SITE LOCATION A B C 1 2 3 4 5 1 2 3 4 5 D NO. DATE BY APP. DESIGNED BY: DRAWN BY: ACT FACILITIES MAINTENANCE ACT PROJECT MANAGER: DATE: Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENT D3 - RICHMOND BUS WASH DRAWING NO.: SHEET NO.: ACT DRAWING #: ACT CONTRACT #: STV INCORPORATED 560 14th Street - Suite 400 Oakland, CA 94612 t: 510.763.1313 f: 510.465.1586 Alameda - Contra Costa Transit District SHEET OF J.JOHNSON D. UNGSON 4/12/2016 2016-xxxx 4/12/16 30% SUBMITTAL D3 - COVER SHEET G-000 01 - GENERAL G-000 D3 - COVER SHEET G-001 D3 - ABBREVIATIONS 08 - ARCHITECTURAL AD-001 D3 - DEMOLITION NOTES AD-101 D3 - DEMOLITION PLAN A-001 D3 - ARCHITECTURAL NOTES AND SYMBOLS A-101 D3 - FLOOR PLAN A-102 D3 - REFLECTED CEILING PLAN A-103 D3 - ROOF PLAN A-201 D3 - EXTERIOR ELEVATIONS 1 A-202 D3 - EXTERIOR ELEVATIONS 2 A-203 D3 - INTERIOR ELEVATIONS 1 A-204 D3 - INTERIOR ELEVATION 2 A-301 D3 - BUILDING SECTIONS INDEX OF DRAWINGS SITE AERIAL 09 - EQUIPMENT QD-101 D3 - EQUIPMENT DEMOLITION PLAN Q-101 D3 - EQUIPMENT FLOOR PLAN Q-301 D3 - EQUIPMENT SECTION 12 - PLUMBING PD-101 D3 - PLUMBING - DEMOLITION PLAN P-001 D3 - PLUMBING NOTES AND SYMBOLS P-002 D3 - PLUMBING SCHEDULES P-101 D3 - PLUMBING - FLOOR PLAN P-301 D3 - PLUMBING DETAILS 14 - MECHANICAL M-101 D3 - MECHANICAL FLOOR PLAN 15 - ELECTRICAL ED-101 D3 - ELECTRICAL DEMOLITION PLAN E-001 D3 - ELECTRICAL NOTES AND SYMBOLS E-101 D3 - POWER PLAN E-102 D3 - LIGHTING PLAN LOCATION MAP
25
Embed
SITE LOCATION D - AC Transit · rem removable repl replace reqd required ret retaining, return rev revision rfi request for information ... kwh kilowatt hour kwhm kilowatt hour meter
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
SITE LOCATION
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENT
D3 - RICHMOND BUS WASHDRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313
f: 510.465.1586Alameda - Contra Costa Transit District
SHEET OF
J.JOHNSON
D. UNGSON
4/12/2016
2016-xxxx
4/12/16 30% SUBMITTAL D3 - COVER SHEETG-000
01 - GENERALG-000 D3 - COVER SHEET
G-001 D3 - ABBREVIATIONS
08 - ARCHITECTURALAD-001 D3 - DEMOLITION NOTES
AD-101 D3 - DEMOLITION PLAN
A-001 D3 - ARCHITECTURAL NOTES AND SYMBOLS
A-101 D3 - FLOOR PLAN
A-102 D3 - REFLECTED CEILING PLAN
A-103 D3 - ROOF PLAN
A-201 D3 - EXTERIOR ELEVATIONS 1
A-202 D3 - EXTERIOR ELEVATIONS 2
A-203 D3 - INTERIOR ELEVATIONS 1
A-204 D3 - INTERIOR ELEVATION 2
A-301 D3 - BUILDING SECTIONS
INDEX OF DRAWINGS
SITE AERIAL SITE MAP
09 - EQUIPMENTQD-101 D3 - EQUIPMENT DEMOLITION PLAN
Q-101 D3 - EQUIPMENT FLOOR PLAN
Q-301 D3 - EQUIPMENT SECTION
12 - PLUMBINGPD-101 D3 - PLUMBING - DEMOLITION PLAN
P-001 D3 - PLUMBING NOTES AND SYMBOLS
P-002 D3 - PLUMBING SCHEDULES
P-101 D3 - PLUMBING - FLOOR PLAN
P-301 D3 - PLUMBING DETAILS
14 - MECHANICALM-101 D3 - MECHANICAL FLOOR PLAN
15 - ELECTRICALED-101 D3 - ELECTRICAL DEMOLITION PLAN
E-001 D3 - ELECTRICAL NOTES AND SYMBOLS
E-101 D3 - POWER PLAN
E-102 D3 - LIGHTING PLAN
LOCATION MAP
STD STANDARDSTIF STIFFENERSTIR STIRRUPSTM STEAMSTOR STORAGEST PR STATIC PRESSURESTRUCT STRUCTURALSUCT SUCTIONSUM SUMMARYSUPT SUPPORTSURF SURFACESUSP SUSPENDSVCE SERVICESW SIDEWALK, SWITCHSWBD SWITCHBOARDSWDR SWING DOORSWGR SWITCHGEARSWR MH SEWER MANHOLESYM SYMBOLSYMM SYMMETRICALSYS SYSTEMT TREADTAN TANGENTT&B TOP AND BOTTOMTC TERRA COTTATD TEMPERATURE DIFFERENCE, TRENCH DRAINTDH TOTAL DYNAMIC HEADTEL TELEPHONETEMP TEMPERATURE, TEMPORARYTER TERRAZZOTERM TERMINALT&G TONGUE AND GROOVETHD THREADTHK THICKNESSTHRES THRESHOLDTHRU THROUGHTO TOP OF ______TOC TOP OF CONCRETE, TOP OF CURBTOF TOP OF FOOTINGTOL TOLERANCETOM TOP OF MASONRYTOPO TOPOGRAPHYTOW TOP OF WALLTOS TOP OF SLAB, TOP OF STEELTP TELEPHONE POLE, TOTAL PRESSURETS TUBE STEELTSTAT THERMOSTATTV TELEVISIONTYP TYPICALUGND UNDERGROUNDUH UNIT HEATERUL UNDERWRITERS LABORATORIESUN UNLESS NOTEDUNO UNLESS NOTED OTHERWISEUP UTILITY POLEUR URINALUTIL UTILITY
V VOLTVA VOLT AMPERESVAC VACUUMVAN VANITYVAR VARIATION, VARIES, VOLT AMPERES REACTIVEVAV VARIABLE AIR VOLUMEVB VACUUM BREAKER, VINYL BASEVC VERTICAL CURVEVCT VINYL COMPOSITION TILE, VITRIFIED CLAY TILEVEL VELOCITYVENT VENTILATORVERT VERTICALVEST VESTIBULEVFD VARIABLE FREQUENCY DRIVEVIB VIBRATIONVIF VERIFY IN FIELDVOL VOLUMEVR VAPOR RETARDERVS VOLTMETER SWITCHVTR VENT THRU ROOFVWC VINYL WALL COVERING
W WASTE, WATT, WEST, WIDEW/ WITHWB WET BULBWC WATER CLOSETWCO WALL CLEANOUTWD WOOD, WOOD DOORWDW WINDOWWF WIDE FLANGEWGL WIRED GLASSWH WALL HYDRANTWHA WATER HAMMER ARRESTERWHM WATT HOUR METERWI WROUGHT IRONWL WIND LOADWM WIRE MESH, WATER METERW/O WITHOUTWP WATER PROOFING, WEATHERPROOF, WORKINGPOINTWT WEIGHT, WIRE TROUGHWTR WATERXFMR TRANSFORMERX SECT CROSS SECTIONYD YARD, YARD DRAINYH YARD HYDRANTYR YEAR
POS POSITION, POSITIVEPP POLYPROPYLENEPR PAIR, PUMPED RETURNPREFAB PREFABRICATEPRELIM PRELIMINARYPRESS PRESSUREPREV PREVIOUSPRI PRIMARYPRKG PARKINGPROJ PROJECTPROP PROPELLERPRV PRESSURE REDUCING VALVEPSF POUND PER SQUARE FOOTPSI POUND PER SQUARE INCHPSIA POUND PER SQUARE INCH ABSOLUTEPSIG POUND PER SQUARE INCH GAGEPT PAINT, PRESSURE TREATEDPTAC PACKAGE TERMINAL AIR-CONDITIONERPTN PARTITIONPVC POLYVINYL CHLORIDEPVG PAVINGPWR POWER
