Activity ID Activity Name Original Duration Rem Dur Start Finish Total Float Site 107 107 02-Oct-20 03-Mar-21 -147 No Floor 107 107 02-Oct-20 03-Mar-21 -147 S1011 Pour Courtyard Bench foundation 4 4 02-Oct-20 07-Oct-20 -147 S1026 Pour Site retaining walls 10 10 08-Oct-20 21-Oct-20 -147 S1027 Install new water service 2 2 22-Oct-20 23-Oct-20 -147 S1028 MH 12 Auditurium downspouts 2 2 22-Oct-20 23-Oct-20 -147 S1047 Install site lighting conduits 5 5 22-Oct-20 28-Oct-20 -87 S1029 MH 9 Main blgs downspouts 5 5 26-Oct-20 30-Oct-20 -147 S1048 Install site lighting bases 5 5 29-Oct-20 04-Nov-20 -87 S1030 MH 9 New addition downspouts 2 2 02-Nov-20 03-Nov-20 -147 S1032 MH 4 stair yard drains 3 3 04-Nov-20 06-Nov-20 -147 S1040 Install Brick pavers 10 10 04-Nov-20 17-Nov-20 -131 S1025 Grade Main entrance area 5 5 05-Nov-20 11-Nov-20 -147 S1049 Install site lighting fixtures 7 7 05-Nov-20 13-Nov-20 -83 S1033 South sanitary C,D,F & G 3 3 09-Nov-20 11-Nov-20 -147 S1034 Pavers Inlet 5 & 6 subdrainage 5 5 12-Nov-20 18-Nov-20 -132 S1035 Install concrete curbs 15 15 12-Nov-20 02-Dec-20 -147 S1037 Install concrete stairs 20 20 03-Dec-20 31-Dec-20 -123 S1038 Install Apron trench drains 3 3 03-Dec-20 07-Dec-20 -117 S1044 Install Fag pole 2 2 03-Dec-20 04-Dec-20 -109 S1046 Install irrigation sleeves 5 5 03-Dec-20 09-Dec-20 -147 S1039 Install concrete Approaches 5 5 08-Dec-20 14-Dec-20 -117 S1036 Install concrete sidewalks 10 10 10-Dec-20 23-Dec-20 -147 S1042 Install Permeable pavers 35 35 10-Dec-20 29-Jan-21 -147 S1045 Install irrigation system 10 10 10-Dec-20 23-Dec-20 -122 S1041 Install Asphalt pavement 10 10 15-Dec-20 29-Dec-20 -117 S1057 Install new stair handrails 7 7 04-Jan-21 12-Jan-21 -123 S1050 Fine grade main bldg area 5 5 01-Feb-21 05-Feb-21 -147 S1043 Stripping and signage 3 3 08-Feb-21 10-Feb-21 -144 S1052 Demo existing canopy 10 10 08-Feb-21 19-Feb-21 -147 S1051 Install landscape materials main area 10 10 11-Feb-21 24-Feb-21 -144 S1053 Patch existing railings 3 3 22-Feb-21 24-Feb-21 -146 S1054 Demo asphalt & grade canopy 4 4 22-Feb-21 25-Feb-21 -147 S1055 Fine grade canopy area 2 2 26-Feb-21 01-Mar-21 -147 S1056 Landscape canopy area 2 2 02-Mar-21 03-Mar-21 -147 Building A West 140 39 11-Feb-20 A 20-Nov-20 -76 Lower Level 10 3 11-Feb-20 A 01-Oct-20 -46 AW1006 Install light fixtues 10 3 11-Feb-20 A 01-Oct-20 -46 First Floor 11 6 25-Sep-20 A 09-Oct-20 -46 AW3049 Finish Punch list 7 6 25-Sep-20 A 09-Oct-20 -46 AW3050 Building A West 1st Floor Complete 0 0 09-Oct-20* -46 2nd Floor 46 39 26-Aug-20 A 20-Nov-20 -76 AW3520 Install doors & Hardware 5 4 26-Aug-20 A 02-Oct-20 -48 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 October 2020 November 2020 December 2020 January 2021 February 2021 March 2021 Pour Courtyar d Bench foundati on Pour Si te retai ni ng wall s Install new water servi ce MH 12 Audi tur i um downspouts Install si te li ghti ng condui ts MH 9 Mai n bl gs downspouts Install si te li ghti ng bases MH 9 New addi ti on downspouts MH 4 stai r yar d drai ns Install Br i ck pavers Grade Mai n entrance area Install si te li ghti ng fi xtures South sani tary C,D,F & G Pavers Inl et 5 & 6 subdrai nage Install concrete cur bs Install concrete stai rs Install Apron trench drai ns Install Fag pol e Install i rr i gati on sl eeves Install concrete Approaches Install concrete sidewalks Install Permeabl e pavers Install i rr i gati on system Install Asphal t pavement Install new stai r handrail s Fi ne grade mai n bldg area Str i ppi ng and si gnage Demo exi sti ng canopy Install l andscape mater ia Patch exi sti ng raili ngs Demo asphal t & grade c Fi ne grade canopy Landscape canop Install li ght fi xtues Fi ni sh Punch li st Install doors & Har dware 4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02 Data Date: 29-Sep-20 Finish Date:10-Mar-21 Run Date:01-Oct-20 Page 1 of 12 BRENTWOOD HS UPDATE 26 Partial co Date Revision Chec... Ap... Actual Wor k Remaining Work Critical Remaining Work Start Constraint Finish Constraint Third Baseline
12

Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Mar 03, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

SiteSite 107 107 02-Oct-20 03-Mar-21 -147

No Floor No Floor 107 107 02-Oct-20 03-Mar-21 -147

S1011 Pour Courtyard Bench foundation 4 4 02-Oct-20 07-Oct-20 -147S1026 Pour Site retaining walls 10 10 08-Oct-20 21-Oct-20 -147S1027 Install new water service 2 2 22-Oct-20 23-Oct-20 -147S1028 MH 12 Auditurium downspouts 2 2 22-Oct-20 23-Oct-20 -147S1047 Install site lighting conduits 5 5 22-Oct-20 28-Oct-20 -87S1029 MH 9 Main blgs downspouts 5 5 26-Oct-20 30-Oct-20 -147S1048 Install site lighting bases 5 5 29-Oct-20 04-Nov-20 -87S1030 MH 9 New addition downspouts 2 2 02-Nov-20 03-Nov-20 -147S1032 MH 4 stair yard drains 3 3 04-Nov-20 06-Nov-20 -147S1040 Install Brick pavers 10 10 04-Nov-20 17-Nov-20 -131S1025 Grade Main entrance area 5 5 05-Nov-20 11-Nov-20 -147S1049 Install site lighting fixtures 7 7 05-Nov-20 13-Nov-20 -83S1033 South sanitary C,D,F & G 3 3 09-Nov-20 11-Nov-20 -147S1034 Pavers Inlet 5 & 6 subdrainage 5 5 12-Nov-20 18-Nov-20 -132S1035 Install concrete curbs 15 15 12-Nov-20 02-Dec-20 -147S1037 Install concrete stairs 20 20 03-Dec-20 31-Dec-20 -123S1038 Install Apron trench drains 3 3 03-Dec-20 07-Dec-20 -117S1044 Install Fag pole 2 2 03-Dec-20 04-Dec-20 -109S1046 Install irrigation sleeves 5 5 03-Dec-20 09-Dec-20 -147S1039 Install concrete Approaches 5 5 08-Dec-20 14-Dec-20 -117S1036 Install concrete sidewalks 10 10 10-Dec-20 23-Dec-20 -147S1042 Install Permeable pavers 35 35 10-Dec-20 29-Jan-21 -147S1045 Install irrigation system 10 10 10-Dec-20 23-Dec-20 -122S1041 Install Asphalt pavement 10 10 15-Dec-20 29-Dec-20 -117S1057 Install new stair handrails 7 7 04-Jan-21 12-Jan-21 -123S1050 Fine grade main bldg area 5 5 01-Feb-21 05-Feb-21 -147S1043 Stripping and signage 3 3 08-Feb-21 10-Feb-21 -144S1052 Demo existing canopy 10 10 08-Feb-21 19-Feb-21 -147S1051 Install landscape materials main area 10 10 11-Feb-21 24-Feb-21 -144S1053 Patch existing railings 3 3 22-Feb-21 24-Feb-21 -146S1054 Demo asphalt & grade canopy 4 4 22-Feb-21 25-Feb-21 -147S1055 Fine grade canopy area 2 2 26-Feb-21 01-Mar-21 -147S1056 Landscape canopy area 2 2 02-Mar-21 03-Mar-21 -147

