SVEPPI Laboratory Energy Management Customer Service - Italy www.siemens.it/serviceT&D
SVEPPI LaboratoryEnergy Management Customer Service - Italy
www.siemens.it/serviceT&D
Our service activities for your success
Experience teaches us that experimental activities are very important and necessary every time the electric phenomena are complex and the choices related to the project seem to be very difficult. It is convenient for the electric equipment to be tested in different conditions according to the international standards, to check not only the electric, dielectric, thermal and mechanic performance but also the performance related to safety and life cycle. The compliance to IEC/EU Standards is an essential requirement and we are able to guarantee it. A higher reliability and a longer life time of products can open the way to the success. Siemens, thanks to the SVEPPI laboratory and related test capabilities allows you to carry out several kinds of electrical and mechanical tests. The tests are carried out according to main technical standards. Built in the early 50ies it is located closed to Terna Substation of Scorzè and connected with a dedicated 220 KV bay.
Area: 16000 m2 Short circuit power: 3 x 500 MVA
Test capability Maximum Ratings
CB MV – HV Up to 550 kV – 50 kA
DS MV - HV Up to 550 kV – 63 kA
Transformers MV Up to 15 MVA
Switchboards Up to 52 kV
CT/VT MV - HV Up to 800 kV 80/210 Ka/ Kap
Switches Up to 36 kV – 800 A
Insulator for overheads lines Up to 550 kV – 50 kA
Accesories for power MV cables Up to 245 kV – 36 kV
Post insulator Up to 550 kV
Reactors LV-MV Up to 50 kA
Bushings Up to 245 kV 80/210 ka/kAp
• The above list isn’t fully exhaustive of the kind of apparatus that can be tested, nor of the variety of tests which can be carried out
• Feasibility of each single test should however be requested to the laboratory for confirmation
• For any IEC standard referred test, the corresponding test feasibility is CEI EN related standard is provided
Prove di stabilimento e di interruzioneMaking and breaking current
Tenuta alla corrente di brevedurata ed alla corrente di piccoShort time withstand currentand peak withstand tests.
Stabilimento ed interruzionedi correnti indotte per effettoelettromagnetico e per effettoelettrostatico, commutazioni di sbarra.Making and breaking due toelettrostatically and electromagneticallyinduced current
Arco per guasto internoArcing due to internal fault
AC power arc test
Prove di tenuta al corto-cortoAbility to withstand short circuit
Prove di stabilimento ed interruzioneMaking and breaking tests
Smart Grid Solutions and Services
L'esperienza insegna che l'attività sperimentale èfondamentale e necessaria laddove i fenomeni elettricipossono essere complessi e le scelte di progetto risultaredifficili. È opportuno che le apparecchiature elettrichevengano provate nelle diverse condizioni previste dallenorme per verificarne le prestazioni non solo elettriche,dielettriche, termiche o meccaniche ma anche quelle legatealla sicurezza e alla durata nel tempo. Poter garantire laconformità alla norma CEI/EN è un requisito essenziale.Garantire una maggior affidabilità e durata dei prodottipuò aprire la strada al successo. Siemens grazie allaboratorio Sveppi e alle sue capacità di prova, vi permettedi effettuare varie tipologie di prove elettriche emeccaniche. Le prove vengono eseguite secondo leprincipali normative tecniche. Costruito all'inizio degli anni'50 è situato vicino alla S/S di Scorzè e connesso con unostallo dedicato a 220 kV
Power testsPlant of 1500 MVA power short circuit, supplied directly from 220 kV national grid.Direct test voltage range beetwen 7 - 115 kV up to 63 kA, 130 kAp
Dielectric test
Prove meccaniche ad ambientali
Device & Standard
