Top Banner
SHENGXI WU · PORTFOLIO This portfolio contains the design work of Shengxi Wu School of Architecture University of Illinois at Urbana Champaign, USA University of Shenzhen, China
53
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Shengxi's Portfolio

SHENGXI WU· PORTFOLIOThis portfolio contains the design work of Shengxi WuSchool of ArchitectureUniversity of Illinois at Urbana Champaign, USAUniversity of Shenzhen, China

Page 2: Shengxi's Portfolio

EDUCATION Master of Architecture (Expected to graduate in May 2015) •Fall 2013 – Fall 2015 University of Illinois at Urbana Champaign, IL, USA Cumulative GPA: 3.74/4.00 Bachelor of Architecture •Fall 2010 – Fall 2012 University of Illinois at Urbana Champaign, IL, USA Cumulative GPA: 3.82/4.00 Bachelor of Architecture Candidate •Fall 2008 – Fall 2010 University of Shenzhen, China Cumulative GPA: 3.37/4.00EMPLOYMENT Intern Architect URBANUS Architecture & Design, Shenzhen Mar 2013 to Jun 2013 •Project : Stadium Renovation of the 26th Summer International Universiade - Graphic design | Schematic Design | Concept development •Project : Historic Preservation Project : Longhua Airport Addition, Shanghai, China - Facade & Landscape design | Schematic Design | Concept development •Project : Urban Planning Project: Future City – Baishizhou Redevelopment, Shenzhen - Urban Planning | Modeling | Concept development | Meeting with Clients •Project : Urban Planning Project : Dayun Nan Commercial District Planning, Shenzhen - Graphic design | Schematic Design | Concept developmentRE

SUM

E

Shengxi Wu

RESEARCH University of Illinois at Urbana Champaign, IL, USA •Oct 2013 Solar Decathlon Project – Rehome Renovation Research Instructor: Mark Taylor •Solar Panel Array Design •Roof Reconstruction

•Oct 2012 Solar Decathlon Project - Gable House HVAC System Analysis Research Instructor: Mark Taylor •Observe and research the operating principle of the HVAC system •Creating illustrations, digital model of the HVAC system

PUBLICATION •Oct 2012 Book : Uncharted Waters: A Hospital in Shenzhen, China Author: William Worn & ARCH572 Studio •Graphics/Layout design

•Oct 2012 Book : Principles of Reinforced Masonry Construction Instructor: Mark Taylor •Graphics/Layout design

COMMUNITY ACTIVITIES •Oct 2014 Solid is Just Better - Exhibition Designer •Arrange position of items on display •Circulation design

•Jun 2014 Volunteer - Haiti Challenge Studio •Visit Haiti and help planning local town Petite Rivere de Nippes •Help local people with construction •Cooperating with students from Universite of GOC, Port-au-Prince

•Aug 2011 Volunteer of 26th International University Sports Federation •Maintain effective communication between stadiums and groups •Provide stadium tour for tourists and athletes •Stadium guide •Chinese/English translator

SKILLS Adobe Creative Suite(Skillful), Sketchup(Skillful), AutoCAD (Intermediate), Artlantis Studio(Skillful), Rhino(Intermediate), Revit (Intermediate)

LANGUAGES English, Chinese, Cantonese,

AWARDS & HONORS University of Illinois at Urbana Champaign •Fall 2013 Fellowship: Robert F. Hastings Memorial Fellowship Recipient Full tuition waver with a monthly stipend •Fall 2013 Design Award: Edward C. Earl Prize Nomination ARCH 574 - Architecture, Urbanism and Preservation •Fall 2012 Graduate Student with High Honor •Fall 2012 Dean’s list

•Spring 2012 Design Award: Earl Prize Nomination of Studio Course ARCH 476 - Architectural Design and Exploration •Spring 2012 Dean’s list •Spring 2011 Dean’s list

Shenzhen University •Spring 2010 Excellent Student of Academic Performance, Shenzhen University •Spring 2010 Suiadr Scholarship, Shenzhen University

Community Service •Oct 2014 ARCH571 - Solid is Just Better Exhibition Design •Aug 2011 Certificates of volunteer of 26th International University Sports Federation, Shenzhen

ACADEMIC EXPERIENCE Teaching Assistant University of Illinois at Urbana Champaign, IL, USA Aug 2014 to Present

Research Assistant of Professor Mark S. Taylor University of Illinois at Urbana Champaign, IL, US Jan 2012 to Dec 2012 •Project : Camejo Hospital Campus Plan, Léogâne Haiti •Project : El Canton Health Center Design, Honduras •Book Design : Principles of Reinforced Masonry Construction •Competition : 2014 Department of Energy - Student House Challenge •Competition : 2012-13 ACSA Collaborative Practice Award •Competition : 2012-13 ACSA 101: New Constellations / New Ecologies

MEMBERSHIP AIAS University of Illinois, AIA Chicago Student Membership

Working with Professor Taylor as Research Assistant in 2012

Page 3: Shengxi's Portfolio

FOCAL POINT CHICAGO - URBAN COMPLEX

Chicago, U.S.