Building A WeBuilding A West 140 39 11-Feb-20 A 20-Nov-20 -76

Lower LevelLower Level 10 3 11-Feb-20 A 01-Oct-20 -46

AW1006 Install light fixtues 10 3 11-Feb-20 A 01-Oct-20 -46

First FloorFirst Floor 11 6 25-Sep-20 A 09-Oct-20 -46

AW3049 Finish Punch list 7 6 25-Sep-20 A 09-Oct-20 -46AW3050 Building A West 1st Floor Complete 0 0 09-Oct-20* -46

2nd Floor2nd Floor 46 39 26-Aug-20 A 20-Nov-20 -76

AW3520 Install doors & Hardware 5 4 26-Aug-20 A 02-Oct-20 -48

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

Pour Courtyard Bench foundationPour Site retaining walls

Install new water serviceMH 12 Auditurium downspouts

Install site lighting conduitsMH 9 Main blgs downspouts

Install site lighting basesMH 9 New addition downspouts

MH 4 stair yard drainsInstall Brick pavers

Grade Main entrance areaInstall site lighting fixtures

South sanitary C,D,F & GPavers Inlet 5 & 6 subdrainage

Install concrete curbsInstall concrete stairs

Install Apron trench drainsInstall Fag pole

Install irrigation sleevesInstall concrete Approaches

Install concrete sidewalksInstall Permeable pavers

Install irrigation systemInstall Asphalt pavement

Install new stair handrailsFine grade main bldg area

Stripping and signageDemo existing canopy

Install landscape materiaPatch existing railingsDemo asphalt & grade c

Fine grade canopy Landscape canop

Install light fixtues

Finish Punch list

Install doors & Hardware

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 1 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 2: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

AW3524 Finish Punch list 7 7 25-Sep-20 A 13-Oct-20 -48AW3525 Building AW 2nd Floor Complete 0 0 20-Nov-20 -76

A roof patchA roof patch infill 50 39 21-Sep-20 A 20-Nov-20 -76

PR 79 AW4543 X210 PRICING 10 9 21-Sep-20 A 09-Oct-20 -77

PR 79 AW4544 X210 PRICING APPROVAL. 5 5 12-Oct-20 16-Oct-20 -77PR 79 AW4545 X210 DEMO UTILITIES & CURB 3 3 19-Oct-20 21-Oct-20 -69PR 79 AW4546 X210 FABRICATE STEEL 5 5 19-Oct-20 23-Oct-20 -77PR 79 AW4548 X210 ORDER & DELIVER ROOF CURB 10 10 19-Oct-20 30-Oct-20 -76AW3527 Demo bar joist 5 5 26-Oct-20 30-Oct-20 -77PR 79 AW4547 X210 INSTALL ROOF FRAME STEEL 2 2 26-Oct-20 27-Oct-20 -73AW3528 Infill existing Block walls/lintels 1 1 02-Nov-20 02-Nov-20 -77PR 79 AW4549 X210 INSTALL ROOF CURB 2 2 02-Nov-20 03-Nov-20 -76AW3529 Extend block parapet walls 1 1 03-Nov-20 03-Nov-20 -77AW3530 Install new beams and deck 2 2 04-Nov-20 05-Nov-20 -77PR 79 AW4550 X210 PATCH ROOF SURFACE 2 2 04-Nov-20 05-Nov-20 -76AW3531 Wood blocking & framing 2 2 06-Nov-20 09-Nov-20 -77PR 79 AW4551 X210 RE-INSTALL RTU 4 2 2 06-Nov-20 09-Nov-20 -76AW3532 Install roofing 2 2 10-Nov-20 11-Nov-20 -77

PR 79 AW4552 X210 INSTALL HVAC UTILITY CONNECT 5 5 10-Nov-20 16-Nov-20 -76PR 79 AW4553 X210 INSTALL NEW POWER CONNECT 3 3 10-Nov-20 12-Nov-20 -74AW3533 Water tight 1 1 12-Nov-20 12-Nov-20 -77PR 79 AW4554 X210 START,TEST & BALANCE RTU 4 4 4 17-Nov-20 20-Nov-20 -76

Main AdditionMain Addition 101 76 05-Aug-20 A 14-Jan-21 -113

Bldg StructuBldg Structure 74 63 16-Sep-20 A 24-Dec-20 -100

MA1014 Form & pour upper walls 1st 5 3 16-Sep-20 A 01-Oct-20 -147MA 1110 CMU Masonry walls upper level 10 9 23-Sep-20 A 09-Oct-20 -147X215 MA1027 CCD 23 REVISE COLUMN UPPER STEE 2 2 29-Sep-20 30-Sep-20 -140MA1025 Pour 1st Floor slab on grade 3 3 02-Oct-20 06-Oct-20 -136MA1027 Pour Roof mech pads 3 3 02-Oct-20 06-Oct-20 -131MA 1107 Set Upper SOG steel 2 & 3 2 2 12-Oct-20 13-Oct-20 -147MA 1111 Brick exterior Masnry walls upper level 5 5 12-Oct-20 16-Oct-20 -93MA 1109 Set bar joist upper area 3 3 14-Oct-20 16-Oct-20 -147MA 1108 Set Upper decking 2 & 3 3 3 19-Oct-20 21-Oct-20 -147MA1016 Frame exterior structural walls 5 5 22-Oct-20 28-Oct-20 -147MA1021 Set Curtain wall Westside 10 10 22-Oct-20 04-Nov-20 -147MA1029 Frame high roof 5 5 22-Oct-20 28-Oct-20 -145MA1031 Install plywood & blocking roof level 10 10 22-Oct-20 04-Nov-20 -145

MA1032 Install roof 7 7 05-Nov-20 13-Nov-20 -145MA1033 Install Curtain wall Eastside 15 15 05-Nov-20 25-Nov-20 -106MA1070 Install Alum Composite panels roof 7 7 16-Nov-20 24-Nov-20 -100MA1080 Install Alum Composite panels walls 15 15 25-Nov-20 15-Dec-20 -100MA 1099 Install gutters & downspouts 7 7 16-Dec-20 24-Dec-20 -100

Lower LevelLower Level 94 66 05-Aug-20 A 05-Jan-21 -106

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

Finish Punch list

X210 PRICING

X210 PRICING APPROVAL.X210 DEMO UTILITIES & CURB

X210 FABRICATE STEELX210 ORDER & DELIVER ROOF CURBDemo bar joist

X210 INSTALL ROOF FRAME STEELInfill existing Block walls/lintelsX210 INSTALL ROOF CURBExtend block parapet walls

Install new beams and deckX210 PATCH ROOF SURFACE

Wood blocking & framingX210 RE-INSTALL RTU 4

Install roofing

X210 INSTALL HVAC UTILITY CONNECTIONSX210 INSTALL NEW POWER CONNECTIONWater tight

X210 START,TEST & BALANCE RTU 4

Form & pour upper walls 1stCMU Masonry walls upper level

CCD 23 REVISE COLUMN UPPER STEELPour 1st Floor slab on gradePour Roof mech pads

Set Upper SOG steel 2 & 3Brick exterior Masnry walls upper levelSet bar joist upper area

Set Upper decking 2 & 3Frame exterior structural walls

Set Curtain wall WestsideFrame high roof

Install plywood & blocking roof level

Install roofInstall Curtain wall Eastside

Install Alum Composite panels roofInstall Alum Composite panels walls

Install gutters & downspouts

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 2 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 3: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