001-17226 CEI dradnatSirotturretnICircuit Breakers
Interruttori Standard IEC 62271-100Circuit Breakers
201-17226 CEI dradnatSirotanoizeSDisconnectorsQuadri elettrici IEC 62271-200AC metal enclosedTrasformatori di Misura IEC 60044-1Current TransformersInterruttori di manovra sezionatori IEC 62271-103Switches
201-17226 CEI irotanoizeSDisconnectors
Quadri elettrici. IEC 62271-200AC metal enclosed
Equipaggi isolanti per line aeree Technical report IEC 61467Insulators for overhead lines
Power Transformer MT/BT IEC 60076-5/11
Interruttori di Manovra e Sezionatori IEC 6Switches
Device range
Up to 24 kV 12.5 kAUp to 12 kV 20 kA
Single phase: up to 80/ 210 kA/ kAp 3s Three phases: up to 50 kA 1s 130 kAp
Up to 550 kV
Up to 52 kV 50 kA
Up to 550 kV 31.5 kAUp to 245 kV 50 kA
Up to 15 MVA MT/BT
Up to 36 kV 800 A 12.5 kAUp to 24 kV 800 A 16kA
Mechanical and environmetal tests
Prove meccaniche ed ambientaliMechanical and environmetal tests
Funzionamento alle temperature limiteOperation at the temperature limitsFunzionamento in severe condizionidi ghiaccioOperation under sever ice conditions
001-17226 CEIirotturretnICircuit Breakers Standard
201-17226 CEI dradnatSirotanoizeSDisconnectors
-40 °C + 55 °C
-40 °C + 55 °C10 mm - 20mm
sgnitar mumixaMavorP id àticapaC
Ak 05 - Vk 055 ot pUVH - VM BCTA - TM irotturretnI
Ak 05 - Vk 055 ot pUVH - VM SDTA - TM irotanoizeS
Trasformatori MT Transformers MV Up to 15 MVA
Quadri Elettrici Switch Boards Up to 52 kV
Up to 800 kV 80/210 kA/ kApVH - VM TV/TC TA -TM VT / AT
IMS Switches Up to 36 kV - 800 A
Isolatori per linee aeree Insulators for overhead lines Up to 550 kV - 50 kA
Accessori per cavi di media tensione Accessories for power MV cables Up to 245 kV
Isolatori di supporto Post Insulator Up to 550 kV
Reattanze BT-MT Reactors LV-MV Up to 50 kA
Passanti Bushings Up to 245 kV 80/210 ka/kAp
• la presente lista non é esaustiva di tutti gli apparecchi che possono essere provati e di tutti i test che possono essere effettuatithe above list isn't fully exhaustive of the kind of apparata that can be tested, nor of the variety of tests which can be carried out
• va comunque richiesta al laboratorio la fattibilità delle singole provefeasibility of each single test should however be asked to the laboratory for confirmation
• per ogni norma IEC esiste la fattibilità di test anche per la corrispondente norma CEI ENfor any IEC Standard referred test, the corresponding test feasibility in CEI EN related Standards is provided
Withstand Power Frequency test
Withstand Lightning impulse test(full & chopped)
Withstand Switching impulse test
RIV Test
Corona Test
Partial discharge
Withstand Power Frequency test
Withstand Lightning impulse test
001-17226 CEI dradnatSirotturretnICircuit Breakers
201-17226 CEI dradnatSirotanoizeSDisconnectorsTrasformatori di Misura TA & TV IEC 60044-1Current & VoltageTransformersTrasformatori di misuraInductive Transformer IEC 60044-2Equipaggi isolanti per line aereeSetting Insulator for overhead lines
Quadri elettrici Standard IEC 62271-200Switch BoardsInterruttori di Manovra e Sezionatori IEC 6Switches
Up to 245 kV
Up to 52 kV
Prova di tenuta a frequenza industriale
Prova di tenuta ad impulso atmosferico(onda piena e tronca)
Prova di tenuta ad onda di manovra
Prova RIV
Rilievo di effetto Corona
Scariche parziali
Prova di tenuta a frequenza industriale
Prova di tenuta ad impulso atmosferico
2271-103
2271-103
Power testsPlant of 1500 MVA power short circuit, supplied directly from 220 kV national grid. Direct test voltage range beetwen 7 - 115 kV up to 63 kA, 130 kAp
Test Device & Standard Device range
Making and breaking current Circuit Breakers Standard IEC 62271 - 100 Up to 24 kV 12.5 kAUp to 12 kV 20 kA
Short time withstand current and peak withstand tests.
