    Six month In plant Training ProgramSix month In plant Training ProgramPresented by KaveendraWijesundara

  • 8/3/2019 Six Month in Plant Training Programme 1

    2/22

    About CompanyAbout Company

    Omega Lines is a leading company in Sri Lanka in

    the garment industry.

    It was started in 1999.

    Recently the company won a prestigious award as

    exporters of the year.

    The two factories at Sandalankawa have employees

    well over 2,000 workers.

  • 8/3/2019 Six Month in Plant Training Programme 1

    3/22

    Organization Hierarchy...

    Organization Hierarchy...

    y The Organization structure is flat and hasonly 3 levels.

    x First level comprises the Managing Director,Productionmanager, Director of Finance and the

    General Manager Human Resources.

    x The second level represents the section heads.

    x The third level comprises the workers.

  • 8/3/2019 Six Month in Plant Training Programme 1

    4/22

    IntroductionIntroduction

    y During my training program I have learnedabout the main departments in the company.

    y These departments are linked together like achain.

    Stores

    Inspection

    Planning

    WorkStudyCutting

    Production

    Audit

  • 8/3/2019 Six Month in Plant Training Programme 1

    5/22

    IntroductionIntroduction contdcontd

    y Among of these departments Production floor is

    the most valuable department of the company.

    y Because of we can measure the company strengthanalyzing the production floor.

    y So Strength of the company measured by

    xOverall efficiency of the production floor.

    x Cost per minute.

    x Capacity of the production floor.

  • 8/3/2019 Six Month in Plant Training Programme 1

    6/22

    What isWork study?What isWork study?

    y It is that body of knowledge concerned

    with the analysis of the workmethods and

    the equipment used in performing a job, the

    design of an optimum work method and

    the standardization of proposed work

    methods.

  • 8/3/2019 Six Month in Plant Training Programme 1

    7/22

    Basic work study procedureBasic work study procedure

    Select the job or process or the operationto be studied.

    Record all relevant facts about the job orprocess or operation.

    Examine critically all the recorded facts. Develop the new method. Measure the work content and establish

    the standard time. Define the new method. Install the new method. Maintain the new method.