MA1028 Frame lower floor 7 2 05-Aug-20 A 05-Oct-20 -138

MA1034 Electric rough in 5 5 02-Oct-20 08-Oct-20 -87MA1036 Sprinkler main & branch lines 7 7 06-Oct-20 14-Oct-20 -91MA1037 HVAC duct rough in 15 15 06-Oct-20 26-Oct-20 -84MA1038 Low voltage electric systems 5 5 06-Oct-20 12-Oct-20 -89MA1039 Hang & tape drywall 7 7 05-Nov-20 13-Nov-20 -106MA1040 Paint lower level floor 7 7 16-Nov-20 24-Nov-20 -106MA1041 Install ceiling grid 2 2 25-Nov-20 26-Nov-20 -106MA1042 Install light fixtures 7 7 27-Nov-20 07-Dec-20 -98MA1043 Bathroom ceramic tile 10 10 27-Nov-20 10-Dec-20 -106MA1046 Install mirrors 2 2 27-Nov-20 30-Nov-20 -89MA1052 HVAC trim out 2 2 27-Nov-20 30-Nov-20 -89MA1044 Install SPFL floor 3 3 08-Dec-20 10-Dec-20 -96MA1048 Install doors & Hardware 3 3 08-Dec-20 10-Dec-20 -97MA1049 Electrical Trim out 4 4 08-Dec-20 11-Dec-20 -98MA1045 Install sink counters 2 2 11-Dec-20 14-Dec-20 -98MA1047 Install plumbing fixture 5 5 11-Dec-20 17-Dec-20 -106MA1050 Install Toilet partitions 2 2 18-Dec-20 21-Dec-20 -106MA1053 Install ceiling pads 1 1 18-Dec-20 18-Dec-20 -102MA1051 Install Toilet accessories 3 3 22-Dec-20 24-Dec-20 -106MA1054 Final cleaning 3 3 28-Dec-20 30-Dec-20 -106MA1055 Finish Punch list 3 3 31-Dec-20 05-Jan-21 -106

First FloorFirst Floor 54 54 02-Oct-20 16-Dec-20 -94

MA1057 Frame soffits & walls 1st 10 10 02-Oct-20 15-Oct-20 -138MA1058 Electric rough in 1st 10 10 16-Oct-20 29-Oct-20 -129MA1059 Plumbing rough in 1st 4 4 16-Oct-20 21-Oct-20 -135MA1060 Sprinkler main & branch lines 1 7 7 16-Oct-20 26-Oct-20 -138MA1061 HVAC duct rough in 1 15 15 16-Oct-20 05-Nov-20 -134MA1062 Low voltage electric systems 1 5 5 16-Oct-20 22-Oct-20 -136MA1067 HVAC piping 1 7 7 16-Oct-20 26-Oct-20 -133MA1063 Hang & tape drywall 1 12 12 05-Nov-20 20-Nov-20 -145MA1064 Paint 1st floor 7 7 12-Nov-20 20-Nov-20 -145MA1065 Install ceiling grid 1 4 4 12-Nov-20 17-Nov-20 -145MA1066 Install light fixtures 1 10 10 18-Nov-20 01-Dec-20 -139MA1068 Overhead/Counter/ Consession doors 1 5 5 18-Nov-20 24-Nov-20 -139MA1072 Install doors & Hardware 1 2 2 18-Nov-20 19-Nov-20 -139MA1073 Electrical Trim out 1 4 4 18-Nov-20 23-Nov-20 -137MA1074 Install Casework & tops 1 8 8 18-Nov-20 27-Nov-20 -145MA1076 HVAC trim out 1 5 5 18-Nov-20 24-Nov-20 -142MA1069 Install interior storefront walls 1 7 7 23-Nov-20 01-Dec-20 -94MA1071 Install plumbing fixture 1 5 5 30-Nov-20 04-Dec-20 -145MA1077 Install ceiling pads 1 5 5 30-Nov-20 04-Dec-20 -145MA1075 Install LTV floor 1 6 6 02-Dec-20 09-Dec-20 -94MA1078 Final cleaning 1 5 5 10-Dec-20 16-Dec-20 -94

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

Frame lower floor

Electric rough inSprinkler main & branch lines

HVAC duct rough inLow voltage electric systems

Hang & tape drywallPaint lower level floor

Install ceiling gridInstall light fixtures

Bathroom ceramic tileInstall mirrorsHVAC trim out

Install SPFL floorInstall doors & HardwareElectrical Trim out

Install sink countersInstall plumbing fixture

Install Toilet partitionsInstall ceiling pads

Install Toilet accessoriesFinal cleaning

Finish Punch list

Frame soffits & walls 1stElectric rough in 1st

Plumbing rough in 1stSprinkler main & branch lines 1

HVAC duct rough in 1Low voltage electric systems 1

HVAC piping 1Hang & tape drywall 1Paint 1st floor

Install ceiling grid 1Install light fixtures 1

Overhead/Counter/ Consession doors 1Install doors & Hardware 1

Electrical Trim out 1Install Casework & tops 1

HVAC trim out 1Install interior storefront walls 1

Install plumbing fixture 1Install ceiling pads 1

Install LTV floor 1Final cleaning 1

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 3 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 4: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

MA1079 Finish Punch list 1 5 5 10-Dec-20 16-Dec-20 -94

Upper LevelUpper Level 71 71 06-Oct-20 14-Jan-21 -113

MA1081 Frame 3rd floor soffit & walls 10 10 06-Oct-20 19-Oct-20 -101MA1082 Electric rough in 3 10 10 06-Oct-20 19-Oct-20 -89MA1085 HVAC duct rough in 3 15 15 06-Oct-20 26-Oct-20 -94MA1084 Sprinkler main & branch lines 3 7 7 09-Oct-20 19-Oct-20 -89MA1091 HVAC Piping 3 7 7 09-Oct-20 19-Oct-20 -89MA1086 Low voltage electric systems 3 5 5 13-Oct-20 19-Oct-20 -89MA1083 Plumbing rough in 3 2 2 16-Oct-20 19-Oct-20 -101MA1087 Hang & tape drywall 3 12 12 05-Nov-20 20-Nov-20 -113MA1088 Paint 3nd floor 7 7 12-Nov-20 20-Nov-20 -113MA1089 Install ceiling grid 7 7 23-Nov-20 01-Dec-20 -113MA1092 Install Sliding Aluminum doors 3 3 02-Dec-20 04-Dec-20 -113MA1093 Install interior storefront 5 5 02-Dec-20 08-Dec-20 -96MA1094 Install casework & tops 5 5 02-Dec-20 08-Dec-20 -109MA1100 HVAC trim out 5 5 02-Dec-20 08-Dec-20 -101MA1090 Install light fixtures 10 10 07-Dec-20 18-Dec-20 -113MA1095 Install plumbing fixture 1 1 09-Dec-20 09-Dec-20 -109MA1098 Install LVT floor 7 7 10-Dec-20 18-Dec-20 -109MA1096 Install doors & Hardware 2 2 21-Dec-20 22-Dec-20 -111MA1097 Electrical Trim out 4 4 21-Dec-20 24-Dec-20 -113MA1101 Install ceiling pads 5 5 28-Dec-20 04-Jan-21 -113MA1102 Final cleaning 3 3 05-Jan-21 07-Jan-21 -113MA1103 Finish Punch list 5 5 08-Jan-21 14-Jan-21 -113MA1056 Main Addition Complete 0 0 14-Jan-21* -113

GymGym 283 13 11-Oct-19 A 23-Nov-20 -77

Corridor 112Corridor 112 283 13 11-Oct-19 A 23-Nov-20 -77

AE2045 Low Voltage Finish 10 2 11-Oct-19 A 10-Nov-20 -71AE2046 Electric Finish 5 2 11-Oct-19 A 10-Nov-20 -71AE2040 Install Lights 10 3 17-Oct-19 A 17-Nov-20 -77AE2041 HVAC Finish 5 3 28-Oct-19 A 10-Nov-20 -71AE2032 Ceiling Grid 3 3 10-Nov-20 13-Nov-20 -74AE2013 Marker Boards 2 2 11-Nov-20 13-Nov-20 -74AE2058 Install LVT flooring 3 3 13-Nov-20 17-Nov-20 -77AE2028 Interior Fire Roll up door 2 2 13-Nov-20 16-Nov-20 -74AE2043 Ceiling Tile 3 3 13-Nov-20 17-Nov-20 -74AE2039 Final Cleaning 4 4 18-Nov-20 23-Nov-20 -77

