Ground Covering Rifiniturat e Sheshit Symbol M Concrete Path with white Pebble Stone Beton me gure te bardhe M0 Dolomit Dolumit M1 Thin Inox Kerb 1x25 Profil Inoksi M2 Standart Concrete Paving Tiles 10x10x20 cm Pllaka standerte betoni me madhesi 10x10x20cm M3 Pervious Concrete Beton paster M4 Pigmented Pink Concrete Beton I pigmentuar ngjyre roze M5 Pigmented sand Color Concrete Beton I pigmentuar ngjyre rere M6 Glass balustrade Parmak xhami M7 Crashed Basakt Gravel (dark) Bazalt I thyer per zhavor (I erret) M8 Red colored asphalt Asfalt ngjyre roze M9 Large format local Stone Tiles 2 different kinds: one for 'Mist' one for 'Water Walls' Pllaka guri lokal te formateve te medha 2 lloje te ndryshme : nje per 'Mist' dhe nje per 'Water Walls' M10 Rock Gure te permasave natyrore M11 Grey concrete- natural smooth cast Beton gri- me siperfaqe natyrale M12 Smooth Rounded Pebbles (white) Gure I rrumbullaket I bardhe M13 EPDM sportsfloor EPDM per dyshemet sportive M14 Concrete supportet wall structure Mure suportues prej betoni M15 Standart Asphalt Asfalt standart M16 Polished concrete for park limits Beton I rashinuar 6x15 ne limite te parkut M17 Polished concrete kerb width as the construction elements (50cm) Beton I rashinuar me gjeresi 50 cm M18 Fine Gravel Zhavorr I imet M19 2.5% (approx.) 2.5% (approx.) L LINE SIPERFAQE E SHESHTE ZHAVORRI RRUGA "HEKTOR SHYTI" RRUGA "HEKTOR SHYTI" RRUGA "FEJZO GJOMEMA" RRUGA "FEJZO GJOMEMA" RRUGA "FEJZO GJOMEMA" RRUGA "FEJZO GJOMEMA" RRUGA "PELIVAN LESKAJ" RRUGA "ÇAMERIA" TROTUAR TROTUAR TROTUAR TROTUAR TROTUAR(KORSI REZERVE) TROTUAR(KORSI REZERVE) KEND LOJRASH BOX Tombino e shkarkimit te ujrave UB TROTUAR TROTUAR TRO SHESH RRUGE RRUGE SHESH PARKIMI RRUGICE 1KT 1KT 6KT 6KT 2KT 6KT 7KT Kati I 5KT 4KT 2KT 4KT 4KT MONUMENT KULTURE 1KT 1KT 6KT 5KT 1KT SHESH- PRONE PRIVATE TUNEL KALIMI 6KT 2KT 3KT 1KT Strukture me trare 1KT 1KT 1KT 4KT 5KT Strehe 13KT 2KT 2KT SHATERVAN 12KT TROTUAR TROTUAR BETONI 12KT+1 12KT 12KT 2KT 13KT 7KT 9KT 2KT 2KT 3KT 2KT 2KT 1KT 2KT BUS STATION 2KT 28° 15 T T T T T T T E8. Olive Grove E5. Walled Garden E4. Slides E3. Lawn/Grass E2. Playscape E1. Arboretum W1. Silent Garden W4. Citrus Orchard W2. Fall Colours W5. Trampoline W6. Museum of Independence W8. Swings W7. Flower Trees W9. Mountain S4. Water Walls S3. Hill S1. Basketball S2. Maquis S6. Stones E9. Flowers E10. Balance Installation S5. Pergola N11. Skate N10. Raised Arboretum N8. Bus N9. Rocks N3. Bicycles N2. Lawn/ Trees N4. Creek N5. Existing N6. Climb Sphere N7. Meadow N1. Palm Forest W3. Bicycles E7. Flowers E6. Mist S7. Sunken Square parkim ekzistues C D A B M17 M17 M17 M17 M17 M17 M17 M17 M17 M17 M17 M17 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M0 M0 M0 M1 M3 M3 M3 M4 M4 M4 M4 M5 M6 M8 M8 M9 M9 M10 M10 M12 M12 M12 M13 M14 M16 M16 M16 M16 M18 M18 M18 M18 M18 M18 M19 M2 M15 M20 M20 M21 M19 M19 M21 M20 M20 M20 M20 M20 M13 M13 M13 