ShipConstructor ShipConstructor PERCEPTION PERCEPTION
58

ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Jun 04, 2018

Download

Documents

trinhhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

ShipConstructorShipConstructor PERCEPTIONPERCEPTION

Page 2: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

ShipConstructor is a CAD system

developed by Albacore Research

Ltd. (ARL).

ShipConstructor is a suite of

software functions with capabilities software functions with capabilities

for structure, piping, outfit, nesting,

build strategy, and N/C code

generation.

Page 3: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

PERCEPTION interfaces with

ShipConstructor.

This interface can be used to down-load

detailed bills of material for

• Cost Estimating

• Purchase Requisitions

• Work Order Bills of Materials

Page 4: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

PERCEPTION downloads

ShipConstructor detailed bills of material

as PERCEPTION drawing bills of

material.

The path of the ShipConstructor drawing

file also is recorded the PERCEPTION

drawing record.

Page 5: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

In addition, the ShipConstructor

product oriented work breakdown

structure (PWBS) may also be

downloaded into PERCEPTION.

Page 6: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

This data then can be processed directly

into material requisitions, purchase

orders, and/or work order pallets.

The data also can be directed into the The data also can be directed into the

PERCEPTION cost estimating

functions.

Page 7: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

ShipConstructor

Cost PlanningScheduling

Purchasing

ManpowerControl

Drawing Control

Material Control

PerformanceReporting

CustomerBillings

AccountingSystems

Accounts Payable

Accounts Receivable

3rd Party Software

Cost

Estimating Scheduling Control Reporting Billings

Time Charges

PERCEPTION

Integrated Shipyard Resource Management System

Page 8: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Sample ShipConstructor Unit 11

Page 9: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Opening PERCEPTION & Proceeding to

ShipConstructor Link

Page 10: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Select

ShipConstructor

Database &

ProjectProject

Page 11: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Select Unit

Number &

Import

Options

(Project (Project

PWBS &

Structures Bill

of Material)

Page 12: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

PERCEPTION pulls in all drawings related

to this unit from ShipConstructor.

Page 13: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

The PERCEPTION Drawing Record stores the

ShipConstructor drawing file location for direct viewing.

Page 14: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Click on the Drawing Items tab to view all

items in that drawing’s bill of material.

Page 15: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

The ShipConstructor detail bills of

material then can be processed within

PERCEPTION for

cost estimating,

for material requisitions and /or

for production work order bills of material

(PERCEPTION “Pallets”).

Page 16: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Cost EstimatingPERCEPTION was developed to permit cost estimating that can

reflect modern ship design and production methods.

Using product- and process-based information, cost estimates can

be generated quickly and accurately at any level of detail:

• Parametric cost estimates based upon modifiable ship

design and mission characteristics

• Standard shipbuilding & ship repair interim products &

services

• Detail cost estimates based upon engineered bills of material

and equipment specifications.

Page 17: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

• Contract Work Breakdown Structure

• Estimate Cost Items

• Estimating Documents & Reports• Estimating Documents & Reports

• Estimate Cost Data Libraries

Page 18: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

For user convenience, standard cost estimating relationships

(CERs) can be cataloged in different database tables:

1. Structural work CERs

2. Machinery work CERs

3. Pipe work CERs

4. Electrical work CERs

5. HVAC work CERs

6. Outfit work CERs

7. Paint work CERs

8. Miscellaneous work CERs

9. Parametric Equations

Page 19: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

PERCEPTION also provides for libraries of standard

work packages.

A Standard Package is a set of cost items that define the

scope of work and material requirements for a specific

production process or product.

Each package item is developed in a way similar to the Each package item is developed in a way similar to the

development of cost items in a project estimate. However,

the standard package can be made parametric and it can

be used as many times as necessary in a project estimate.