  • 8/3/2019 Six Month in Plant Training Programme 1

    8/22

    ExampleExample

    First balancing,Production per hour : 22pcs

    Efficiency : 69%

    Style No : CLD944

    Module :17-B

    Date : 2011/12/08

    GSD SMV : 20.830

    Module SMV : 35.741

    Time Achievement : 58.28%

    Time Achievement :: GSD TIMEGSD TIME * 100* 100SMVSMV

    EMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME ACHEIVEMENT

    AS %

    01

    S\R on front piping 1.378 0.664 48.19

    Gathering bottom part 0.948 0.944 99.58

    Join bottom part 2.212 0.862 38.97

    02 Join bottom part 2.386 0.862 36.13O\L bottom part 1.370 0.814 59.42

    03

    O\L bottom part 1.165 0.814 69.87

    S\R on bottom ruches 1.590 1.020 64.15

    Attach sleeve edge elastic 0.622 0.439 70.58

    04Sleeve attach 1.918 0.937 48.85

    O\L sleeve 1.290 0.623 48.29

    05O\L sleeve 1.230 0.623 50.65

    O\L side seam 2.177 1.097 50.39

    06

    O\L Hem & Sleeve edge 1.465 0.905 61.77

    Attach thread elastic 0.596 0.301 50.50

    Attach collar 1.250 0.513 41.04

    07

    Attach collar 1.067 0.513 48.08

    O\L collar seam 0.219 0.299 136.53

    Close collar 2.367 1.849 78.12

    08

    Close collar 2.227 1.849 83.03

    Mark & Tack label 0.371 0.205 55.26

    Mark *03 point 0.250 0.143 57.20

    Button attach *04 1.153 0.536 46.49

    09

    Trimming 1.185 1.095 92.41

    Ironing 1.225 1.200 97.96

    Packing 1.231 0.388 31.52

    10 Trimming 1.185 0.000 0.00

    11Packing 0.826 0.388 46.97

    Checking 2.023 1.040 51.41

  • 8/3/2019 Six Month in Plant Training Programme 1

    9/22

    ExampleExample contdcontd

    Re balancing,Production per hour : 25pcs

    Efficiency : 79%

    Style No : CLD944

    Module :17-BDate : 2011/12/16

    GSD SMV : 20.830

    Module SMV : 34.717

    Time Achievement : 60%

    Time Achievement :: GSD TIMEGSD TIME *100*100SMVSMV

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME

    ACHEIVEMENT

    AS %

    VARIATION

    01

    S\R on front piping 0.664 1.125 59.02 10.84

    Gathering bottom part 0.944 0.825 114.42 14.85

    Join bottom part 0.862 1.910 45.13 6.16

    02Join bottom part 0.862 2.063 41.78 5.66

    O\L bottom part 0.814 1.150 70.78 11.37

    03

    O\L bottom part 0.814 1.015 80.20 10.33

    S\R on bottom ruches 1.020 1.478 69.01 4.86

    Attach sleeve edge ela. 0.439 0.532 82.52 11.94

    04

    Attach sleeve edge ela. 0.439 0.496 88.51 0.00

    Sleeve attach 0.937 1.778 52.70 3.85

    O\L sleeve 0.623 1.211 51.45 3.15

    05 O\L sleeve 0.623 1.152 54.08 3.43O\L side seam 1.097 2.088 52.54 2.15

    06

    O\L side seam 1.097 2.231 49.17 0.00

    O\L Hem & Sleeve edge 0.905 1.312 68.98 7.20

    Attach thread elastic 0.301 0.532 56.58 6.08

    Attach collar 0.513 0.000 0.00 0.00

    07

    Attach thread elastic 0.301 0.453 66.45 0.00

    Attach collar 0.513 0.971 52.83 4.75

    O\L collar seam 0.299 0.194 154.12 17.59

    Close collar 1.849 2.264 81.67 3.55

    08

    Close collar 1.849 2.197 84.16 1.13

    Mark & Tack lable 0.205 0.343 59.77 4.51

    Mark *03 point 0.143 0.214 66.82 9.62

    Button attach *04 0.536 1.108 48.38 1.89

    09

    Button attach *04 0.536 0.713 75.18 0.00

    Ironing 1.200 1.162 103.27 5.31

    Packing 0.388 0.791 49.05 17.53

    10 Trimming 1.185 1.585 74.76 0.00

    11Packing 0.388 0.00 0.00

    Checking 1.040 1.824 57.02 5.61

  • 8/3/2019 Six Month in Plant Training Programme 1

    10/22

    ExampleExample contdcontdOPERATOR 01

    First Balance Re BalanceEMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME ACHEIVEMENT

    AS %

    01

    S\R on front piping 1.378 0.664 48.19

    Gathering bottom part 0.948 0.944 99.58

    Join bottom part 2.212 0.862 38.97

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME ACHEIVEMENT

    AS %

    01

    S\R on front piping 0.664 1.125 59.02

    Gathering bottom part 0.944 0.825 114.42

    Join bottom part 0.862 1.910 45.13

    48.19

    99.58

    38.97

    59.02

    114.42

    45.13

    0

    20

    40

    60

    80

    100

    120

    S\R on frontpiping

    Gatheringbottompart

    Join bottompart

    First Balance

    Re Balace

    IMPROVEMENT

    %

    10.84

    14.85

    6.16

    Reduce no of burst .Attach gauges.

    Motivate the operator.

  • 8/3/2019 Six Month in Plant Training Programme 1

    11/22

    OPERATOR 02

    First Balance Re Balance

    Example contd

    EMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME ACHEIVEMENT AS

    %

    02Join bottom part 2.386 0.862 36.13

    O\L bottom part 1.370 0.814 59.42

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME ACHEIVEMENT

    AS %

    02Join bottom part 0.862 2.063 41.78

    O\L bottom part 0.814 1.150 70.78

    36.13

    59.42

    41.78

    70.78

    0

    20

    40

    60

    80

    100

    Join bottompart O\L bottompart

    First Balance

    Re Balace

    IMPROVEMENT

    %

    5.66

    11.37

    Reduce no of burst .Attach gauges.

    Motivate the operator.Attach air pressure.