M13 M13 M13 Legjenda: Shenime: ALL DIMENSIONS HAVE TO BE VERIFIED BY THE CONTRACTOR ON TE CONSTRUCTION SITE TË GJITHA DIMENSIONET DUHET TË VERIFIKOHEN NGA KONTRAKTORI NË VËND data: shkalla: numri i fletes: SHERBIME PROJEKTIMI PER RIGJENERIMIN URBAN TE SHETITORES BREGDETARE QENDRORE TE VLORES, SHESHIT TE FLAMURIT DHE PORTIT Faza Projekt Zbatimi Klient: Fondi Shqiptar i Zhvillimit N Qershor 2020 faza: PZ formati: Local Architecture Office Studio Lokale Arkitekture Gent Agolli (LOC) (VEND) N.6844 Firma: Lexuar dhe aprovuar Firma: Lexuar dhe aprovuar Firma: Lexuar dhe aprovuar Firma: Lexuar dhe aprovuar (LOC) (VEND) N . 5820 / 3 MEP Engineering HYDRO&ENERGY Hidro-Mekanik Nikolin Risilia, Artur Dado (LOC) (VEND) N.6700/1 Electrical Engineer Inxhinieri Elektrik Saimir Saliaj Eurotest International Studio Studio Nderkombetare (INT) IMPORTANT: These drawings are property of iRI, Rruga DERVISH HIMA, nr 8 kati i pare – 1001 TIRANA. Copy, multiplication or distribution inbetween parties of these plans (or any part of it) without written permission of iRI is prohibited. E RËNDËSISHME: Këto vizatime janë pronë e iRI, Rruga DERVISH HIMA, nr 8 kati i parë – 1001 TIRANË. Kopjimi, shumëfishimi apo shpërndarja e këtyre vizatimeve (apo pjesëve të tyre) pa lejen me shkrim të iRI është e ndaluar. disiplina A Firma: Lexuar dhe aprovuar (LOC) (VEND) K 1248/3 Structural Engineer LUAN MYRTAJ Inxhinier strukturor Firma: Lexuar dhe aprovuar (LOC) (VEND) K 0305/1 Structural Engineer Inxhinier strukturor PIRO KOKALARI XDGA Plan dyshemeje 1:5000 A0 13
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Ground Covering Rifiniturat e Sheshit Symbol
MConcrete Path with white Pebble Stone Beton me gure te bardhe M0Dolomit Dolumit M1Thin Inox Kerb 1x25 Profil Inoksi M2Standart Concrete Paving Tiles10x10x20 cm
Pllaka standerte betoni me madhesi10x10x20cm M3
Pervious Concrete Beton paster M4 Pigmented Pink Concrete Beton I pigmentuar ngjyre roze M5Pigmented sand Color Concrete Beton I pigmentuar ngjyre rere M6Glass balustrade Parmak xhami M7Crashed Basakt Gravel (dark) Bazalt I thyer per zhavor (I erret) M8Red colored asphalt Asfalt ngjyre roze M9Large format local Stone Tiles 2different kinds: one for 'Mist' one for'Water Walls'
Pllaka guri lokal te formateve te medha 2 llojete ndryshme : nje per 'Mist' dhe nje per'Water Walls' M10
Rock Gure te permasave natyrore M11Grey concrete- natural smooth cast Beton gri- me siperfaqe natyrale M12Smooth Rounded Pebbles (white) Gure I rrumbullaket I bardhe M13EPDM sportsfloor EPDM per dyshemet sportive M14Concrete supportet wall structure Mure suportues prej betoni M15Standart Asphalt Asfalt standart M16Polished concrete for park limits Beton I rashinuar 6x15 ne limite te parkut M17Polished concrete kerb width as theconstruction elements (50cm) Beton I rashinuar me gjeresi 50 cm M18Fine Gravel Zhavorr I imet M19
2.5% (approx.)
2.5% (approx.)
