Page 1: Simple Project Management Christin Nevins, Catalyst OC.

Simple Project ManagementChristin Nevins, Catalyst OC

Page 2: Simple Project Management Christin Nevins, Catalyst OC.

Conflict of Interest Disclosures

None

Page 3: Simple Project Management Christin Nevins, Catalyst OC.

Objectives

Summary: Too many projects flounder or stall due to weak project management. Many tools and resources on the market are cumbersome and require special training. This presentation offers simple templates, practical processes, and relationship-centered principles that get results and empower participants to quickly add value to any project.

Objectives: Participants will understand how to start, manage, and end a project with

clear metrics and a focus on relational health . Participants will practice using 4 simple project management tools:

Project Template Project Spider RACI Project Plan Status Meeting Template  

Page 4: Simple Project Management Christin Nevins, Catalyst OC.

Agenda

Topic Duration

Welcome :5 Fundamentals :15 Starting Well :45 Ongoing Project Management :20 Finishing Well :20 Wrap Up :10 Q & A :5

Page 5: Simple Project Management Christin Nevins, Catalyst OC.

Expectations

Brisk paceYou likely won’t finish any exerciseUse it within a week after the workshop (or

lose it)

Page 6: Simple Project Management Christin Nevins, Catalyst OC.

Two Requests

Page 7: Simple Project Management Christin Nevins, Catalyst OC.

Pick a Project

Please pick a project to use for activities during this workshop. Characteristics of a good choice:

It is work-related, and it is happening now or soon.

Success or failure matters.It is challenging to manage.

Page 8: Simple Project Management Christin Nevins, Catalyst OC.

Is It a Project?

Project Task ProcessDuratio

nFinite, longer

Finite, shorter

Ongoing

People Involved

Many 1 or few Depends

Goals Often competin

g

Simple Depends

Page 9: Simple Project Management Christin Nevins, Catalyst OC.

Fundamentals

“I’m all alone and fully responsible.”

Project Sponsor role: • Definer of success• Liberator of resources• “Organizational Enzyme”

Project Manager role: • Steward of budget, scope, schedule

Page 10: Simple Project Management Christin Nevins, Catalyst OC.

Fundamentals

Clearing the Head Trash

Page 11: Simple Project Management Christin Nevins, Catalyst OC.

Fundamentals

“I’m all alone and fully responsible.”

Project Sponsor role: • Definer of success• Liberator of resources• “Organizational Enzyme”

Project Manager role: • Steward of budget, scope, schedule

Page 12: Simple Project Management Christin Nevins, Catalyst OC.

Fundamentals

“I’m not a real project manager.”

Page 13: Simple Project Management Christin Nevins, Catalyst OC.

Fundamentals

The Iron Triangle

schedule

scope / quality

budgetfastcheap

good

Page 14: Simple Project Management Christin Nevins, Catalyst OC.

Simple Project Management

Project Charter

Project Spider

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 15: Simple Project Management Christin Nevins, Catalyst OC.

Project Charter

Project Spider

RACI Project Plan

Simple Project Management

Project Charter

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 16: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Project Charter

project charter - the first project document, intended to clarify project purpose & scope

The importance? It helps the project get a running start, instead of limping off the starting line

Page 17: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Project Charter - TemplateProject Name:

Objective:

Sponsor: PM:

Value Drivers Success Metrics

In-Scope Out-of-Scope

Page 18: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Project Objective

project objective: a short description of what the project will attempt to accomplish

The importance? Helps people quickly understand what the project is

Page 19: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Project Objective - Example

“To provide a healthy meal for the team, to increase productivity & morale today”

Page 20: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Value Drivers

value driver: the must-have elements of the project that significantly contribute to its value

value = [ benefits • P(benefits) ] - [ costs ]

The importance? People wander. They lose sight of what must happen to capture the full value of the project.

Page 21: Simple Project Management Christin Nevins, Catalyst OC.

focused team

employee satisfaction

employee health

quality food

fast delivery

clear timeline communication

food

tip

consumables

Starting Well: Project Charter

Value Drivers - Example

benefits • P(benefits) - costs

Page 22: Simple Project Management Christin Nevins, Catalyst OC.

The key? Regular, public review

The importance? Success metrics align actions and communicate priorities.

