Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections Document Number: Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo Revision: 0 Date Issued: 10 May 2019 1 of 18 TABLE OF CONTENTS 1. Scope Of Work 2. Definition 3. Contract Price Adjustment Factor 4. Value Added Tax 5. Supervision 6. To Be Supplied By Contractor 7. To Be Supplied By TNPA Lighthouse And Navigational Systems 8. Information To Be Obtained On Site 9. Site Arrangements 10. Occupational Health And Safety Act (Act 85 Of 1993) 11. Special Requirements 12. Measurement And Payment 13. Insurances 14. General 15. Work Specification 16. Bill Of Quantities 17. Signing Off
20
Embed
Site: Lighthouse and Navigational Systems Western Document … · 2019-06-21 · contact project leader or regional manager – western region. 11. occupational health and safety
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
1 of 18
TABLE OF CONTENTS
1. Scope Of Work
2. Definition
3. Contract Price Adjustment Factor
4. Value Added Tax
5. Supervision
6. To Be Supplied By Contractor
7. To Be Supplied By TNPA Lighthouse And Navigational Systems
8. Information To Be Obtained On Site
9. Site Arrangements
10. Occupational Health And Safety Act (Act 85 Of 1993)
11. Special Requirements
12. Measurement And Payment
13. Insurances
14. General
15. Work Specification
16. Bill Of Quantities
17. Signing Off
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
2 of 18
1. Scope Of Work
For the purpose of this contract the ‘Works’ shall include the examination, inspection, testing, servicing
and repairing to all Lifting Equipment, Plant and Machinery owned by TRANSNET NATIONAL PORTS
AUTHORITY (TNPA), LIGHTHOUSES AND NAVIGATIONAL SYSTEMS (LNS) - WESTERN REGION in
accordance with the OCCUPATIONAL HEALTH AND SAFETY ACT OF 1993 (ACT 85 of 1993) and the
TRANSNET CODE OF PRACTICE 29 (COP 29) and provide certification and register thereof.
2. Definition
Lighthouses and Navigational Systems, Western Region: Lighthouses from Plettenberg Bay to Port
Nolloth including the Port of Cape Town and the Port of Saldanha plant, machinery and equipment shall
be examined, inspected, tested and repairs, in accordance and compliance with the Transnet Code of
Practice 29 (COP 29) requirements for such equipment, in accordance with the Occupational Health and
Safety Act (Act 85 of 1993), or any other relevant Transnet Code or Procedure governing such
equipment.
3. Contract Price Adjustment Factor
Escalation after a twelve month period shall be in accordance to CPI.
4. Value Added Tax
All tendered rates are to be exclusive of VAT.
5. Supervision
The Service Provider shall carry out the “work”, as reflected in the contract at intervals specified by LNS
- Regional Manager, West and shall not appoint or subcontract anyone to perform the “work” or to act
in his/ her capacity.
6. To Be Supplied By Contractor
The Service Provider shall be responsible for providing the required labour, material, personal protective
clothing, transport, and ad hoc costs required for the proper completion of the works.
7. To be supplied by TNPA, Lighthouse and Navigational Systems
TNPA, LNS will provide access to each premise.
8. Information to be obtained on site
The Service Provider shall visit the sites of the proposed work and acquaint themselves with the nature
of work, the condition under which the work is to be performed, the means of access to the site, any
limitations or other authorities and in general with all matters that may influence or affect the contract
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
3 of 18
and shall be deemed to have allowed in his tender for any additional cost involved due to the foregoing,
as no claims with regard to compensation in connection with the position or nature of the work will be
entertained.
9. Site Arrangements
Contact Project Leader or Regional Manager – Western Region.
11. OCCUPATIONAL HEALTH AND SAFETY ACT (ACT 85 OF 1993)
For the purpose of the contract the Occupational Health and Safety Act 1993 (Act No 85 of 1993) and
Transnet’s Code of Practice 29 governs all works/contractors undertaken, in accordance with the Act
and Control of the relevant Transnet National Ports Authority SHERQ Official.
