Top Banner
Six Sigma Tool Prepared by: Salah A. Al- Muaini Submitted to: Dr. Nabil AlSawalhi November 2014
47

Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

Dec 22, 2015

Download

Documents

Roxanne Osborne
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

Six Sigma Tool

Prepared by: Salah A. Al-MuainiSubmitted to: Dr. Nabil AlSawalhi

November 2014

Page 2: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

2

Overview about Six Sigma

• Six Sigma methodology is a recent subject,It was first put into implementation at Motorola in 1986,but it's now widely used by most large corporations.

• Def: Six Sigma is a process quality technique that focuses on reducing variation in the process and preventing deficiencies in the product. In a process that has achieved Six Sigma capability, the variation is small compared to the specification limits.

• Six Sigma is a measurement of “goodness” using a universal measurement scale.

Page 3: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

3

Overview about Six Sigma

• Six Sigma means that, for a process to be capable at the Six Sigma level, the specification limits should be at least 6σ from the average point. So, the total spread between the upper specification (control) limit and the lower specification (control) limit should be 12σ.

• Sigma is measured in defects per million opportunities (DPMO).

Page 4: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

4

Overview about Six Sigma

The distribution of data when using Six sigma can be illustrated in the following figure;

Figure 1.

Page 5: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

5

Overview about Six SigmaYield = percentage of items

without defects (%)Defects per million

opportunitiesSigmalevel

30.9 690,000 169.2 308,000 293.3 66,800 399.4 6,210 4

99.98 320 599.9997 3.4 6

To reach a level of Three Sigma, you can only have 66,811 defects, given a million opportunities. A level of Five Sigma only allows 233 defects. Minimizing variation is a key focus of Six Sigma.

Page 6: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

6

Overview about Six Sigma

• The most critical issue in Six Sigma is to understand customer’s needs and requirements and to improve customer’s satisfaction.

• Six Sigma uses the concept of facts and data to drive better solutions.

• Six Sigma methodology also focuses on- Leadership principles- Integrated approach to improvement- Engaged teams- Analytic tool- Hard-coded improvements

Page 7: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

7

Six Sigma roadmap

Six Sigma roadmap can be illustrated in Figure

Figure 1. Six Sigma roadmap

Page 8: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

8

Leadership principals

The Six Sigma methodology has four leadership principles. These are: 1. Align: Leadership should ensure that all improvement

projects are in line with the organization’s strategic goals.2. Mobilize: Leadership should enable teams to take action by providing clear direction, feasible scope, a definition of success, and rigorous reviews.3. Accelerate: Leadership should drive a project to rapid

results through tight clock management, training as needed, and shorter deadlines.

Page 9: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

9

Leadership principals

4. Govern: Leadership must visibly sponsor projects and conduct regular and rigorous reviews to make

critical midcourse corrections.

Page 10: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

10

Six Sigma team

There are four types of teams:1. Black Belt2. Green Belt3. Breakthrough4. Blitz

Each of the four teams’ characteristics and responsibilities will be demonstrated.

Page 11: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

11

Six Sigma team

1- Black Belt team: Black Belts are internal Six Sigma practitioners, skilled in the application of rigorous statistical methodologies, and they are crucial to the success of Six Sigma.

The responsibilities of Black Belts are to:- Function as Team Leader on Black Belt projects- Integrate their functional discipline with statistical, project, and interpersonal skills- Serve as internal consultants- Tackle complex, high-impact improvement opportunities- Mentor and train Green Belts

Page 12: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

12

Six Sigma team

2- Green Belt team: Led by a Green Belt and comprised of nonexperts, Green Belt teams tackle less complex, high-impact process improvement projects.

Green Belt responsibilities include- Acting as Team Leader on business improvements requiring less complex analysis- Adding their unique skills and experiences to the team- Working with the team to come up with inventive solutions- Performing basic statistical analysis- Conferring with a Black Belt as questions arise

Page 13: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

13

Six Sigma team

3- Breakthrough team: While creating simple processes, sophisticated statistical tools may not be needed. Breakthrough teams are typically used to define low-complexity, new processes.

4- Blitz team:Blitz teams are put in place to quickly execute improvements produced by other projects. These teams can also implement digitization for efficiency using a new analytic tool set.