WA
TE
R L
EV
EL
LIN
E
SIP
ER
FA
QE
E S
HE
SH
TE
ZH
AV
OR
RI
RR
UG
A "H
EK
TO
R SH
YT
I"
RR
UG
A "H
EK
TO
R S
HY
TI"
RRUGA "FEJZO GJOMEMA" RRUGA "FEJZO GJOMEMA"
RR
UG
A "F
EJZ
O G
JOM
EM
A"
RR
UG
A "F
EJZ
O G
JOM
EM
A"
RR
UG
A "P
EL
IVA
N L
ES
KA
J"
RR
UG
A "Ç
AM
ER
IA"
TR
OTU
AR
TR
OTU
AR
TR
OTU
AR
TR
OTU
AR
TR
OTU
AR
(KO
RSI R
EZ
ER
VE
)
TR
OTU
AR
(KO
RSI R
EZ
ER
VE
)
KE
ND
LO
JRA
SH
BO
X
Tom
bino e shkark
imit te ujrave U
B
TR
OT
UA
RT
RO
TU
AR
TR
OT
UA
R
SH
ESH
RR
UG
E
RR
UG
E
SH
ESH
PA
RK
IMI
RRUGICE
1KT
1KT
6KT
6KT
2KT
6KT
7KT
Kati I
5KT
4KT
2KT
4KT
4KT
MO
NU
ME
NT
KU
LT
UR
E
1KT
1KT
6KT
5KT
1KT
SH
ESH
- PR
ON
E P
RIV
AT
E
TUNEL KALIMI
6KT
2KT
3KT
1KT
Struk
ture me trare 1
KT
1KT
1KT
4KT
5KT S
trehe
13KT
2KT
2KT
SH
AT
ER
VA
N
12KT
TR
OTU
AR
TR
OTU
AR
BE
TO
NI
12KT
+1
12KT
12KT
2KT
13KT
7KT
9KT
2KT
2KT
3KT
2KT
2KT
1KT
2KT
BU
S S
TA
TIO
N
2KT
28°
15
T
TT T T
T
T
E8.Olive Grove
E5.Walled Garden
E4.Slides
E3.Lawn/Grass
E2.Playscape
E1.Arboretum
W1.Silent Garden
W4.Citrus Orchard
W2.Fall Colours
W5.Trampoline
W6.Museum of Independence
W8.Swings
W7.Flower Trees
W9.Mountain
S4.Water Walls
S3.Hill
S1.Basketball
S2.Maquis
S6.Stones
E9.Flowers
E10.Balance Installation
S5.Pergola
N11.Skate N10.
Raised Arboretum
N8. Bus
N9.Rocks
N3.Bicycles
N2.Lawn/ Trees
N4.Creek
N5.Existing
N6.Climb SphereN7.
Meadow
N1.Palm Forest
W3.Bicycles
E7.Flowers
E6.Mist
S7.Sunken Square
parkim ekzistues
C
D
A
B
M17
M17
M17
M17
M17
M17
M17 M17 M17 M17 M17 M17
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1 M1
M1 M1
M1 M1
M2
M2
M2 M2
M2
M2
M2
M2
M2 M2
M2
M2
M2
M2
M2
M2
M2
M2
M2 M2
M2 M2
M2
M2
M2
M2 M2
M2
M2
M0
M0
M0
M1
M3
M3
M3
M4
M4
M4 M4
M5
M6
M8
M8
M9
M9 M10
M10
M12
M12
M12
M13
M14
M16
M16
M16
M16
M18
M18
M18
M18
M18
M18
M19
M2
M15
M20
M20
M21
M19
M19
M21 M20
M20 M20
M20 M20
M13
M13
M13
M13
M13 M13
Legjenda:
Shenime:
ALL DIMENSIONS HAVE TO BE VERIFIED BY THECONTRACTOR ON TE CONSTRUCTION SITE
TË GJITHA DIMENSIONET DUHET TË VERIFIKOHENNGA KONTRAKTORI NË VËND
data: shkalla:
numri i fletes:
SHERBIME PROJEKTIMI
PER RIGJENERIMIN URBAN TE SHETITORES BREGDETARE
QENDRORE TE VLORES, SHESHIT TE FLAMURIT DHE PORTIT
Faza
Projekt Zbatimi
Klient: Fondi Shqiptar i Zhvillimit
N
Qershor 2020
faza:
PZ
formati:
Local Architecture Office
Studio Lokale Arkitekture
Gent Agolli
(LOC)
(VEND)
N.6844
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
N . 5820 / 3
MEP Engineering
HYDRO&ENERGY
Hidro-Mekanik
Nikolin Risilia, Artur Dado
(LOC)
(VEND)
N.6700/1
Electrical Engineer
Inxhinieri Elektrik
Saimir Saliaj
Eurotest
International Studio
Studio Nderkombetare
(INT)
IMPORTANT: These drawings are property of iRI, Rruga DERVISH
HIMA, nr 8 kati i pare – 1001 TIRANA. Copy, multiplication or
distribution inbetween parties of these plans (or any part of it) without
written permission of iRI is prohibited.