12. Special requirements
Special attention and compliance to General Safety Regulations as promulgated in terms of the OSH Act
(Act 85 of 1993) and compliance to Transnet Specification E4E, and Transnet’s Code of Practice 29.
13. Measurement and payment
The unit of measurement will be as stipulated in the RFQ Quotation Form. Monthly payment will be
made thirty days from statement as per Transnet National Ports Authority’s Procurement Policy.
14. Insurances
The Contractor shall in effect be liable for, in his own interest, any insurance of which he deems
necessary to cover any loss and/or damage to TNPA Lighthouse and Navigational Systems
property/assets, against any legal liability for accidental death, injury or damage to third party and/or
property arising out of or in connection with, the requirements of this contract.
15. General
15.1 The Service Provider shall not cede, assign, transfer or sub-let the agreement or any part thereof, not
enter into any sub-contract of any nature for the execution hereof without prior written consent of TNPA
Lighthouse and Navigational Systems, Regional Manager, East.
15.2 No amendment or variation of, or addition to this agreement shall be of any force or effect unless reduced
to writing and signed by both parties.
15.3 All Service Providers shall submit with their tenders their Tax Clearance Certificate or electronic access PIN
obtained from SARS’s new Tax Compliance Status (TCS) system.
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
4 of 18
15. WORK SPECIFICATION
15.1 The Service Provider shall provide the inspection, testing of all Lifting Equipment, Plant and
Machinery as stipulated under the contract for Lighthouse and Navigational Systems assets as
stipulated in the Bill of Quantities.
15.2 The service provider shall complete on a basis, the quarterly report of equipment, examination
and testing of portable and fixed plant, machinery and equipment as indicated on the bill of
quantities in accordance with the Transnet Code of Practice 29 and occupational health and
safety act
15.3 The service provider shall endorse appropriate Logsheets and ensure that all necessary
documentation/certificate(s) are completed.
15.4 The Service Provider shall be granted access onto the premises to conduct
Inspections for quotations when required with the Project Leader or a Lighthouse and
Navigational Systems Technician present.
15.5 The Service Provider shall submit a copy of the company’s Engineering Council ECSA
registration certificate.
15.6 The contract shall be valid for a 24 months period commencing on the 01 August 2017 and
shall conclude on the 31 July 2019
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
5 of 18
16. BILL of QUANTITIES
ITEM NO MATERIAL SERVICE REQUESTED
0010 MONTHLY REPORTS, EXAMINATIONS OF PORTABLE AND FIXED MACHINERY PLANT
AND LIFTING EQUIPMENT AS PER EQUIPMENT LIST AT WESTERN REGION
LIGHTHOUSES AND NAVIGATIONAL SYSTEMS. REPORT ON NON CONFORMANCES.
ENDORSEMENTS OF APPROPRIATE LOGSHEETS
0020 THREE MONTHLY REPORTS, EXAMINATIONS OF SAFETY HARNESSES AND
LANYARDS AT THE WESTERN REGIONS WORKSHOPS. REPORT ON NON
CONFORMANCES.
ENDORSEMENTS OF APPROPRIATE LOGSHEETS
0030 SIX MONTHLY REPORTS, INSPECTIONS OF PORTABLE LADDERS AT PORT OF CAPE
TOWN AND PORT OF SALDANHA BAYS WORKSHOPS AND STORES AS PER LADDER
REGISTER
SIX MONTHLY INSPECTIONS OF FIXED LADDERS AND STAIRCASES AT WESTERN
REGIONS LIGHTHOUSES.
REPORT ON NON CONFORMANCES.
ENDORSEMENTS OF APPROPRIATE LOGSHEETS
0040 ANNUAL LOAD TESTING OF EQUIPMENT SUPPLY LOAD TEST CERTIFICATE AND
REPORT DOCUMENT.
REPORT ON NON CONFORMANCES.