Building BBuilding B 361 108 03-Oct-19 A 01-Mar-21 -140

1st Flr B So1st Flr B South 287 34 03-Oct-19 A 13-Nov-20 -71

B1003 Demo interior space 4 1 03-Oct-19 A 29-Sep-20 -84B1011 Frame walls and ceilings 5 1 28-Apr-20 A 30-Sep-20 -84B1035 Set Door frames 5 1 25-May-20 A 01-Oct-20 -66B1016 Electric rough in 5 3 19-Jun-20 A 05-Oct-20 -63

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

Finish Punch list 1

Frame 3rd floor soffit & wallsElectric rough in 3

HVAC duct rough in 3Sprinkler main & branch lines 3HVAC Piping 3Low voltage electric systems 3Plumbing rough in 3

Hang & tape drywall 3Paint 3nd floor

Install ceiling gridInstall Sliding Aluminum doors

Install interior storefrontInstall casework & topsHVAC trim out

Install light fixturesInstall plumbing fixture

Install LVT floorInstall doors & Hardware

Electrical Trim outInstall ceiling pads

Final cleaningFinish Punch list

Low Voltage FinishElectric Finish

Install LightsHVAC Finish

Ceiling GridMarker Boards

Install LVT flooringInterior Fire Roll up doorCeiling Tile

Final Cleaning

Demo interior spaceFrame walls and ceilingsSet Door frames

Electric rough in

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 4 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 5: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

B1012 Low voltage electric systems 3 2 19-Jun-20 A 02-Oct-20 -62B1017 Hang & tape drywall 10 5 01-Jul-20 A 08-Oct-20 -66PR 59 B2042 RFI 161 PR 59R2 ELECTRIC WORK 3 2 10-Jul-20 A 01-Oct-20 -69PR 59 B2044 RFI 161 PR 59R2 HVAC WORK 5 4 10-Jul-20 A 05-Oct-20 -71PR 59 B2045 RFI 161 PR DRYWALL & TAPE WORK 6 5 10-Jul-20 A 12-Oct-20 -71B1014 Sprinkler branch revisions 3 2 23-Jul-20 A 02-Oct-20 -62B1018 Paint walls & ceilings 5 4 15-Sep-20 A 07-Oct-20 -66CCD 19 B2049 X203 TM DEMO STAIR TREADS 5 5 29-Sep-20 05-Oct-20 -55PR 59 B2046 RFI 161 PR 59R2 PAINTING WORK 2 2 13-Oct-20 14-Oct-20 -71B1019 Install ceiling grid 3 3 15-Oct-20 19-Oct-20 -71B1023 Install light fixtures 6 6 20-Oct-20 27-Oct-20 -71B1030 Install Toilet partitions 3 3 20-Oct-20 22-Oct-20 -63B1020 HVAC trim out 3 3 20-Oct-20 22-Oct-20 -63B1031 Install Toilet accessories 3 3 23-Oct-20 27-Oct-20 -63B1021 Install Flooring 5 5 28-Oct-20 03-Nov-20 -71B1025 Install doors & Hardware 4 4 28-Oct-20 02-Nov-20 -70B1024 Electrical Trim out 4 4 28-Oct-20 02-Nov-20 -70B1029 Install ceiling pads 3 3 04-Nov-20 06-Nov-20 -71B1032 Final cleaning 2 2 09-Nov-20 10-Nov-20 -71B1033 Finish Punch list 3 3 11-Nov-20 13-Nov-20 -71

1st Flr B Eas1st Flr B East & North 111 47 28-May-20 A 02-Dec-20 -84

B1057 Frame walls and ceilings 10 1 28-May-20 A 05-Oct-20 -84B1062 Electric rough in 15 5 05-Jun-20 A 05-Oct-20 -75B1058 Low voltage electric systems 7 2 05-Jun-20 A 05-Oct-20 -77B1064 Hang & tape drywall 5 5 29-Sep-20 05-Oct-20 -80CCD19 B2099 X203 DEMO STAIR TREADS 5 5 29-Sep-20 05-Oct-20 -54B1052 Cut New openings 3 3 01-Oct-20 05-Oct-20 -84PR 59 B2082 RFI 161 PR59R2 SPRINKLER WORK 3 3 06-Oct-20 08-Oct-20 -62PR 59 B2083 RFI 161 PR59R2 ELECTRIC WORK 3 3 06-Oct-20 08-Oct-20 -62PR 59 B2084 RFI 161 PR59R2 PLUMBING WORK 5 5 06-Oct-20 12-Oct-20 -64PR 59 B2085 RFI 161 PR59R2 HVAC WORK 3 3 06-Oct-20 08-Oct-20 -62CCD20R B208 X207 TM PLASTER PATCHING 5 5 06-Oct-20 12-Oct-20 -80CCD27 B2091 X222 TM DRYWALL LAMINATION & TAP 4 4 06-Oct-20 09-Oct-20 -79CCD27 B2094 X223 TM SHOP SINK DEMO 2 2 06-Oct-20 07-Oct-20 -84CCD27 B2095 X223 TM PLUMBING REVISION 2 2 08-Oct-20 09-Oct-20 -84CCD27 B2096 X223 TM SHOP SINK WALL REPAIR 5 5 12-Oct-20 16-Oct-20 -84PR 59 B2086 RFI 161 PR59R2 DRYWALL & TAPING W 6 6 13-Oct-20 20-Oct-20 -64B1065 Paint walls & ceilings 5 5 19-Oct-20 23-Oct-20 -84B1066 Install ceiling grid 4 4 26-Oct-20 29-Oct-20 -84B1069 Install light fixtures 12 12 30-Oct-20 16-Nov-20 -84B1068 Bathroom ceramic tile 5 5 30-Oct-20 05-Nov-20 -78B1071 Install doors & Hardware 7 7 30-Oct-20 09-Nov-20 -75B1075 Install Casework 3 3 30-Oct-20 03-Nov-20 -76B1067 HVAC trim out 5 5 30-Oct-20 05-Nov-20 -73

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

Low voltage electric systemsHang & tape drywall

RFI 161 PR 59R2 ELECTRIC WORKRFI 161 PR 59R2 HVAC WORK

RFI 161 PR DRYWALL & TAPE WORKSprinkler branch revisions

Paint walls & ceilingsX203 TM DEMO STAIR TREADS

RFI 161 PR 59R2 PAINTING WORKInstall ceiling grid

Install light fixturesInstall Toilet partitionsHVAC trim out

Install Toilet accessoriesInstall Flooring

Install doors & HardwareElectrical Trim out

Install ceiling padsFinal cleaning

Finish Punch list

Frame walls and ceilingsElectric rough inLow voltage electric systemsHang & tape drywallX203 DEMO STAIR TREADSCut New openings

RFI 161 PR59R2 SPRINKLER WORKRFI 161 PR59R2 ELECTRIC WORK

RFI 161 PR59R2 PLUMBING WORKRFI 161 PR59R2 HVAC WORK

X207 TM PLASTER PATCHINGX222 TM DRYWALL LAMINATION & TAPING

X223 TM SHOP SINK DEMOX223 TM PLUMBING REVISION

X223 TM SHOP SINK WALL REPAIRRFI 161 PR59R2 DRYWALL & TAPING WORK

Paint walls & ceilingsInstall ceiling grid

Install light fixturesBathroom ceramic tile

Install doors & HardwareInstall Casework

HVAC trim out

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 5 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 6: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

PR 59 B2087 RFI 161 PR59R2 PAINTING WORK 3 3 30-Oct-20 03-Nov-20 -71B1079 Install marker boards/tackboards 2 2 04-Nov-20 05-Nov-20 -73B1073 Install plumbing fixture 5 5 06-Nov-20 12-Nov-20 -78B1076 Install Toilet accessories 2 2 13-Nov-20 16-Nov-20 -77B1072 Install Flooring 4 4 17-Nov-20 20-Nov-20 -84B1070 Electrical Trim out 4 4 17-Nov-20 20-Nov-20 -84B1074 Install ceiling pads 3 3 23-Nov-20 25-Nov-20 -84B1077 Final cleaning 2 2 26-Nov-20 27-Nov-20 -84B1078 Finish Punch list 3 3 30-Nov-20 02-Dec-20* -84