Page 14: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

14

Six Sigma team

For a typical Six Sigma project, four critical roles exist:1. Sponsor2. Champion3. Team Leader4. Team member

Page 15: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

15

Analytical tool sets

The following are the analytic tools used in Six Sigma projects:1- Ford Global 8D Tool,2- DMADV Tool,3- DMAIC Tool,4- DMADDD Tool.

Page 16: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

16

Analytical tool sets

1- Ford Global 8D Tool:D1: Establish the teamD2: Describe the problem → What Problem Needs Solving?

Who should help solve problem?

How do we quantify symptoms?D3: Implement and verify containment → How do we contain it?D4: Identify and verify root causes → What is the root cause?D5: Choose and verify corrective action → What is the permanent corrective action?

Page 17: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

17

Analytical tool sets

D6: Implement and validate permanent corrective action → How do we implement?D7: Prevent recurrence → How can we prevent this in future?D8: Congratulate the team → Who should we reward?

The Ford Global 8D Tool is primarily used to bring performance back to a previous level.

Page 18: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

18

Analytical tool sets

2- DMADV Tool 1- Define—What is important?

Define the project goals and customer deliverables (internal and external)2. Measure—What is needed?

Measure and determine customer needs and specifications3. Analyze—How will we fulfill?

Analyze process options and prioritize based on capabilities to satisfy customer requirements

Page 19: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

19

Analytical tool sets

4. Design—How do we build it? Design detailed processes capable of

satisfying customer requirements5. Verify—How do we know it will work?

Verify design performance capability

The DMADV tool is used primarily for the invention and innovation of modified or new products, services, or process.

Page 20: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

20

Analytical tool sets

3- DMAIC Tool1- Define—What is important?

Define the project goals and customer deliverables (internal and external)2- Measure—How are we doing?

Measure the process to determine current performance3- Analyze—What is wrong?

Analyze and determine the root causes of the defects

Page 21: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

21

Analytical tool sets

4. Improve—What needs to be done?Improve the process by permanently removing

the defects5. Control—How do we guarantee performance?

Control the improved process’s performance to ensure sustainable results

The DMAIC tool refers to a data-driven quality strategy and is used primarily for improvement of an existing product, service, or process.

Page 22: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

22

Analytical tool sets

4- DMADDD tool:1- Define—Where must we be learner?

Identify potential improvements2- Measure—What’s our baseline? Analog touch points3- Analyze—Where can we free capacity and improve yields?

Task elimination and consolidated ops Value-added /non-value-added tasks

Free capacity and yield

Page 23: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

23

Analytical tool sets

4- Design—How should we implement?Future state visionDefine specific projectsDefine drawdown timingDefine commercialization plans

5- Drawdown—How do we eliminate parallel paths?Commercialize new processEliminate parallel path

The DMADDD tool is primarily used to drive the cost out of a process by incorporating digitization improvements.

Page 24: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

24

Analytical tool sets The DMAIC process

DMAIC stands for the following:1- Define opportunities2- Measure performance3- Analyze opportunity4- Improve performance5- Control performance

Page 25: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

25

Analytical tool sets The DMAIC process

1- Define opportunities (what is important?)The objective of this phase is - To identify and/or validate the improvement opportunities that will achieve the organization’s goals and provide the largest payoff, develop the business process, define critical customer requirements, and prepare to

function as an effective project team.

Page 26: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

26

Analytical tool sets The DMAIC process

2- Measure Performance (How Are We Doing?)The objectives of this phase are- To identify critical measures that are necessary to evaluate success or failure, meet critical customer requirements, and begin developing a methodology to effectively collect data to measure process performance.- To understand the elements of the Six Sigma calculation and establish baseline sigma for the processes the team is analyzing

Page 27: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

27

Analytical tool sets The DMAIC process

Analytical tools used in measure phase: Histogram;

Page 28: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

28

Analytical tool sets The DMAIC process

Run Charts;

Page 29: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

29

Analytical tool sets The DMAIC process

Scatter Diagrams;

Page 30: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

30

Analytical tool sets The DMAIC process

Cause-and-effect Diagram;

Page 31: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

31

Analytical tool sets The DMAIC process

3- Analyze Opportunity (What Is Wrong?)The objectives of this phase are-To stratify and analyze the opportunity to identify a specific problem and define an easily understood problem statement.- To identify and validate the root causes and thus the problem the team is focused on.- To determine true sources of variation and potential failure modes that lead to customer dissatisfaction.