Shenzhen, China

Champaign, U.S.

Petite-Riviere-de-Nippes, HaitiLéogâne, Haiti

El Canton, Honduras

CONTENT

ACSA SUMMER PROGRAM - HAITI CHALLENGE

SOLID IS JUST BETTER - CONCRETE STUDIO

CENTRO DE SALUD (HEALTH CENTER) DESIGN

CAMEJO HOSPITAL CAMPUS

ARTIST VILLAAPPENDIX - INTERN & OTHER WORK

UniversalArchitecture is

GRA

D LE

VEL

UNDE

RGRA

D LE

VEL

BUILDING HEALTH CHALLENGE COMPETITION

Page 4: Shengxi's Portfolio

FOCAL POINT CHICAGO- UNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGN

Project Type : Team Project

Team Member : Annapoorna Halepatali Shengxi Wu

Date : Sept. 2013 Grad

Studio : ARCH572 FA2013

Instructor : Botand Bognar

Category : Urban Complex

Site Location : Chicago, USA

UrbanArchitecture is

Page 5: Shengxi's Portfolio

URBAN CONTEXT

MASTER PLANThe site is located just south of the Chicago loop and Congress Parkway next to the Chicago River. The two city-block size site is bounded by the River on the west, W. Harrison St. on north, S. Wells St. on the east and extends till W. Polk St. in the south. The 8.75 acres site is currently empty.

The site is embraced by a combination of residential, commercial and hospitality buildings with heavy traffic concentrated on the Harrison Street. The Well Street on the eastern side has considerably less traffic with more parking areas. Construction materials like glass, brick, stone are abundantly used which forms the greater part of the architecture of the vicinity. The challenge here is to develop a design which integrates into the community and thus giving a sense of stability to the eye.

SITE ANALYSISThe site can be accessed from the Harrison street(northern side) and the exit could be made into the Well street (eastern side) for efficient circulation. Glass, brick and granite can be used in the design to blend with the surroundings. An open space could be provided at the entrance to get a better view of the city and the park. This space acts as a transition space.

DOWNTOWN CHICAGO

SITE VIEW

RIVER VIEW

RESIDENTIAL BLOCK

CHICAGO RIVER WATER FRONT

Page 6: Shengxi's Portfolio

FOCAL POINTCONCEPTThe three buildings, Hotel, Gallery and the Arena, which serve different purposes leisure, knowledge and entertainment, are treated with equal importance in this program. The main concept of the design is the fundamental element of architecture-“The Visual Axis”. The orientation of main axis of the Hotel and the Gallery aligned with the Chicago River and Wells St.- to make the site harmoniously blend with the trapezoidal site.

The Hotel and the Gallery were designed to be high rises to blend with the Chicago skyline and it is balanced with the less verticality of Arena by making it, the Arena the focal point between these two buildings and to the site. The Arena was framed between the other two buildings to provide the visitors from the main entrance on Harrison St, a grand entrance. Narrowing flight of steps breaks the monotony, elevates the perspective and heightens anticipation as visitors approach the building complex at the podium level, where they are greeted by an open space triangulated by the three buildings. Open spaces and the river walk encourage the visitors to, appreciate the forms of the buildings, enjoy nature and appreciate the urban landscape of Chicago

1Traffic & Visual Axis

2Align Building Mass

3Elevate Buildings

4Pedestrian Access

5Visual Access

SITE PLANThe site can be accessed from the Harrison street(northern side) and the exit could be made into the Well street (eastern side) for efficient circulation.

An open space could be provided at the entrance to get a better view of the city and the park. This space acts as a transition space.

1 Hotel Tower2 Art Gallery3 Arena4 Outdoor Cafe5 Overlooking deck6 Steps to 2nd Podium7 Riverwalk8 1st Podium Roof Top9 2nd Podium Roof Top10 Service Vehicle Entry11 Main Vehicle Entry12 Front Drop Off13 Hotel Service Entry14 Hotel Entry15 Ground Podium Entry16 Basement Parking Ramp

Page 7: Shengxi's Portfolio

1 Hotel Lobby2 Retail3 Arena Lobby4 Gallery Lobby5 Walk Path6 Spill Out Space7 Parking Ramp8 Gallery Drop Off9 Hotel Drop Off10 Arena Service Yard

1 Hotel Lobby2 Cafe Atrium3 Arena Lobby4 Gallery Lobby5 Arena Spill Out6 Staff Dinning7 Retail8 Arena Court9 Overlooking Deck