Circuit Breakers Standard IEC 62271 - 100 Single phase: up 80/210 kA/kAp 3sThree phases: up to 50 kA 1s130 kAp
Disconnectors Standard IEC 62271 - 102AC metal enclosed IEC 62271 - 200Current Transformers IEC 60044 - 1Switches IEC 62271 - 103
Making and breaking due to electrostatically and electromagnetically induced current
Disconnectors IEC 62271 - 102 Up to 550 kV
Arcing due to internal fault AC metal enclosed IEC 62271 - 200 Up to 52 kV 50 kAAC power arc test Insulators for overhead lines IEC 61467 Up to 550 kV 31.5 kA
Up to 245 kV 50 kAAbility to withstand short circuit Power Transformer MT/BT IEC 60076 – 5/11 Up to 15 MVA MT/BTMaking and breaking tests Switches IEC 62271 - 103 Up to 36 kV 800 A 12.5 kA
Up to 24 kV 800 A 16kA
Prove di stabilimento e di interruzioneMaking and breaking current
Tenuta alla corrente di brevedurata ed alla corrente di piccoShort time withstand currentand peak withstand tests.
Stabilimento ed interruzionedi correnti indotte per effettoelettromagnetico e per effettoelettrostatico, commutazioni di sbarra.Making and breaking due toelettrostatically and electromagneticallyinduced current
Arco per guasto internoArcing due to internal fault
AC power arc test
Prove di tenuta al corto-cortoAbility to withstand short circuit
Prove di stabilimento ed interruzioneMaking and breaking tests
Smart Grid Solutions and Services
L'esperienza insegna che l'attività sperimentale èfondamentale e necessaria laddove i fenomeni elettricipossono essere complessi e le scelte di progetto risultaredifficili. È opportuno che le apparecchiature elettrichevengano provate nelle diverse condizioni previste dallenorme per verificarne le prestazioni non solo elettriche,dielettriche, termiche o meccaniche ma anche quelle legatealla sicurezza e alla durata nel tempo. Poter garantire laconformità alla norma CEI/EN è un requisito essenziale.Garantire una maggior affidabilità e durata dei prodottipuò aprire la strada al successo. Siemens grazie allaboratorio Sveppi e alle sue capacità di prova, vi permettedi effettuare varie tipologie di prove elettriche emeccaniche. Le prove vengono eseguite secondo leprincipali normative tecniche. Costruito all'inizio degli anni'50 è situato vicino alla S/S di Scorzè e connesso con unostallo dedicato a 220 kV
Power testsPlant of 1500 MVA power short circuit, supplied directly from 220 kV national grid.Direct test voltage range beetwen 7 - 115 kV up to 63 kA, 130 kAp
Dielectric test
Prove meccaniche ad ambientali
Device & Standard
001-17226 CEI dradnatSirotturretnICircuit Breakers
Interruttori Standard IEC 62271-100Circuit Breakers
201-17226 CEI dradnatSirotanoizeSDisconnectorsQuadri elettrici IEC 62271-200AC metal enclosedTrasformatori di Misura IEC 60044-1Current TransformersInterruttori di manovra sezionatori IEC 62271-103Switches
201-17226 CEI irotanoizeSDisconnectors
Quadri elettrici. IEC 62271-200AC metal enclosed
Equipaggi isolanti per line aeree Technical report IEC 61467Insulators for overhead lines
Power Transformer MT/BT IEC 60076-5/11
Interruttori di Manovra e Sezionatori IEC 6Switches
Device range
Up to 24 kV 12.5 kAUp to 12 kV 20 kA
Single phase: up to 80/ 210 kA/ kAp 3s Three phases: up to 50 kA 1s 130 kAp
Up to 550 kV
Up to 52 kV 50 kA
Up to 550 kV 31.5 kAUp to 245 kV 50 kA