2nd Floor B 2nd Floor B South 40 22 03-Apr-20 A 29-Oct-20 -60

B1110 Electric rough in 7 4 03-Apr-20 A 06-Oct-20 -57B1106 Low voltage electric systems 7 4 03-Apr-20 A 06-Oct-20 -52B1108 Sprinkler branch revisions 3 2 07-Apr-20 A 06-Oct-20 -52B1113 Paint walls & ceilings 5 3 07-Apr-20 A 16-Oct-20 -60B1114 Install ceiling grid 4 3 09-Apr-20 A 13-Oct-20 -60B1118 Install light fixtures 10 2 16-Apr-20 A 13-Oct-20 -59B1124 Install Flooring 4 2 09-Jul-20 A 16-Oct-20 -58B1116 Install Casework 3 1 14-Sep-20 A 08-Oct-20 -58B1102 Masonry infills 2 1 30-Sep-20 A 06-Oct-20 -55B1100 Cut New openings 3 3 01-Oct-20 05-Oct-20 -60B1105 Frame walls and ceilings 5 5 06-Oct-20 13-Oct-20 -60B1101 Install Lintel/masonry 2 2 06-Oct-20 07-Oct-20 -60X218 B1133 CCD 26 TM REVISE ELEC DRINKING FO 5 5 06-Oct-20 12-Oct-20 -57B1103 Form Conc ramp & stairs 3 3 08-Oct-20 12-Oct-20 -60B1119 Install marker boards/tackboards 2 2 09-Oct-20 12-Oct-20 -55B1130 Install rails at ramp & stairs 3 3 13-Oct-20 15-Oct-20 -55B1111 Set Door frames 3 3 13-Oct-20 15-Oct-20 -60B1104 Pour ramp & stairs 2 2 13-Oct-20 14-Oct-20 -60B1120 Install plumbing fixture 5 5 13-Oct-20 19-Oct-20 -60

B1123 Install doors & Hardware 4 4 13-Oct-20 16-Oct-20 -59B1122 Electrical Trim out 4 4 13-Oct-20 16-Oct-20 -59B1115 HVAC trim out 4 4 13-Oct-20 16-Oct-20 -59X218 B1134 CCD 26 TM REPLACE DRINKING FOUNT 5 5 13-Oct-20 19-Oct-20 -57B1112 Hang & tape drywall 5 5 16-Oct-20 22-Oct-20 -60B1121 Install Toilet accessories 2 2 20-Oct-20 21-Oct-20 -59B1125 Install ceiling pads 3 3 20-Oct-20 22-Oct-20 -60B1126 Final cleaning 2 2 23-Oct-20 26-Oct-20 -60B1127 Finish Punch list 3 3 27-Oct-20 29-Oct-20* -60

2nd B Flr Ea2nd B Flr East & North 146 36 20-Apr-20 A 17-Nov-20 -71

B1202 Demolition - Bldg B 2nd Flr E & N 8 4 20-Apr-20 A 07-Oct-20 -73B1200 Owner relocate 2nd B E & N 10 5 20-Apr-20 A 07-Oct-20 -73B1213 Electric rough in 20 10 30-Apr-20 A 15-Oct-20 -65B1209 Low voltage electric systems 7 5 30-Apr-20 A 15-Oct-20 -65B1212 Plumbing rough in 15 3 01-May-20 A 15-Oct-20 -65

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

RFI 161 PR59R2 PAINTING WORKInstall marker boards/tackboards

Install plumbing fixtureInstall Toilet accessories

Install FlooringElectrical Trim out

Install ceiling padsFinal cleaning

Finish Punch list

Electric rough inLow voltage electric systemsSprinkler branch revisions

Paint walls & ceilingsInstall ceiling gridInstall light fixtures

Install FlooringInstall Casework

Masonry infillsCut New openings

Frame walls and ceilingsInstall Lintel/masonry

CCD 26 TM REVISE ELEC DRINKING FOUNTAINSForm Conc ramp & stairsInstall marker boards/tackboards

Install rails at ramp & stairsSet Door frames

Pour ramp & stairsInstall plumbing fixture

Install doors & HardwareElectrical Trim outHVAC trim out

CCD 26 TM REPLACE DRINKING FOUNTAINSHang & tape drywall

Install Toilet accessoriesInstall ceiling pads

Final cleaningFinish Punch list

Demolition - Bldg B 2nd Flr E & NOwner relocate 2nd B E & N

Electric rough inLow voltage electric systemsPlumbing rough in

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 6 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 7: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

B1208 Frame walls and ceilings 10 5 06-May-20 A 21-Oct-20 -73B1203 Cut New openings 2 1 14-May-20 A 07-Oct-20 -66B1215 Hang & tape drywall 15 7 05-Jun-20 A 20-Oct-20 -69B1214 Set Door frames 7 4 01-Jul-20 A 20-Oct-20 -69B1216 Paint walls & ceilings 10 8 07-Jul-20 A 21-Oct-20 -63B1229 Install ceiling pads 3 2 13-Jul-20 A 12-Nov-20 -73B1217 Install ceiling grid 10 8 16-Jul-20 A 21-Oct-20 -69B1228 Install Flooring 15 13 27-Jul-20 A 12-Nov-20 -73B1221 Install light fixtures 20 15 07-Aug-20 A 19-Oct-20 -55B1226 Electrical Trim out 10 8 07-Aug-20 A 19-Oct-20 -55B1211 Sprinkler branch revisions 5 2 11-Aug-20 A 21-Oct-20 -68B1219 Install Casework 7 5 14-Aug-20 A 12-Oct-20 -54B1220 Bathroom ceramic tile 15 12 20-Aug-20 A 27-Oct-20 -66B1224 Install plumbing fixture 7 5 16-Sep-20 A 27-Oct-20 -66

X207 B3241 CCD 20R TM PLASTER PATCHING 7 7 01-Oct-20 12-Oct-20 -69B1205 Masonry infills 3 3 02-Oct-20 07-Oct-20 -66B1227 Install doors & Hardware 10 10 06-Oct-20 19-Oct-20 -55PR 72 B3238 X185 CHIMNEY STEEL ADD 5 5 08-Oct-20 14-Oct-20 -73PR 72 B3239 X185 CHIMNEY MASONRY 5 5 08-Oct-20 14-Oct-20 -64X218 B3245 CCD 26 TM REVISE ELEC DRINKING FO 5 5 15-Oct-20 21-Oct-20 -64X217 B3243 CCD 25R TM RUBBER BASE PREP INST 5 5 20-Oct-20 27-Oct-20 -62B1222 Install rails at ramp & stairs 3 3 22-Oct-20 26-Oct-20 -73B1223 Install marker boards/tackboards 4 4 22-Oct-20 27-Oct-20 -63B1218 HVAC trim out 10 10 22-Oct-20 04-Nov-20 -69X218 B3246 CCD 26 TM REPLACE DRINKING FOUNT 5 5 22-Oct-20 28-Oct-20 -64X203 B3249 CCD 19 TM DEMO STAIR TREADS 5 5 22-Oct-20 28-Oct-20 -57B1232 Install Toilet partitions 5 5 28-Oct-20 03-Nov-20 -66B1225 Install Toilet accessories 5 5 28-Oct-20 03-Nov-20 -66B1230 Final cleaning 2 2 11-Nov-20 12-Nov-20 -73B1231 Finish Punch list 3 3 13-Nov-20 17-Nov-20* -73

B Vestibule B Vestibule Addition 94 94 29-Sep-20 09-Feb-21 -131

X215 B2036 CCD 23 STEEL REVISIONS 5 5 29-Sep-20 05-Oct-20 -123X215 B2017 CCD 23 FORM & POUR HAUNCH 3 3 29-Sep-20 01-Oct-20 -129X212 B2021 CCD 22 BLOCK UP EXISTING OPENING 2 2 29-Sep-20 30-Sep-20 -131B2004 Pour lower slab on grade 3 3 01-Oct-20 05-Oct-20 -131