Starting Well: Project Charter

Success Metrics

Future-State - varies by project

Change Mgt - engagement - commitment - understanding - retention - satisfaction

Project - schedule - scope - budget

Page 23: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Success Metrics - Example

Project Team eating by 11:45am Total project cost <$115

Change Management Nobody quits today 100% of team members get some choice

Future State Team rates food quality >4 out of 5 (avg) RDA saturated fat <40% for each employee

Page 24: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Scope

in-scope: the work that must be delivered for the project to achieve its objective

out-of-scope: work that will intentionally not be done on the project

The importance? Just because you can do it, doesn’t mean you should.

Page 25: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Scope Example

In-Scope Research Deciding on Restaurant Ordering Food Setting Table Distribution of Food

Out-of-Scope Drinks (BYO) Dessert Plan for leftovers

Page 26: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Project Charter - ExampleProject Name: Operation GoodMeal

Objective: To provide a healthy meal for the team, to increase productivity & morale

Sponsor: Boss Hog PM: Christin

Value Drivers Success Metrics

In-Scope Research, Deciding on Restaurant, Ordering Food, Setting Table, Distribution of Food

Out-of-Scope Drinks (BYO), Dessert, Plan for leftovers

B: focused team, employee…P(b): quality food, fast delivery…C: food, tip, consumables

P: Team eating by 11:45am, …CM: Nobody quits today, …FS: Team rates food quality >4 …

Page 27: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

So… what do I do with it?

Align with the Project Sponsor on all its elements & get Project Sponsor approval

Show it to all new project team members

Use it as the starting point for negotiating scope changes

Page 28: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: Project Charter

Key Take-Aways

Focus on value drivers; all else is a distraction

Publicize success metrics regularlyNarrow the scope to focus on value

driversTake the Charter for a walk to

increase engagement

Page 29: Simple Project Management Christin Nevins, Catalyst OC.

Activity Purpose: To get a head start on chartering (or re-chartering) your project.

1. Fill out the worksheet. 2. Pair up and debrief.

Charter Worksheet

Starting Well: Project Charter

Activity

Page 30: Simple Project Management Christin Nevins, Catalyst OC.

Project Charter

Project Spider

RACI Project Plan

Simple Project Management

Project Spider

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 31: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: The Project Spider

The Project Spider

Project Spider: a tool for visually communicating the stakeholders, deliverables, and scope of the project

deliverable: work product created during the project

The importance? People pay more attention to a drawing; they engage with it.

Page 32: Simple Project Management Christin Nevins, Catalyst OC.

stakeholder

stakeholder

stakeholder

stakeholder

stakeholder

project

project objective

Starting Well: The Project Spider

A Generic Project Spider

Page 33: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: The Project Spider

Example

Page 34: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: The Project Spider

Benefits

Communicates the big pictureDemonstrates complexity and

magnitude to the Project SponsorSparks discussion and engagementHelps set up future work:

Communication PlanTasks for the Project Plan

Page 35: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: The Project Spider

How To Use It

Hand draw it on (big) paper and take it for a walk (show it to stakeholders to get their feedback)

Update it whenever necessaryWhen scope changes, use it to

negotiate for resources or time

Page 36: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: The Project Spider

Key Take-Aways

Building a Spider is hard work; but worth it

Take the Project Spider for a walk to quickly increase engagement and commitment

Page 37: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: The Project Spider

Activity

Activity Purpose: to practice building your Spider

1. Start the worksheet 2. Group debrief

Build-A-Spider

Page 38: Simple Project Management Christin Nevins, Catalyst OC.

Project Charter

Project Spider

RACI Project Plan

Simple Project Management

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 39: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: RACI Project Plan

The RACI Model

Action How Many in this Role?

R Responsible Do the task Usually one (but sometimes a few)

A Approver Say it’s good enough One

C Consulted Provide input to Approver Varies (0 to many)

I Informed Get Told about task completion Varies (0 to many)

Page 40: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: RACI Project Plan

ExampleTask Responsible Approver Consulted Informed Due

Select restaurant

Christin Christin Team, Boss H

9am

Gather indiv food orders

Christin Christin 10am

Allocate budget

Christin Boss Hogg

10am

Set table Jane Christin 11am

Accept food delivery

Christin Christin Team 1130am

Page 41: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: RACI Project Plan

Benefits

Clarity on roles, deliverables, and deadlines

Serves as the “flexible backbone” of ongoing project management efforts & project status communication

Page 42: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: RACI Project Plan

How to Use It

Use the Project Spider to generate a reasonable number of tasks & stakeholder roles for those tasks.