ENDORSEMENTS OF APPROPRIATE LOGSHEETS
0050 REPORT AND QUOTE ON ADHOC REPAIRS ON COP 29 LIFTING EQUIPMENT
ENDORSEMENTS OF APPROPRIATE LOGSHEETS
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
6 of 18
Name of station Location
Monthly examination of the Fixed and Portable Machinery
3 Monthly examination of the safety harnesses and Lanyards
6 Monthly examination of Portable and Fixed Ladders
Annual Load Testing
Port Nolloth Port Nolloth, NC X X
Hondeklipbaai Hondeklip X X
Groenriviermond Groen Rivier X X
Doringbaai Doringbaai X X X
Cape St. Martin St Helena Bay, WC X X
Stompneus Punt St Helena Bay, WC X X
Cape Columbine Paternoster, WC X X
North Head Saldanha Bay, WC X X X
South Head Saldanha Bay, WC X X X
Dassen Island Dassen Island, WC X X
Milnerton Milnerton, WC X X
Robben Island Robben Island, X X
Green Point Green Point, WC X X
Slangkop Kommetjie X X
Cape Point Simon's Bay, WC X X
Roman Rock Simon's Town, WC X X
Cape Hangklip Pringle Bay X X
Danger Point Gansbaai X X
Quion Point Buffelsjag X X
Cape Agulhas Cape Agulhas, WC X X
Cape Infanta Breedie Rivier X X
Ystervarkpunt Gouritzmond X X X
Cape St. Blaize Mossel Bay X X
Cape Seal/Robberg Plettenberg Bay X X
Port of Cape Town Workshop
Coode Cres, Port Of Cape Town
X X X X
Port of Saldanha workshop
Small Craft harbour, Port of
Saldanha X X X X
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
7 of 18
CODE NUMBER DESCRIPTION CAPACITY S.W.L SIZE WHERE APPLICABLE
CLH-1 SWR SLING 630 KG 8 X 2000
CLH-3
CLH-4 " " "
CLH-5 " " 8 X 4000
CLH-6 " " "
CLH-7 " " "
CLH-8 " " "
CLH-9 " 1500 KG 13 X 2000
CLH-10 " " "
CLH-11 A " " "
CLH-12 " " "
CLH-13 " " 13 X 4000
CLH-14 " " "
CLH-15 A " " "
CLH-16 " " "
CLH-17 " 2500 KG 16 X 2000
CLH-18 A " " "
CLH-19 " " "
CLH-20 " " "
CLH-21 SWR SLING 2500 KG 16 X 4000
CLH-22 A " " "
CLH-23 " " "
CLH-24 " " "
CLH-25 " 3400 KG 20 X4500
CLH-26 " " "
CLH-27 " 4930 KG 24 X 1800
CLH-28 " " "
CLH-29 " 630 KG 8 X 27000
CLH-30 " 1420 KG 13 X 27000
CLH-32 " 6850 KG 28 X 3000
CWN4C / 1131 CIRCULAR SAW HAND MAKITA
CWN4C / 064 ANGLE GRINDER SMALL MAKITA
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
8 of 18
CWN4C / 1438 " BIG
CWN4C / 724 CUT-OFF MACHINE
CWNOP0153 Porta Pack Gas set "
CWN4C / 2047 Porta Pack Gas set " "
CLH-1 BOW SHACKLE 3250 KG
CLH-2 " "
CLH-3 " "
CLH-4 " "
CLH-5 " "
CLH-6 " "
CLH-7 " "
CLH-8 " "
CLH-9 " 6500 KG
CLH-10 " "
CLH-11 A " "
CLH-12 " "
CLH-13 " 8500 KG
CLH-14 " "
CLH-15 A " "
CLH-16 A " "