1 Arena Court2 Arena Lobby3 Arena Podium Platform4 Arena Spill Out5 Office6 Pantry7 Retail

URBAN CONTEXT STUDY

AERIAL VIEW

FOCAL POINT - ARENA

PedestrianVehicle

ROAD LEVEL PLAN 2ND LEVEL PLAN 3RD LEVEL PLAN

PODIUM SYSTEM

Page 8: Shengxi's Portfolio

1 Balcony2 Lobby3 Conference Rooms4 Service Corridor5 Swimming Pool6 Storage7 Restrooms8 Service Rooms9 Educational Space10 Gallery11 Kitchen12 Pantry13 Terrace

1 Balcony2 Lobby3 Conference Rooms4 Cafe Lobby5 Overlooking Deck6 Storage7 Restrooms8 Service Rooms9 Terrace10 Dining11 Kitchen12 Pantry

Level 20 - Outdoor Sculpture

Level 16 - Bridge Roof Top

Level 12 - Conference Room

Gallery/Educational SpaceGiftshop/Cafe

Bridge Gallery/DiningAuditorium

Gallery/Educational SpaceSpecial Collections/Office

Level 3 - Podium Top

Level 2 - 2nd Podium

Level 1 - Road Level

Level 1 - Road Level

Level B4 Basement

LEVEL 10 - BRIDGE PLAN LEVEL 11 - BRIDGE PLAN

GALLERY SECTION A-A

A

A

HOTEL AND GALLERY

RIVERSIDE OVERLOOKING PEDESTRIAN PATHWAY MAIN ENTRY

Page 9: Shengxi's Portfolio

1 Suite Rooms2 Lobby3 Rooms-14 Rooms-25 Service Rooms6 Storage7 Pantry8 Atrium Below9 Terrace10 Special Gallery11 Kitchen12 Indoor Sculpture13 Education Space

1 Lobby2 Restaurant3 Kitchen4 Banquet Hall5 Discotheque6 Storage/Pantry7 Restrooms8 Terrace

Level 34 - Roof TopLevel 33 - Restaurant

Restaurant, Banquet Hall

Semi-public Conference Rooms

Suite and Typical Rooms

Level 14 - Bridge Roof

Level 2 - 2nd PodiumLevel 3 - Podium Top

Level 1 - Road Level

Level B4 - Parking Basement

Level 9 - Mechanical Floor

LEVEL 14 - BRIDGE ROOF PLAN LEVEL 33 - RESTAURANT PLAN

HOTEL SECTION B-B

B

BHOTEL AND GALLERY

SUITE ROOM - LOWER LEVEL SUITE ROOM - HIGHER LEVEL TYPICAL ROOM

Page 10: Shengxi's Portfolio

Level 34 - Roof Top

Connection Bridge

Hotel Rooms

Level 14 - Bridge Roof

Art Gallery

Auditorium

Auditorium

Dining

Gallery

Level 1 - Road Level

Podium Top (3rd Level)

2nd Podium

Level B4 - Parking Basement

Level 10 - Bridge Level

BRIDGE SECTION C-C

CC

HOTEL AND GALLERY

STRUCTURAL DIAGRAM

Page 11: Shengxi's Portfolio

1 Lobby2 Reception/Ticket Counter3 Office4 Cafe/Pantry5 Visitor’s Locker6 Public Cafe7 Janitor8 HVAC/AHU Room9 Electrical Room10 Conference Room11 Records Storage12 Event Manager13 Staff Dining14 Equipment Storage15 Public Activity Room16 Hall of Fame - Display17 Productions Office18 Drinking Fountain

Tensile Cable SupportedMembrane Roof

Roof Top

Level 5 - Private Space

Level 4 - Public Space

Level 3 - Public Entry

Level 2 - Private Space

Level 1 - Public Drop Off

Level B4 - Parking Basement

ARENA SECTION D-D

DD

ARENA

ARENA - ROAD LEVEL PLAN

PedestrianVehicle

Page 12: Shengxi's Portfolio

1 Lobby2 Reception/Ticket Counter3 Office4 Cafe/Pantry5 Visitor’s Locker6 Public Cafe7 Janitor8 HVAC/AHU Room9 Basketball Court10 Drinking Fountain11 Restroom12 HVAC/AHU Room13 Electrical Room14 Mechanical Room15 Storage16 Operation Room

ARENA VIEW FROM CHICAGO RIVER

ARENA

ARENA - PODIUM (3RD) PLAN

PedestrianVehicle

Page 13: Shengxi's Portfolio

THE HAITI CHALLENGE- UNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGN

Project Type : Team Project

Team Member : Erasmo OrtegaEric Ellis

Holden ScullyJeremy Copley

Kevin GreweLawrence Wyman

Manasvinee PramodMinhoo Kim

Neris SandovalShengxi Wu

Yang Yu

Date : Jun. 2014 Grad

Studio : ARCH572 Summer 2014

Instructor : Lynne Dearborn

Category : Town Planning

Site Location : Petite-Rivière-de-Nippes

ChallengeArchitecture is

Page 14: Shengxi's Portfolio

UNDERSTAND THE COMMUNITYMEETING WITH LOCAL PEOPLE

Meeting with Engineers : "Haiti is CAPABLE"- Explained proposed projects, and possible sites- Working mechanism for projects- Priorities for new projects- Agriculture & Education- Building codes and regulations- Need for an urban plan