Up to 15 MVA MT/BT
Up to 36 kV 800 A 12.5 kAUp to 24 kV 800 A 16kA
Mechanical and environmetal tests
Prove meccaniche ed ambientaliMechanical and environmetal tests
Funzionamento alle temperature limiteOperation at the temperature limitsFunzionamento in severe condizionidi ghiaccioOperation under sever ice conditions
001-17226 CEIirotturretnICircuit Breakers Standard
201-17226 CEI dradnatSirotanoizeSDisconnectors
-40 °C + 55 °C
-40 °C + 55 °C10 mm - 20mm
sgnitar mumixaMavorP id àticapaC
Ak 05 - Vk 055 ot pUVH - VM BCTA - TM irotturretnI
Ak 05 - Vk 055 ot pUVH - VM SDTA - TM irotanoizeS
Trasformatori MT Transformers MV Up to 15 MVA
Quadri Elettrici Switch Boards Up to 52 kV
Up to 800 kV 80/210 kA/ kApVH - VM TV/TC TA -TM VT / AT
IMS Switches Up to 36 kV - 800 A
Isolatori per linee aeree Insulators for overhead lines Up to 550 kV - 50 kA
Accessori per cavi di media tensione Accessories for power MV cables Up to 245 kV
Isolatori di supporto Post Insulator Up to 550 kV
Reattanze BT-MT Reactors LV-MV Up to 50 kA
Passanti Bushings Up to 245 kV 80/210 ka/kAp
• la presente lista non é esaustiva di tutti gli apparecchi che possono essere provati e di tutti i test che possono essere effettuatithe above list isn't fully exhaustive of the kind of apparata that can be tested, nor of the variety of tests which can be carried out
• va comunque richiesta al laboratorio la fattibilità delle singole provefeasibility of each single test should however be asked to the laboratory for confirmation
• per ogni norma IEC esiste la fattibilità di test anche per la corrispondente norma CEI ENfor any IEC Standard referred test, the corresponding test feasibility in CEI EN related Standards is provided
Withstand Power Frequency test
Withstand Lightning impulse test(full & chopped)
Withstand Switching impulse test
RIV Test
Corona Test
Partial discharge
Withstand Power Frequency test
Withstand Lightning impulse test
001-17226 CEI dradnatSirotturretnICircuit Breakers
201-17226 CEI dradnatSirotanoizeSDisconnectorsTrasformatori di Misura TA & TV IEC 60044-1Current & VoltageTransformersTrasformatori di misuraInductive Transformer IEC 60044-2Equipaggi isolanti per line aereeSetting Insulator for overhead lines
Quadri elettrici Standard IEC 62271-200Switch BoardsInterruttori di Manovra e Sezionatori IEC 6Switches
Up to 245 kV
Up to 52 kV
Prova di tenuta a frequenza industriale
Prova di tenuta ad impulso atmosferico(onda piena e tronca)
Prova di tenuta ad onda di manovra
Prova RIV
Rilievo di effetto Corona
Scariche parziali
Prova di tenuta a frequenza industriale
Prova di tenuta ad impulso atmosferico
2271-103
2271-103
Dielectric test
Test Device and standard Device range
Withstand power frequency testWithstand lightning impulse test (full & chopped)
Circuit breakers Standard IEC 62271 – 100 Up to 36 kVDisconnectors Standard IEC 62271 – 102
Current & Voltage Transformer
IEC 60044 - 1
Setting insulator for overhead lines
IEC 61869 – 1IEC 61869 - 2
Withstand power frequency test
Withstand lightning impulse test
Switchboard IEC 62271 - 200 Up to 52 kV
Switches IEC 62271 - 103
Prove di stabilimento e di interruzioneMaking and breaking current
Tenuta alla corrente di brevedurata ed alla corrente di piccoShort time withstand currentand peak withstand tests.