S SOUTHSAN SANITARYSAPC SUSPENDED ACOUSTICAL PLASTER CEILINGSATC SUSPENDED ACOUSTICAL TILE CEILINGSB SPLASH BLOCKSC SOLID CORESCHED SCHEDULESCHEM SCHEMATICSCMU SOLID CONCRETE MASONRY UNITSSCP SCUPPERSD STORM DRAINSDL SADDLESDMPR SMOKE DAMPERSECT SECTIONSEP SEPARATOR, SEPARATESF SQUARE FOOT (FEET)SHLDR SHOULDERSHR SHOWERSHT SHEETSIM SIMILARSLNT SEALANTSLV SLEEVESOLV SOLENOID VALVESP STANDPIPESPC SUSPENDED PLASTER CEILINGSPDT SINGLE POLE DOUBLE THROWSPEC SPECIFICATIONSPKLR SPRINKLERSPKR SPEAKERSPLY SUPPLYSPRT SUPPORTSPST SINGLE POLE SINGLE THROWSQ SQUARESQ IN SQUARE INCHSQ YD SQUARE YARDSS STORM SEWERSSP STAINLESS STEEL PIPESST STAINLESS STEELST STREETSTA STATIONSTC SOUND TRANSMISSION CLASS
MCC MOTOR CONTROL CENTERMECH MECHANICALMECH RM MECHANICAL ROOMMEMB MEMBRANEMEZZ MEZZANINEMFD MANUFACTUREDMFG MANUFACTURINGMFR MANUFACTURERMFR REC MANUFACTURER'S RECOMMENDATIONMG MOTOR GENERATORMGT MANAGEMENTMH MANHOLEMIC MICROPHONEMIN MINIMUMMIR MIRRORMISC MISCELLANEOUSmm MILLIMETERmm3 CUBIC MILLIMETERMO MASONRY OPENINGMOD MODEL, MODIFYMOD BIT MODIFIED BITUMENMON MONUMENTMOT MOTORMOV MOTOR OPERATED VALVEMPH MILE(S) PER HOURMPT MALE PIPE THREADMR MOISTURE RESISTANTMRT MARBLE THRESHOLDMS MOP SINKMSL MEAN SEA LEVELMTD MOUNTEDMTG MOUNTINGMTL METALMVA MEGAVOLT AMPERES
N NORTHNA NOT APPLICABLENATL NATIONALNC NORMALLY CLOSEDNEG NEGATIVENEUT NEUTRALNF NEAR FACENIC NOT IN CONTRACTNO NORMALLY OPEN, NUMBERNOM NOMINALNON STD NONSTANDARDNORM NORMALNPT NATIONAL PIPE THREADNRC NOISE REDUCTION COEFFICIENTNS NEAR SIDENTS NOT TO SCALENT WT NET WEIGHT
1P SINGLE POLEP POLE, PUMPPARA PARAGRAPHPAT PATTERNPB PANELBOARD, PULL BOXPC PIECE, POINT OF CURVE, PORTLAND CEMENTPCC POINT OF COMPOUND CURVEPCF POUNDS PER CUBIC FOOTPCT PERCENTPD PRESSURE DROPPE PNEUMATIC-ELECTRICPED PEDESTALPERF PERFORATEDPERIM PERIMETERPERM PERMANENTPERP PERPENDICULARPF POWER FACTORPG PRESSURE GAGEPH PHASEPHC PREHEAT COILPI POINT OF INTERSECTIONPIV POST INDICATOR VALVEPK GAR PARKING GARAGEPL PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTERPLAT PLATFORMPLBG PLUMBINGPLC PLACEPLF POUNDS PER LINEAR FOOTPLYWD PLYWOODPMF PROBABLE MAXIMUM FLOODPN PART NUMBERPNEU PNEUMATICPNL PANELPOB POINT OF BEGINNINGPORC PORCELAIN
H HATCH (ROOF), HIGHHAZ HAZARDHB HOSE BIBBHC HEATING COIL, HOLLOW COREHCMU HOLLOW CONCRETE MASONRY UNITHCP HANDICAPPEDHD HEADHDBD HARDBOARDHDPE HIGH DENSITY POLYETHYLENEHDW HARDWAREHDWD HARDWOODHDWL HEADWALLHEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)HEX HEXAGONHG MERCURYHGR HANGERHH HANDHOLEHID HIGH INTENSITY DISCHARGEHM HOLLOW METALHNDRL HAND RAILHORIZ HORIZONTALHP HEAT PUMP, HORSEPOWERHPS HIGH PRESSURE SODIUMHQ HEADQUARTERSHS HIGH STRENGTHHT HEIGHTHVAC HEATING, VENTILATING & AIR CONDITIONINGHW HOT WATERHWP HOT WATER PUMPHWY HIGHWAYHYD HYDRANTHz HERTZ
ID INSIDE DIAMETER, INSIDE DIMENSIONID NO IDENTIFICATION NUMBERIF INSIDE FACEIMC INTERMEDIATE METALLIC CONDUITINCAND INCANDESCENTINCIN INCINERATORINCL INCLUDEDINFO INFORMATIONIN-LB INCH-POUNDINSTR INSTRUMENTINSUL INSULATIONINT INTERIORINTL INTERNATIONALINV INVERTINV EL INVERT ELEVATIONIP IRON PIPEIR INSIDE RADIUS, INFRARED
KB KNEE BRACEKIT KITCHENKLF KIP(S) PER LINEAR FOOTKO KNOCKOUTKPa KILOPASCALKSF KIP(S) PER SQUARE FOOTkV KILOVOLTkVA KILOVOLT-AMPEREkVAR KILOVOLT-AMPERE REACTIVEkW KILOWATTkWh KILOWATT HOURkWhm KILOWATT HOUR METER
L ANGLELA LIGHTNING ARRESTERLAB LABORATORYLAD LADDERLAM LAMINATELAM GL LAMINATED GLASSLAT LATITUDE, LEAVING AIR TEMPERATURELAV LAVATORYLB POUNDLF LINEAR FEETLH LEFT HANDLHS LEFT HAND SIDELIM SW LIMIT SWITCHLIN LINEARLINO LINOLEUMLIQ LIQUIDLL LIVE LOADLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLNG LONGITUDELP LOW PRESSURE, LIGHT POLELPT LOW POINTLRA LOCKED ROTOR AMPSLS LUMP SUMLT LIGHTLTG LIGHTINGLT WT LIGHT WEIGHTLVR LOUVERLWT LEAVING WATER TEMPERATURE
m3 CUBIC METERm METERMA MILLIAMPMACH MACHINEMACH RM MACHINE ROOMMAINT MAINTENANCEMAG MAGNETMAN MANUALMATL MATERIALMAX MAXIMUMMB MAIL BOX, MIXING BOXMBtuH THOUSAND BRITISH THERMAL UNITS/HOURMC MOMENT CONNECTIONMCB MAIN CIRCUIT BREAKER
EPRF EXPLOSION PROOFEQ EQUALEQL SP EQUALLY SPACEDEQUIP EQUIPMENTEQUIV EQUIVALENTES EDGE OF SHOULDERESC ESCAPEESMT EASEMENTESP EXTERNAL STATIC PRESSUREETC AND SO FORTHEVAP EVAPORATEEW EACH WAYEWC ELECTRIC WATER COOLEREWH ELECTRIC WATER HEATEREWT ENTERING WATER TEMPERATUREEX EXAMPLEEXC EXCAVATEEXH EXHAUSTEXHV EXHAUST VENTEXIST EXISTINGEXP EXPANSIONEXT EXTERIOR, EXTERNAL, EXTINGUISHER
F FARENHEIT, FEMALEFA FIRE ALARM, FRESH AIRFAB FABRICFACP FIRE ALARM CONTROL PANELFAI FRESH AIR INLETFC FILE CABINET, FOOT CANDLEFCO FLOOR CLEANOUTFCTY FACTORYFCU FAN COIL UNITFD FLOOR DRAINFDMPR FIRE DAMPERFDR FEEDERFDTN FOUNDATIONFDW FEED WATERFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER W/CABINETFED FEDERALFF FAR FACE, FINISH FACEFF BATT FOIL BACKED BATT INSULATIONFF&E FURNITURE, FIXTURE & EQUIPMENTF/F FACE TO FACEFH FIRE HOSEFHC FIRE HOSE CABINETFHR FIRE HOSE RACKFHWA FEDERAL HIGHWAY ADMINISTRATIONFIG FIGUREFIL FILLETFIN FINISHFIN BS FINISH BOTH SIDESFIN FLR FINISHED FLOORFIXT FIXTUREFLA FULL LOAD AMPSFLEX FLEXIBLEFLG FLANGEFLL FLOW LINEFLMT LUSH MOUNTFL OZ FLUID OUNCEFLR FLOORFLR SK FLOW SINKFL SW FLOW SWITCHFLUOR FLUORESCENTFN FENCEFO FUEL OILFOTK FUEL OIL STORAGE TANKFP FIREPROOF, FLAGPOLEFPM FOOT (FEET) PER MINUTEFPS FOOT (FEET) PER SECONDFR FRAMEFREQ FREQUENCYFRP FIBER GLASS REINFORCED PLASTICFS FAR SIDE, FEDERAL SPECIFICATIONFT FOOT, FEETFTG FOOTINGFT HD FEET OF HEADFURN FURNISH, FURNITUREFUT FUTUREFVNR FULL VOLTAGE NON-REVERSINGFVR FULL VOLTAGE REVERSINGFWC FABRIC WALL COVERING