Meeting with Pastors : "Haiti is CAPABLE"- Education is the main priority- The need for English teaching- Agriculture improvements with better irrigation- Master plan improvement

Meeting with Mayor“When you don't have anything everything is a priority"- Priorities being Electrification and Education- Explained current situation of project, post earthquake- Current situation of land ownership

Meeting with Delatour "Nobody accepted slavery as the ultimate human condition"- History of the life in Haiti- Historic preservation for post earthquake architecture- Tourism development plans for Port-Au-Prince, Cap Haitien- Building Back Better Communities

NIPPES POPULATION DENSITY CURRENT POPULATION

LABOR CONDITION

LAND DISPUTECOMMUNITY SECTION

Haiti average

Sillegue

Cholette

Fonds de Lianes

400m

350m

150m

Petite-Riviere-de-Nippes

Sillegue

Cholette

Fonds de Lianes

Paillant

Fond Des Negres

Bezin

Miragone

Nippes

1,461mm

1,335mm

1,161mm

32,000

5% 1,168mm

of land is legally accounted for in Haiti

7,840 Unemployed Adult

35% Unemployment

1.7% Growthin 2013

35%

15%

50%

20% 15%

35%30%

Rural Land Ownership

63% Claim

37% Deeds

Page 15: Shengxi's Portfolio

CURRENT TOWN PLANA LINEAR GROWING TOWN

CURRENT MASTER PLAN

STAGE ONE 5-8 YEAR GROWTH PLAN- addition of 152 homes, 24 retail, and 18 mixed use- 6-8 member homes- 1000-1100 people

PROS- Existing road can provide immediate infrastructure to allow for fast progress- Easy access to the village for outsiders- Visibility to passersby and hence increases commercial sales- Growth occurs only on non-fertile coastal lands to the east and the west- Allows for more connections to inland agricultural development

CONS- Dangerous as the highway, commercial and residential shares street- Growth will be curtailed by the town eventually reaching neighboring towns- Multiple centers will have to form to reduce the need for travel

GovernmentPublic FacilitiesEducationCommercialRetailResidential

DOCUMENTING THE TOWN

Page 16: Shengxi's Portfolio

FUTURE TOWN PLANBYPASS AND WATER FRONT DEVELOPMENT

Farms to grow bamboo.Educative in nature as well as to increase eco-friendly construction materials

Growth of the co-op to account for multiple crops, and larger scales Farmlands friendly to tourists,

to educate and give farmers incentives to improve their agricultural methods

Expanding the dock to account for water recreation on the reef

Secondary green belt acts as a breather space

Tourist zone to develop tourism

Zone for education and research development

Road to bypass the town of Petite to allow for higher traffic loads on the highways

Co-op

Bamboo Farm

Park

Dock & Recreation

Park & Playground

Hotel & TourismEducation

Transportation Bypass

STAGE TWO 8-12 YEAR GROWTH PLAN- addition of 140 homes, 28 retail, and 6 mixed use- 6-8 member homes- 1200-1500 people

FUTURE MASTER PLAN

Page 17: Shengxi's Portfolio

PROPOSED PROJECTS - THE SITES PROPOSED MARKETNeris Sandoval

Shengxi WuTeam Member :

CO-OPERATIVESA Space to bring the grass roots farmer to the market for his product. Educating the farmer to better the growth of his crop as well utilize resources to the fullest.

MEDIA CENTERBringing education to the rural community of Petite-Riviere-de-Nippes. A link to the rest of the country, with the help of new age technology.

FISHING DOCKA boat dock for the local fisherman. To allow for a harbor for temporary transfer of goods, and storage of fresh catch.

MARKETA structure to provide an organized market for daily sales, for goods like fruits vegetables, and other household items. Flexible in nature to provide the town for a secondary gathering space.

FOUR FURTHER PROPOSED PROJECTS

Page 18: Shengxi's Portfolio

Water Collection4 tons/day of rainwateris collected and used forcleaning and cooking