Stabilimento ed interruzionedi correnti indotte per effettoelettromagnetico e per effettoelettrostatico, commutazioni di sbarra.Making and breaking due toelettrostatically and electromagneticallyinduced current
Arco per guasto internoArcing due to internal fault
AC power arc test
Prove di tenuta al corto-cortoAbility to withstand short circuit
Prove di stabilimento ed interruzioneMaking and breaking tests
Smart Grid Solutions and Services
L'esperienza insegna che l'attività sperimentale èfondamentale e necessaria laddove i fenomeni elettricipossono essere complessi e le scelte di progetto risultaredifficili. È opportuno che le apparecchiature elettrichevengano provate nelle diverse condizioni previste dallenorme per verificarne le prestazioni non solo elettriche,dielettriche, termiche o meccaniche ma anche quelle legatealla sicurezza e alla durata nel tempo. Poter garantire laconformità alla norma CEI/EN è un requisito essenziale.Garantire una maggior affidabilità e durata dei prodottipuò aprire la strada al successo. Siemens grazie allaboratorio Sveppi e alle sue capacità di prova, vi permettedi effettuare varie tipologie di prove elettriche emeccaniche. Le prove vengono eseguite secondo leprincipali normative tecniche. Costruito all'inizio degli anni'50 è situato vicino alla S/S di Scorzè e connesso con unostallo dedicato a 220 kV
Power testsPlant of 1500 MVA power short circuit, supplied directly from 220 kV national grid.Direct test voltage range beetwen 7 - 115 kV up to 63 kA, 130 kAp
Dielectric test
Prove meccaniche ad ambientali
Device & Standard
001-17226 CEI dradnatSirotturretnICircuit Breakers
Interruttori Standard IEC 62271-100Circuit Breakers
201-17226 CEI dradnatSirotanoizeSDisconnectorsQuadri elettrici IEC 62271-200AC metal enclosedTrasformatori di Misura IEC 60044-1Current TransformersInterruttori di manovra sezionatori IEC 62271-103Switches
201-17226 CEI irotanoizeSDisconnectors
Quadri elettrici. IEC 62271-200AC metal enclosed
Equipaggi isolanti per line aeree Technical report IEC 61467Insulators for overhead lines
Power Transformer MT/BT IEC 60076-5/11
Interruttori di Manovra e Sezionatori IEC 6Switches
Device range
Up to 24 kV 12.5 kAUp to 12 kV 20 kA
Single phase: up to 80/ 210 kA/ kAp 3s Three phases: up to 50 kA 1s 130 kAp
Up to 550 kV
Up to 52 kV 50 kA
Up to 550 kV 31.5 kAUp to 245 kV 50 kA
Up to 15 MVA MT/BT
Up to 36 kV 800 A 12.5 kAUp to 24 kV 800 A 16kA
Mechanical and environmetal tests
Prove meccaniche ed ambientaliMechanical and environmetal tests
Funzionamento alle temperature limiteOperation at the temperature limitsFunzionamento in severe condizionidi ghiaccioOperation under sever ice conditions
001-17226 CEIirotturretnICircuit Breakers Standard
201-17226 CEI dradnatSirotanoizeSDisconnectors
-40 °C + 55 °C
-40 °C + 55 °C10 mm - 20mm
sgnitar mumixaMavorP id àticapaC
Ak 05 - Vk 055 ot pUVH - VM BCTA - TM irotturretnI
Ak 05 - Vk 055 ot pUVH - VM SDTA - TM irotanoizeS
Trasformatori MT Transformers MV Up to 15 MVA
Quadri Elettrici Switch Boards Up to 52 kV
Up to 800 kV 80/210 kA/ kApVH - VM TV/TC TA -TM VT / AT
IMS Switches Up to 36 kV - 800 A
Isolatori per linee aeree Insulators for overhead lines Up to 550 kV - 50 kA
Accessori per cavi di media tensione Accessories for power MV cables Up to 245 kV
Isolatori di supporto Post Insulator Up to 550 kV
Reattanze BT-MT Reactors LV-MV Up to 50 kA
Passanti Bushings Up to 245 kV 80/210 ka/kAp
• la presente lista non é esaustiva di tutti gli apparecchi che possono essere provati e di tutti i test che possono essere effettuatithe above list isn't fully exhaustive of the kind of apparata that can be tested, nor of the variety of tests which can be carried out
• va comunque richiesta al laboratorio la fattibilità delle singole provefeasibility of each single test should however be asked to the laboratory for confirmation
• per ogni norma IEC esiste la fattibilità di test anche per la corrispondente norma CEI ENfor any IEC Standard referred test, the corresponding test feasibility in CEI EN related Standards is provided
Withstand Power Frequency test
