Page 1: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

SIMRANसि�मरन

Real Time Train TrackingRDSO Lucknow

H. S. Pannu Director GeneralM. Alam Excutive Director (Tele.)

T.P. Agrawal Director (Tele)

IIT KanpurProf. Sanjay G. Dhande Director IIT-K

B. M. Shukla Sr. Software Engineer

Page 2: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Historical Background.

Corporate Safety Plan (2003-2013) of IR issued in August’2003 incorporates the role of Technologies in chapter IV. Mapping of Rail Network and tracking of trains using GPS & wireless connectivity are covered under item 4.6.

Under Integrated Railway Modernisation Plan (2005-2010) issued in Nov.’2004, Geographical Information System (GIS) mapping of Indian Railway’s Network and Assets/Facilities is covered under item no. 7.4. Provision of Display System inside the coaches is covered under item No.11for giving information to passengers.

12 projects have been selected under Technology Mission for Railway Safety (TMRS) after announcement of Hon’ble Prime Minister of India on 15th Aug.’2003. Project SIMRAN was one of them.

Page 3: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Historical Background.

Project SIMRAN under TMRS was sanctioned at an estimated cost of Rs. 2.0 Crores. This cost is to be shared by Ministry of Railways, Ministry of HRD and Industry Partner in the Ratio of 30%, 50% and 20%.However in absence of valid Industry Partner, the cost was shared equally by MHRD and MOR.

The Project SIMRAN had started in April 2006 and has been completed on 30th September 2009.

Page 4: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Scope of Trial Project (SIMRAN)

Project SIMRAN envisages provision of real-time collection of train running information obtained through Global Positioning System (GPS) and proper communication arrangement between Train and Central Computer.

Project SIMRAN envisages dissemination of train running information so collected to passengers at stations through Passenger Information Display Panels. to passengers in train through Passenger Information Display Panels. to public/passengers on the Internet to public/passengers through IVRS to public/passengers through SMS

Page 5: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

GSM/GPRSGSM/GPRSInternet Internet NetworkNetwork

2.4 GHz RF Exchange2.4 GHz RF Exchange

Central/Divisional DatabaseCentral/Divisional Database

SMS/GPRSSMS/GPRS

Locomotive EquipmentLocomotive Equipment

GPS GSM

MCU RF

Station EquipmentStation Equipment

GSM/LAN

MP RF

Cluster Web ServerCluster Web Server

InternetInternet

Railway Users/AuthoritiesRailway Users/Authorities

Central Traffic ControllerCentral Traffic ControllerStation DisplayStation Display

GPRS

SMS Logger

SMS

Dark FiberOFC LAN

Real Time Train Tracking System

Data Logger

Coach Display EquipmentCoach Display Equipment

RFMCU

2.4

GHz

RF

Exch

ange

2.4

GHz

RF

Exch

ange

Page 6: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Technology Adopted.

Locomotive Equipments developed under Trial Project have an inbuilt GPS Receiver for collecting GPS Co-ordinates, Speed and Time every second.

Locomotive Equipments do have inbuilt GSM Module for communicating the information so collected to Central Server.

Locomotive and Station Equipments do have inbuilt RF Transceivers which operates at 2.4 GHz to exchange information.

Station Equipments do have inbuilt Data Port for Transmission/Reception of Information to/from Central Server through Railway’s OFC Network. Station Equipment are also provided with GSM Module as backup to OFC Network.

Coach Display Equipment equipped with 2.4 GHz RF Transceivers receives information from Locomotive Equipment pertaining to its Current Location, Current Speed, Time and Time & Distant to reach Next Station and displays it inside coaches.

Page 7: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Technology Adopted.

GPS Co-ordinates based Digital Map of all stations of Indian Railway have been prepared.

Page 8: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Salient Features of Technology Adopted.

Data Acquisition Process in fully Automatic, it does not requires manual feeding of Train Running Information (Time IN/Time Out) at Station, Control Office and NTES Terminals.

