Shielding of Route Goward Status – 25 June 2013 • Main works of Route Goward will be completed end of June 2013 (1st layer blacktop on june 28th) • Finishing works: – Metalworks – in july 2013 –2 nd layer of blacktop and parking – after Septum 16 works
Shielding of Route Goward Status – 25 June 2013. Main works of Route Goward will be completed end of June 2013 (1st layer blacktop on june 28th) Finishing works : Metalworks – in july 2013 2 nd layer of blacktop and parking – after Septum 16 works. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Shielding of Route Goward Status – 25 June 2013
• Main works of Route Goward will be completed end of June 2013 (1st layer blacktop on june 28th)
• Finishing works: – Metalworks – in july 2013– 2nd layer of blacktop and parking – after Septum 16 works
Temporary road
Retaining wallPiling works
Some pictures of the works:
Slab reinforcement
Formwork for the slab
Biocofra
Concreting
Road works
Backfilling
Shielding of Septum 16 Status – 25 June 2013
• Adjudication of the works on 19 June 2013
• June-July 2013 - Preparatory works
– « Sondages » – Felling of trees– Removal of the barrier closing access to the PS – Removal of the street lighting– Setting out of the works– Worksite installation– Information campaign for users and TSO