Waste CollectionAgricultural and human waste will be collected for recycle

Fruits &VeggiesMarket as an incentive for local farmers’ development

Co-op SectionThe market will work with the co-op to promote new products

Craft SectionMarket as an incentivefor local craftmenshipdevelopment

Fresh FishEach cublicle providesa solar chiller

Security SectionDaily security is providedto ensure the markets’ success

Livestock SectionMarket as an incentivefor local farmers’ development

Cooking SectionBiogas is used to cookmeat and fish everyday

Efficient SanitaryBiogas digestors are usedto produce gas for cooking

PedestrianVehicle DEMONSTRATION OF

BIOGAS COOKING MARKET AXON

Page 19: Shengxi's Portfolio

EDUCATIONAL VALUE

Solar Panels Light Fan

Solar Chiller

Water TankWater Tank Water Tank

Solar ChillerRainwater Collection SystemBiogas System

Waste Collection

Pressure Tank

Daily Cleaning

Waste Sorting

Recycle/Upcycle

Organic WasteCollection

Biogas Cooking

Bio-digestor

Gutter System

Cooking

SOLAR ENERGY COLLECTION SYSTEM RECYCLE SYSTEM BIOGAS SYSTEM

RAINWATER COLLECTION SYSTEMSECTION DIAGRAM

MARKET AS A DEMONSTRATION TOOL OF ALTERNATIVE TECHNOLOGY

Page 20: Shengxi's Portfolio

DEMONSTRATION OF SOLAR CHILLER MARKET CLOSED DAY - PUBLIC GATHERING SPACE

Page 21: Shengxi's Portfolio

SOLID IS JUST BETTER- UNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGN

Individual Project

Sept. 2014 Grad

ARCH571 FA2014

Jeff Poss

Architecture Tectonic

Champaign, IL

Project Type :

Date :

Studio :

Instructor :

Category :

Site Location :

SolidArchitecture is

Page 22: Shengxi's Portfolio

Cracked Glass· translucent· fuzzy· fragile

Concrete· cold· grave· firm

As light comes through the cracked safe glass, it splits and casts shadow on the concrete surface, creating a special pattern as if the concrete is cracked.

NODE DETAIL 1” = 1’- 0”Safe glass inserts into slot

CAST CONCRETE MODEL 1/4” = 1’- 0”

Formwork

Reinforcement

Add water

Final Cast

Cast

Dry

Mix concrete

Close Formwork

Vibrate

Finish

Cracked texture

Cracked glass

PLAN

SECTION A-A

A A

PHASE 1 - LIGHT STUDY

Concrete Cube Subdivide Access Penetration Seat

CONCEPT - "CRACKED" CONCRETE

Page 23: Shengxi's Portfolio

In contrast to traditional rigid moulds such as timber or steel formwork, cable formwork could be manipulated into any kind of shape. Its flexibility allows designer to position the formwork in a very sculptured way and take advantage of the fluidity of concrete, creating highly optimized, architecturally interesting building forms. All these characteristics make cable formwork perfect for a concrete lamp design.

CONCEPT SKETCH

PHASE 2 - FORMWORK STUDY: CONCRETE LAMP ARIZONA

CASE STUDY - FLEXIBLE FORMWORK

Page 24: Shengxi's Portfolio

CONCRETE LAMP ARIZONA

Page 25: Shengxi's Portfolio

Phase 3 is a further exploration on light and concrete formwork. This is a natural light capture device inspired by an analemmatic sundial.

In this project, tie of concrete formwork is part of the important design element which is being used as a guide to indicate time.

As sunlight cast into each units, it lights up the ties, casting shadows on the concrete wall. These ties are deliberately positioned such that the number of ties that casted shadows changed hourly, indicating the elapse of time.

1

3

2

4

PLAN

Seats

1' Timber PlankLarge Observing

Space

DecemberSolstice Unit

SeptemberEquinox Unit March

Equinox UnitJune

Solstice Unit

Pebble Paving

CorbelDrainage

Light Notch

Precast Roof

Drainage Concrete Corbel

4-Season Units

1' Tie Grid

Precast Unit

Extruded Ties

Formwork Ties

2nd Cast

Light Slot

1st Cast

PHASE 3 - AN OBSERVING SPACE

1

4

2

5

3

6

CONCEPT - TIME AND LIGHT CONSTRUCTION SEQUENCES

Page 26: Shengxi's Portfolio

NORTH-SOUTH SECTION EAST-WEST SECTION

JOINT DETAIL

Metal Cap Stepped Down Roof

Stepped Down GutterOpenings allowing

morning sun coming in

Roof Drainage

Project Wall with Ties

SECTION

Page 27: Shengxi's Portfolio

INTERIOR OBSERVING SPACE

8:00 AM 4 Ties

11:00 AM 1 Ties

9:00 AM 3 Ties

12:00 PM 0 Ties Noon Notch

10:00 AM 2 Ties

13:00 AM 0 Ties 13:00 PM Notch

HOURLY SCENES

Page 28: Shengxi's Portfolio

TOGETHER IN EL PARAISE- UNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGN

Project Type : Team Project

Team Member : Annie SitBejil ThomasShengxi Wu

Date : Mar. 2012 UG

Studio : ARCH476 SP2012

Instructor : Mark Taylor

Category : Healthcare

Site Location : El Canton, Honduras

HumanitarianArchitecture is

Page 29: Shengxi's Portfolio

UNDERSTAND THE COMMUNITYWHY IS HEALTHCARE SO IMPORTANT IN EL CANTON?

