Top Banner
KARMJIT SINGH CHAIRMAN CILT SINGAPORE 4 JULY 2014 Singapore – Infrastructure Projects
19

Singapore – Infrastructure Projects

Jan 30, 2016

Download

Documents

bayard

Singapore – Infrastructure Projects. Karmjit singh Chairman cilt singapore 4 july 2014. Agenda. Changi Airport East Industrial / Logistics Project Project Jewel at Changi Airport Relocation of PSA Container Port to Pasir Panjang (Phase 1) and Tuas (Phase 2) - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Singapore – Infrastructure Projects

KARMJIT SINGHCHAIRMAN CILT SINGAPORE

4 JULY 2014

Singapore – Infrastructure Projects

Page 2: Singapore – Infrastructure Projects

Agenda

1. Changi Airport East Industrial / Logistics Project

2. Project Jewel at Changi Airport

3. Relocation of PSA Container Port to Pasir Panjang

(Phase 1) and Tuas (Phase 2)

4. Development and Expansion of Seletar Airport &

Aerospace Park

5. New International Cruise Terminal

Page 3: Singapore – Infrastructure Projects

Agenda

6. E-Freight and IoT (Internet of Things)

7. High Speed Rail between SIN-KUL

8. Expansion of MRT Rail Network

9. New Generation of Logistics / Warehouses

10. Development of Modern Industrial Parks in Iskandar

(South Johore)

11. Development of Industrial Parks in Bintan and Batam

Page 4: Singapore – Infrastructure Projects

1. Changi Airport East Industrial / Logistics Project

Project description: New airfreight terminals, cargo centre for forwarders, logistics park and mail control

Expected completion date: 2020 – 2022

Budget: SGD 1 Billion

Project Owner: Changi Airport Group

Capacity: 4.5 – 5.5 million tonnes

Page 5: Singapore – Infrastructure Projects

2. Project Jewel at Changi AirportProject description:

World-class lifestyle destination for global travelers. The complex will offer aviation facilities, retail offerings and unique leisure attractions.

Expected completion date: 2018

Budget: SGD 1.47 Billion

Project Owner: Changi Airport Group

Capacity: 24 million passengers per annum

Page 6: Singapore – Infrastructure Projects

3. Relocation of PSA to Pasir Panjang (Phase 1) & Tuas (Phase 2)

Project description: PSA port to be relocated in two phases: (1) Pasir Panjang Port and (2) Tuas Port

Expected completion date: 2020

Budget: SGD 4.5 Billion

Operated by: PSA

Capacity: Additional 15 new berths

Page 7: Singapore – Infrastructure Projects

4. Development & Expansion of Seletar Airport & Aerospace Park

Project description: Development of Seletar Airport designed to support industrial and business aviation activities.

Expected completion date: End of 2014

Budget: SGD 60 Million

Project Owner: JTC & EDB

Capacity: 30 aerospace companies & an 1,800 m runway

Page 8: Singapore – Infrastructure Projects

5. New International Cruise TerminalProject

description: Development of the Marina Bay Cruise Terminal Singapore for international passenger traffic.

Completion date: 2012

Budget: SGD 450 Million

Operated by: SATS

Capacity: Able to berth two 3,000 pax cruise ships

Page 9: Singapore – Infrastructure Projects

6. E-Freight & IoT (Internet of Things)Project

description: Using RFID to improve land/sea/freight information flow and productivity

Expected completion date: 2017

Project Owner: CAAS & IDA

Page 10: Singapore – Infrastructure Projects

6. E-Freight & IoT (Internet of Things)Project

description: Using RFID to improve land/sea/freight information flow and productivity

Expected completion date: 2017

Project Owner: CAAS & IDA

Page 11: Singapore – Infrastructure Projects

7. High Speed Rail between SIN-KULProject

description: High Speed Rail (HSR) between Singapore and Malaysia to improve SIN-KUL intercity connectivity

Expected completion date: 2024

Budget: SGD 15 Billion

Operated by: ?

Page 12: Singapore – Infrastructure Projects

8. Expansion of MRT Rail NetworkProject

description: Expansion and development of MRT rail network to serve extended areas and a greater number of commuters.

Expected completion date: 2025

Budget: SGD 60 Billion

Operated by: LTA

Capacity: Increase from 160 to 320 km of track

Page 13: Singapore – Infrastructure Projects

8. Expansion of MRT Rail NetworkProject

description: Expansion and development of MRT rail network to serve extended areas and a greater number of commuters.

Expected completion date: 2025

Budget: SGD 60 Billion

Operated by: LTA

Capacity: Increase from 160 to 320 km of track

Page 14: Singapore – Infrastructure Projects

9. New Generation of Logistics / Warehouses (Green Logistics)Project description:

Improve productivity and develop green buildings, green transport, green ports and green freight and logistics.

By 2020, the commitment is to have 16% reduction in emissions, 30% energy usage reduction, 20% green buildings and 11% increase in public transport usage.

Expected completion date: On-going

Page 15: Singapore – Infrastructure Projects

9. New Generation of Logistics / Warehouses (Green Logistics)Project description:

Improve productivity and develop green buildings, green transport, green ports and green freight and logistics.

By 2020, the commitment is to have 16% reduction in emissions, 30% energy usage reduction, 20% green buildings and 11% increase in public transport usage.

Expected completion date: On-going

Page 16: Singapore – Infrastructure Projects

10. Development of Modern Industrial Parks in Iskandar (South Johore)

Project description: Joint Malaysian and Singapore government collaboration

Expected completion date: On-going

Page 17: Singapore – Infrastructure Projects

10. Development of Modern Industrial Parks in Iskandar (South Johore)

Project description: Joint Malaysian and Singapore government collaboration

Expected completion date: On-going

Page 18: Singapore – Infrastructure Projects

10. Development of Modern Industrial Parks in Iskandar (South Johore)

Project description: Joint Malaysian and Singapore government collaboration

Expected completion date: On-going

Page 19: Singapore – Infrastructure Projects

11. Development of Industrial Parks in Bintan and BatamProject

description: Development of Bintan Industrial Estate and Batamindo Industrial Park for manufacturing companies.

Expected completion date: On-going