Offshore Wind Farm Operation & Maintenance of Shanghai Donghai Bridge Project of Shanghai Donghai Bridge Project Dr. Chen Danghui Vice president & CTO Vice president & CTO Sinovel Wind Group Co.,Ltd
Offshore Wind Farm Operation & Maintenanceof Shanghai Donghai Bridge Projectof Shanghai Donghai Bridge Project
Dr. Chen DanghuiVice president & CTOVice president & CTO Sinovel Wind Group Co.,Ltd
CONTENTS
1. Overview of Sinovel Group
2. Overview of Shanghai Donghai Bridge offshore wind farm project
3. Operation and maintenance
Overview of Sinovel Group
Sinovel Wind Group Co., LtdA wind turbine manufacturer, headquartered in Beijing, is engaged in designing, manufacturing and marketing of the large-scale onshore
p ,
and offshore wind turbine generator system
With a newly added installation of 4386MW in 2010, Sinovel has i d ki N 2 i th ldimproved ranking as No.2 in the world
2010 Annual turnover is 20.3 trillion RMB ( about 3.1 trillion USD) 48% increase than 2009USD),48% increase than 2009
The first 6MW prototype in China had be delivered in May,2011
R & D
Key Strengths:
Technology innovation
•Over 600 research and development engineersdevelopment engineers
•National Energy Offshore Wind Power Technology and Equipment Research & Development Center
State-of-art testing base:State of art testing base:
Max 15MW
Massive production p
Quality control
Services
MANUFACTURE BASES
WTG ASSEMBLING PLANT
WTG TESTING PLATFORM
Assembling lines providing the massive production of 1.5 MW and 3 MW series of WTGs.
Professional and unique testing platform providing the Zero fault before delivery.
MarketingOffshore harbor base
European Branch
Canadian Branch
Indian Branch
American Branch
South American Branch
Australian Branch
Project Overview
Sh h i D h i B id Off h Wi d P
Approved by Chinese National Development and Reform
Shanghai Donghai Bridge Offshore Wind Power Demonstrate Project
Approved by Chinese National Development and Reform Committee in 2008
The first offshore wind power project in Asiap p j
Site Location:8~13km from beach of Shanghai city
SDB wind farm
Project Overview
Shanghai Donghai Bridge Offshore Wind Power
T t l C it 102MW (3MW 34 t )
Shanghai Donghai Bridge Offshore Wind Power Demonstrate Project
Total Capacity : 102MW (3MW×34 sets)
Total investment: 2.365 billion RMB (230 million GBP)
Project Overview
Shanghai city
Average water depth: 10 m
Sea route
Sea route
Average water depth: 10 m
Average wind speed at height 90m: 8.4mpsSea route
Wind farm
at height 90m: 8.4mps
WTGs connect to 110KV onshore transform station by 35KV
Sea route
ysea cable, and by 110KV cable integrated to the 220KV grid system into the Shanghai electric
Donghai Bridge
power grid.
Project Overview
Construction Progress
28th Sept 2008, Offshore foundation project launched
Construction Progress
20th Mar 2009, 1St 3MW WTG installation
4th Sept 2009,3 sets WTG put into operation
27th Feb 2010, completed 34 sets 3MW WTG installation
6th July, 34 sets WTG put into operation
Project Overview
SL3000 Features: M i i i h i i h i l i i Main transmission chain with single-point supporting
Sea environmental anticorrosive and seal design
High-performance generation system
Superior pitch control system
Optimized gearbox design
Grid friendly integrationGrid friendly integration
Reliable redundancy design
Self maintenance crane equipment
C h i Li ht i t ti Comprehensive Lightning protection
Updated wind farm management system
On line monitoring for local and remote supervision
Operation and Maintenance
WTG Commissioning
Professional engineers carried out the commissioningg gEffective equipments and facilities to implementing the O&M Sufficient storage of spare partsStrong support from manufacture bases
Operation and Maintenance
Daily checking and routing maintenance
Different transportation vessels for varies O&M purposes
Operation and Maintenance
Optimize the operation and maintenance schedulep p•Carry out operation data collection and analysis•Standardizing the O&M process and Team training•Conduct routing maintenance during the wake wind period
Operation and Maintenance
WTG availability 34 sets 3MW WTG running smoothly,
the average availability is over 95%
Power production
Till August 2011 the total power production is over 200 MWH.
Outputs of SDB project
Sinovel would like to share mastered technology d i ith ll tand experience with all partners
Delivery the clean energy for the worldDelivery the clean energy for the world