G GROUND, NATURAL GASGA GAGEGAL GALLONGALV GALVANIZEDGALV STL GALVANIZED STEELGC GENERAL CONTRACTORGD GUARDGEN GENERAL, GENERATORGFCI GROUND FAULT CIRCUIT INTERRUPTERGFRG GLASS FIBER REINFORCED GYPSUMGL GLASSGL BLK GLASS BLOCKGLZ GLAZINGGOVT GOVERNMENTGP GROUPGPD GALLONS PER DAYGPH GALLONS PER HOURGPM GALLONS PER MINUTEGPS GALLONS PER SECONDGR FL GROUND FLOORGR WT GROSS WEIGHTGRAN GRANITEGRTG GRATINGGSU GLAZED STRUCTURAL UNITGV GASOLINE VALVEGVL GRAVELGWT GLAZED WALL TILEGYP BD GYPSUM BOARDGYP GYPSUM
CJ CONSTRUCTION JOINT, CONTROL JOINTCKT CIRCUITCKT BRKR CIRCUIT BREAKERCL CENTER LINE, CLASSCLG CEILINGCLG HT CEILING HEIGHTCLO CLOSETCLR CLEARCLRM CLASSROOMcm CENTIMETERCMP CORRUGATED METAL PIPECMU CONCRETE MASONRY UNITCND CONDUITCNDS CONDENSATECNTR COUNTERCO CLEAN OUT, COMPANYCOEFF COEFFICIENTCOL COLUMNCOMB COMBINATIONCOMM COMMUNICATIONCOMPR COMPRESSORCONC CONCENTRIC, CONCRETECONC FL CONCRETE FLOORCOND CONDENSERCONF CONFERENCECONN CONNECTCONSTR CONSTRUCTIONCONT CONTINUE, CONTROLLERCONTR CONTRACT, CONTRACTORCOORD COORDINATECOP COEFFICIENT OF PERFORMANCECORR CORRIDORCPT CARPET, CONTROL POWER TRANSFORMERCPVC CHLORINATED POLYVINYL CHLORIDECR CONTROL RELAYCRP CONDENSATE RETURN PUMPCRS COLD ROLLED STEELCSK COUNTERSUNKCT CERAMIC TILE, CURRENT TRANSFORMERCTB CERAMIC TILE BASECTD COATEDCTG COATINGCTR CENTERCTRL CONTROLCU COPPERCU FT CUBIC FOOT (FEET)CUH CABINET UNIT HEATERCU IN CUBIC INCHCUR CURRENTCU YD CUBIC YARDCW COLD WATER PIPINGCYL CYLINDER
D DEEP, DEPTHDA DRAINAGE AREAdB DECIBELDB DRY BULBDBL DOUBLEDC DIRECT CURRENTDDC DIRECT DIGITAL CONTROLDEG DEGREEDEL DELETEDEMO DEMOLITIONDEPT DEPARTMENTDET DETAILDEV DEVELOPMENTDF DRINKING FOUNTAINDI DROP INLETDIA DIAMETERDIAG DIAGRAMDIFF DIFFERENCE, DIFFUSERDIM DIMENSIONDIP DUCTILE IRON PIPEDIR DIRECTIONDISC DISCONNECTDISCH DISCHARGEDISP DISPENSERDIST DISTANCEDISTR PNL DISTRIBUTION PANEL
DIV DIVISIONDL DEAD LOADDMPR DAMPERDOM DOMESTICDOZ DOZENDPDT DOUBLE POLE DOUBLE THROWDPST DOUBLE POLE SINGLE THROWDR DOOR, DRAIN, DRIVEDS DISCONNECT SWITCH, DOWNSPOUTDW DISHWASHER, DISTILLED WATERDWG DRAWING
E EASTEA EACHEAT ENTERING AIR TEMPERATUREECC ECCENTRICEER ENERGY EFFICIENCY RATIOEF EACH FACEEFF EFFICIENCYEIFS EXTERIOR INSULATION FINISH SYSTEMEH ELECTRIC HEATEREJ EXPANSION JOINTEL ELEVATIONELEC ELECTRICELEV ELEVATOREMER EMERGENCYEMI ELECTROMAGNETIC INTERFERENCEEMT ELECTRICAL METALLIC TUBINGENCL ENCLOSUREENGR ENGINEERENTR ENTRANCEEOS EDGE OF SLABEPA ENVIRONMENTAL PROTECTION AGENCYEPDM ETHYLENE PROPYLENE DIENE MONOMER
AAD AUTOMATIC AIR DAMPERAB ANCHOR BOLTABAN ABANDONA/C AIR CONDITIONA/C UNIT AIR CONDITIONING UNITAC ALTERNATING CURRENT, ARMORED CABLEACCU AIR COOLED CONDENSING UNITACS DR ACCESS DOORACS PNL ACCESS PANELACSR ALUMINUM CABLE STEEL REINFACST ACOUSTICACT ACOUSTICAL CEILING TILEAD AREA DRAINADA AMERICANS WITH DISABILITIES ACTADDL ADDITIONALADDM ADDENDUMADJ ADJUSTABLEAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAGGR AGGREGATEAH AMPERE HOURAHJ AUTHORITY HAVING JURISDICTIONAHU AIR HANDLING UNITALM ALARMALT ALTERNATEALUM ALUMINUMAMB AMBIENTAMP AMPEREANN ANNUNCIATORAPPD APPROVEDAPPROX APPROXIMATEAR AS REQUIREDARCH ARCHITECTASCE AMERICAN SOCIETY OF CIVIL ENGINEERSASPH ASPHALTASSY ASSEMBLYASTM AMERICAN SOCIETY FOR TESTING MATERIALSASYM ASYMMETRICALATS AUTOMATIC TRANSFER SWITCHAUTO AUTOMATICAUX AUXILIARYAVE AVENUEAVG AVERAGEAWG AMERICAN WIRE GAGEAWT ACOUSTICAL WALL TREATMENTAWWA AMERICAN WATER WORKS ASSOCIATIONAZ AZIMUTH
BAT BATTERYBC BOLT CIRCLE, BOOKCASEBD BOARDBDD BACKDRAFT DAMPERBDRY BOUNDARYBF BOTH FACESBFP BACKFLOW PREVENTERBFWP BOILER FEED WATER PUMPBHP BRAKE HORSEPOWERBITUM BITUMINOUSBLWDN BLOWDOWNBL BASE LINEBLDG BUILDINGBLKT BLANKETBLR BOILERBLR HP BOILER HORSEPOWERBLT BORROWED LIGHTBLVD BOULEVARDBLW BELOWBM BEAM, BENCHMARKBOS BOTTOM OF STEELBOT BOTTOMB PL BASE PLATEBR BEDROOMBRCG BRACINGBRDG BRIDGINGBRG BEARINGBRKT BRACKETBRZ BRONZEBS BOTH SIDESBSMT BASEMENTBtu BRITISH THERMAL UNITBtuH BRITISH THERMAL UNIT PER HOURBTWN BETWEENBUR BUILT-UP ROOF
C CELSIUS, CHANNELC TO C CENTER TO CENTERCAB CABINETCALC CALCULATECAP CAPACITYCAT CATALOGUECB CATCH BASIN, CERAMIC BASEC/C COOLING COILCC CUBIC CENTIMETERCCTV CLOSED CIRCUIT TELEVISIONCCW COUNTERCLOCKWISECEM CEMENTCER CERAMICCF/CI CONTRACTOR FURNISHED / CONTR INSTALLEDCFE CONTRACTOR FURNISHED EQUIPCFM CUBIC FOOT (FEET) PER MINUTECF/OI CONTRACTOR FURNISHED / OWNER INSTALLEDCFS CUBIC FOOT (FEET) PER SECONDCG CENTER OF GRAVITY, CORNER GUARDCH CHILLERCHB CHALKBOARDCHEM CHEMICALCHFR CHAMFERCHG CHARGERCHK CHECKCHWP CHILLED WATER PUMPCI CAST IRON, CURB INLETCIP CAST IRON PIPECIR CIRCLE
STANDARD ABBREVIATIONS
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
J.JOHNSON
D. UNGSON
4/12/2016
2016-xxxx
4/12/16 30% SUBMITTAL D3 - ABBREVIATIONSG-001
GENERAL ARCHITECTURAL NOTESCONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WORK WITH ALL
SUB-CONTRACTORS AND APPLICABLE TRADES.