Withstand Lightning impulse test(full & chopped)
Withstand Switching impulse test
RIV Test
Corona Test
Partial discharge
Withstand Power Frequency test
Withstand Lightning impulse test
001-17226 CEI dradnatSirotturretnICircuit Breakers
201-17226 CEI dradnatSirotanoizeSDisconnectorsTrasformatori di Misura TA & TV IEC 60044-1Current & VoltageTransformersTrasformatori di misuraInductive Transformer IEC 60044-2Equipaggi isolanti per line aereeSetting Insulator for overhead lines
Quadri elettrici Standard IEC 62271-200Switch BoardsInterruttori di Manovra e Sezionatori IEC 6Switches
Up to 245 kV
Up to 52 kV
Prova di tenuta a frequenza industriale
Prova di tenuta ad impulso atmosferico(onda piena e tronca)
Prova di tenuta ad onda di manovra
Prova RIV
Rilievo di effetto Corona
Scariche parziali
Prova di tenuta a frequenza industriale
Prova di tenuta ad impulso atmosferico
2271-103
2271-103
Temperature Rise, mechanical and on site test
testDC 50/60 Hz
Mechanical test
101-17226 CEI dradnatS irotturretnICircuit Breakers
201-17226 CEI dradnatSirotanoizeSDisconnectors
002-17226 CEI dradnatSicirttele irdauQSwitch boardsInterruttori di Manovra e Sezionatori IEC 62271-103Switches
101-17226 CEI dradnatSirotturretnICircuit Breakers
201-17226 CEI dradnatSirotanoizeSDisconnectors Standard IEC 62271-200Interruttori di Manovra e Sezionatori IEC 6Switches
TrasformatoriPower transformersTrasformatori amperometriciCurrent Transformers
Up to 4000 A single phaseUp to 3150 A three phases
• Rilievo dei tempi di funzionamento degli interruttori e sezionatori, convenzionali e blindati.Measurement of operating times of circuit breakers and disconnecting switches in GIS or AIS installations
• Misura della resistenza di contatto.Measurement of the resistance of the main circuit.
• Rigidità dielettrica sui circuiti ausiliari.Dielectric tests on auxiliary and control circuits.
• Rilievo delle perdite di gas SF6.SF6 tightness tests
• Misura dell'umidità del gas SF6.Measurement of the moisture content for SF6
• Prove del rapporto di trasformazione su trasformatori di misura e di potenza con iniezione primaria e secondaria.Measurement of transformation ratio for instrument transformers and power transformers
• Prova delle protezioni escluse quelle distanziometriche.Tests on protection relays (excluding distance protection)
• Prove d'induttanza su bobine di sbarramento e trasformatori di potenza.Measurement of inductance for line traps and power transformers
• Prove di capacità.Measurement of capacitance
• Prove di riscaldamento.Temperature rise test
• Termografie.Thermography
• Rilievo delle correnti di dispersione degli scaricatori.Leakage current measuring for surge arresters
Test on site
Temperature rise
2271-103
Temperature Rise, mechanical and on site tests
Temperature rise test DC 50/60 Hz
Circuit Breakers Standard IEC 62271 – 101 Up to 6000 A single phase
Up to 3150 A three phasesDisconnectors Standard IEC 62271 - 102
Switch boards Standard IEC 62271 - 200
Switches IEC 62271 - 103
Power transformer Standard IEC 60076 – 2&11
Current transformers Stardard IEC 61869 – 1&2
Mechanical test Circuit Breakers Standard IEC 62271 - 101 Up to 6000 A single phase
Up to 3150 A three phasesDisconnectors Standard IEC 62271 - 102Standard IEC 62271 - 200
Switches IEC 62271 - 103
On site test • Measurement of operating times of circuit breakers and disconnecting switches in GIS or AIS installations
• Measurement of the resistance of the main circuit.• Dielectric tests on auxiliary and control circuits.• SF6 tightness tests• Measurement of the moisture content for SF6• Measurement of transformation ratio for instrument transformers and power transformers• Tests on protection relays (excluding distance protection)• Measurement of inductance for line traps and power transformers• Measurement of capacitance• Measurement of dielectric dissipation factor• Thermography• Leakage current measuring for surge arresters
Siemens S.p.AEnergy ManagementCustomer ServiceLaboratorio SVEPPIVia A. Volta, 34/a - 30037 Scorzè (VE) ItalyTel +39 041 894 5092 Tel: +39 02 2431
[email protected]/serviceT&D