Put 1 name only in each “Approver” bucket.

Align with stakeholders on your initial Project Plan.

Track progress weekly, at minimum send a “cut & paste” version via email to the team.

Page 43: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: RACI Project Plan

Extra Credit (yeah!)

Task R A C I DueFeb Mar Apr

3 10

17

24

3 10

17

24

31

7 14

21

[Task 1] Christin Christin 2/27

[Task 2] Christin Christin Jane 3/6

[Task 3] ChristinBoss Hogg 3/6

[Task 4] Christin Christin 3/28

[Task 5] Jane ChristinOffice Mgr 4/4

Page 44: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: RACI Project Plan

Key Take-Aways

Single ApproversThe Project Plan is the primary tool

for ongoing PM communicationsComplexity will paralyze the PM

Page 45: Simple Project Management Christin Nevins, Catalyst OC.

Starting Well: RACI Project Plan

Activity

Activity Purpose: to get a start on your RACI Project Plan

1. Start filling out the worksheet. 2. Pair up and debrief.

RACI Project Plan Worksheet

Page 46: Simple Project Management Christin Nevins, Catalyst OC.

Simple Project Management Ongoing Project Management

Project Charter

Project Spider

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 47: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: Status Meetings

Status Meetings

status meeting: a regular meeting/call led by the PM, intended to align and engage project team members

The importance? Team members can see the big picture and resolve problems quickly with all key players together.

Page 48: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: Status Meetings

Effective Status Meetings

Regularly ScheduledShort (stand-up)Focused Agenda

New Issues New Risks Old Issues Old Risks Update Project Plan

issue: a current problem with the project

risk: a potential issue

Page 49: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: Status Meetings

Issues Log

Issue OriginatorDate Logged

Plan to Resolve Owner Due Comments

Not enough plates

Jane 4/20 Borrow from cafeteria

Jane 10:30 am

Page 50: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: Status Meetings

Risk Log

Risk Originator Date Logged

Plan to Mitigate Owner Due Comments

Lactose intolerant eater

Bob (PM) 4/20 Ensure milkless options

Bob 9:30 am

Page 51: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: Status Meetings

Key Take-Aways

If you have an Issues Log, Risk Log, and Project Plan (which you should) update them regularly, or no one will take you seriously

Page 52: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: Status Meetings

ACTIVITY

Activity Purpose: to capture some issues and risks on your project.

1. Fill out the worksheet. 2. Pair up and debrief.

Issues & Risks

Page 53: Simple Project Management Christin Nevins, Catalyst OC.

Simple Project Management Ongoing Project Management

Project Charter

Project Spider

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 54: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: XYZ Feedback

The Truth will Set You Free

Bad news early is good news.

Page 55: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: XYZ Feedback

Providing Feedback

feedback: an explanation of the impact (both positive and negative) of an individual’s behaviors

The importance? The team counts on the PM to lead (solve performance problems & encourage good work).

Page 56: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: XYZ Feedback

An XYZ Sandwich

Page 57: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: XYZ Feedback

Advantages

Focuses on behaviors and impact, not intentOpens up options Useful in 360 degreesDrives dialogue

Intent ≠ Impact

Page 58: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: XYZ Feedback

Example 1

Bob (PM): “Jane, here’s what I think… I overheard you talking to a client about your frustration with me for not buying your team a lunch from St Elmo’s. When you complain to clients about things over which you (and they) have no control, they tend to lose confidence in us. Client satisfaction may suffer as a result. I’d prefer you bring your concerns to me, work with me to find solutions, and not let your frustration and anxiety spill onto our clients. What do you think?”

Page 59: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: XYZ Feedback

Example 2

Team Boss: “Bob, I overheard you talking to Jane and telling her what a great job she did setting the table. Good job.”

Page 60: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: XYZ Feedback

Key Take-Aways

The PM must deal with performance problems-- they won’t get better on their own

The PM is in a great position to reinforce good work

Edify, don’t condescend

Page 61: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: XYZ Feedback

ACTIVITY

Activity Purpose: to practice providing XYZ feedback.