ALL WORK SHALL BE IN ACCORDANCE WITH MANUFACTURER'S LATEST
STANDARD RECOMMENDATIONS AND ALL APPLICABLE CODES.
FOR LEGEND AND ABBREVIATIONS SEE DRAWING G-003, G-004 AND THIS DRAWING.
COORDINATE OPENING LOCATIONS AND SIZES THROUGH PARTITIONS ABOVE
THE CEILINGS REQUIRED PENETRATIONS WITH MEP AND PROCESS DRAWINGS.
CONTRACTOR SHALL COORDINATE LOCATIONS OF LIGHT FIXTURES, SPRINKLER
HEADS, REGISTERS, ETC. WITH THE ELECTRICAL, MECHANICAL, PLUMBING, AND
SPRINKLER DRAWINGS. ALL SPRINKLER HEADS, DIFFUSERS AND REGISTERS
SHALL BE CENTERED IN SUSPENDED ACOUSTICAL PANELS, UNLESS OTHER
WISE NOTED ON DRAWINGS.
CONTRACTOR SHALL FILL ALL VOIDS IN MASONRY AND CONCRETE
AROUND ALL PENETRATIONS WITH CONSTRUCTION TO MATCH SURROUNDINGCONDITIONS.
CONTRACTOR IS RESPONSIBLE FOR PAINTING ALL EXPOSED STEEL, DECKING,
PIPING, CONDUIT, SPRINKLER PIPING AND DUCTS WHICH ARE EXPOSED IN AREAS
WITH NO CEILINGS AND SCHEDULED TO RECEIVE PAINT FINISH AS INDICATED ON
INTERIOR FINISH NOTES.
THE ABBREVIATION "AFF" STANDS FOR "ABOVE FINISHED FLOOR". THIS IS MEANT
TO INDICATE THE DIMENSION ABOVE THE FINAL FLOOR FINISH (I.E. CARPET, CT,
VCT, ETC.) THE GENERAL CONTRACTOR MUST REVIEW AND COORDINATE ANY
REQUIRED FINAL FLOOR FINISH WITH ANY HEIGHTS REQUIRED BEFORE THE
INSTALLATION OF THE FLOOR FINISH.
ALL INTERIOR DIMENSIONS ARE TO FACE OF FINISHED WALL. ALL EXTERIOR
DIMENSIONS ARE TO THE FACE OF PRECAST CONCRETE.
INTERIOR PARTITIONS ARE DIMENSIONED TO NOMINAL THICKNESS ON FLOOR
PLANS. SEE PARTITION TYPES ON SHEET A-501 FOR ACTUAL THICKNESS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
BUILDING FINISHED FLOOR REFERENCE ELEVATION 100'-0" EQUALS ELEVATION23.50', REFER TO CIVIL DRAWINGS FOR ACTUAL ELEVATION.
11.
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
J.JOHNSON
D. UNGSON
4/12/2016
2016-xxxx
4/12/16 30% SUBMITTAL D3 - DEMOLITION NOTESAD-001
A B D
2
3
1
C
21
4
3
9
9
6
4
1
1
2
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
J.JOHNSON
D. UNGSON
4/12/2016
2016-xxxx
4/12/16 30% SUBMITTAL D3 - DEMOLITION PLANAD-101
1/4" = 1'-0"AD-101
DEMOLITION PLAN1
4' 8' 16'0
GENERAL DEMOLITION NOTES
SHEET NOTES
BLAST CLEAN CONCRETE SLAB.
CLEAN PAINTED MASONRY WALLS. REMOVE ALLMOSS AND LOOSE PAINT.
REMOVE (E) METAL DOORS AND HARDWARE.
PROTECT DRAINS FROM ALL CLEANING RUNOFF.
PROTECT DRAINS FROM ALL CLEANING RUN-OFF.REMOVE DEBRIS FROM SITE.
REMOVE CENTER PARTITION-CORRUGATED FIBERGLASS PANELS.
CLEAN CEILING BEAMS AND DECKING.
CUT OPENING IN ROOF DECK FOR FAN.
REMOVE (E) BUILT UP ROOFING WITH GRAVELBALLAST.
1
2
3
4
5
6.
7.
8.
9.
SEE Q SHEETS FOR EQUIPMENT DEMO.
SEE E SHEETS FOR ELECTRICAL DEMO.
SEE P SHEETS FOR PLUMBING DEMO.
AFTER EQUIPMENT (QD-101) AND CENTRAL PANEL (NOTE6) CONTRACTOR TO FIELD VERIFY PLACEMENT OFANCHOR BOLTS THAT DO NOT MEET PLACEMENTREQUIREMENTS FOR ANCHORING NEW EQUIPMENT TOGROUND FLUSH.
10.
4
TR
UE
NO
RTH
GENERAL ARCHITECTURAL NOTESCONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WORK WITH ALL
SUB-CONTRACTORS AND APPLICABLE TRADES.
ALL WORK SHALL BE IN ACCORDANCE WITH MANUFACTURER'S LATEST
STANDARD RECOMMENDATIONS AND ALL APPLICABLE CODES.
FOR LEGEND AND ABBREVIATIONS SEE DRAWING G-003, G-004 AND THIS DRAWING.
COORDINATE OPENING LOCATIONS AND SIZES THROUGH PARTITIONS ABOVE
THE CEILINGS REQUIRED PENETRATIONS WITH MEP AND PROCESS DRAWINGS.
CONTRACTOR SHALL COORDINATE LOCATIONS OF LIGHT FIXTURES, SPRINKLER
HEADS, REGISTERS, ETC. WITH THE ELECTRICAL, MECHANICAL, PLUMBING, AND
SPRINKLER DRAWINGS. ALL SPRINKLER HEADS, DIFFUSERS AND REGISTERS
SHALL BE CENTERED IN SUSPENDED ACOUSTICAL PANELS, UNLESS OTHER
WISE NOTED ON DRAWINGS.
CONTRACTOR SHALL FILL ALL VOIDS IN MASONRY AND CONCRETE
AROUND ALL PENETRATIONS WITH CONSTRUCTION TO MATCH SURROUNDINGCONDITIONS.
CONTRACTOR IS RESPONSIBLE FOR PAINTING ALL EXPOSED STEEL, DECKING,
PIPING, CONDUIT, SPRINKLER PIPING AND DUCTS WHICH ARE EXPOSED IN AREAS
WITH NO CEILINGS AND SCHEDULED TO RECEIVE PAINT FINISH AS INDICATED ON
INTERIOR FINISH NOTES.
THE ABBREVIATION "AFF" STANDS FOR "ABOVE FINISHED FLOOR". THIS IS MEANT
TO INDICATE THE DIMENSION ABOVE THE FINAL FLOOR FINISH (I.E. CARPET, CT,
VCT, ETC.) THE GENERAL CONTRACTOR MUST REVIEW AND COORDINATE ANY
REQUIRED FINAL FLOOR FINISH WITH ANY HEIGHTS REQUIRED BEFORE THE
INSTALLATION OF THE FLOOR FINISH.
ALL INTERIOR DIMENSIONS ARE TO FACE OF FINISHED WALL. ALL EXTERIOR
DIMENSIONS ARE TO THE FACE OF PRECAST CONCRETE.
