetermine the most appropriate method and length ofcourse.
t 108
Reference number: 307
Projectstitle: Needs of children in residential care
Contact perons: Mr Graham Stevenson; Mrs Coralie Mathews
Contact address: Whitehorse College of TAFE1000 Whftehor$e RoadBOX HILL 3128
prollet status: 1/2 completed
Proposed completion date: December 1982
Estimated cost of project: less than $2,000
Remarks: To assess, purchase and develop resource materials inorder that courses relating to residential child care,.can be expanded.
Reference number:
Projeet title:
Contact persons:
Contact address:
122J2.21 21422;
308
Survey of current and future needs of thefloristry industry
Kr Peter Coughlin; Mrs Lois Fraser
Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL 3128
1/4 completed
Proposed completion date: Deeember 1982.
Estimated cost of project: $2,600 - $10,000
Remarks: To survey the floristry indu-stry in orderprogress of the current course offered.
Reference number:
Project title:
Contact ptrson;:
Contact address:
Project stetus:
to evaluate
of a
309
Following a review in 1981, developmentnew course for library technicians
Graham Stevenson; Lois Ganderton
Whitehorse College of TAFE1000 Whitehorse-RoadBOX HILL 3128
1/2 completed
Proposed completion date: End of September 1982
Estimated cost of project: $11,000 - $40,000
Remarks: A new syllabus document will be the 'main outcome ofthis project.
Reference number:
Project title:
Contact persons:
Contact address:
310
Preparation of audio visual materials foranimal technicians and veterinary nursingcourses
John Nevada; Sue Lewis
Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL 3128
109
VICTORIA
Project status: 1/2 completed
Proposed completion date:
Estimated cost of project:
Remarks:
December 1982 (Submission for ron-tinuation.of project in 1983.
$2,000 -,$10,000
To investigate the A.V. , resourcek in similarinstitutions in Australia, U.K. and U.S.A., evaluatesome selectedaprogrammes and purchase the most suitablematerial.
To cataenue all A.V. resources already existing atWhitehorse College of TAPE.
Reference number: 311
Project title: Ibt" Farming Tsades
Contact person:
, Contact address:
Project status:
Andrew Dennis
McMillan RuralSoutK RoadWARRAGUL 3820
3/4 completed
- Course Design
Studies Centre
December 1982
$40,000
Remarks: of course documentation ready for trialling.Rev_sed course to be trialled in all centrei in 1983.Ful implementation proposed for 1984.
110
4
0
A
.A
.A.
A
A
"AAA
J. o
A
TAFE NATIONAL CENTRE. F 0 1
RESEARCH AND DEVELOPMENT4
113
Reference numbe'r:
Projeot title:
Contact person':
Contact adOrets:
Project status:
Proposed comPletion
TAPE NATIONAL CENTRE
312i- TNC: C3
Common Skills Occupational Education - Iasuea(previously known as Broad Based OccupationalEducation)
Dr. R.G. Schliling
TAPE National Centre for Researchand Development296 Payneham RoadPAYNEHAN 5070
1/4 completed
date:
EstimaLed cost or projeot:
Remarks:
January,1983
$11,0(10 - $40,000
To investigate the feasibility of developing andpresenting apprentioeship/trade education programsbased on skills that are common across (allied) trades.
will be given to two program levels:(1 Tre-vooational (trade based); and(2 Apprenticeship/trade.
Contact address: TAPE Nationa Centre for Researchand Development296 Payneham RoadPAYNEHAH 5070 or34 Gorge RoadBELLEVUE HEIGHTS 5050
Prolnt status: 3/4 comp16ted
,Proposed completion date: End Jtily
Estimated cost of mlest: $11,000 - $40,000*
geharks: To provide theory, access skills programme, staffdevelopment struotures, case studies, resource papers.
Reference number: 314; TNC: T6
Project title:1 Ouldelinea to Currioulum Writers
Contact personl' Bev Beasley
Contact address: TAPE HationalTentre for Researohand Development296 Payneham RoadPAYNEHAM 5070
Project status: Planned
Proposed completion date: End August
Estimated cost of projeot: less than $2,000
Remarks: To develop models of currioulum design, effectivewriting to an audience and implementation programme.