E RËNDËSISHME: Këto vizatime janë pronë e iRI, Rruga
DERVISH HIMA, nr 8 kati i parë – 1001 TIRANË. Kopjimi,
shumëfishimi apo shpërndarja e këtyre vizatimeve (apo pjesëve të
tyre) pa lejen me shkrim të iRI është e ndaluar.
disiplina
A
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
K 1248/3
Structural Engineer
LUAN MYRTAJ
Inxhinier strukturor
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
K 0305/1
Structural Engineer
Inxhinier strukturor
PIRO KOKALARI
XDGA
Plan dyshemeje
1:5000A0
13
Legjenda:
Shenime:
ALL DIMENSIONS HAVE TO BE VERIFIED BY THECONTRACTOR ON TE CONSTRUCTION SITE
TË GJITHA DIMENSIONET DUHET TË VERIFIKOHENNGA KONTRAKTORI NË VËND
data: shkalla:
numri i fletes:
SHERBIME PROJEKTIMI
PER RIGJENERIMIN URBAN TE SHETITORES BREGDETARE
QENDRORE TE VLORES, SHESHIT TE FLAMURIT DHE PORTIT
Faza
Projekt Zbatimi
Klient: Fondi Shqiptar i Zhvillimit
N
Qershor 2020
faza:
PZ
formati:
Local Architecture Office
Studio Lokale Arkitekture
Gent Agolli
(LOC)
(VEND)
N.6844
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
N . 5820 / 3
MEP Engineering
HYDRO&ENERGY
Hidro-Mekanik
Nikolin Risilia, Artur Dado
(LOC)
(VEND)
N.6700/1
Electrical Engineer
Inxhinieri Elektrik
Saimir Saliaj
Eurotest
International Studio
Studio Nderkombetare
(INT)
IMPORTANT: These drawings are property of iRI, Rruga DERVISH
HIMA, nr 8 kati i pare – 1001 TIRANA. Copy, multiplication or
distribution inbetween parties of these plans (or any part of it) without
written permission of iRI is prohibited.
E RËNDËSISHME: Këto vizatime janë pronë e iRI, Rruga
DERVISH HIMA, nr 8 kati i parë – 1001 TIRANË. Kopjimi,
shumëfishimi apo shpërndarja e këtyre vizatimeve (apo pjesëve të
tyre) pa lejen me shkrim të iRI është e ndaluar.
disiplina
A
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
K 1248/3
Structural Engineer
LUAN MYRTAJ
Inxhinier strukturor
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
K 0305/1
Structural Engineer
Inxhinier strukturor
PIRO KOKALARI
XDGA
Detaje mobilimi urban ne parkun e lojerave
1:25A0
14
AutoCAD SHX Text
Detaj i tavolines se Ping Pongut
AutoCAD SHX Text
Detaj i kacavjerreses me shkallare
AutoCAD SHX Text
Detaj i tavolines me peteza
AutoCAD SHX Text
Detaj i kubave te ngjitshem
AutoCAD SHX Text
Detaj i shkalles me kuba
AutoCAD SHX Text
Detaj i tombinos per femije
AutoCAD SHX Text
Detaj elementi loje
AutoCAD SHX Text
Detaj elementi loje
AutoCAD SHX Text
Pamje ballore
AutoCAD SHX Text
Pamje nga siper
AutoCAD SHX Text
Pamje anesore
AutoCAD SHX Text
Pamje ballore
AutoCAD SHX Text
Pamje nga siper
AutoCAD SHX Text
Pamje nga siper
AutoCAD SHX Text
Pamje anesore
AutoCAD SHX Text
Pamje ballore
AutoCAD SHX Text
Pamje ballore
AutoCAD SHX Text
Pamje anesore
AutoCAD SHX Text
Pamje nga siper
AutoCAD SHX Text
Pamje ballore
AutoCAD SHX Text
Pamje anesore
AutoCAD SHX Text
Pamje nga siper
AutoCAD SHX Text
Pamje anesore
AutoCAD SHX Text
Pamje ballore
AutoCAD SHX Text
Pamje nga siper
AutoCAD SHX Text
Pamje anesore
AutoCAD SHX Text
Pamje ballore
AutoCAD SHX Text
Pamje nga siper
AutoCAD SHX Text
Pamje anesore
AutoCAD SHX Text
Pamje nga siper
AutoCAD SHX Text
Pamje ballore
1m a
ppro
x.