INTERIOR PARTITIONS ARE DIMENSIONED TO NOMINAL THICKNESS ON FLOOR
PLANS. SEE PARTITION TYPES ON SHEET A-501 FOR ACTUAL THICKNESS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
BUILDING FINISHED FLOOR REFERENCE ELEVATION 100'-0" EQUALS ELEVATION23.50', REFER TO CIVIL DRAWINGS FOR ACTUAL ELEVATION.
11.
GENERAL MATERIAL LEGEND
CONCRETEMASONRY UNIT
INSULATION(BLANKET,BATT)
CONCRETE
GRAVEL
EXTERIOR FINISHMASONRY UNIT
EARTH
RIGIDINSULATION
STEEL IN SECTION
COMPOSITE METALPANEL
WOODBLOCKING
PLYWOOD
GYPSUM WALLBOARD
X
X-XXXX
X-XXX
X
X
X
X
X
XXX
X
X-XXX
DATUM ELEVATION
EXISTING CONSTRUCTION TO BE REMOVED
EXISTING CONSTRUCTION TO REMAIN
NEW CONSTRUCTION
DEMOLITION NOTE
ROOM IDENTIFIER, NAME AND NUMBER
REVISION TAG
DETAIL BUBBLE ELEVATION SYMBOL
PROJECT NORTH ARROW(FOR SITE WORK)
MULTIPLE INTERIORELEVATION SYMBOL
SECTION SYMBOL
GENERAL SYMBOLS
DETAIL LETTER
DRAWING ON WHICHDETAIL IS REFERENCED
ELEVATION LETTER
DRAWING ON WHICHELEVATION ISREFERENCED
SECTION NUMBER
DRAWING ON WHICHSECTION IS REFERENCED
DIRECTION OF VIEWSECTION IS TAKEN
ELEVATION LETTER
DRAWING ON WHICHELEVATIONS AREREFERENCED
SECTION NUMBER ORDETAIL, ELEVATION ORENLARGED PLAN LETTER
DRAWING ON WHICH SECTION, DETAIL,ELEVATION OR ENLARGED PLAN ISREFERENCED
x-xxx
LISTS ADDITIONAL DRAWINGS FROM WHERESECTION, DETAIL, ELEVATION OR ENLARGEDPLAN IS REFERENCED
X
101
FE
X
X-XXX
SECTION NUMBER
WINDOW SECTION CUT
DOOR NUMBER
PARTITION TYPE
WINDOW NUMBER
INTERNATIONAL SYMBOLOF ACCESSIBILITY
FIRE EXTINGUISHER -SURFACE MOUNTED
DRAWING ON WHICH SECTIONIS SHOWN
X SIGN NUMBER
1t
1i
Room name
101
1/8" = 1'-0"
X1
R101
PLAN/SECTION/ELEVATION4' 8' 16'0
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
J.JOHNSON
D. UNGSON
4/12/2016
2016-xxxx
4/12/16 30% SUBMITTAL D3 - ARCHITECTURAL NOTES AND SYMBOLSA-001
VEHICLE WASH AGENT CONCENTRATE
VEH I CL E WAS H AG ENT B LEN D T AN K
A B D
2
3
A-204
1
A-204
7
2
3
4
5
86STORAGE
3
ELECTRICAL
4
BUS WASHER
BAY #1
1
1
C
BUS WASHER
BAY #2
2
3
2TYP.
4
4
21
A-201
2
A-201 1
A-2011
A-202 2
A-202
1
A-203
1
A-203
2
1
A-301
2
A-301
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENT
D3 - RICHMOND BUS WASHDRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313
f: 510.465.1586Alameda - Contra Costa Transit District
SHEET OF
J.JOHNSON
D. UNGSON
4/12/2016
2016-xxxx
4/12/16 30% SUBMITTAL D3 - FLOOR PLANA-101
1/4" = 1'-0"A-101
FLOOR PLAN1
4' 8' 16'0
GENERAL NOTES
FOR BUS WASH EQUIPMENT SEE Q SHEETS.
FOR PLUMBING SEE P SHEETS.
FOR ELECTRICAL SEE E SHEETS.
SHEET NOTES
A.
B.
C.
SEAL CONCRETE FLOOR WITH CLEAR PENETRATING
SEALER.
REPAINT MASONRY WALLS AT INTERIOR.
PROVIDE NEW FLUSH METAL DOORS AND HARDWARE.
UNDERCUT DOORS AND PROVIDE A DOOR SHOE.
CLEAN OUT TRENCH AND PITS.
1
2
3
4
A B D
2
3
1
C
6
7
8
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
J.JOHNSON
D. UNGSON
4/12/2016
2016-xxxx
4/12/16 30% SUBMITTAL D3 - BUILDING SECTIONSA-301
1/4" = 1'-0"A-101
CROSS SECTION1
1/4" = 1'-0"A-101
LONGITUDINAL SECTION2
GENERAL NOTES
FOR BUS WASH EQUIPMENT SEE Q SHEETS.
FOR PLUMBING SEE P SHEETS.
FOR ELECTRICAL SEE E SHEETS.
SHEET NOTES
A.
B.
C.
SEAL CONCRETE FLOOR WITH CLEAR PENETRATINGSEALER.
REPAINT MASONRY WALLS.
PROVIDE NEW FLUSH METAL DOORS AND HARDWARE.UNDERCUT DOORS AND PROVIDE A DOOR SHOE.
CLEAN OUT TRENCH AND PITS.
CLEAN AND REPAINT (E) METAL DECKING AND (E)STEEL BEAMS.
REINFORCED OPENING WITH 8" CURBS. SEEMECHANICAL FOR FAN UNITS.
NEW LIGHT FIXTURE.
REPLACE ROOFING.
1
2
3
4
5
6.
7.
8.
A B D
2
3
1
C
STORAGE
4ELECTRICAL
3
BUS WASHER
BAY #1
1
BUS WASHER
BAY #2
2
2
1
2
1
10
2
1
2
1
5
5
5
5
3
3
4
6 8
7
9
11
EQUIPMENT DEMOLITION NOTES
PROTECT IN PLACE (E) SKID PLATE
PROTECT IN PLACE (E) WHEEL GUIDE
PROTECT IN PLACE (E) GRATING OVER CATCH BASIN ANDTRENCH DRAIN
PROTECT IN PLACE (E) GRATING OVER RECLAIM PIT
REMOVE AND DISPOSE OF ALL FLOOR-MOUNTED BUS WASHEQUIPMENT INSIDE THE WASH BAY, INCLUDING RED/GREENLIGHT ENTRANCE LIGHT, ELECTRIC EYE POSTS, SPRAY ARCHES,BRUSH MACHINE, WHEEL SPINNERS (AKA BLASTERS), AND ALLINTERCONNECTING PIPING AND HANGERS
REMOVE AND DISPOSE OF (E) 1500-GAL STORAGE TAANKSAND ASSOCIATED PIPING
REMOVE AND DISPOSE OF (E) 30 HP WHEEL WASHER("BLASTER") PUMPS AND ASSOCIATED PIPING AND CONDUIT
REMOVE AND DISPOSE OF (E) ABOVEGROUND WATERRECLAMATION MODULES AND ASSOCIATED PIPING AND CONDUIT
REMOVE AND DISPOSE OF (E) WALL-MOUNTED DETERGENTINJECTION SYSTEM AND ASSOCIATED PIPING AND CONDUIT
REMOVE AND DISPOSE OF (E) WALL-MOUNTED BUS WASHPANELS LABELED BLASTER PANEL 1, WASH PANEL 1, BLASTPANEL 2, AND WASH PANEL 2. REFER TO ELECTRICALDRAWINGS FOR ALL OTHER PANELS
1
2
3
4
5
6
7
8
9
10
REMOVE AND DISPOSE OF (E) WALL PARTITION ANDASSOCIATED SUPPORTS
11
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTDIVISION 3 - RICHMOND BUS WASH
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTDIVISION 3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED560 14th Street - Suite 400
Oakland, CA 94612t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
K. XU
P. WINGERD
4/12/2016
2016-xxxx
45
4/12/16 30% SUBMITTAL D3 - PLUMBING DEMOLITION PLAN PD-101
1/4" = 1'-0"
PLUMBING DEMOLITION PLAN2' 4' 8'0
SHEET NOTES:
SEE ARCHITECTURAL DRAWINGS FOR EXACTPLACEMENT AND QUANTITY OF ALL EQUIPMENT.
BEFORE STARTING WORK, VERIFY LOCATIONS,ELEVATIONS AND SIZES OF ALL PIPING ANDEQUIPMENT REQUIRING PLUMBING CONNECTIONS.