Train Running Information will be communicated to Central Server through Redundant Transmission Path. One is through GPRS/SMS from Locomotive Equipment other is through Mobile Satellite Services (MSS).

Current train position can be displayed using Atlas Map, Logical Map or in Tabular/Text form.

Page 9: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Additional Facilities(Uses) of the System. Locomotive Equipments also works as transmission platform through which

data generated by On-board Diagnostics Systems is transmitted to Designated Server.

As Locomotive are being tracked continuously, this information can be utilized to improve the Rolling Stock Utilization. As the location of Locomotives will be available on Real Time Basis, POH can also be planned in advance.

As the trains are continuously tracked, Control Chart can be prepared instantly and accurately. These Control Charts shall be available to Divisional Officers on Real Time Basis.

As all the Trains in the vicinity of a Section is tracked in Real-Time basis, availability of Maintenance Block (P-Way as well as Traction) can be predicted accurately.

Locomotive Equipment equipped with GPS Receiver and RF Transmitter can be used to provide advance warning to Road Users of Unmanned Level Crossing Gates .

Page 10: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Additional Facilities(Uses) of the System.

Locomotive Equipments integrated with Smart-Card (provided to Train Drivers) can facilitate Real-Time Crew Management System

Train Running Information generated through SIMRAN can be Input Data for Freight Operation Information System.

Industry can track location of their consignment on Real Time basis and plan for unloading in advance which will reduce Demurrage Charges levied upon.

Empty Rakes can be monitored and predicted for their availability. As such these empty rakes can be offered to industry in transparent manner similar to PRS.

Locomotive Equipment integrated with Train PA System can facilitate Control Office to Passengers Audio Messages at the time of emergency.

Traffic Analysis Report can be generated using SIMRAN Data to improve Train Operation.

Page 11: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Locomotive Equipment.

Page 12: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Real Time Train Tracking

Page 13: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Train Position Multi Lingual

Page 14: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Train Arrival Chart at Station

Page 15: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Real Time Passenger Information System

Locomotive Equipment generated Train Running Information can be used for Automatic Train Charting

Page 16: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Field Trial For past 30 months continuous trials are going on. Now daily around

50 - 60 trains are being tracked. 7 Nos. Shatabdi Express Rakes (Originating/Terminating from/at

New Delhi) have been equipped with Locomotive Equipment, which are installed in Guard’s Brake Van.

31 Rakes of Rajdhani Express have been equipped with Locomotive Equipment which are installed in Pantry Car/Guard’s Brake Van

14 MEMU Rakes are equipped with Train Device Moving in Lucknow, Barabanki, Tundla, Agra, Aligarh, Ambala, Panipat, Palval, Kurukshtra,Ludhiana, Phaphund, Etawah, Ghaziabad section.

One Rake of Sealdah-New Delhi Duronto Express Train has also been equipped with SIMRAN Locomotive Equipment.

Page 17: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Field Trial

Online Station Display Board has been installed at Patna Jn. Showing Online Running Information of Patna boundTrains equipped with SIMRAN Train Equipment.

Page 18: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Field Trial

Under Project SIMRAN, a website www.simran.in have been developed which is being used to monitor Real Time Tracking of Trains equipped with Locomotive Equipment.

Under Project SIMRAN, SMS Responder Service has also been developed. As such Real Time Tracking of Trains equipped with Locomotive Equipment can be accessed through Mobile Phone by sending an SMS “T <Train No.>” to following Phone Nos. 9415213409 9415213493 9415213497

Page 19: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Proposed Deployment of

SIMRAN TechnologyOn

Indian Railways

Page 20: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

InternetInternet

Zonal Railways

Divisions

RDSO

Rly.Board

Important Stations

GPRS/SMS LoggerServer 1

GPRS/SMS LoggerServer 2

Cluster Web Server1

Cluster Web Server2

8000 Passenger/Goods Locomotives700 EMU/DMU/MEMU Rakes

Deployment Scheme of Real Time Train Tracking System

PassengersPassengers

Call CentreSMS-Responder

Page 21: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Cost Details,Target & Status

Proposed Cost of Work

Plan Head, Allocation DF-III : 83 Crore

Target for Completion : 2 Years

Proposal has been sent to Railway Board for inclusion in Works Program 2010-11.