1. Fill out the worksheet.2. Pair up and debrief.

XYZ Feedback Worksheet

Page 62: Simple Project Management Christin Nevins, Catalyst OC.

Simple Project Management Ongoing Project Management

Project Charter

Project Spider

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 63: Simple Project Management Christin Nevins, Catalyst OC.

Ongoing Project Management: Zen Time

Zen Time

zen time: regularly scheduled periods of reflection and meditation for the PM

The importance? Our intuition helps us avoid big problems.

Page 64: Simple Project Management Christin Nevins, Catalyst OC.

Simple Project Management

Finishing Well

Project Charter

Project Spider

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 65: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Project Performance Measurement

Project Performance Measurement

project performance measurement: a post-project assessment of a project’s success in achieving its objectives

The importance? Accountability: those entrusted with the organization’s scarce resources should account for their use

Page 66: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Project Performance Measurement

How to Measure Project Results

Success Metrics (duh)

Data tell a story, but not always a complete story-- can also use:InterviewsQuotesStoriesSurvey text responses

Page 67: Simple Project Management Christin Nevins, Catalyst OC.

Simple Project Management

Finishing Well

Project Charter

Project Spider

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 68: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Individual Evaluations Individual Evaluations

individual evaluation: a report from the PM on the performance of an individual project team member

The importance? Individuals on the project (and their supervisors) deserve to know how they’ve performed, to help further their professional development

Page 69: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Individual Evaluations Quick E-Mail Format

Dear Jane Doe’s Supervisor (cc: Jane), Thanks for supporting this important project. I thought you’d be interested in my thoughts on Jane’s performance during the project:What Jane should START doing…What Jane should KEEP doing…What Jane should STOP doing…

Page 70: Simple Project Management Christin Nevins, Catalyst OC.

Simple Project Management

Finishing Well

Project Charter

Project Spider

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 71: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Formal Closure

Formal Closure - 3 Critical Elements

Sponsor AcceptanceAfter-Action Review (AAR)Closure Communication

Page 72: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Formal Closure

Sponsor Acceptance

Sponsor acceptance: a formal acceptance of the project’s key deliverables, signifying the completion of the project’s work

The importance? It ain’t over until the Project Sponsor says it’s over.

Page 73: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Formal Closure

AAR

after-action review (AAR): a meeting led by the PM that captures lessons learned from the project; also allows an opportunity to acknowledge & celebrate

The importance? Allows for emotional closure for project team members. Also helps deepen the individual and organizational learning.

Page 74: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Formal Closure

Key AAR Elements

Recap of project history (objectives, schedule, staffing)

Review of project performance (using Success Metrics)

Capturing & prioritizing lessons learnedFoodA sappy speech from a leader

(acknowledging and celebrating)A team photo

Page 75: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Formal Closure

Closure Communication

closure communication: a formal communication from the PM to stakeholders, stating the that project is complete & summarizing the project’s results

The importance? Avoids confusion, creates some buzz

Page 76: Simple Project Management Christin Nevins, Catalyst OC.

Finishing Well: Formal Closure

Key Take-Aways

Data are great. Data + stories are better.

People gave blood, sweat, and tears to the project. Acknowledge, honor, & edify (build) them.

Speeches only feel cheesy to the speaker.

Page 77: Simple Project Management Christin Nevins, Catalyst OC.

Wrap Up

Review

Project Charter

Project Spider

RACI Project Plan

Status Meetings

XYZ Feedback

Zen Time

Project Performance Measurement

Individual Evaluations

Formal Closure

step 3

Finishing Well

step 2

Ongoing PM

step 1

Starting Well

Page 78: Simple Project Management Christin Nevins, Catalyst OC.

Wrap Up

Key Take-Aways

Page 79: Simple Project Management Christin Nevins, Catalyst OC.

I will ________________within the next ____ day(s).

Wrap Up

Commit

Page 80: Simple Project Management Christin Nevins, Catalyst OC.

Team Dynamics

Wrap Up

Related Workshops

Sustaining Organizational Change

Leading Change

Strategic Change Management

Building Trust

Simple Project Management

Page 81: Simple Project Management Christin Nevins, Catalyst OC.

Christin [email protected]

317.413.4663