113
114
Reference number:
Project title:
Contact person:
Contact address:
Project statue':
TAFE NATIONAL CENTRE
315; TNC: C4
An Evaluation olt. the Development andImplementation of National Core Curricula inAustralian TAM.
Nail Jones
TAFE National Cent,e for Researchand Development296 Payneham RoadPAYNEHAM 5070
1/2 completed
Proposed completion date: January 1983
,Estimated cost of project: over $40,000
Remarks: To assess utility of future development of TAFENational Core Curricula (NCC).
To design a methodology for development and implementa-tion of NCC in Auatralian TAPE.
Reference number: 316; TNC: T6
Project title: 4 Trade Mathematics Rattan!,
Contact person: Roaemary Osman
Contact address: TAFE National Centre for Researchand Development296 Payneham Road*PAYNEHAM 5070
Project status: 3/4 completed
Proposed completion date: End 1982
Eaiimated cost of project: $11,000 - $40,000
Remarks: This*Oroject reviews recent research inte teaching andlearning mathemat4es with implications for TAFE. Onthe basis of the research findings, a report on theteaching and learning of trade mathematics has beenproduced. A series of videos which illustrate variousaspects raised in the report are currently beingdeveloped. This material and proposals for facilita-ting change will be diacussed at a nationalworkshop (sponsore d. by the TAPE National Centre) forTAFE teacher educators and staff development officers.
* Audio/visual material: Videos suitable for use in ataffdevelopment programmes on teaching trademathematics for conceptual understandingare being produced.
Reference number:
Project title:
Contaa persons:
Contaot address:
317
Glossary of term used in TAFE
Diana Meat and Graham Hermann
TAFE National Centresfor Researehan4 Development296 Payneham RoadPAYNEHAH 5070
Projeot status: 3/4 completed
Proposed completion date: 482
11 '611'4
orn
TAPE NATIONAL CEsTRE
stimated cost of project: /42,000 - $10,000
Remarks: The glossary of terms is being prepared for use in theAEC project invelving.,the development of a Thesaurus ofAustralian Educational Terms, and in National TAFSClearinghouse booklets.
Reference number:
Project title:
Contact person:
Contact address:
318; TNC: C1'
Analysis of relative awvantages of differentattendance patterns for ,trade preparation
Tim Padford
TAFE National Centre for,Reaeamphand Development296 Paypeham RoadPAYNENAM 5070
project statue: 1/2 completed
epropoled completion date: Jenuary-1983-
Estimated cost of projects . $11,000 - $40,000
Remarks: This project considers educational, industrial,economic, and social factors; teaching methodologies;and the possible roles of skill centres and of work
_experience in basic trade training..
115
a
4
AO 3 TR ALIAN CAPITAL TERRITORY*
A
AostEK1! CAPITAL TERRITORY
Reference number:. 319
Prolect title: , Dovelopsiont plan for ACT FUrther Education
Contact person: E H MeConchie
Project status: 3/4 completed
Proposed Completion date: Dec 1982
Reference number: 320
Project title: An investigation oL attrition rates incomputing stvdies at Cffnberra TAFE College
Contact person: Mt D Adams .
Froject status: 3/4 completed
Proposed completion date: End 1982
0
Reference number: 321
Project title: Streaming: a possrle expectation effect
Contact person: mr D AdamsA
Voject status: 3/4 completed
l'roposed'completion date: End 1982
Reference number: 322
Project title: Testing for streaming of secretarial studiesstudents: a factor analytical approach
Contact person: Dr R Lee
Project status: 2/3 completed
Proposed completion date: Early 1983
Reference number: 323
Project title: ACT Further Education graduates destinationssurvey
Contact person: Mr A H Vheoley
Project status: 1/8 completed
Proposed completion date: Feb 1983
se
AUTHOR Inn
The numbers liated are the project reference numbers
Computer Service Technology; 166Computing industry; 215Cooking Trades; 213Core curriculum see: Hatinal core curriculum, Common skillaCorrespondence study (see also: External study programs); 99Courae evaluation aee also: Course review and speoific subject
area 32, 33, 37, 42, 137,.178, 233-235, 254, 308Course review (acre also: Courpe evaluation and specific subject