BUS STOP BUS STOP Tick et Ticket Ticket Tick et Tick et Entrance Car Park Access Site Entrance Existing Foot Bridge Future Pedestrian Foot Bridge Pedestrian Foot Bridge to Central Park Fire Exit Fire Exit New Bus Stop Existing Stairs 2000x600 Feeder Pillar Existing retaining wall partially demolished - path widened to 3 meters with dawrf wall built alongside with reused stone Refer to DRW 90030 Fire Appliance Point Location of plant within acoustic timber fenced enclosure Existing paving to be Retained Existing landscaping to be retained (area TBC by further site investigation) Maintenance Strip Maintenance Access Fire Tender and Service Access Only Fire Appliance Point Loading Bay Drop Off / Coach Replacement Planting Bed Crossing 800mm Maintenance Strip 800mm Maintenance Strip Area for detention basin and below ground cellular attenuation Tank Railing to edge of escape ramps Railing to edge of path 1:25 49050 48100 1:25 48250 1500mm PPC steel railings and gate to network rail expansion land Highways works by Darlington Borough Council Highways works by Darlington Borough Council Highways works by Darlington Borough Council Extent of works to this area in abeyance, existing parking surface to be retained 5 4 3 2 1 Retractable Security Bollards Area for below ground cellular attenuation Tank Open cycle storage 24x bikes Enclosed cycle storage 26x bikes Enclosed Bin Store Security Bollards Fire Exit Security Bollards Public Art (by others) on plinth integrated into raised planter Raised planter and vehicle protection Raised planter and vehicle protection Rotunda Entrance Drop Off Drop Off Planting Bed Planting Bed Planting Bed Planting Bed Planting Bed Primary Entrance 23 22 21 20 19 18 17 16 15 14 13 1 2 3 4 5 6 7 8 9 10 11 12 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6 B7 D3 D2 D1 A4.1 Post mounted Special Assistance Call Point Fire escape Muster Point Planting to perimeter of detention basin Planting to perimeter of detention basin Site Plan Key Pre - cast Concrete Block Paving with feature banding Colour - Mix Tarmac access road surface to engineers spec Planting area/ Hedges Proposed Trees (type TBC) Species rich grass seed mix Red line indicates site boundary Lighting Column, TBC electrical engineers Litter bin Note: *** Levels, Falls and drainage TBC *** Orange line indicates site works under a seperate contract Blue line indicates location (TBC) of existing hard landscaping works to be retained Pavement Paving: Pressed Grey Concrete Flag Paving Slab to match existing pavements 800mm Maintenance Strip to endge of MSCP: Pressed Grey Concrete Flag Paving Green line indicates location of handrail to footpath Pink line indicates location of 1500 high pallisade fence to Network Rail specification Permeable pre - cast concrete block paving to drop off and loading bay laid in herringbone pattern Pre - Cast concrete raised planter Built up asphalt footpath to service areas, loading to support MEWP access External plant enclosure, surrounded by timber acoustic fencing with gated access Concrete plinth to external plant enclosure, loading to support plant equipment Pre - cast Concrete Block Paving contrasting stripes All dimensions to be checked on site. DO NOT SCALE FROM DRAWING. Discrepancies ambiguities and/or omissions between this drawing and information given elsewhere must be reported immediately to the architect before proceeding. THIS DRAWING IS COPYRIGHT. This drawing is to be read in conjunction with drawings:- Notes: OS Licence No: 100006354 Rev : Napper Architects Ltd 3 Waterloo Square Newcastle Upon Tyne NE1 4DR Tel: 0191 2610491 Date : Drawn : Scale : Client : Project : Job Number: NAPPER [email protected] www.napperarchitects.co.uk First Floor, 6 Bakers Yard London EC1R 3DD Tel: 0203 9066814 Originator: Zone: Level: Type: Role: Drawing Number: Drawing Number : Internal Project No : P6 27/05/2020 1 : 250 @ A0 _Landscape General Arrangement Darlington Station MSCP Willmott Dixon JT SGMSCP - NAP - Z0 - XX - DR - A - 90001 B2013 1 : 250 Landscape General Arrangement 0 12.50m 25.0m C R DATE N AMENDMENT JT AR 03/04/2020 P1 First Issue JT AR 09/04/2020 P2 Updated Access Road JT AR 17/04/2020 P3 Updated With Reduced Landscaping JT AR 17/03/2021 P4 Stage 3 Issue JT AR 09/04/2021 P5 Updated Stage 3 Issue JT AR 27/05/2020 P6 Final Stage 3 Issue