COORDINATE ALL PLUMBING WORK WITH ALL OTHERWORK TO AVOID CONFLICTS. RUN ALL PIPING TOAVOID ARCHITECTURAL OPENINGS, STRUCTURALMEMBERS, DUCTS OR OTHER OBSTRUCTIONS.OFFSET PLUMBING PIPING WHERE REQUIRED.
1.
2.
3.
KEY NOTES:
EXISTING PIT TO REMAIN.
DEMOLISH (E) CW PIPING AND ASSOCIATED FITTINGSTO POD W/ CAP AND SOV.
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTDIVISION 3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED560 14th Street - Suite 400
Oakland, CA 94612t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
K. XU
P. WINGERD
4/12/2016
2016-xxxx
45
4/12/16 30% SUBMITTAL D3 - PLUMBING GENERAL NOTES, SYMBOLSAND ABBREVIATIONS
P-001
OFFICE OF STATEWIDE HEALTHPLANNING AND DEVELOPMENT (STATE OF CALIFORNIA)
PLUS/MINUS±
TEMPERATURE AND PRESSURET & P
AMERICAN SOCIETY OF HEATING, REFRIGERATING ANDAIR-CONDITIONING ENGINEERS
ASHRAE
CONDENSATE DRAIN LINECD
W/ WITH
INVERTINV
APPROXIMATEAPPROX
TYP
DWGS DRAWINGS
TYPICAL
EXISTING
NEW
(E)
(N)
MAXIMUMMAX
VENT TO ROOFVTR
OPEN DRIP PROOFODP
UNDERWRITERS LABORATORYUL
TEMPERATURETEMP
POUNDS PER SQUARE INCH, GAGEPSIG
MINIMUMMIN
INSIDE DIAMETERID
GALLONS PER MINUTEGPM
DOWNDNDIAMETERDIA
LC CENTER LINE
BELOW FLOORBF
AMPERESAMPSABOVE FINISHED FLOORAFFAT@
ABBREV.
BELOW GROUNDBG
FLOOR DRAIN
GALLON
HOT WATER
°FFD
GALGPH
HW
IN
MBH
LVG
NSF 61
MSS
LEAVING
INCH
MSS SP-58
MSS SP-69
KITCHEN WASTE/KILOWATTKW
HB/HB-WB
PIPE HANGERS AND SUPPORTS - MATERIALS DESIGNAND MANUFACTUREPIPE HANGERS AND SUPPORTS - SELECTION AND APPLICATION
NATIONAL SANITATION FOUNDATION - DRINKING WATER SYSTEMCOMPONENTS - HEALTH EFFECTS
MANUFACTURERS STANDARD SOCIETY
THOUSAND BRITISH THERMAL UNITS
GALLONS PER HOUR
DEGREES FAHRENHEIT
HOSE-BIBB/HOSE BIBB-WALL BOX
DDC DIRECT DIGITAL CONTROL
SEISMIC GAS VALVE
PRESSURE REDUCING VALVE
WATER HAMMER ARRESTERWHA
M
PRV
METER
COMPRESSED AIR
SEWER OR STORM DRAIN PIPE ABOVE FLOOR
DOMESTIC HOT/TEMPERED WATER RETURN PIPE
FCO/COTG
CKVST
VTR/ARV VENT THRU ROOF/AIR RELIEF VALVE
CHECK VALVESTRAINER
ISOLATION/SHUT OFF/VALVE
POC
HB
RED
CO
WCO
CO
FCO
FS
WCO
FD
POINT OF CONNECTION
TEE UP
HOSE BIBB
REDUCER
ELBOW DOWNELBOW UPTEE DOWN
WALL CLEAN OUT
FLOOR OR CLEAN OUT TO GRADE
CLEAN OUTSLOPE
FLOOR SINKFLOOR DRAIN
G
CA
SYMBOL
S OR SDS OR SD
VTR VTR
G
V
CA
ABBREV.
HWR/TWR
CWHWS/TWS
VENT THRU ROOF
VENT PIPE
GAS PIPE
DOMESTIC COLD WATER PIPEDOMESTIC HOT/TEMPERED WATER SUPPLY PIPE
DESCRIPTION
IW INDUSTRIAL WASTE WATER
BALANCING VALVEBV
PUMP
TP TRAP PRIMER
GAS PRESSURE REGULATORBALL VALVE
1/4" TEST PLUG
TEMPERATURE AND PRESSURE RELIEF VALVET & P
THERMOMETER
THERMOSTAT/AQUASTAT/TEMPERATURE SENSOR
FURNISHED AS INSTALLED BY ELECTRICAL
DIRECT DIGITAL CONTROLDDC
IW
SEWER OR STORM DRAIN PIPE BELOW FLOOR OR BURIED
UNION
FLEXIBLE PIPE
CAPPED PIPE
PRESSURE GAUGE
DESCRIPTION
OSHPD
INSTANTANEOUS WATER HEATERIWH
EXISTING PIPING / EQUIPMENT TO BE DEMOLISHEDCALIFORNIA PLUMBING CODECPC
FEETFT
VOLTS/PHASE/HERTZV/PH/HzVENTV
SANITARY SEWERSSINKSK
HOT WATER RETURNHWRHORSEPOWERHP
GASG
DRINKING FOUNTAINDF
CEILINGCLG
COLD WATERCW
INDIRECT WASTEIW
BACKFLOW PREVENTERBFP
TW TW TEPID WATER
T
E
P
M
ABBREVIATIONSLEGENDGENERAL NOTES1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
POINT OF DISCONNECTIONPOD
REDUCED PRESSURE PRINCIPAL BACKFLOW PREVENTERRPBP
EXAMINE ALL DRAWINGS & FIELD VERIFY MECHANICAL/ELECTRICAL AND PLUMBING CONDITIONS PRIOR TO WORK & REPORT ANY DISCREPANCIES INWRITING TO FACILITY ENGINEER.
THE DRAWINGS ARE DIAGRAMMATIC & SHALL NOT BE SCALED TO DETERMINE EXACT LOCATION OF PLUMBING & EQUIPMENT.
SEQUENCE WORK TO AVOID CUTTING AND PATCHING. IF NECESSARY, REMOVE & REPAIR WALL FOR ACCESS TO WORK ON THE PLUMBING SYSTEMS (SEEARCHITECTURAL PLANS & SPECIFICATIONS). PATCH & FINISH TO MATCH ADJACENT SURFACE.
SECURELY FASTEN ALL PIPING WITHIN STRUCTURES TO THE BUILDING CONSTRUCTION BY MEANS OF HANGERS, SUPPORTS, GUIDES, ANCHORS, ANDSWAY BRACES TO MAINTAIN PIPE ALIGNMENT, TO PREVENT SAGGING, AND TO PREVENT NOISE AND EXCESSIVE STRAIN ON PIPING DUE TO MOVEMENTUNDER OPERATING CONDITIONS. ALL MECHANICAL/PLUMBING EQUIPMENT SHALL BE BRACED OR ANCHORED TO RESIST A HORIZONTAL FORCE ACTING INANY DIRECTION USING THE FOLLOWING CRITERIA: THE TOTAL DESIGN LATERAL SEISMIC FORCE SHALL BE DETERMINED FROM CBC 1613A. FORCES SHALLBE APPLIED IN THE HORIZONTAL DIRECTIONS THAT WILL RESULT IN THE MOST CRITICAL LOADING FOR DESIGN. WHERE ANCHORAGE DETAIL ANDLOCATIONS ARE NOT SPECIFICALLY SHOWN ON THE PLANS, THE FIELD INSTALLATION SHALL BE SUBJECT TO REVIEW AND APPROVAL OF THE MECHANICALENGINEER OF RECORD. SUPPORTS FOR ALL PIPING SHALL BE IN ACCORDANCE WITH LATEST SMACNA GUIDELINES FOR SEISMIC RESTRAINTS OFMECHANICAL SYSTEMS AND PIPING SYSTEMS AND MSS SP-58 AND SP-69.
ALL PIPES AND FITTINGS UTILIZED IN WATER SUPPLY SYSTEMS SHALL CONFORM TO 2013 CALIFORNIA PLUMBING CODE.
COORDINATE INSTALLATION OF ALL EQUIPMENT AND PIPING WITH OTHER TRADES PRIOR TO INSTALLATION. ENSURE THAT ALL CONTROL DEVICES,ACCESS PANELS IN FINISHED SPACES, OTHER THAN THAT SHOWN, CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PANELS PRIOR TOINSTALLATION. INSTALL PIPING TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH OTHER TRADES.
