Page 1: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Sheboygan River Dredging Project

2012“Short Term Inconvenience for a Long Term Gain”

By: Chad Pelishek, Development Manager

Page 2: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

`

Page 3: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Total of ~350,000 cy of material to be removed. Three major fish and habitat restoration

projects Three offloading/dewatering sites. Approximately 200 trucks per day on Indiana

Ave. Approx. 100 trucks per day on Penn Ave and S.

14th Street. 24 hours a day 7 days a week dredging

operations. Bright Lights, Dust, Noise, etc. will occur.

Short Term Inconveniences

Page 4: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

8th Street and 14th Street Boat Launches closed.

Discouraging of canoers/kayakers from mouth of river to Taylor Drive Bridge.

Docks will be relocated during construction. Traffic Impacts along truck routes. Portions of Kiwanis Park closed.

Short Term Inconveniences

Page 5: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.
Page 6: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.
Page 7: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Redevelopment Opportunities of underutilized property.◦ Allows for reinvestment of the riverfront with up to

10 feet of depth for development docking from 8th Street to 14th Street Bridge.

◦ Case Study by Illinois-Indiana Sea Grant in 2011:Findings1. Sheboygan River was viewed as an asset but has a

negative stigma.2. Depth was a primary concern of the interviewees.3. Remediation will result in economic revitalization.4. Quality of Life and Aesthetics viewed as potential

improvements of remediation.

Long Term Gains

Page 8: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Additional Depths. 10-16 feet from the 8th Street bridge to the mouth.

Allow for additional cruise ships like:

Long Term Gains

Page 9: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

With Tourism, we are working to secure the Blount Cruise Ships stops in Sheboygan next Summer:

Long Term Gains

Page 10: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Long Term GainsFish and Wildlife Habitat Restoration

Page 11: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Long Term Gains

Page 12: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Long Term Gains

Page 13: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Help with increasing the local economic benefit of $8.7m that is spent on recreational activities related to the waterfront.

New development potential in 2013 of approximately $3.5 Million adjacent to the riverfront.

Slated to begin end of May, early June and be completed by Fall 2012.

Changes the perception of “its got the perception of being dirty, I wouldn’t go swimming in it as you might glow!”, stated a local resident.

Long Term Gains

Page 14: “Short Term Inconvenience for a Long Term Gain ” By: Chad Pelishek, Development Manager.

Sheboygan River Dredging Project

2012“Short Term Inconvenience for a Long Term Gain”

By: Chad Pelishek, Development Manager

Questions?