El Canton does not have any health center in their rural community. People who suffer from diseases have to go to health center in other town, which is a serious problem if emergency happens.

Together in El Paraise is a place for the residents of El Cantón and the surrounding communities to heal. The goal of Together in El Paraise is not only a place to get well, but also is a hub for the community to gather and create a support network. Upon completion, Juntos en El Paraíso will be the center that helps create a sense of belonging for the communities in the region.

Most people there do not have access to car. Currently the closest place to seek medical attention is in the county seat of Teupasenti, a 2 and 1/2 hour walk from El Canton, which is very time consuming.

People in El Canton are threatened by various of diseases, such as AIDS, dengue, malaria, yellow fever, cholera and hepatitis. Some of them are highly infectious or even fatal.

Because of El Canton’s central location, if the new health center is built, it will benefit a total of 12 communities, providing access to basic health care to nearly 5,000 people.

Healthcare Facility

Hours Walk

Fatal Diseases

People

0

2.5

10

5,000 SITE PLAN

Page 30: Shengxi's Portfolio

CONCERN I

Non-skillful Labor Force

SOLUTION

Modualize Building Plan, Materials

CONCERNS AND SOLUTIONS

1 Reception2 Exam Room3 Waiting Area4 Garden5 Office6 Medical Storage7 General Storage8 Treatment Room9 Exam Room/Infirmary10 Waiting Area11 Restrooms12 Dental Rooms

GROUND FLOOR PLAN

PLAN DESIGN

The organization of the plan emphasizes the patient experience and privacy. The program is divided into outpatient and inpatient services. The outpatient consult and dental clinic are in the center pavilion to provide easy access to patients with minor illnesses. The treatment and inpatient ward enjoy more privacy and isolation from the public areas.

MODUALThe 3.2m x 3.2m module provides flexibility for the clinic operation, as well as repetition for the ease of construction

COMPRESSED EARTH BLOCK — Main Building Material

The incorporation of CEB provides several opportunities for this small span structure. The first being ease of construction with consideration to volunteer labor, inavailability of power tools and the use of local materials. Another being the building’s structural module can be discreet enough to match the local vernacular and provide a high level of versatility for future additions.

A modualized brick wall system

Page 31: Shengxi's Portfolio

1 32 4

Reinforced Brick Column Concrete Sill Beam Concrete Bond Beam

CONCERN II

Earthquake and Other Natural Disasters

SOLUTION

Dual Beam Reinforced Structure

#4 Rebars extend from foundation and connect to bond beam and lintel

#3 Stirrup every 1’-0” on center

Poured concrete foundation on moisture barrier and # 3 rebar 0.6m on center. # 4 re-bars are positioned vertically according to the placement of columns and windows in a repeated module. These extend vertical 0.6m, then grooving wire.

At the column points the CEB alternate between header and stretcher, providing vertical reinforcement in both directions. Half bricks are used to stabilize the voids.

At 1.2m, a reinforced sill beam is cast in place atop the low brick wall, providing lateral support for all interior and exterior walls. Windows are placed atop sill beam and bricks are installed with mortar between window hangars.

Wall is then capped with a reinforced concrete bond beam, extending through all interior and exterior walls.

Reinforced Brick Columnwith grout voids

Concrete Bond Beamwith 3# Stirrup and #4 Bar

Concrete Sill Beamwith #4 Bar

CONCERNS AND SOLUTIONS

Page 32: Shengxi's Portfolio

CONCERN III

Cooling Ventilation and Lighting

SOLUTION

Dual Roof with Passive Strategies

Corrugated Metal Roof

Bamboo Space Frame

Photovoltaic Panels

Reinforced brick column

Concrete sill beam

Concrete bond beam

Wood rafters supported by concrete lintel

The new health clinic implements passive strategies that integrate with the roof and building design. The building orientation takes advantage of the prevailing wind directions to encourage cross ventilation. The building includes a double layer roof system. The photovoltaic panels on the top layer not only serves as a shading device but also reduces the solar heat gain through the building’s roof.

Photovoltaic roof absorbssolar energy and decreasesthermal heat gain on roof

Cross ventilation cools interior spaces

Incinerator

Latrine pit

Prevailing winds remove oddor

Photovoltaic panels supported bybamboo space frame

Prevailing wind (from north, east, and northeast)

Summer Solstice

Winter Solstice

SECTION A-A SECTION B-B

OVERALL ROOF STRUCTURECONCERNS AND SOLUTIONS

Page 33: Shengxi's Portfolio

CONCERN IV

Energy and Roof Structure

SOLUTION

Solar Panel and Space Frame

Bamboo frame

All plates are 8mm thickFasten all members with 10mm bolts

SLR100 Solar mid-clamp

1cm bolt

P1000T U-channel

The roof structure is composed of two levels, the lower roof protects the building interiors from natural elements; the upper roof, supported on bamboo space frame structure, shields the building from direct sunlight, while reducing solar heat gain in the building. Composed of photovoltaic panels, the upper roof diverts the sun’s radiation into usable energy to power the campus. Solar energy can also be stored for future use in batteries.