  • 8/3/2019 Six Month in Plant Training Programme 1

    12/22

    Example contdOPERATOR 03

    First Balance Re BalanceEMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME

    ACHEIVEMENT

    AS %

    03

    O\L bottom part 1.165 0.814 69.87

    S\R on bottom ruches 1.590 1.020 64.15

    Attach sleeve edge elastic 0.622 0.439 70.58

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME

    ACHEIVEMENT

    AS %

    03

    O\L bottom part 0.814 1.015 80.20

    S\R on bottom ruches 1.020 1.478 69.01

    Attach sleeve edge elastic 0.439 0.532 82.52

    69.8764.15

    70.58

    80.2

    69.01

    82.52

    0

    20

    40

    60

    80

    100

    O\L bottompart

    S\R on bottomruches

    Attach sleeveedge elastic

    First Balance

    Re Balace

    IMPROVEMENT

    %

    10.33

    4.86

    11.94

    Reduce no of burst .Attach gauges.

    Motivate the operator.Attach air pressure.

  • 8/3/2019 Six Month in Plant Training Programme 1

    13/22

    Example contdOPERATOR 04

    First Balance Re BalanceEMPNO

    DESCRIPTION SMVGSD

    TIME

    TIME ACHEIVEMENT

    AS %

    04

    Attach sleeve edge ela. 0.439 0.000 0.00

    Sleeve attach 1.918 0.937 48.85

    O\L sleeve 1.290 0.623 48.29

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME ACHEIVEMENT

    AS %

    04

    Attach sleeve edge ela. 0.439 0.496 88.51

    Sleeve attach 0.937 1.778 52.70

    O\L sleeve 0.623 1.211 51.45

    48.85 48.29

    88.51

    52.7 51.45

    0

    20

    40

    60

    80

    100

    Attach sleeveedge ela.

    Sleeve attach O\L sleeve

    First Balance

    Re Balace

    Reduce no of burst .Motivate the operator.

    Attach side bars.

    IMPROVEMENT

    %

    0.00

    3.85

    3.15

  • 8/3/2019 Six Month in Plant Training Programme 1

    14/22

    Example contdOPERATOR 05

    First Balance Re BalanceEMPNO

    DESCRIPTION SMVGSD

    TIME

    TIME ACHEIVEMENT

    AS %

    05O\L sleeve 1.230 0.623 50.65

    O\L side seam 2.177 1.097 50.39

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME ACHEIVEMENT AS

    %

    05O\L sleeve 0.623 1.152 54.08

    O\L side seam 1.097 2.088 52.54

    Reduce no of burst .Motivate the operator.

    IMPROVEMENT

    %

    3.43

    2.15

    50.65 50.3954.08 52.54

    0

    20

    40

    60

    80

    100

    O\L sleeve O\L side seam

    First Balance

    Re Balace

  • 8/3/2019 Six Month in Plant Training Programme 1

    15/22

    Example contdOPERATOR 06

    First Balance Re BalanceEMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME

    ACHEIVEMENT

    AS %

    06

    O\L side seam 1.097 2.231 0.00

    O\L Hem & Sleeve edge 1.465 0.905 61.77

    Attach thread elastic 0.596 0.301 50.50

    Attach collar 1.250 0.513 41.04

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME

    ACHEIVEMENT

    AS %

    06

    O\L side seam 1.097 2.231 49.17

    O\L Hem & Sleeve edge 0.905 1.312 68.98

    Attach thread elastic 0.301 0.532 56.58

    Attach collar 0.513 0.000 0.00

    61.77

    50.5

    41.0449.17

    68.98

    56.58

    0

    20

    40

    60

    80

    100

    O\L sideseam

    O\L Hem& Sleeve

    edge

    Attachthreadelastic

    Attachcollar

    First Balance

    Re Balace

    Reduce no of burst .Motivate the operator.

    IMPROVEMENT

    %

    0.00

    7.20

    6.08

    0.00

  • 8/3/2019 Six Month in Plant Training Programme 1

    16/22

    Example contdOPERATOR 07

    First Balance Re BalanceEMPNO

    DESCRIPTION SMVGSD

    TIME

    TIME ACHEIVEMENT

    AS %

    Attach thread elastic 0.000 0.453 0.00

    07

    Attach collar 1.067 0.513 48.08

    O\L collar seam 0.219 0.299 136.53

    Close collar 2.367 1.849 78.12

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME ACHEIVEMENT

    AS %

    07

    Attach thread elastic 0.301 0.453 66.45

    Attach collar 0.513 0.971 52.83

    O\L collar seam 0.299 0.194 154.12

    Close collar 1.849 2.264 81.67

    48.08

    136.53

    78.1266.45

    52.83

    154.12

    81.67

    02040

    6080

    100120140160

    Attachthreadelastic

    Attachcollar

    O\L collarseam

    Closecollar

    First Balance

    Re Balace

    Reduce no of burst .Motivate the operator.