CLH-17 WEB LIFTING UNIT 3180 KG
CLH-18 " "
CLH-20 " "
CLH-21 TIFORE HOOK 1500 KG 12 X 4900
CLH-23 " " 12 X 15900
CLH-24 " " "
CLH-25 " " 12 X 88000
CLH-26 " " 12 X 15300
CLH-27 " " 12 X 14800
CLH-29 DRUM LIFTER 250 KG CHAIN
CLH-30 " " "
CLH-32 D - SHACKLE 4300 KG
CLH-33 " "
CLH-34 " "
CLH-36 " "
CLH-28 TIRFOR HOOK 1500 kg 12 X 88000
GANTRY 1 TON
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
9 of 18
4CWS/6010 CHAIN HOIST 1 TON
CWN OP / 1276 ANGLE GRINDER SMALL
PFB433W FORKLIFT 3 TON
CWN4C / 0253 BENCH POLISHER
CWN4C / 911 HYD. CRANE PAL FINGER 4600 KG CA 873 - 765
" HOOK " "
CWN4C / 0856 BENCH GRINDER SMALL
CWN4C / 840 A CHAIN BLOCK 500 KG
CWN4C / 833 A & B ROPE BLOCK 400 KG
CWN4C / 834 A & B " "
CLH-1 SAFETY BELT
CLH-2 "
CLH-3 "
CLH-4 "
CWN4C / 836 TIRFOR HOIST 1500 KG
CWN4C / 835 " "
CWN4C / 838 CHAIN BLOCK 1000 KG
CWN4C / 840 CHAIN BLOCK 500 KG
CWN4C /0246 Porta Pack Gas sets SMALL
CWN4C / 1077 GAS SET BIG
CWN4C / 129 Porta Pack Gas sets SMALL
CWN4C / 1647 PEDASTEL GRINDER
CWN4C / 861 MOB. COMPRESSOR 690 KPA
20581 AIR RECEIVER 690 KPA
CWN4C / 867 MOB. COMPRESSOR 690 KPA
2601 AIR RECEIVER 690 KPA
? MOB. COMPRESSOR 690 KPA
2868 AIR RECEIVER 690 KPA
CWN4C / 470 CIRCULAR SAW HAND 325 mm
CWN4C /851 CONCRETE CUTTER HAND 180 mm
CWNCP / 066 CONCRETE CUTTER HAND 125mm
CWN4C / 0256 HYDRAULIC PRESS 10 TON
CWN4C / 0858 POWER SAW
CWN4C / 0859 LATHE SMALL
CWN4C / 0862 BAND SAW STANDARD
CWN4C / 0874 RADIAL ARM DRILLING M/C
CWN4C / 0875 BOX AND PAN BENDER
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
10 of 18
CWN4C / 0877 METAL ROLLER
CWN4C / 0878 MILLING MACHINE FEXAC 3352A
CWN4C / 0855 PEDESTAL DRILL PRESS 16400
CWN4C / 1366 MORTIFAX MACHINE U 101375
CWN4C / 1367 SANDING M/C 5050008
CWN4C / 1368 DRILL PRESS SMALL 841499
CWN4C / 1369 SPINDLE CUTTER 94000036
CWN4C / 1370 PLAINER
CWN4C / 1371 CIRCULAR SAW 933009
CWN4C / 1428 SAW DUST EXTRACTOR 96/87 C
CWN4C / 1643 RADIAL ARM CIRCULAR SAW
4305849
CTFLH 10649 ELECT. HYDRO BLAST
CWN4C / 671 GENERATOR PETROL HONDA
CWNCP / 084 GENERATOR / BATTERY CHARGER
CWN4C / 0871 HP CLEANER PETROL
4CWS /1/005 ELECT. WELDER MILLER TRANS ARC
CWN4C / 710 ELECT. WELDER TONCO
1 ROLLER CHUTTER DOOR AUTO
2 "
3 PUSH - UP DOOR STORE
4 ROLLER MECH. CURTAIN
5 ROLLER SHUTTER DOOR
6 HORIZONTAL SLIDING GATE
AUTO
CWN4C / 1753 A & B EXT. LADDER 15 STEPS
CWN4C / 1754 A & B " "
CWN4C / 1755 A& B STEP EXT. LADDER 10 STEPS
CWN4C / 1756 A & B " "
CWN4C / 1757 A & B " "