Page 22: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Wireless Coach Display System

Page 23: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Coach Display Broadcasting

Engine Coach Coach Coach Coach Coach Brake Van

Coach CoachCoachCoachCoachEngine

Page 24: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

System Advantage

At the start of journey, Train No. is to be entered only in Main Equipment at Locomotive. Programming of route map for every individual coach will not be required.

Emergency communication from Control Office to individual Coach can also be displayed.

At the time of annual Time Table change, Main Equipment will automatically download required data from Central Server. Individual Programming of each coaches will not be required.

Successful Field Trial of Online Coach Display Board integrated with SIMRAN System has also been conducted in Gomati Express.

Page 25: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

SIMRAN Based Warning at

LC Gates and to Gang man

Page 26: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

LC Gate Warning System

ControlUnit

Road

2 KM

Display

Hooter

Power LinePower Line

Power Line& Control Line

Train Detection UnitsTrain Detection Units

Station

12 1 2

Detection Control Units

Page 27: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

•A project has been taken up with IIT-K do develop SIMRAN based audio and visual warning to road users at LC Gates andto Gang man working on the track.

•Warning to LC gate users and gang man shall be provided at a fixed time before arrival of train.

•Warning at LC Gate will consist of Hooter and Flashing red light.

•Warning to Gang man will consist of a portable Hooter to be kept at the working site.

Page 28: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Integration with Onboard Passenger Announcement System

Page 29: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

RDSO Specification RDO/SPN/TC/78/2008 for Onboard Passenger Announcement System has been issued.

This specification covers provision of PAS Control Unit with Amplifier at Guard Brake-Van.

For integration with SIMRAN System, there will be one Integration Module. This module will comprise of RF Transceiver, Micro controller, Flash Memory and Digital Signal Processor.

This module will have prerecorded message in its Flash Memory to be played as based upon location of Train. This will also have facility to play pre-recorded emergency messages as and when activation signal is received from Control Office.

These generated messages will be given as input to PAS. On-board PAS will have a defined priority for incoming message from

this Integration Module.

Integration with Onboard Passenger Announcement System

Page 30: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Train Traffic Analysis through SIMRAN

Page 31: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Time: Booking vis-à-vis Actual Taken• Late running through out GZB to TDL• Max delay AJR-CHL, MWU-SNS & TDL• No speed restriction between AJR-CHL• Speed restriction between MXK-SNS

Speed Restriction

MXK-SNS MXK-SNS

Page 32: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Speed: Restrictions17 April, 2009

• Speed Restriction 30 kmph (GZB-CPYZ)

Time Speed TP Length133600 33.57676 1429.685/23133620 34.304596 1429.499/17133640 40.1884 1429.290/10

Remark: Train speed was 3 to 10 kmph more than booked

Page 33: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Speed17 Apr to 21, 2009

Page 34: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Non Scheduled Stoppages :17 April

Msg Train ITTS Speed Station Stn_dst_mtr

NSS 2420 20090417-170135 0.0 Balrai 87.424975

NSS 2420 20090417-210358 0.0 Manak Nagar 794.761374

Page 35: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Over speed: 19 April

Time Speed Station Dst_stn_mts180520 122.12Kmph Jaswant Nr (JGR ) 1172.8

Over speed

Page 36: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.

Project SIMRAN is to Indian Railways as

Project Unique ID to India

Page 37: SIMRAN सिमरन Real Time Train Tracking RDSO Lucknow H. S. Pannu Director General M. Alam Excutive Director (Tele.) T.P. Agrawal Director (Tele) IIT Kanpur.