Page 32: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

32

Analytical tool sets The DMAIC process

Tools used in analyzing phase;- Correlation Coefficient- Regression Analysis

Page 33: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

33

Analytical tool sets The DMAIC process

4- Improve Performance (What Needs to Be Done?)The objectives of this phase are- To identify, evaluate, and select the right improvement solutions- To develop a change management approach

to assist the organization in adapting to the changes introduced through solution implementation

Page 34: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

34

Analytical tool sets The DMAIC process

5- Control Performance (How Do We Guarantee Performance?)The objectives of this phase are- To understand the importance of planning and executing against the plan and determine the approach to be taken to ensure achievement of the targeted results- To understand how to disseminate lessons learned, identify replication and standardization opportunities/processes, and develop related plans

Page 35: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

35

Analytical tool sets The DMAIC process

Gantt Chart method can be used in control phase;

Page 36: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

36

Applications of Six Sigma in construction

The Six Sigma methodology is not so commonly used in construction projects; however the DMAIC tool can be applied at various stages in construction projects. These are

1. Detailed design stage: To enhance coordination method in order to reduce repetitive work.

2. Construction stage: Preparation of builder’s workshop drawings and composite drawings, as it needs much coordination among different trades

3. Construction stage: Preparation of contractor’s construction schedule

4. Execution of works

Page 37: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

37

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

• The contractor’s construction schedule (CCS) is an important document used during the construction phase.

• In most cases, contractors experience problems with getting the CCS approved, at the very first submission, from the construction manager/project manager / consultant. It could be rejected if it does not meet the specifications.

Page 38: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

38

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

The DMADV Process:1. Define—What is important?

The objective of this phase is to define the project goals and customer deliverables.The key deliverables of this phase are:

- Establish the goal: Develop CCS using Six Sigma tools.

- Identify the benefits: CCS that meet all the requirements of the

specifications and approved by the construction manager/project manager/ consultant.

Page 39: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

39

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

- Selection of team: Sponsor - Project ManagerChampion - Construction ManagerTeam Leader - Planning and Control ManagerTeam Members - Planning Engineer, Cost

Engineer, and one representative from each subcontractor

Page 40: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

40

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

- Develop project plan:Time frame in the form of the

Gantt chart shall be prepared to meet the target dates for submitting the contractor’s construction schedule (CCS).

Page 41: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

41

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

2. Measure Phase (What Is Needed?)The objective of this phase is to measure and determine customer needs and specifications

The key deliverable in this phase is: -Identify specification requirements.The schedule shall include, but not be limited to, the following:

1. Project site layout.2. Concise description of the work.3. Milestones (contractual milestones or constraints).4. Number of working days.….. Etc.

Page 42: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

42

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

3- Analyze Phase (How Will We Fulfill?)The objective of this phase is to analyze process options and prioritize based on capability to satisfy customer requirements.

The key deliverables in this phase are- Data collection- Prioritization of data under major variables

Page 43: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

43

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

- Data collection: the objective of this process is to:1. Identify milestone dates and constraints2. Identify project calendar3. Identify resource calendar4. Review contract conditions and technical specifications5. Identify mobilization requirements

…… etc.

Page 44: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

44

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

- Prioritization of data under major variables (arrangement of data):The generated data can be prioritized in an orderlyarrangement under the following major variables:1. Milestones2. WBS activities3. Time schedule4. General requirements5. Resources6. Engineering7. Cost loading

Page 45: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

45

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

4- Design Phase (How Do We Build It?)The objective of this phase is to design detailed processes capable of satisfying customer requirements.

The key deliverable in this phase is:- Preparation of program using suitable (specified) software program

The Project and Control Manager can prepare the CCS based on the collected data and sequence of activities.

Page 46: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.

46

Six Sigma (DMADV tool) example;Contractor’s Construction Schedule (CCS)

5- Verify Phase (How Do We Know It Will Work?)The objective of this phase is to verify design performance capability

The key deliverables in this phase are- Review the schedule by the team members to ascertain that all the required elements are included

for compliance with specification requirements.- Submit CCS to Construction Manager/Project Manager/Consultant. - Update the schedule as and when required.

Page 47: Six Sigma Tool Prepared by: Salah A. Al-Muaini Submitted to: Dr. Nabil AlSawalhi November 2014.