CWN4C/1758 A & B STEP / EXT LADDER 10 STEPS
CWN4C/1759 A & B " "
CWN4C/1761 A & B " "
CWN4C/1762 A& B " "
CWN4C/1763 A& B " "
CWN4C/1764 A & B " "
CWN4C/1765 STEP LADDER 7 STEPS
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
11 of 18
CWN4C/1766 " 6 STEPS
CWN4C/1767 " "
CWN4C/1768 " "
CWN4C/1771 " "
CWN4C/1772 " "
CTLHWS - 1 A& B EXT LADDER 15 STEPS
CWNOP 043 EXT LADDER 24 STEPS
CPT - 10 MULTIFLEX LADDER
CWN4C/1769 STEP LADDER 4 STEPS
BM29778 SPREADER BEAM 10 000 KG
62836 TWO LEGGED CHAIN SLING
13 940 KG
62834/2 SINGLE LEG CHAIN SLING 8 200 KG
62834/1 SINGLE LEG CHAIN SLING 8 200 KG
62835/1 SINGLE LEG CHAIN SLING 8 200 KG
62835/2 SINGLE LEG CHAIN SLING 8 200 KG
REGISTER / INVENTORY I.D MARKS SWL KG
STEEL WIRE ROPE SLH - 1 630 KG
STEEL WIRE ROPE SLH - 2 630 KG
STEEL WIRE ROPE SLH - 3 1420 KG
STEEL WIRE ROPE SLH – 4 1420 KG
STEEL WIRE ROPE SLH – 5 1420 KG
STEEL WIRE ROPE SLH – 6 1420 KG
STEEL WIRE ROPE SLH – 7 2210 KG
STEEL WIRE ROPE SLH – 8 2210 KG
STEEL WIRE ROPE SLH – 9 2210 KG
STEEL WIRE ROPE SLH - 10 2210 KG
STEEL WIRE ROPE SLH – 11 2210 KG
STEEL WIRE ROPE SLH – 12 2210 KG
STEEL WIRE ROPE SLH – 13 34000 KG
STEEL WIRE ROPE SLH – 14 34000 KG
STEEL WIRE ROPE SLH – 15 34000 KG
STEEL WIRE ROPE SLH - 16 34000 KG
STEEL WIRE ROPE SLH - 17 6030 KG
STEEL WIRE ROPE SLH - 18 6030 KG
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
12 of 18
STEEL WIRE ROPE SLH - 19 6030 KG
BOW SHACKLE SLH - 1 3250KG
BOW SHACKLE SLH - 2 3250KG
BOW SHACKLE SLH – 3 3250KG
BOW SHACKLE SLH – 4 3250KG
BOW SHACKLE SLH – 5 6500 KG
BOW SHACKLE SLH – 6 6500 KG
BOW SHACKLE SLH – 7 6500 KG
BOW SHACKLE SLH – 8 6500 KG
BOW SHACKLE SLH – 9 8500 KG
BOW SHACKLE SLH – 10 8500 KG
BOW SHACKLE SLH – 11 8500 KG
BOW SHACKLE SLH – 12 8500 KG
DEE SHACKLE SLH – 13 6000 KG
DEE SHACKLE SLH – 14 6000 KG
DEE SHACKLE SLH - 15 6000 KG
DEE SHACKLE SLH - 16 6000 KG
POLYESTER WEB SLING SLH- 20
POLYESTER WEB SLING SLH- 21
POLYESTER WEB SLING SLH- 22
POLYESTER WEB SLING SLH- 23
HYD. CRANE CA 324552 CWN4C/ 830 3000 KG
HOOK CA 324552 CTFL4C/830 3000 KG
PORTABLE/ COMPRESS SDB/5116 690 KPA
AIR RECEIVER 2781 690 KPA
BENCH GRINDER SLDFLH - 1 3600 RPM
PEDESTAL GRINDER SDB4B / 5182 1430 RPM
EXT LADDER SDB4B / 5124
SINGLE STEP LADDER SDB4B / 5125
MULTIFLEX LADDER SDB4B / 5255
STEP LADDER SDB4B / 5269
SINGLE STEP LADDER SLH - 1
FULL BODY SAETY HARNESS SLH - 2 25000KG
FULL BODY SAETY HARNESS SLH - 3 13000KG
CHAIN BLOCK SDB4B / 138 1000 KG