B2006 Backfill exterior walls 3 3 06-Oct-20 08-Oct-20 -131B2007 CMU exterior masonry walls 5 5 09-Oct-20 15-Oct-20 -131B2008 Set Steel 5 5 16-Oct-20 22-Oct-20 -131B2009 Set roof bar joist 3 3 23-Oct-20 27-Oct-20 -131B2010 Install floor & roof decking 5 5 28-Oct-20 03-Nov-20 -131B2011 Pour 1st floor deck 2 2 04-Nov-20 05-Nov-20 -131B2012 Frame exterior structural walls 5 5 06-Nov-20 12-Nov-20 -131B2019 Demo new opening/set lintel 7 7 06-Nov-20 16-Nov-20 -119B2013 Brick exterior masonry walls 7 7 13-Nov-20 23-Nov-20 -124

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

Frame walls and ceilingsCut New openings

Hang & tape drywallSet Door framesPaint walls & ceilings

Install ceiling padsInstall ceiling grid

Install FlooringInstall light fixturesElectrical Trim out

Sprinkler branch revisionsInstall Casework

Bathroom ceramic tileInstall plumbing fixture

CCD 20R TM PLASTER PATCHINGMasonry infills

Install doors & HardwareX185 CHIMNEY STEEL ADDX185 CHIMNEY MASONRY

CCD 26 TM REVISE ELEC DRINKING FOUNTAINCCD 25R TM RUBBER BASE PREP INSTALL

Install rails at ramp & stairsInstall marker boards/tackboards

HVAC trim outCCD 26 TM REPLACE DRINKING FOUNTAINSCCD 19 TM DEMO STAIR TREADS

Install Toilet partitionsInstall Toilet accessories

Final cleaningFinish Punch list

CCD 23 STEEL REVISIONSCCD 23 FORM & POUR HAUNCH

CCD 22 BLOCK UP EXISTING OPENINGPour lower slab on grade

Backfill exterior wallsCMU exterior masonry walls

Set SteelSet roof bar joist

Install floor & roof deckingPour 1st floor deck

Frame exterior structural wallsDemo new opening/set lintel

Brick exterior masonry walls

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 7 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 8: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

B2014 Install plywood & blocking roof level 10 10 13-Nov-20 26-Nov-20 -131B2016 Set Exterior storefront /Windows 10 10 27-Nov-20 10-Dec-20 -127B2015 Install roof 7 7 27-Nov-20 07-Dec-20 -131B2018 Rough in Electric 5 5 08-Dec-20 14-Dec-20 -124B2020 Install HVAC 7 7 08-Dec-20 16-Dec-20 -131B2029 Install Alum Composite panels 7 7 11-Dec-20 21-Dec-20 -109B2021 Frame Drywall ceiling 5 5 17-Dec-20 23-Dec-20 -131B2030 Install gutters & downspouts 7 7 22-Dec-20 31-Dec-20 -109B2022 Hang drywall /tape ceiling 7 7 24-Dec-20 05-Jan-21 -131B2023 Paint walls and ceiling 5 5 06-Jan-21 12-Jan-21 -131B2024 Install ceiling grid 5 5 13-Jan-21 19-Jan-21 -131B2026 Install interior storefront/glazed 5 5 13-Jan-21 19-Jan-21 -126B2025 Install light fixtures 5 5 20-Jan-21 26-Jan-21 -131B2027 Install flooring 5 5 27-Jan-21 02-Feb-21 -131B2028 Punch list Vestibule 5 5 03-Feb-21 09-Feb-21* -131

B Multi-PurpB Multi-Purpose 59 59 07-Dec-20 01-Mar-21 -145

B3000 Owner Relocate Library 5 5 07-Dec-20 11-Dec-20 -145B3001 Owner Abatement 5 5 14-Dec-20 18-Dec-20 -145B3002 Demolition 7 7 14-Dec-20 22-Dec-20 -145B3003 Frame Drywall Soffit 3 3 17-Dec-20 21-Dec-20 -145B3004 Electric rough in 5 5 22-Dec-20 29-Dec-20 -145B3005 Revise Sprinkler branch lines 5 5 22-Dec-20 29-Dec-20 -145B3006 HVAC rough in 10 10 22-Dec-20 06-Jan-21 -145B3007 Low voltage electric systems 5 5 22-Dec-20 29-Dec-20 -145B3008 Form & Pour conc steps 7 7 22-Dec-20 31-Dec-20 -136B3010 Hang & tape drywall Soffit 5 5 30-Dec-20 06-Jan-21 -145B3011 Paint Gym walls 7 7 30-Dec-20 08-Jan-21 -144B3016 Install Steel handrails 5 5 07-Jan-21 13-Jan-21 -125B3009 Paint lounge rooms 3 3 07-Jan-21 11-Jan-21 -145B3018 Install AWP panels 7 7 11-Jan-21 19-Jan-21 -141B3015 Install Gym lights 10 10 12-Jan-21 25-Jan-21 -145B3012 Install ceiling grid lounge 3 3 12-Jan-21 14-Jan-21 -145B3013 Install light fixtures lounge 7 7 12-Jan-21 20-Jan-21 -135B3014 Install doors & Hardware 3 3 12-Jan-21 14-Jan-21 -123B3017 HVAC trim out 2 2 15-Jan-21 18-Jan-21 -128B3019 Install flooring lounge 5 5 21-Jan-21 27-Jan-21 -135B3020 Electrical Trim out 4 4 21-Jan-21 26-Jan-21 -134

B3025 Install Gym wood flooring system 25 25 26-Jan-21 01-Mar-21 -145B3021 Install ceiling pads 3 3 28-Jan-21 01-Feb-21 -135B3022 Final cleaning 5 5 02-Feb-21 08-Feb-21 -135B3023 Finish Punch list 5 5 23-Feb-21 01-Mar-21* -145

B South UpB South Upper level 136 30 06-May-20 A 09-Nov-20 -67

B2500 Owner relocation B South Upper Flr 5 3 06-May-20 A 05-Oct-20 -59B2510 Paint 3nd floor 7 5 03-Aug-20 A 06-Oct-20 -57

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

Install plywood & blocking roof levelSet Exterior storefront /Windows

Install roofRough in Electric

Install HVACInstall Alum Composite panels

Frame Drywall ceilingInstall gutters & downspouts

Hang drywall /tape ceilingPaint walls and ceiling

Install ceiling gridInstall interior storefront/glazed

Install light fixturesInstall flooring

Punch list Vestibule

Owner Relocate LibraryOwner Abatement

DemolitionFrame Drywall Soffit

Electric rough inRevise Sprinkler branch lines

HVAC rough inLow voltage electric systems

Form & Pour conc stepsHang & tape drywall Soffit

Paint Gym wallsInstall Steel handrails

Paint lounge roomsInstall AWP panels

Install Gym lightsInstall ceiling grid lounge

Install light fixtures loungeInstall doors & Hardware

HVAC trim outInstall flooring lounge

Electrical Trim out

Install Gym wood floInstall ceiling pads

Final cleaningFinish Punch list

Owner relocation B South Upper FlrPaint 3nd floor

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 8 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 9: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

PR 66 B2537 PLACE DOOR ORDER & DELIVER 45 20 03-Aug-20 A 26-Oct-20 -67B2509 Hang & tape drywall 5 4 04-Aug-20 A 09-Oct-20 -58B2512 Install light fixtures 10 8 20-Aug-20 A 08-Oct-20 -62B2519 Electrical Trim out 4 3 21-Aug-20 A 08-Oct-20 -57

B2523 Install ceiling pads 3 2 21-Aug-20 A 09-Oct-20 -58B2508 Low voltage electric systems 5 3 25-Aug-20 A 05-Oct-20 -51B2517 HVAC trim out 2 2 02-Sep-20 A 07-Oct-20 -58