For ease of construction, the bamboo space frame members are pre-fabricated in the nearby town and are easily transported to the project site because the components are small and light weight (compared to conventional wood truss).

SLR150 Solar end-clamp

Photovoltaics panel100cm x 170cm

Space frame top plate and cross plate connector

UP-MPDS Unipier strut support

Base plate Cross plate I Cross plate II Arm plate

PHOTOVOLTAIC PANEL INSTALLATION DIAGRAM

SPACE FRAME JOINTS

CONCERNS AND SOLUTIONS

Page 34: Shengxi's Portfolio

The site aims at creating a welcoming and intimate ambience for patients and families. The open courtyard and garden between the buildings allow people to relax and enjoy nature.

VIEW FROM COURTYARD

SOUTH ELEVATION

EXAM ROOM/INFIRMARY

Page 35: Shengxi's Portfolio

CAMEJO HOSPITAL CAMPUS- UNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGN

Project Type : Team Project

Team Member : Annie SitShengxi Wu

Date : May. 2012 UG

Studio : ARCH476 SP2012

Instructor : Mark Taylor

Category : Healthcare

Site Location : Léogâne, Haiti

CaringArchitecture is

Page 36: Shengxi's Portfolio

AFTER THE EARTHQUAKE

FAILED ROOF

CANOPY

The existing hospital on the Camejo campus partially collapsed during the earthquake on Jan. 12, 2010 while it was under construction. After initial analysis, we found more structural problems due to various factors. We were concerned about the safety, the longevity, as well as the potentially high cost for examining and reconstructing the integrity of the remaining concrete structure. Therefore, a new proposal is prefered.

The hospital building constructed on the CAMEJO campus prior to the Haitian earthquake was not designed to resist lateral loads. Failures occurred at column and beam connections. The building was still under construction at the time of the earthquake. The weight of the second floor slab and lack of shear stiffness were major factors in the failure of the second story.

The heavy canopy at the entrance/exit of the structure poses a significant risk of failure. The non-uniform design with lack of sufficient concrete cover over the rebar is a major concern. The temporary positioning of water tanks increases the potential of catastrophic failure.

COLUMNS AND BEAMSMany of the columns on the second floor were insufficiently constructed. Aggregates in the concrete appear too smooth and too large to form a strong bond. Poor consolidation of concrete in the formwork has left rebar exposed to weathering.

STRUCTURAL DETAILSThe information in the original drawing set for the hospital did not provide sufficient information for the contractor to construct a building that would resist lateral forces.

CEILING CONSTRUCTIONBesides the collapsed roof, the remaining ceiling is poorly constructed as well. CMUs are rotated, instead of aligning in the same direction. The connection between beam and roof slab is inadequate, according to the design drawings.

RESEARCH ON REMAINING STRUCTURE

Page 37: Shengxi's Portfolio

A NEW PROPOSAL

Main Road

Jan 24, 2010

Haiti’s construction Vernacular

Phase 1 Phase 2 Phase 3

Emergency TriageJan - April. 2010

Remaining Camejo Hospital

Intended Guest Parking and Accommodation

Cholera Screening/ Needs Assessment CenterFuture phase

Main Road

Education PavilionFuture phase Kay Famn Yo Women’s House

Complete on September 2012

New HospitalEmergency/Reception

EXISTING CAMPUS

PHASE CONSTRUCTION - NEW HOSPITAL

PROPOSED CAMPUS PLANThe goals for the design of the Camejo Health campus are to focus on the patient experience not only within the new hospital but also at the campus. We aim at developing an efficient construction system that will be easy to construct.

The new proposal for the Camejo Hospital serves as an alternative solution that focuses on building efficiency and cost effectiveness. Through re-organizing the campus and the existing program for the hospital, the new Camejo Health Campus will bring a sense of renewal and togetherness to the communities in Leogane.

Since available construction materials and budget are limited, phase construction becomes a traditional custom in Haiti. By breaking up the programs into several independent units, the hospital will deal with the local challenges and cater to the local construction vernacular.

The campus provides a welcoming and open feeling upon arrival. It is organized in a series of buildings, with the Kay Famn Yo Women’s House in the center (will be completed in September 2012). The Cholera Screening/Needs Assessment Center is located near the main campus entrance, so that patients with infectious illness will not affect the other patients and visitors on the Camejo Health Campus.

An Education Pavilion provides an open space for public health education and performance. The Main Hospital is located in the east end of the site to ensure privacy for patience. A green corridor (healing gardens in-between the buildings) unites the campus and provides opportunities for patients and visitors to enjoy outdoors and greeneries.