HYSTER FORKLIFT PGB048W 12 TON
BIG CUTTING SET - OXY & ACET SLH - 1
PORTA PACK - OXY & ACET SLH - 2
ANGLE GRINDER BIG SDB4B / 5106
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
13 of 18
ANGLE GRINDER BIG SDB4B / 5130
ANGLE GRINDER SMALL SDB4B / 5130
CUT - OFF M/C SDB / 4B / 5263
CIRCLE SAW SDB / 4B / 5235
CONCRETE CUTTER SDB / 4B / 5160
ROUTER CWNCP/119 METABO
PED GRINDER M/C SDB / 4B / 5107 REXIN
PED GRINDER M/C SDB / 4B / 5241 ROBOR
LATHE SDB / 4B / 5242 HARRISON
BAND SAW SDB / 4B / 5240 FORTE
PORT/GENERATOR SDB / 4B / 5236 HONDA
PORT/HYDRO BLAST SDB / 4B / 5234 HONDA
CASTER WHEEL SLH - 1A / 1
CASTER WHEEL SLH - 1A / 2
CASTER WHEEL SLH - 1A / 3
CASTER WHEEL SLH - 1A / 4
END FRAME SLH – 1B /1 BIG
" SLH – 1B / 2 BIG
" SLH – 1B/ 3 BIG
" SLH – 1B/ 4 BIG
END FRAME SLH – 1C / 1 SMALL
" " SLH – 1C/ 2 SMALL
END FRAME HAND RAILING SLH – 1D / 1
END FRAME HAND RAILING SLH – 1D / 2
WORKING PLATFORM SLH – 1E / 1
BRACE BAR SLH – 1F / 1 LONG
" " SLH – 1F / 2 LONG
" " SLH – 1F / 3 LONG
" " SLH – 1F / 4 LONG
" " SLH – 1F / 5 LONG
" " SLH – 1F/ 6 LONG
" " SLH – 17/ 7 LONG
BRACE BAR SLH – 1G / 1 SHORT
" " SLH – 1G / 2 SHORT
" " SLH – 1G / 3 SHORT
" " SLH – 1H / 4 SHORT
STABILIZER LEG SLH – 1G / 5 SHORT
" " SLH – 1G / 6 SHORT
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
14 of 18
CODE NUMBER DESCRIPTION CAPACITY S.W.L SIZE WHERE APLICABLE
PNL-1 ALLUMINIUM EXT .LADDER
10 STEP
PNL-2 ALLUMINIUM STEP LADDER
4 STEP
PNL-3 ALLUMINIUM TOWER EXCESS LADDER
PNL-4 D/A SET ML10 DEUTZ O/C
PNL-5 LAWNMOWER
PNL-6 WEED EATER STIHL FS 420
PNL-7 WORKING PLATFORM
HK-1 FIX LADDER
GRM-1 ALLUMINIUM LADDER 11 STEP
GRM-2 D/A SET ML10 DEUTZ O/C
GRM-3 D/A SET F2L912 ENGINE
DRB-1 D/A SET F2L912 ENGINE
DRB-2 LUMINARE ACCESS LADDER
CSM-1 PLATFORM HOOK ON LADDER
CSM-2 WORKING PLATFORM
SNP-1 LADDER FIXED
CCB- 1 ALLUMINIUM EXT. LADDER
10 STEP 3 METER
CCB- 3 ALLUMINIUM STEP LADDER
1,2 METER
CCB- 5 WEED EATER MARU YAMA
CCB- 6 LAWN MOWER
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
15 of 18
CCB- 7 DRILLING M/C RYOBI
CCB- 8 ANGLE GRINDER 115mm BOSCH
CCB- 9 HIGH PRESSURE WATER GUN
K ARCHER
CCB- 10 D/A SET F4L912 DEUTZ
CCB- 12 DRILLING M/C 570 W BOSCH
MCI-1 WORKING PLATFORM 200 KG LEADING LIGHT
MCI-2 HOOK ON LADDER FOR PLATFORM
MCI-3 INSIDE LADDER FIXED
MCI-4 OUTSIDE LADDER FIXED
SHD-1 D/A SET ML10 DEUTZ O/C
SHD-5 LUMINARE ACCESS LADDER
BLUE
NHD-1 D/A SET ML10 DEUTZ O/C
NHD-2 D/A SET
NHD-4 STEEL ACCESS LADDER
MLT-1 D/A SET F2L912 ENG.