    IMPROVEMENT

    %

    0.00

    4.75

    17.59

    3.55

  • 8/3/2019 Six Month in Plant Training Programme 1

    17/22

    Example contdOPERATOR 08

    First Balance Re BalanceEMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME

    ACHEIVEMENT

    AS %

    08

    Close collar 2.227 1.849 83.03

    Mark & Tack label 0.371 0.205 55.26

    Mark *03 point 0.250 0.143 57.20

    Button attach *04 1.153 0.536 46.49

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME

    ACHEIVEMENT

    AS %

    08

    Close collar 1.849 2.197 84.16

    Mark & Tack lable 0.205 0.343 59.77

    Mark *03 point 0.143 0.214 66.82

    Button attach *04 0.536 1.108 48.38

    83.03

    55.26 57.2

    46.49

    84.16

    59.7766.82

    48.38

    0

    20

    40

    60

    80

    100120

    Closecollar

    Mark &Tack label

    Mark *03point

    Buttonattach *04

    First Balance

    Re Balace

    Reduce no of burst .Motivate the operator.

    IMPROVEMENT

    %

    1.13

    4.51

    9.62

    1.89

  • 8/3/2019 Six Month in Plant Training Programme 1

    18/22

    Example contdOPERATOR 09

    First Balance Re BalanceEMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME

    ACHEIVEMENT

    AS %

    09

    Trimming 1.185 1.095 92.41

    Ironing 1.225 1.200 97.96

    Packing 1.231 0.388 31.52

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME

    ACHEIVEMENT

    AS %

    09

    Button attach *04 0.536 0.713 75.18

    Ironing 1.200 1.162 103.27

    Packing 0.388 0.791 49.05

    92.4197.96

    31.52

    103.27

    49.05

    75.18

    0

    20

    40

    60

    80

    100120

    Trimming Ironing Packing Buttonattach *04

    First Balance

    Re Balace

    Motivate the operator.

    IMPROVEMENT

    %

    0.00

    5.31

    17.53

    0.00

  • 8/3/2019 Six Month in Plant Training Programme 1

    19/22

    Example contdOPERATOR 10

    First Balance Re BalanceEMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME

    ACHEIVEMENT

    AS %

    10 Trimming 0.000 1.585 0.00

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME

    ACHEIVEMENT

    AS %

    10 Trimming 1.185 1.585 74.76

    74.76

    0

    20

    40

    60

    80

    100

    120

    Trimming

    First Balance

    Re Balace

    Motivate the operator.

    IMPROVEMENT

    %

    0.00

  • 8/3/2019 Six Month in Plant Training Programme 1

    20/22

    Example contdOPERATOR 11

    First Balance Re BalanceEMP

    NODESCRIPTION SMV

    GSD

    TIME

    TIME

    ACHEIVEMENT

    AS %

    11Packing 0.826 0.388 46.97

    Checking 2.023 1.040 51.41

    EMP

    NODESCRIPTION

    GSD

    TIMESMV

    TIME

    ACHEIVEMENT

    AS %

    11Packing 0.388 0.00

    Checking 1.040 1.824 57.02

    46.9751.41

    57.02

    0

    20

    40

    60

    80

    100

    120

    Packing Checking

    First Balance

    Re Balace

    Motivate the operator.

    IMPROVEMENT

    %

    0.00

    5.61

  • 8/3/2019 Six Month in Plant Training Programme 1

    21/22

    Summary of TrainingSummary of Training

    y List important points from each lesson.y Provide resources for more information

    about the subject.

    List resources on this slide. Provide handouts with additional resourcematerial.

  • 8/3/2019 Six Month in Plant Training Programme 1

    22/22

    Assessment and EvaluationAssessment and Evaluation

    y Prepare a quiz or challenge to assess howmuch information participants learned.

    y Survey participants to see if they foundthe training beneficial.