B2518 Install flooring 8 7 08-Sep-20 A 16-Oct-20 -62B2516 Install marker boards 5 5 29-Sep-20 05-Oct-20 -56B2527 Install new windows 5 5 29-Sep-20 05-Oct-20 -57B2514 Install Casework 4 4 30-Sep-20 05-Oct-20 -56B2513 Install doors & Hardware 7 7 30-Sep-20 08-Oct-20 -57B2528 Install new window sills 3 3 06-Oct-20 08-Oct-20 -57X218 B2648 CCD 26 TM RELOCATE FOUNTAIN ELEC 5 5 09-Oct-20 15-Oct-20 -62X203 B2651 CCD 19 DEMO STAIR TREADS 5 5 12-Oct-20 16-Oct-20 -58B2524 Final cleaning 5 5 16-Oct-20 22-Oct-20 -62X218 B2647 CCD 26 TM REPLACE DRINKING FOUNT 5 5 16-Oct-20 22-Oct-20 -62B2504 Install operable partitions 3 3 27-Oct-20 29-Oct-20 -67B2525 Finish Punch list 7 7 30-Oct-20 09-Nov-20 -67B2526 Building B South 3rd floor complete 0 0 09-Nov-20* -67

B East/NorthB East/North Upper level 56 34 02-Jun-20 A 13-Nov-20 -66

B2750 Owner Relocate B 3rd Flr E&N 5 2 02-Jun-20 A 01-Oct-20 -70B2762 Hang & tape drywall 12 6 14-Jul-20 A 15-Oct-20 -67B2757 Electric rough in 15 10 30-Jul-20 A 15-Oct-20 -71B2761 Low voltage electric systems 7 5 30-Jul-20 A 08-Oct-20 -66B2767 Install light fixtures 12 4 30-Jul-20 A 30-Oct-20 -56B2774 Electrical Trim out 5 3 30-Jul-20 A 28-Oct-20 -55B2756 Set Door frames 7 3 06-Aug-20 A 06-Oct-20 -60B2769 HVAC trim out 7 6 19-Aug-20 A 30-Oct-20 -56B2764 Install ceiling grid 10 6 31-Aug-20 A 06-Nov-20 -71B2763 Paint walls & ceilings 10 8 01-Sep-20 A 22-Oct-20 -67B2770 Install Flooring 12 7 14-Sep-20 A 28-Oct-20 -54B2753 Masonry infills elevator 3 3 29-Sep-20 01-Oct-20 -71B2754 Cut New openings elevator 2 2 29-Sep-20 01-Oct-20 -70X207 B2882 CCD 20R2 TM PLASTER PATCHING 5 5 16-Oct-20 22-Oct-20 -67X218 B2886 CCD 26 TM ELEC DRINKING FOUNTAIN 5 5 16-Oct-20 22-Oct-20 -65X219 B2890 CCD24 FIRE & DUCT MODULES INSTAL 10 10 16-Oct-20 29-Oct-20 -71B2771 Install marker boards/tackboards 4 4 19-Oct-20 23-Oct-20 -58B2772 Install plumbing fixture 7 7 21-Oct-20 30-Oct-20 -66

B2773 Install doors & Hardware 7 7 21-Oct-20 30-Oct-20 -56B2768 Install Casework 5 5 23-Oct-20 30-Oct-20 -66B2777 Install ceiling pads 7 7 23-Oct-20 02-Nov-20 -58X217 B2883 CCD 25 TM DRYWALL CEILING BASE R 7 7 23-Oct-20 02-Nov-20 -67X218 B2887 CCD 26 TM REPLACE DRINKING FOUNT 5 5 23-Oct-20 29-Oct-20 -65

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

PLACE DOOR ORDER & DELIVERHang & tape drywall

Install light fixturesElectrical Trim out

Install ceiling padsLow voltage electric systems

HVAC trim out

Install flooringInstall marker boardsInstall new windowsInstall Casework

Install doors & HardwareInstall new window sills

CCD 26 TM RELOCATE FOUNTAIN ELECCCD 19 DEMO STAIR TREADS

Final cleaningCCD 26 TM REPLACE DRINKING FOUNTAINS

Install operable partitionsFinish Punch list

Owner Relocate B 3rd Flr E&NHang & tape drywallElectric rough in

Low voltage electric systemsInstall light fixtures

Electrical Trim outSet Door frames

HVAC trim outInstall ceiling grid

Paint walls & ceilingsInstall Flooring

Masonry infills elevatorCut New openings elevator

CCD 20R2 TM PLASTER PATCHINGCCD 26 TM ELEC DRINKING FOUNTAIN

CCD24 FIRE & DUCT MODULES INSTALLInstall marker boards/tackboards

Install plumbing fixture

Install doors & HardwareInstall Casework

Install ceiling padsCCD 25 TM DRYWALL CEILING BASE REVISION

CCD 26 TM REPLACE DRINKING FOUNTAINS

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 9 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 10: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

X203 B2893 CCD 19 TM DEMO STAIR TREADS 5 5 23-Oct-20 30-Oct-20 -55B2766 Install window sills 2 2 28-Oct-20 30-Oct-20 -55

B2775 Install Toilet partitions 3 3 30-Oct-20 03-Nov-20 -66B2776 Install Toilet accessories 3 3 30-Oct-20 03-Nov-20 -66

B2778 Final cleaning 2 2 09-Nov-20 10-Nov-20 -71

B2779 Finish Punch list 3 3 11-Nov-20 13-Nov-20* -71

Building CBuilding C 67 7 18-Mar-20 A 07-Oct-20 -44

First FloorFirst Floor 67 7 31-Jul-20 A 07-Oct-20 -44

C1098 Finish Punch list 7 3 31-Jul-20 A 01-Oct-20 -41C1100 Building C 1st Floor Complete 1 1 07-Oct-20 07-Oct-20 -44

2nd Floor2nd Floor 36 6 18-Mar-20 A 06-Oct-20 -44

C2026 Finish Punch list 7 1 18-Mar-20 A 29-Sep-20 -44C2075 Building C 2nd Flr 1st half Complete 5 5 30-Sep-20 06-Oct-20 -44

Elevator 2 - SoElevator 2 - South 65 65 29-Sep-20 29-Dec-20 -102

No Floor No Floor 65 65 29-Sep-20 29-Dec-20 -102

ES1007 Pour walls 1 1 29-Sep-20 29-Sep-20 -102ES1008 Waterproof Walls 3 3 30-Sep-20 02-Oct-20 -102ES1021 Install courtyard downspouts/drains 5 5 30-Sep-20 06-Oct-20 -46ES1009 Backfill walls 3 3 05-Oct-20 07-Oct-20 -102ES1010 Pour vestibule slab 3 3 08-Oct-20 12-Oct-20 -102ES1011 Install block walls 10 10 13-Oct-20 26-Oct-20 -102ES1012 Infill existing windows 5 5 13-Oct-20 19-Oct-20 -90ES1013 Rough in Electric 3 3 13-Oct-20 15-Oct-20 -69ES1014 Set Beam, bar joist, decking 7 7 27-Oct-20 04-Nov-20 -102ES1015 Install Face Brick 5 5 05-Nov-20 11-Nov-20 -102ES1016 Roof Lobby & Shaft 7 7 12-Nov-20 20-Nov-20 -102ES1018 Install roof sheet metal & gutters 3 3 23-Nov-20 25-Nov-20 -82ES1026 Demo Elevator stop openings 7 7 23-Nov-20 01-Dec-20 -102ES1020 Pour courtyard conc. 3 3 26-Nov-20 30-Nov-20 -82ES1017 Install Elevator 15 15 02-Dec-20 22-Dec-20 -102

ES1019 Drywall patching at connections 3 3 02-Dec-20 04-Dec-20 -90ES1022 Paint lobby 2 2 23-Dec-20 24-Dec-20 -102ES1023 Install lobby ceiling grid 1 1 28-Dec-20 28-Dec-20 -102ES1024 Hang Doors & hardware 2 2 28-Dec-20 29-Dec-20 -102ES1025 Trim Electric 1 1 29-Dec-20 29-Dec-20 -102ES1027 South Elevator Complete 0 0 29-Dec-20* -102

Elevator 3 - NElevator 3 - North 97 92 29-Sep-20 A 05-Feb-21 -129

No Floor No Floor 97 92 29-Sep-20 A 05-Feb-21 -129

PR 61R EN103 X162 REVISED SHORING CALCULATION 15 15 29-Sep-20 A 19-Oct-20 -129PR 61R EN103 X162 REVISED STEEL SUBMITTTALS 10 10 29-Sep-20 A 02-Nov-20 -112EN1000 Start North Elevator 0 0 29-Sep-20 -129

EN1028 Demo connector & Conc slab 2 2 20-Oct-20 21-Oct-20 -129

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

CCD 19 TM DEMO STAIR TREADSInstall window sills

Install Toilet partitionsInstall Toilet accessories

Final cleaning

Finish Punch list

Finish Punch listBuilding C 1st Floor Complete

Finish Punch listBuilding C 2nd Flr 1st half Complete

Pour wallsWaterproof Walls

Install courtyard downspouts/drainsBackfill walls

Pour vestibule slabInstall block walls

Infill existing windowsRough in Electric

Set Beam, bar joist, deckingInstall Face Brick

Roof Lobby & ShaftInstall roof sheet metal & gutters

Demo Elevator stop openingsPour courtyard conc.