VERIFY AT PROJECT SITE EXACT SIZE, LOCATION, INVERT ELEVATION, AND CLEARANCE OF ALL EXISTING SERVICES BEING EXTENDED, RELOCATED, ORREMOVED.
CONTRACTOR IS TO MAINTAIN RECORDED "AS-BUILT" INFORMATION ON ALL EXISTING SERVICES UNCOVERED DURING CONSTRUCTION AND ALL NEWSERVICES BEING INSTALLED. "AS-BUILT" INFORMATION SHALL BE CLEARLY MARKED IN COLORED PENCIL ON A BLUE PRINT OF CONTRACT DRAWING.RECORDED INFORMATION SHALL INCLUDE ROUTING AND INVERT ELEVATIONS. AT THE COMPLETION OF THE CONTRACT, THE CONTRACTOR SHALL TURNRECORDED "AS-BUILT" INFORMATION OVER TO THE ENGINEER.
ADVISE THE ENGINEER IN WRITING IN THE EVENT A CONFLICT OCCURS BETWEEN THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND ACTUALFIELD CONDITIONS. THE CONTRACTOR SHALL BEAR ALL COSTS FOR RELOCATION OF EQUIPMENT, PIPING, ETC., FROM FAILURE TO PROPERLYCOORDINATE INSTALLATIONS AND ADVISE OF THE CONFLICT IN WRITING PRIOR TO INSTALLATION.
ARRANGE ALL PIPING WITHIN STRUCTURES NEATLY ALONG WALLS AND/OR IN NEAT, HORIZONTAL GROUPS AND MAINTAIN REQUIRED SLOPES.
DO NOT SLEEVE STRUCTURAL MEMBERS WITHOUT CONSENT OF THE ENGINEER. REVIEW STRUCTURAL DRAWINGS PRIOR TO PLACING ANY SLEEVES.
DO NOT SPRING OR FORCE PIPING DURING INSTALLATION.
SLOP ALL PIPING AS INDICATED. TRUE TO LINE AND GRADE, AND FREE OF TRAPS AND AIR POCKETS.
DO NOT INSTALL VALVES WITH STEM POINTING DOWNWARD UNLESS INDICATED OTHERWISE.
PROVIDE OPERATING HANDLES FOR ALL VALVES AND COCKS WITHOUT INTEGRAL OPERATIONS.
PROVIDE VALVES AND OTHER PIPING SPECIALTIES SAME SIZE AS LINE SIZE UNLESS INDICATED OTHERWISE.
WHERE POSSIBLE, INSTALL VALVES ACCESSIBLE FROM FLOOR LEVEL.
PROVIDE VALVES AND OTHER PIPING SPECIALTIES SAME SIZE AS LINE SIZE UNLESS INDICATED OTHERWISE.
PROVIDE A HANGER NOT MORE THAN 12-INCHES FROM THE POINT OF CHANGE OF DIRECTION OF A PIPE RUN IN BOTH HORIZONTAL AND VERTICAL PLANE.
PIPE HANGERS SHALL BE DESIGNED TO SUPPORT THE WEIGHT OF THE PIPE AND THE WEIGHT OF THE CONTENTS OF THE PIPE. REFER TO DETAILS ONDRAWINGS FOR ATTACHMENTS.
CONNECTION BETWEEN DISSIMILAR MATERIAL PIPES SHALL BE MADE WITH DIELECTRIC ISOLATING UNIONS, OR GASKETED FLANGES WITH ISOLATEDTHROUGH BOLTS.
CERTAIN VERTICAL AND HORIZONTAL OFFSETS ARE SHOWN IN PIPING ON PLANS TO INDICATE THE GENERAL POSITION RELATIONSHIP OF THE SYSTEMSWITHIN THE FURRED CEILING SPACE. PROVIDE ADDITIONAL OFFSETS SIMILAR TO THOSE SHOWN, AS REQUIRED TO COORDINATE WITH INSTALLATIONREQUIREMENTS OF OTHER SYSTEMS.
CONTRACTOR SHALL REMOVE, RELOCATE, REPLACE WITH NEW AND/OR RECONNECT ALL EXISTING SERVICES AS REQUIRED BY NEW CONSTRUCTION.
PROVIDE A TIGHT SEAL OF INCOMBUSTIBLE MATERIAL AROUND ALL PIPES WHICH PENETRATE FIRE SEPARATIONS. PROVIDE COLLARS OR TRIM RINGSAROUND PIPING TO RETAIN PACKING.
INVERT ELEVATIONS OF UTILITY MAINS SHALL BE VERIFIED AT PROJECT SITE PRIOR TO INSTALLATION OF NEW BRANCH SERVICES.
COOPERATE WITH OTHER TRADES TO LOCATE EXPOSED PIPING RUNS, SPRINKLER HEAD LOCATIONS, ETC., TO FORM A FULLY COORDINATED CEILINGPATTERN AND VISUAL APPEARANCE AS INDICATED ON ARCHITECTURAL DRAWINGS.
PIPING SYSTEM SHALL COMPLY WITH ASME B31.9, "BUILDING SERVICES PIPING", FOR LOW-PRESSURE COMPRESSED AIR PIPING. FIELD VERIFICATION OFSYSTEM DESIGN AND LAYOUT PRIOR TO FABRICATION.
PERFORM ALL INLET AND DISCHARGE PIPING DESIGN TO PROVIDE SMOOTH FLOW WITH UNIFORM VELOCITY OVER THE ENTIRE AREA OF PIPING.
PROVIDE ADEQUATE SUPPORT FOR ALL PARTS OF THE PIPING SYSTEM.
CONTRACTOR SHALL COORDINATE EXACT LOCATION OF THE PIPING STUB-OUT PRIOR TO INSTALLATION.
CONTRACTOR SHALL PROTECT THE PIPING TO PREVENT ENTRY OF DIRT AND ANY OTHER FOREIGN MATERIAL DURING THE INSTALLATION.
REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL PLUMBING FIXTURES, DRAINS, CATCH BASINS, PIPE TUNNEL, ACCESS PANELS ANDRISER SHAFTS.
VEHICLE
WAS
H AG
ENT
CONCEN
TRATE
VEH I CL E WAS H AGEN T BL EN D T AN K
A B D
2
3
1
C
ELECTRICAL3
STORAGE4
BUS WASHERBAY #1
1
BUS WASHERBAY #2
2
2
3
1
A B DC
POC
2
1
AC1
3(N)
(N)3" RPBP
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTDIVISION 3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED560 14th Street - Suite 400
Oakland, CA 94612t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
K. XU
P. WINGERD
4/12/2016
2016-xxxx
45
4/12/16 30% SUBMITTAL D3 - PLUMBING FLOOR PLAN P-101
1/4" = 1'-0"
PLUMBING NEW WORK PLAN
SHEET NOTES:
SEE ARCHITECTURAL DRAWINGS FOR EXACTPLACEMENT AND QUANTITY OF ALL EQUIPMENT.
BEFORE STARTING WORK, VERIFY LOCATIONS,ELEVATIONS AND SIZES OF ALL PIPING ANDEQUIPMENT REQUIRING PLUMBING CONNECTIONS.
COORDINATE ALL PLUMBING WORK WITH ALL OTHERWORK TO AVOID CONFLICTS. RUN ALL PIPING TOAVOID ARCHITECTURAL OPENINGS, STRUCTURALMEMBERS, DUCTS OR OTHER OBSTRUCTIONS.OFFSET PLUMBING PIPING WHERE REQUIRED.
1.
2.
3.
KEY NOTES:
PROVIDE 3" RPBF ASSEMBLY W/ CAP & SOV FOR BUSWASH EQUIPMENT CONNECTION.
PIPING FROM SOV SHALL BE PROVIDED BY BUS WASHEQUIPMENT VENDER.
INSTALL NEW AIR COMPRESSOR. POWERED BYELECTRICAL ENGINEER. COMPRESSED AIR PIPINGSHALL BE PROVIDED BY BUS WASH EQUIPMENTVENDOR.
DOUBLE DUPLEX RECEPTACLE20A, 125V, NEMA 5-20R MTD @ 18"A.F.F. (U.O.N.)