MLT-2 STEEL LADDERS INSIDE TOWER
FIXED
CODE NUMBER DESCRIPTION CAPACITY S.W.L SIZE WHERE APLICABLE
DSI- 1 DOME LADDER BALCONY TO CAT WALK
DSI- 2 DOME LADDER CATWALK TO DOME
DSI- 3 FIX LADDER STEEL WATER TANKS ACCESS
DSI- 5 A & 5 B ALLUMINIUM EXT. LADDER
19 STEPS
DSI- 6 ALLUMINIUM STEP LADDER
6 STEPS
DSI- 7 A & 7 B ALLUMINIUM EXT. LADDER
10 STEPS
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
16 of 18
DSI- 8 WATER PUMP HONDA GX 120 4.0
DSI- 9 BENCH GRINDER FEMCO
DSI- 10 D/A SET ML10 DEUTZ O/C
DSI- 11 D/A SET F4L912 DEUTZ
DSI- 14 DRILLING MACHINE RYOBI
SLK-1 A ALLUMINIUM STEP LADDER
10 STEP
SLK-2A & 2B ALLUMINIUM EXIT. LADDER
10 STEP
SLK-3 ALLUMINIUM STEP LADDER
6 STEP
SLK-4 ALLUMINIUM OPTIC LADDER
SLK-5 ALLUMINIUM STEP LADDER
7 STEP
SLK-6 A,B7C DOME LADDERS
SLK-7 WEED EATER STIHL
SLK-8 LAWN MOWER HONDA 11.0 ENG. ALPHA MARK 1
SLK-9 D/A SET ML10 DEUTZ O/C
SLK-10 BENCH GRINDER
GPT.1 D/A SET F2L912 ENGINE
GPT.2 FOLD UP LADDER 12 STEP
CODE NUMBER DESCRIPTION CAPACITY S.W.L SIZE WHERE
APLICABLE
RBI. 1 D/A SET ML10 DEUTZ O/C
RBI. 2 BENCH GRINDER 150 mm
RBI. 3 ORBITAL SANDER BOSCH
RBI. 4 EXTENSION LADDER 10 STEP
CPT.1 D/A SET ML10 DEUTZ O/C
CPT.2 LAWN MOWER HONDA HRU 196
CPT.3 WEED EATER STIHL
HGK. 1 D/A SET F2L912 ENGINE
HGK. 2A & 2B TOWER LADDER FIXED
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
17 of 18
DAP.1 A DOME LADDER
DAP.2 ALUMINIUM STEP LADDER
6 STEP 1.8 METER
DAP.3 ALUMINIUM STEP LADDER
10 STEP 3 METER
DAP.4 BENCH GRINDER 150 mm
DAP.5 WEED EATER STIHL FS 550
DAP.6 LAWN MOWER ALPHA MARK 1
DAP.7 WATER PUMP HONDA GX160/5.5
DAP.8 D/A SET ML10 DEUTZ O/C
DAP.9 DRILLING MACHINE 750 W RIOBI HAND DRILL
DAP.10A & 10B ALUMINIUM EXTENSION LADDER
10 STEP
DAP - 1B DOME LADDER FIX
DAP - 1C DOME LADDER REMOVABLE
DAP - 11 HORIZONTAL STEEL SLIDING GATE
AUTOMATIC
CODE NUMBER DESCRIPTION CAPACITY S.W.L SIZE WHERE APLICABLE
QUP. 1A TOWER LADDER FIX
QUP. 2B TOWER LADDER ACCESS
AGH.1 BENCH GRINDER 150 mm
AGH.2 ALUMINIUM STEP LADDER
