on Site 2010 Brian Sheldon Partner SITE a/s SITE A/S BIM værdi Bentleyuser.dk Vejle 11.10.10 Projektudvikling BIM
onSite
2010
Brian Sheldon
Partner SITE a/s
SIT
E A
/SB
IM v
ærd
i
Bentleyuser.dk
Vejle 11.10.10
Pro
jektu
dvik
ling
BIM
onSite
2010
BIM værdiB
IM v
ærd
iS
ITE
A/S
Part 1. POWERPOINT
•Hvad er BIM
•3D CAD vs. BIM
Brian Sheldon
Partner SITE a/s
Pro
jektu
dvik
ling
BIM
•3D CAD vs. BIM
•Hvem bruger BIM
•Hvad kan BIM bruges til
•BIM standarder
Part 2. LIVE
•PC Ballerup
•Spaces
•IFC
Bentleyuser.dk
Vejle 11.10.10
onSite
2010
3D visualization
Client
Method – the creative process
Indledende mødeKunde / bygherre
3D BIM modelArkitektoniskkoncept
Start up meeting
Client
Præsentation &
decision
Kreativ partnering
Sketch proposal 2D drawings
Plan, section, facade
Architectural concept
3D visualisering Præsentation &beslutning
SITE
onSite
2010
It is advantagouss to sketch with 3D Cad software. Some
3D skitsering
ProjektudviklingN
øg
leta
lK
om
mu
nik
atio
n
Cad software. Some of the benefits include: quickly visualising a series of alternatives, while maintaining an overview of m2, hieght, volume, and design. A sketch model can be
Ca
se
onSite
2010
Kregme Børnehavevæ
rdik
æd
eS
ITE
A/S
traditional 2D drawings
are generated or
extracted, from the 3D
model. The 3D model is
constantly maintained
Dokumentation
Adobe Acrobat
Document
Ca
se
BIM
væ
rdi
constantly maintained
which subsequently
ensures that all drawing
documentation is
dynamicly updated.
Niras used Sites 3D BIM
model to perform energy
and light simulations to
aid in the design
process.
CASE:
Kregme Børnehave
onSite
2010
traditional 2D drawings
are generated or
extracted, from the 3D
model. The 3D model is
constantly maintained
BIM (Building Information Modeling)
Dokumentation
constantly maintained
which subsequently
ensures that all drawing
documentation is
dynamicly updated.
Niras used Sites 3D BIM
model to perform energy
and light simulations to
aid in the design
process.
CASE:
Kregme Børnehave
onSite
2010
BIM object data
Filudveksling og
standarder
Behind the 2d and 3D
geometry lies intelligent
object data. Our dataset
væ
rdik
æd
eS
ITE
A/S
is currently based on
BIPS 2005 /sfb. We
translate our BIM data in
IFC.
Ca
se
BIM
væ
rdi
onSite
2010
SITE has developed an
optimised price
calculation tool together
Succesive price
calculations
IFCvæ
rdik
æd
eS
ITE
A/S
with Denmarks
Teknologisk institute.
We use IFC data from
our BIM model and
import it directly into
SIGMA Bim data is
keyed to standard and
project specific price
databases to calculate
on the fly succesive
price calculations.
Ca
se
BIM
væ
rdi
onSite
2010
Kommunikation
Mynd. godkend
The authorities in Borås
Sweden were
concerned about the
Nø
gle
tal
Ko
mm
un
ika
tion
concerned about the
visual impact of a
40.000m2 shopping
center in the city’s
historic center. A series
of realistic images were
generated from
predifined vantage
points to aid in the
approval proccess..
CASE: Wafveriet
Borås, Sverige
Pro
jektu
dvik
ling
BIM
onSite
2010
Shadow diagrams provide
an accurate picture of the
Kommunikation
Projekt
godkendelse
Nø
gle
tal
Ko
mm
un
ika
tion
an accurate picture of the
effects of a proposed
building mass. The results
are a useful tool for client
and building authorities to
make qualified decisions.
Pro
jektu
dvik
ling
BIM
onSite
2010
3D pdf
�3d pdf is a quick and
easily accessable
interactive viewing tool.
Viewing models are
KommunikationN
øg
leta
lK
om
mu
nik
atio
n
Adobe Acrobat
Document
Viewing models are
created directly from
the active working
model, which
garauntees an up to
date and accurate
document.
Pro
jektu
dvik
ling
BIM
CASE:
Køge Centrum
Volume study
onSite
2010
Animations are an
effectve way to explore
Kommunikation
Animation
væ
rdik
æd
eS
ITE
A/S
effectve way to explore
the 3D model. The
ambittion level can vary
according to the purpose
of the presentation.
Animations are produce
directly from the working
3D model.
Ca
se
BIM
væ
rdi