Install Elevator

Drywall patching at connectionsPaint lobby

Install lobby ceiling gridHang Doors & hardwareTrim Electric

X162 REVISED SHORING CALCULATIONSX162 REVISED STEEL SUBMITTTALS

Demo connector & Conc slab

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 10 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 11: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

PR 61R EN103 X162 SHORING INSTALLATION 5 5 20-Oct-20 26-Oct-20 -122EN1029 Install Excavation shoring 10 10 22-Oct-20 04-Nov-20 -129PR 61R EN103 X162 FAB STEEL REVISION 7 7 03-Nov-20 11-Nov-20 -112EN1001 Excavate Elevator Pit 5 5 05-Nov-20 11-Nov-20 -129EN1002 Underpin existing walls 5 5 05-Nov-20 11-Nov-20 -129EN1003 Dig footings tie rebars 3 3 12-Nov-20 16-Nov-20 -129PR 61R EN103 X162 ADDITIONAL STEEL INSTALLATIO 5 5 12-Nov-20 18-Nov-20 -112EN1004 Pour footings 3 3 17-Nov-20 19-Nov-20 -129EN1005 Form walls with rebar 5 5 20-Nov-20 26-Nov-20 -129EN1006 Pour walls 2 2 27-Nov-20 30-Nov-20 -129EN1007 Waterproof Walls 3 3 01-Dec-20 03-Dec-20 -129EN1008 Install downspouts/drains 2 2 01-Dec-20 02-Dec-20 -87EN1009 Backfill walls 3 3 04-Dec-20 08-Dec-20 -129EN1010 Pour vestibule slab 3 3 09-Dec-20 11-Dec-20 -129EN1011 Install block walls 10 10 14-Dec-20 28-Dec-20 -129EN1012 Infill existing windows 3 3 14-Dec-20 16-Dec-20 -123EN1013 Rough in Electric 3 3 14-Dec-20 16-Dec-20 -109EN1015 Install Face Brick 4 4 28-Dec-20 31-Dec-20 -129EN1014 Set Beam, bar joist, decking 3 3 29-Dec-20 31-Dec-20 -129EN1016 Roof Lobby & Shaft 3 3 04-Jan-21 06-Jan-21 -129EN1017 Install roof sheet metal & gutters 3 3 07-Jan-21 11-Jan-21 -113EN1018 Demo Elevator stop openings 7 7 07-Jan-21 15-Jan-21 -129PR 61R EN103 X162 ADDITIONAL DRYWALL & TAPING 5 5 07-Jan-21 13-Jan-21 -119EN1019 Pour courtyard conc. 3 3 12-Jan-21 14-Jan-21 -113EN1020 Install Elevator 15 15 18-Jan-21 05-Feb-21 -129EN1021 Drywall patching at connections 3 3 18-Jan-21 20-Jan-21 -121EN1022 Fall semester start 0 0 18-Jan-21 18-Jan-21* -114EN1023 Paint lobby 2 2 21-Jan-21 22-Jan-21 -121EN1024 Install lobby ceiling grid 1 1 25-Jan-21 25-Jan-21 -121EN1025 Hang Doors & hardware 2 2 25-Jan-21 26-Jan-21 -121EN1026 Trim Electric 1 1 26-Jan-21 26-Jan-21 -121EN1027 North Elevator Complete 0 0 05-Feb-21* -129

AuditoriumAuditorium 163 65 01-Jun-20 A 29-Dec-20 -102

No Floor No Floor 163 65 01-Jun-20 A 29-Dec-20 -102

AD 7019 PR 10 Wood trim at Ramp walls 3 3 01-Jun-20 A 01-Oct-20 -65PR 47 AD 7029 X125 ORDER AISLE LIGHTS 65 35 07-Aug-20 A 16-Nov-20 -102AD 7008 New Stage curtains 5 5 29-Sep-20 05-Oct-20 -47AD 7022 PR 10 Install ramp Handrails 3 3 02-Oct-20 06-Oct-20 -65PR 47 AD 7033 X125 INSTALL CONDUITS 2 2 17-Nov-20 18-Nov-20 -102PR 47 AD 7034 X125 PATCH TRENCHES 1 1 19-Nov-20 19-Nov-20 -102PR 47 AD 7035 X125 INSTALL AISLE LIGHTS 5 5 20-Nov-20 26-Nov-20 -102AD 7007 New carpet 5 5 27-Nov-20 03-Dec-20 -102AD 7020 PR 10 Install Carpet at ramps 5 5 04-Dec-20 10-Dec-20 -102AD 7021 PR 47 Install floor lighting. 7 7 11-Dec-20 21-Dec-20 -102

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

X162 SHORING INSTALLATIONInstall Excavation shoring

X162 FAB STEEL REVISIONExcavate Elevator PitUnderpin existing walls

Dig footings tie rebarsX162 ADDITIONAL STEEL INSTALLATIONPour footings

Form walls with rebarPour walls

Waterproof WallsInstall downspouts/drains

Backfill wallsPour vestibule slab

Install block wallsInfill existing windowsRough in Electric

Install Face BrickSet Beam, bar joist, decking

Roof Lobby & ShaftInstall roof sheet metal & gutters

Demo Elevator stop openingsX162 ADDITIONAL DRYWALL & TAPINGPour courtyard conc.

Install ElevatorDrywall patching at connections

Fall semester startPaint lobby

Install lobby ceiling gridHang Doors & hardwareTrim Electric

PR 10 Wood trim at Ramp wallsX125 ORDER AISLE LIGHTS

New Stage curtainsPR 10 Install ramp Handrails

X125 INSTALL CONDUITSX125 PATCH TRENCHES

X125 INSTALL AISLE LIGHTSNew carpet

PR 10 Install Carpet at rampsPR 47 Install floor lighting.

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 11 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline

Page 12: Site - WordPress.com · 2020. 10. 23. · MA1025 Pour 1st Floor slab on grade 3 302-Oct-20 06-Oct-20 -136 MA1027 Pour Roof mech pads 3 302-Oct-20 06-Oct-20 -131 MA 1107 Set Upper

Activity ID Activity Name Original

Duration

RemDur

Start Finish TotalFloat

AD 7023 Auditorium Punch list 5 5 22-Dec-20 29-Dec-20 -102

No Building No Building 5 5 04-Mar-21 10-Mar-21 -147

No Floor No Floor 5 5 04-Mar-21 10-Mar-21 -147

A1005 Substantial Completion 5 5 04-Mar-21 10-Mar-21* -147

27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14October 2020 November 2020 December 2020 January 2021 February 2021 March 2021

Auditorium Punch list

Substanti

4704 Brentwood HS plus Co Classrms 26 4704 Brentwood -26 4650 01-Oct-20 16:02

Data Date: 29-Sep-20Finish Date:10-Mar-21Run Date:01-Oct-20

Page 12 of 12BRENTWOOD HS

UPDATE 26 Partial co

Date Revision Chec... Ap... Actual WorkRemaining WorkCritical Remaining WorkStart ConstraintFinish Constraint

Third Baseline