M2
G1.1
+1
.8
2
G1.1 M
2
D4
D4
D6
D6
+1
.7
2
a-a
+1
.7
1
+1
.7
6
+1
.7
7
+1
.7
8
+1
.7
7
+1
.7
3
+1
.7
4
+1
.7
6
+1
.6
1
+1
.6
1
+1
.5
7
+1
.6
2
+1
.7
1
+1
.6
6
+1
.6
8
+1
.7
0
+1
.7
6
+1
.7
7
+1
.7
6
+2
.8
6
+2
.9
0
+2
.9
1+
2
.9
0
G1.2
G1.3
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
G1.1
M2
+1
.8
1
D5
D5
E4
G1.1
+1
.7
7
+2
.1
7
G1.4
M2
+1
.6
5
E20
+2.00
b-b
+1
.80
+1.80
+1.80
+1.80
+1.80
D13
D13
D15
D15
D16
D16
D17
D17
M2
E13
M3
+2.00
+2.00
+2.00
+1.80
M16
D29 D29
D14 D14
D30
D30
D30
D30
D29 D29
D14 D14
D15
D15
G1.2
E9
M2
+1
.9
5
G1.3
E5
+2
.2
7
+2
.3
7
+1
.8
7
D25
D25
+1
.6
3
G1.3 M
2
E5
+1
.5
5
G2
M18
E14 E15
D10
D10
D11
D11
+1
.4
7
G1.3
M2
D4
D4
+1
.5
0
+1
.6
8
+1
.5
0
+1
.3
2
D26
D26
E8 G
1.3
M18
E3
+1
.4
9
+1
.8
5
+1
.5
2
D4
D4
G1.3
M2
M2
+1
.8
5
D4
D4
G1.3
M2
G1.3
+1
.6
8
D4
D4
M2
+1
.5
8
M19
G1.2
+1
.5
8
+4
.0
8
+4
.0
8
D4
D4
M2
+1
.4
5
G1.3
M13
D4
D4
+1
.4
5
D4
D4
M2
G1.3
+1
.2
7
+1
.3
6
+1
.3
6
1,15
+1
.1
5
+1
.2
0
+1
.2
0
+1
.2
0
+1
.2
0
E5
M6
M19
M18
+1
.3
7
M2
G1.3
D4
D4
M2
G1.3
+2
.0
8
+2
.2
4
+2
.3
1
+2
.1
5
D4
D4
G1.2
M2
+2
.0
7
+2
.0
7
+2
.1
5
+2
.1
0
+3
.5
7
D4
D4
+1.88
+1.92
+1.90
+1.94
E11
M1
D4
D4
M2
G1.2
M11
+1
.9
3
T
TT T T
T
T
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
xx
xx
x
xx
xx
xx
x
xx
xx
x
x
x
x
x
x
x
xx
xx
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
xx
xx
x
x
RR
UG
A "H
EK
TO
R SH
YT
I"
RR
UG
A "H
EK
TO
R S
HY
TI"
RRUGA "FEJZO GJOMEMA" RRUGA "FEJZO GJOMEMA"
RR
UG
A "F
EJZ
O G
JOM
EM
A"
RR
UG
A "F
EJZ
O G
JOM
EM
A"
RR
UG
A "P
EL
IVA
N L
ES
KA
J"
RR
UG
A "Ç
AM
ER
IA"
RR
UG
A "Ç
AM
ER
IA"
TR
OTU
AR
TR
OTU
AR
TR
OTU
AR
TR
OTU
AR
TR
OTU
AR
(KO
RSI R
EZ
ER
VE
)
TR
OTU
AR
(KO
RSI R
EZ
ER
VE
)
KE
ND
LO
JRA
SH
BO
X
Tom
bino e shkark
imit te ujrave U
B
TR
OT
UA
RT
RO
TU
AR
TR
OT
UA
R
SH
ESH
RR
UG
E
RR
UG
E
SH
ESH
PA
RK
IMI
RRUGICE
1KT
1KT
6KT
6KT
2KT
6KT
7KT
Kati I
5KT
4KT
2KT
4KT
4KT
MO
NU
ME
NT
KU
LT
UR
E
1KT
1KT
6KT
5KT
1KT
SH
ESH
- PR
ON
E P
RIV
AT
E
TUNEL KALIMI
6KT
2KT
3KT
1KT
Struk
ture me trare 1
KT
1KT
1KT
4KT
5KT S
trehe
13KT
2KT
2KT
SH
AT
ER
VA
N
12KT
TR
OTU
AR
TR
OTU
AR
BE
TO
NI
10KT
12KT
+1
12KT
12KT
2KT
13KT
7KT
9KT
2KT
2KT
3KT
2KT
2KT
1KT
2KT
BU
S S
TA
TIO
N
|
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
|
|
|
|
|||
||
||
||
||
||
||
||
||
||
||
||
|
|||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
|
||
||
|
||
||
||
||
|
||
|||
||
|
|||
||
|
|||
||
|
|||
|
|||
||
|
|||
||
|
|||
||
|
|||
||
|
|||
|
|||
||
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||
| || |
| | || |
| | || |
| | || |
| | || | | | | |
| | | | | | | | ||
|||
||
|
|||
|
