Singapore’s MRT (Mass Rapid Transit) – The 4 lines and extension
7

Singapore's MRT (Mass Rapid Transit) - The four lines and extension

Dec 05, 2014

Download

Travel

Tracy Barb

It is all about the MRT lines in Singapore
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Singapore's MRT (Mass Rapid Transit) - The four lines and extension

Singapore’s MRT (Mass Rapid

Transit) – The 4 lines and extension

Page 2: Singapore's MRT (Mass Rapid Transit) - The four lines and extension

MRT

• Local Metro Transport• Backbone of intra railway system • Operates daily• Starts from 5.30 am and ends at 1

am• Runs through four lines

Page 3: Singapore's MRT (Mass Rapid Transit) - The four lines and extension

MRT - Lines

North South Line (NS):

• First MRT line in Singapore• Runs with 25 stations• Extends to 44 km• Managed by SMRT Corporation• Binds northern part and southern

part of Singapore

Page 4: Singapore's MRT (Mass Rapid Transit) - The four lines and extension

East West Line (EW)

• 2nd MRT line in Singapore• 31 stations are in operation• Administered by SMRT

Corporation• About 49.2km • Joins the eastern parts and the

western parts of the Island

MRT - Lines

Page 5: Singapore's MRT (Mass Rapid Transit) - The four lines and extension

MRT - lines

North East Line (NEL)

• 3rd MRT line• Operates with 16 stations • Managed by SBS transit• About 20 km long• Connects central Singapore to

the north-eastern part• World’s 2nd longest fully

underground line

Page 6: Singapore's MRT (Mass Rapid Transit) - The four lines and extension

MRT - lines

Circle Line (CCL)

• Central line linking all the radial lines

• Functions 31 stations everyday• Monitor by SBS transit• Extends around 35.7 km long line• The world’s longest completely

automatic metro line• Runs without driver• Underground metro railway

system

Page 7: Singapore's MRT (Mass Rapid Transit) - The four lines and extension

• Expansions of all the 4 lines are under construction

• Expects the daily ridership of 4.6 millions in 2020

• Extension will bring the MRT to 278 km by 2020

• Planned a railway network of 540 km by 2050

• Circle line will extend to Marian Bay by 2012

• Downtown line, Thomson line and Eastern region line are expect to finish by 2013, 2018 & 2020 respectively.