Page 20: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Sample Summary Cost Proposal

Page 21: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Planning & SchedulingPERCEPTION has features for planning and scheduling

all project activities:

• Schedule Design & Engineering Activities

• Schedule Engineering Drawings

• Schedule Production Work Orders

• Schedule Work Order Material Pallets

• Schedule Purchased Material Deliveries

• Schedule Subcontractors

• Schedule Tests & Trials

Page 22: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

• Build Strategy Development

• Master Scheduling

• Detail Scheduling (Drawings, Purchasing, Work Orders,

& Subcontractors)

• Resource Loading & Leveling

Page 23: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Planning Activity

Planning Activity

Activity Work

Orders

Work Order

Pallet Items

Drawing Requisition PO

Planning Activity

Page 24: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

PERCEPTION can schedule and track

various stages of material schedules.

Page 25: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Material Deliveries Must Be Scheduled

to Meet Required Delivery DatesR

eq

uir

ed

De

livery

Date

Nee

d D

ate

Re

qu

ired

De

livery

Date

Nee

d D

ate

Stores BufferTime

Work OrderSchedule

Production Planned Start Date

Production Planned Finish Date

Page 26: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Drawing Control

Material requirements for a project can begin with

requisitions.

However, requisitions can be preceded by engineering However, requisitions can be preceded by engineering

drawings and their bills of material (BOMs).

Drawing BOMs can be entered manually or via down-

loading this detail information from ShipConstructor.

Page 27: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Drawings

Linked to Requisitions

With PERCEPTION, a

drawing BOM can be used drawing BOM can be used

to generate one or more

requisitions.

Page 28: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Drawings

Linked to Work Order Pallets

With PERCEPTION, a

drawing BOM can be used to drawing BOM can be used to

generate one or more work

order pallets.

The pallets then can be used

to generate a requisition.

Page 29: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

• Drawing Lists & Schedule Control

• Drawing Bills of Material Control

• CAD Interfaces For Electronic Down-Load• CAD Interfaces For Electronic Down-Load

Page 30: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Purchasing

PERCEPTION generates a variety of purchase orders:

• Normal POs formulated directly from purchase

requisitionsrequisitions

• QUICK PO for items not entered on a requisition.

• Blanket Purchase Agreement

• Bulk Purchase Order

Page 31: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

• Purchase Requisitions

• Purchase Orders

• Expediting Functions & Reports

• Receiving Functions• Receiving Functions

• Vendor Invoice Control

• Transactions To Accounting System’s Accounts

Payable (A/P) & General Ledger (G/L)

Page 32: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Sample Purchase

Order Document

Using Domestic

Funds

Page 33: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Sample Purchase

Order Document

Using Foreign

Funds

Page 34: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Planning & Scheduling

Material Purchases & Deliveries

Page 35: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Manpower Control

PERCEPTION provides features for planning and

forecasting shipyard manpower requirements by

project, by work center, and by trade.

PERCEPTION provides for a full compliment of

features for developing work orders and for

collecting time charges.

Page 36: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

• Manpower Planning & Forecasting

• Work Order Budgeting & Scheduling

• Work Order Authorization & Release

• Work Order Time Charging

• Work Order Closings• Work Order Closings

• Exception Reporting (Late Start & Finish, Budget

Variances, Rework, Premium Time Charges, etc.)

• Time Charge Transactions To Accounting System’s

Payroll

Page 37: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills
Page 38: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Sample Work Order Ticket Pages

Work Order Ticket Cover with Work Order Ticket Cover with Work Order Ticket Cover with Work Order Ticket Cover with

budget, schedule, & trade budget, schedule, & trade budget, schedule, & trade budget, schedule, & trade

requirementsrequirementsrequirementsrequirements

Detail work instructionsDetail work instructionsDetail work instructionsDetail work instructions Work Order Material Work Order Material Work Order Material Work Order Material

Requirements ListRequirements ListRequirements ListRequirements List

Page 39: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Work Order Ticket CAD Drawing Page

Page 40: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Sample Manpower “Proposal” Graphic Report

Page 41: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Manpower planning & forecasting, by project, by

work center, and by trade across the yard.

Page 42: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Material Control

PERCEPTION has many features for managing

material throughout the shipyard operations.