| | | | | | | | | | | | | | ||
|||
|
|||
|
|||
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
||
|
2KT
Legjenda:
Shenime:
ALL DIMENSIONS HAVE TO BE VERIFIED BY THECONTRACTOR ON TE CONSTRUCTION SITE
TË GJITHA DIMENSIONET DUHET TË VERIFIKOHENNGA KONTRAKTORI NË VËND
data: shkalla:
numri i fletes:
SHERBIME PROJEKTIMI
PER RIGJENERIMIN URBAN TE SHETITORES BREGDETARE
QENDRORE TE VLORES, SHESHIT TE FLAMURIT DHE PORTIT
Faza
Projekt Zbatimi
Klient: Fondi Shqiptar i Zhvillimit
N
Qershor 2020
faza:
PZ
formati:
Local Architecture Office
Studio Lokale Arkitekture
Gent Agolli
(LOC)
(VEND)
N.6844
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
N . 5820 / 3
MEP Engineering
HYDRO&ENERGY
Hidro-Mekanik
Nikolin Risilia, Artur Dado
(LOC)
(VEND)
N.6700/1
Electrical Engineer
Inxhinieri Elektrik
Saimir Saliaj
Eurotest
International Studio
Studio Nderkombetare
(INT)
IMPORTANT: These drawings are property of iRI, Rruga DERVISH
HIMA, nr 8 kati i pare – 1001 TIRANA. Copy, multiplication or
distribution inbetween parties of these plans (or any part of it) without
written permission of iRI is prohibited.
E RËNDËSISHME: Këto vizatime janë pronë e iRI, Rruga
DERVISH HIMA, nr 8 kati i parë – 1001 TIRANË. Kopjimi,
shumëfishimi apo shpërndarja e këtyre vizatimeve (apo pjesëve të
tyre) pa lejen me shkrim të iRI është e ndaluar.
disiplina
A
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
K 1248/3
Structural Engineer
LUAN MYRTAJ
Inxhinier strukturor
Firma: Lexuar dhe aprovuar
(LOC)
(VEND)
K 0305/1
Structural Engineer
Inxhinier strukturor
PIRO KOKALARI
XDGA
Plani i pergjithshem i i mobilimit urban
1:1500A0
14/01
E8.Olive Grove
E5.Walled Garden
E4.Slides
E3.Lawn/Grass
E2.Playscape
E1.Arboretum
W4.Citrus Orchard
W2.Fall Colours
W5.Trampoline
W6.Museum of
IndependenceW8.Swings
W7.Flower Trees
W9.Mountain
S4.Water Walls
S3.Hill
S1.Basketball
S2.Maquis
S6.Stones
E9.Flowers
E10.Balance Installation
S5.Pergola
N11.Skate
N10.Raised
Arboretum
N9.Rocks
N3.Bicycles
N2.Lawn/Trees
N5.ExistingN7.
Meadow
N1.Palm Forest
W3.Bicycles
E7.Flowers
E6.Mist
S7.Sunken Square
W1.Silent garden
N4.Creek
N6.Climb Sphere
N8. BusKy plan ka per qellim te tregoje shperndarjen dhe vendndodhjen e karrigeve te levizshmedhe koshave te mbeturinave.Permasat finale dhe specifikimet e tyre ndodhen ne Librin eSpecifikimeve.Stolat fiks jane pjese e integruar e rratheve specifik dhe mund te evidentohen ne fletetspecifike te rratheve ose ne Librin e Specifikimeve.Mobilimi urban i parkut te lojerave eshte i detajuar me dimensione dhe permasa finale nefleten e detajeve te mobilimit urban te parkut A_14/2.