6 STEP 1.8 METER
AGH.3 ALUMINIUM STEP LADDER
10 STEP 3 METER
AGH.4A & 4B ALUMINIUM EXT. LADDER
10 STEP 3 METER
AGH.5 WEED EATER MARUYAMA
AGH.6 HAND DRILLING MACHINE
750 W RYOBI
AGH.7 D/A SET ML10 DEUTZ O/C
AGH.9 HEAT GUN 1500 W SKIL
CIF.1A TOWER LADDER FIX
CIF.1B TOWER LADDER ACCESS
CIF.2 D/A SET F2L912 ENGINE
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
18 of 18
CIF.4 ALUMINIUM TIP UP GARAGE DOOR
YVP.1 ALUMINIUM STEP LADDER
8 STEP 2.3 METER
YVP.2 LAWNMOWER HOPPER 535
YVP.4 D/A SET ML10 DEUTZ O/C
YVP.5 DOME LADDER
YVP.6 STEEL LIFTING HOOK 200 KG CODE NUMBER DESCRIPTION CAPACITY S.W.L SIZE WHERE
APLICABLE
CSB.2 ALUMINIUM STEP LADDER
4 STEP 1.2 METER
CSB.3 ALUMINIUM STEP LADDER
6 STEP 1.8 METER
CSB.4 ALUMINIUM STEP LADDER
10 STEP 3 METER
CSB.5 ALUMINIUM EXT. LADDER
10 STEP 3 METER
CSB.6 ALLUVIUM EXT. LADDER
15 STEP 4.5 METER
CSB.7 LAWN MOWER SOUTHERN CROSS
CSB.8 WEED EATER
CSB.9 D/A SET ML10 DEUTZ O/C
CSB.10 HAND HELD ELECT. DRILLING M/C
BOSH 550-2
CSB.11 HAND HELD ELECT. SANDING M/C
BOSH GS 516A
CSB.12 ANGLE GRINDER 115mm / MATABO W7
CSB.13 ELECTRICAL PAINT STRIPPER
MOS. 2 BENCH GRINDER GREUSEN / 150mm
MOS. 3 GAS CUTTING SET PORTA PACK
MOS. 4 PEDESTAL DRILL PRESS
15 mm max
MOS. 5 ELECTRICAL ORBITAL SANDER
BOSCH
MOS. 6 ANGLE GRINDER 115 mm
MOS. 7 HAND HELD DRILLING 13mm max
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo
Revision: 0
Date Issued:
10 May 2019
19 of 18
M/C
MOS. 8 JIG SAW BOSCH PST 50 A
MOS. 10 ELECTRIC WELDING M/C
KWIKWELD D 160
ROB.1A TOWER LADDER FIX
ROB.1B TOWER LADDER ACCESS
CIF.3 WEED EATER STIHL
CODE NUMBER DESCRIPTION CAPACITY S.W.L SIZE WHERE APLICABLE
KNY.1 FRONT LEADING LIGHT
KNY.2 REAR LEADING LIGHT
VBI-1 FRONT LEADING LIGHT
Mossel Bay
VBI-2 REAR LEADING LIGHT Mossel Bay
DOS-1 FRONT LEADING LIGHT
Mossel Bay
DOS-2 REAR LEADING LIGHT Mossel Bay
Site: Lighthouse and Navigational Systems Western Region Title: COP 29 Inspections
Document Number:
Inspection: Robin Poggenpoel Barnie Germishuys T George Makondo