Page 43: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

• Material Storage & Buffer Areas Management

• Work Order Material Requirements (Pallets)

• Electronic Interfaces With Engineering CAD

Drawing Systems

• Stock Requisitions• Stock Requisitions

• Manufactured Parts Control

• Stock Inventory Control & Replenishment

• Small Tools Control

Page 44: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

PERCEPTION supports a Parts Catalog that can be used in the

following areas of the system’s capabilities:

• Cost estimating that identifies detail material

requirements using Part IDs from the catalog.

• Stock inventory control, where stock items are managed in

the Parts Catalog.

• Standard Direct Purchase Material Items that provide the • Standard Direct Purchase Material Items that provide the

means for bulk purchasing benefits.

• Production pallet planning and management functions

using standard parts (stock and/or direct purchase items)

from the catalog.

• Engineering drawing bills of material using standard

parts (stock and/or direct purchase items) from the catalog.

Page 45: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

If part attributes are to be used, open the next tab window

and enter attribute values.

Pictures, drawings & spec files also can be identified here.

Page 46: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Performance Reporting

The process of tracking and managing contract

performance requires accurate and timely feedback of

costs and schedules which can be measured against a costs and schedules which can be measured against a

baseline of budgets and planned schedules.

PERCEPTION can produce a wide variety of reports

that provide visibility of project performance at

different levels of detail.

Page 47: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

• Contract WBS Cost & Schedule Performance Reporting

• Shipyard Work Center Cost & Schedule Performance

Reporting

• Interim Products Cost & Schedule Performance

Reporting

• Cost & Schedule Tracking & Forecasting

• Progress Measurement & Tracking

• Cost Estimate Analysis

• On-Line Status & Reports Generation

Page 48: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

OnOn--Line Reporting of Line Reporting of

Cost/Schedule StatusCost/Schedule Status

Page 49: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Cost & Schedule Performance Cost & Schedule Performance

ReportsReports

Page 50: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Tracking ProgressTracking Progress

Page 51: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Tracking & Forecasting Tracking & Forecasting

Schedule VarianceSchedule Variance

Page 52: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Earned Value Management is a project

management technique designed to:

� Ensure work is properly & adequately planned,

budgeted & scheduled

� Isolate problems for corrective action� Isolate problems for corrective action

� Measure cost & schedule performance of work

accomplished

� Measure true cost condition

� Forecast completion date & final cost

Page 53: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

PERCEPTION ties together all areas of

Earned Value Management:

1. Cost Estimating

2. Planning, Budgeting & Scheduling

3. Labor Work Order & Manpower Management

4. Purchasing & Inventory Control4. Purchasing & Inventory Control

5. Change Order Management

6. Earned Value Performance Measurement Reporting

7. Cost & Schedule Forecasting

8. Cost Analysis For Future Work Estimating

Page 54: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Customer BillingsPERCEPTION generates customer bills quickly and easily:

• Time & Material Charges

• Progress Payments Billings• Progress Payments Billings

• Fixed Price Services

• Transactions To Accounting System’s Accounts

Receivable (A/R) and General Ledger (G/L)

Page 55: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

• Time & Material

Charges

• Progress Payments

Billings

• Fixed Price Services• Fixed Price Services

• Transactions To

Accounting System’s

Accounts Receivable

(A/R) and General

Ledger (G/L)

Page 56: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Accounting Systems

PERCEPTION generates transactions that can be

electronically input into accounting systems:

• Purchase Orders & Receipts• Purchase Orders & Receipts

• Vendor Invoices

• Time Charges

Page 57: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Accounting Systems Interfaces:

• Great Plains

• Peachtree

• Solomon

• Quick Books

• Generic Interface Transactions

Page 58: ShipConstructorShipConstructor PERCEPTION PERCEPTION ERP with ShipConstru… · PERCEPTION interfaces with ShipConstructor. This interface can be used to down-load detailed bills

Over 35 Years Serving the Shipbuilding &

Repair Industry