Top Banner
25

Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

Mar 06, 2018

Download

Documents

ngonhi
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight
Page 2: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

Can We Safely Keep it Simple?

First Flight of a Major Aircraft Upgrade

CDR James P. Borghardt, USN

Amy E. Guoan, Naval Air Systems CommandFlight Test Safety Workshop

Vienna, Austria

November 2009

Page 3: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

Overview• Basic aircraft• The upgrade• First flight issues and risks• Risk mitigation• First flight• Lessons learned

Page 4: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

Basic Aircraft• US Navy C-2A (R) Greyhound

(aka “COD”, carrier onboard delivery)– Dual piloted, medium range– Twin turboprop– Reconfigurable for cargo/passenger

• First delivered in 1965 (19)• Re-procured C-2A delivered in 1985 (39)• Carrier and shore-based (NOT a GA aircraft)

Page 5: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight
Page 6: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

The Upgrade

C - communicationsN – navigationS – surveillance/A – airT – trafficM - management

Page 7: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

Purpose of CNS/ATM• CNS/ATM was to certify the aircraft in these

areas:– RNP RNAV – Provides navigation accuracy,

containment, integrity and appropriate alerts for operating in airspace where advanced civil navigation mandates are emerging.

– Mode S – For operating in airspace where Mode S surveillance (ID) is being mandated (Europe). Includes both Elementary and Enhanced Surveillance requirements.

– 8.33 kHz Channel Spacing – For operating in European airspace where 8.33 kHz is mandated at high altitudes.

• And not degrade any legacy capabilities

Page 8: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

CNS/ATM Upgrade included• New navigation suite • New transponder• Upgraded radio• New Flight Management System (FMS)• MAJOR cockpit upgrades

– Glass displays – Lighting– New backup gyro

• Mod did NOT directly affect: engines, hydraulics, external aircraft mold-line, flight controls*

* Input to autopilot was modified

Page 9: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

Legacy Cockpit

Page 10: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

CNS/ATM Cockpit

Page 11: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

First Flight Issues

• Test asset had not flown in almost a year• Required Functional Check Flight of basic

aircraft systems• First flight with new

navigation, IFF, comm suite

• First flight with glass cockpit

Page 12: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

First Flight Risks

• Failure of navigation sources• Failure of FMS• Failure of displays• Basic aircraft post-maintenance failure

Page 13: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

Low

Medium

High

• Risk: Failure of CNS/ATM component during first flight• Description: Components fail due to new component design or integration.• Mitigation: 1. COTS products

2. No mod to pitot static system 3. Legacy AOA system remains installed4. Reuse baseline software5. Extensive lab and ground test

Mitigations lower likelihood &

consequence of new component

failures.

Initial risk level

Risk after all mitigation

1 2 3 4 5Consequence

1

2

5

3

4

Like

lihoo

d

1, 2

34

5

Page 14: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

Low

Medium

High

• Risk: Potential for non-program-related aircraft system failure• Description: Aircraft has not flown for almost 1 year, functional check flight requires new components

• Mitigation: 1. Extensive FCF ground test2. Red-line FCF flight procedures approved3. Utilize two FCF qualified aircraft commanders w/ CNS/ATM training

1 2 3 4 5Consequence

1

2

5

3

4

Like

lihoo

d Mitigations lower likelihood &

consequence of non-CNS/ATM

failures.

Initial risk level

Risk after mitigation1

2,3

Page 15: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

CNS/ATM Risk Mitigation

• Risk mitigation required reducing consequence to go from medium to low risk.

• What about instrumentation, monitoring or Safety Chase?– None reduce the consequence efficiently

• What do we need to fly an airplane day/VMC?– Airspeed, stall warning, energy state

Page 16: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

Why AOA?• For C-2 aircraft, in Day/VMC, reliable AOA

gauge is all you really need to land– Provides precise airspeed/attitude– Provides stall warning– With known IHP can estimate ROD

• Legacy AOA system remained in cockpit– Not a part of the potentially compromised

pitot/static system – Requires AOA probe and gauge only

Page 17: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

AOA Displays

November 2009

Page 18: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

Preparation for First flight• Test planning including hazard analysis• Extensive Lab test*• On-aircraft ground test*• Day/VMC weather restriction• Familiar field• Baseline software for nav and FMS already flying in

another aircraft*• New glass flight displays were modified COTS*• No change to pitot static system*• Legacy AOA intact*• New COTS Emergency standby display• CNS/ATM Procedures Trainer available for pilots

Page 19: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

First Flight• 23 Oct 2007• FCF required 3 separate flights• Cockpit video recording of displays for

post-flight review• No safety-of-flight instrumentation• No real-time monitoring• Data bus recording for nav/IFF not working

for 1st flight

Page 20: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight
Page 21: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

Lessons Learned• Instrumentation and monitoring can improve

safety. However, keeping it simple and providing a safe viable alternative kept the test program on schedule and under budget.

• Early tester involvement in the design process led to the decision to keep the legacy AOA gauge and eventually simplified the requirements for mitigating first flight risks.

• Overcoming engineering’s resistance to keeping it simple can be challenging at best.

Page 22: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

Questions?

Page 23: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

Backup slides

Page 24: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

New Primary Flight Display

Page 25: Simplifying First Flight of a Major Upgradeflighttestsafety.org/images/stories/workshop/2009Nov/18... · Purpose of CNS/ATM • CNS/ATM was to ... Backup slides. ... New Primary Flight

November 2009

New Emergency Standby