HOMERUN TO PANELBOARD WITH GROUNDING CONDUCTOR
3 POLE (U.O.N.) FUSED SAFETY DISCONNECT
SWITCH, 600V, SWITCH RATING/FUSE RATING
3 POLE (U.O.N.) UNFUSED SAFETY DISCONNECT
WP INDICATES WEATHERPROOF ENCLOSURE
SWITCH, 600V, 30A (U.O.N.)
AS INDICATED
WP
30AF
30AS
J
AHU
HORSEPOWER AS INDICATED
AIR HANDLING UNIT
CEILING MOUNTED JUNCTION BOX
MOTOR
ELECTRICAL PANELBOARD
WALL MOUNTED SPECIAL RECEPTACLE FORLAUNDRY 20A, 125V, NEMA 4-20R (2 POLE, 3 WIRES)FIELD COORDINATE MOUNTING HEIGHT
COMBINATION DATA/VOICE OUTLET.
3/4" EMPTY CONDUIT W/ PULLSTRING
STUB-UP TO CEILING
LIGHTING SWITCHOS - INDICATES OCCUPANCY SENSOR
CEILING MOUNTED DUPLEX RECEPTACLE
CEILING MOUNTED DATA OUTLET
FLOOR MOUNTED DUPLEX RECEPTACLE
FLOOR MOUNTED DATA/VOICE OUTLET 3/4"
EMPTY CONDUIT W/ PULLSTRING RUN TO
NEAREST COLUMN THEN STUB-UP TO CEILING
125V, NEMA 5-20R MTD @ 18" A.F.F. (U.O.N.)DUPLEX RECEPTACLE 20A,
GFI - GROUND FAULT INTERRUPTER
SURFACE
CEILING MOUNTED OCCUPANCY SENSOR
D - INDICATES DIMMERSSTUB-UP TO CEILING
WALL TELEPHONE OUTLET.
3/4" EMPTY CONDUIT W/ PULLSTRING
WALL MOUNTED SINGLE DUPLEX RECEPTACLE20A, 125V, NEMA 5-20R MTD @ 18"A.F.F. (U.O.N.)
RF- RETURN FANTE - TOILET EXHAUST
EF- EXHAUST FAN
STUB-UP TO CEILING
WALL PA SPEAKER OUTLET.
3/4" EMPTY CONDUIT W/ PULLSTRING
GROUND BUS BAR
PROVIDE (2) #10 + (1) #10 GND IN 3/4" C. FOR
CCTV CAMERA (N.I.C.)
PROVIDE 3/4" EMPTY CONDUIT W/ PULLSTRING
FSD FIRE SMOKE DAMPER
WALL MOUNTED JUNCTION BOXJ
FROM OUTLET TO CABLETRAY
WLAN ACCESS POINT (AP) OUTLET
PROVIDE 3/4" EMPTY CONDUIT W/ PULLSTRING
PROVIDE JUNCTION BOX
PROVIDE JUNCTION BOX
PROVIDE JUNCTION BOX
PROVIDE JUNCTION BOX
PROVIDE JUNCTION BOX
PROVIDE JUNCTION BOX
GN
VAV VARIABLE AIR VOLUME BOX
FURNISHED BY HVAC CONTRACTOR, INSTALLED BY
ELECTRICAL CONTRACTOR
POKE THRU FLOOR BOX
FOR SIGNAL FROM CCTV TO CABLE TRAY.
PROVIDE JUNCTION BOX FOR CCTV.
EXTERIOR CCTV's HEATER
AC - ABOVE COUNTER
125V, NEMA 5-20R MTD @ 18" A.F.F. (U.O.N.)DUPLEX RECEPTACLE 20A,
# #
A
manufacturer #description
GENERAL NOTES
DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS ANDWORK. FOLLOW DRAWINGS IN LAYING OUT WORK AND CHECK DRAWINGS OF OTHERTRADES TO VERIFY ADDITIONAL REQUIREMENTS & COORDINATION.
CUT STEEL CONDUIT ENDS SQUARE, REAM SMOOTH, PAINT MALE THREADS OF FIELD THREADEDCONDUIT WITH GRAPHITE BASE PIPE COMPOUNDS DRAW UP TIGHT WITH CONDUIT COUPLINGS.
LEAVE WIRE SUFFICIENTLY LONG TO PERMIT MAKING FINAL CONNECTIONS.
COVERS OF JUNCTION AND PULL BOXES SHALL BE ACCESSIBLE.
SUPPORT PANEL, JUNCTION AND PULL BOXES INDEPENDENTLY FROM STRUCTURE WITH NOWEIGHT BEARING ON CONDUITS.
SUPPLEMENTARY JUNCTION & PULL BOXES IN ADDITION TO JUNCTION & PULL BOXES INDICATEDON THE CONTRACT DRAWINGS. AND REQUIRED BY APPLICABLE CODES, PROVIDESUPPLEMENTARY JUNCTION & PULL BOXES AS FOLLOWS:
WHEN REQUIRED TO FACILITATE INSTALLATION OF WIRING.
AT EVERY THIRD 90° TURN.
AT INTERVALS NOT EXCEEDING 100 FEET FOR RACEWAY SIZES OVER 1 INCH.
1.
2.
3.
4.
5.
6.
7.
1.
2.
3.
COORDINATE WITH OTHER TRADES AS TO THE EXACT LOCATION AND CONFIGURATION OF THEIRRESPECTIVE EQUIPMENT. PROVIDE POWER AND MAKE CONNECTION TO EQUIPMENTREQUIRING ELECTRICAL CONNECTIONS AS INDICATED ON PLAN AND DRAWINGS OF OTHER TRADES.REVIEW THE DRAWINGS OF OTHER TRADES FOR CONTROL DIAGRAMS, SIZE AND LOCATION OFEQUIPMENT. DISCONNECT SWITCHES, WIRING, CONTROLS, AND CONDUIT FORMECHANICAL AND PLUMBING OPERATIONS SHALL BE PROVIDED. THE CONTRACTOR SHALL BERESPONSIBLE FOR OBTAINING MANUFACTURER'S SHOP DRAWINGS PRIOR TO ROUGHING IN ALLCONDUIT TO THIS EQUIPMENT.
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
R. FEE
T. LWIN
4/12/2016
2016-xxxx
45
4/12/16 30% SUMMITAL D3-GENERAL NOTES AND SYMBOLSE-001
A B D
2
3
1
C
GENERAL NOTES
VERIFY ALL EXISTING INSTALLATION IN THE FIELD PRIOR TO ANYDEMOLITION WORK. NOTIFY THE ARTHITECT OD ANY DISCREPANCIESPRIOR TO DEMOLITION.
1.
UTILITIES (ELECTRIC, SIGNAL, FEEDERS, ETC.) THAT ARE DAMAGEDAS A RESULT OF ANY DEMOLITION WORK SHALL BE RESTORED INWORKING CONDITION TO THE SATISFACTION OF THE AC TRANSIT.
2.
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH
DRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313f: 510.465.1586
Alameda - Contra Costa Transit DistrictSHEET OF
R. FEE
T. LWIN
4/12/2016
2016-xxxx
45
4/12/16 30% SUMMITAL D3 - DEMOLITION PLANED-101
1/4" = 1'-0"
DEMOLITION PLAN4' 8' 16'0
VEHICLE WASH AGENT CONCENTRATE
VEH I CL E WAS H AG ENT B LEN D T AN K
A B D
2
3
1
C
ELECTRICAL
3
STORAGE
4
BUS WASHER
BAY #1
1
BUS WASHER
BAY #2
2
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENT
D3 - RICHMOND BUS WASHDRAWING NO.:
SHEET NO.:
ACT DRAWING #:
ACT CONTRACT #:
STV INCORPORATED
560 14th Street - Suite 400
Oakland, CA 94612
t: 510.763.1313
f: 510.465.1586Alameda - Contra Costa Transit District
SHEET OF
R. FEE
T. LWIN
4/12/2016
2016-xxxx
45
4/12/16 30% SUMMITAL D3-POWER PLANE-101
1/4" = 1'-0"
POWER PLAN
DP1
4' 8' 16'0
NOTES:
1. XXXXXXXX
A B D
2
3
1
CA B D
2
3
1
C
A
B
C
1 2 3 4 5
1 2 3 4 5
D
NO. DATE BY APP.
DESIGNED BY:
DRAWN BY:
ACT FACILITIES MAINTENANCE
ACT PROJECT MANAGER:
DATE:
Alameda - Contra Costa Transit District AC TRANSIT BUS WASH REPLACEMENTD3 - RICHMOND BUS WASH