CAMEJO HEALTH CAMPUS PLANNINGMain Hospital Building and Proposed Future Phases

Page 38: Shengxi's Portfolio

KAY FAMN YO WOMEN’S HOUSE - CONSTRUCTION

With Dr. Charles and HoldenThe Owner and My Partner

Summer Trip to Haiti in 2014In front of Kay Famn Yo

Page 39: Shengxi's Portfolio

NEW HOSPITAL - PLAN

1 Reception and Waiting2 Security3 Triage/Consult Room4 Emergency Treatment5 Sonography/X-Ray6 Consult Room7 Changing Room8 Lab9 Courtyard10 Pre-/Post-Op11 Surgery12 Scrub13 Clean Room14 Soiled Room15 Laboratory16 Laboratory Work Room

17 Consult Room18 Staff Dormitory19 Caregiver Station20 Private Patient Room21 Large Patient Ward22 Inpatient Reception/Waiting23 Courtyard24 Elevator

GROUND FLOOR PLAN

Emergency Entrance

Public Road

Camejo Campus Private Road

A B C

A

B COutpatient Drop-off and Entrance

Inpatient Entrance

Page 40: Shengxi's Portfolio

NEW HOSPITAL - BUILDING SYSTEM

Concrete block wallsfinished with stucco

Felt underlayment

Sheathing

Light gauge steel truss

Outpatient Pavilion

Inpatient Pavilion

Corrugated metal roof panels

Roof underlayment

Sheathing

Light gauge steel truss and roof framing

Concrete bond beam

Ridge/Hip cap withcontinuous caulk at laps

Fasteners

Light gauge steel channels for interior ceiling finish

Foam enclosureand tape sealer

Eave flashing, endlaps with continuouscaulk at laps

Photovoltaic Panels Solar-powered batteries, stored in benches in the courtyard

Metal lath and scratch coats(interior stucco finish)

Roof metal panel

OUTPATIENT PAVILION ROOF SYSTEM

ROOF PANEL DETAIL D-D

D

D

SECTION A-A SECTION B-B SECTION C-C

Page 41: Shengxi's Portfolio

INTERIOR COURTYARD OF INPATIENT BUILDING

MAIN COURTYARD

ARRIVAL AND OUTPATIENT WAITING

Page 42: Shengxi's Portfolio

ARTIST VILLA- UNIVERSITY OF SHENZHEN, CHINA

Individual Project

Dec, 2009 UG

Sophomore Studio

Zhong Zhong

Residential

Shenzhen, China

Project Type :

Date :

Studio :

Instructor :

Category :

Site Location :

NatureArchitecture is

Page 43: Shengxi's Portfolio

SITE ANALYSISPEDESTRIAN WALK

SITE ACCESS

MAIN SITE

XIA WENSHAN LAKE

PUBLIC ACCESS

Wooden deck for pedestrian, quite busy during the school hours. Able to view the entire site.

Run across the site, with plants on both side. Need to push back to leave more space.

Heavily planted site. There are also several big trees. Considering preservation if possible.

Right in front of the site, providing excellent natural view.

One-way road for car. Very noisy during busy hours.

SITE PLAN 1/128” =1’- 0”

CLIMATE CONDITION

LANDSCAPE

ACOUSTIC AND PRIVACY

Page 44: Shengxi's Portfolio

INCORPORATE WITH NATURE

BETTER ACCESS

BETTER VIEW

Internal Circulation

External Circulation

PRIVATEStudio

Meeting

PrivateExhibition

PublicExhibition

ReceptionLiving Room

PUBLIC

SITEThis site is unexploited, thus was heavily planted. It faced Xia Wenshan Lake to its southwest, all these factors created a very natural, original scene

ISSUEThe required program is 300 sqm. If we stack programs and make a three-level houses, it would interrupt and discontinue the site

SOLUTIONIn order to prevent blockage, compressed the programs and extended on the lake. Thus preserve the continuity of the site

BENEFITSaving more spaces for greens, allows residents to access lake through extending deck. This contributes to better living experience and site preservation

Page 45: Shengxi's Portfolio

INCORPORATE WITH NATURE

1 Public Exhibition2 Living Room3 Reception4 Guest Room5 Studio6 Private Exhibition and Reading Room7 Research Room8 Main Bedroom9 Parking

PLAN PERSPECTIVE 1/12'' = 1' - 0"

SECTION A-A 1/24" = 1' - 0"

SECTION C-C 1/24" = 1' - 0"

SECTION B-B 1/24" = 1' - 0"

SECTION D-D 1/24" = 1' - 0"

MASTER PLAN 1/64" = 1' - 0"

ServiceEntrance

A

A

B

B

C

C

D

D

Entrance

Page 46: Shengxi's Portfolio

MAIN ENTRANCE VIEW

COURTYARD CORRIDORMEETING ROOM VIEWLIVING ROOM VIEW

Page 47: Shengxi's Portfolio

APPENDIX- INTERN AND OTHER WORK

PracticeArchitecture isURBANUS ARCHITECTURE & DESIGN, SHENZHEN, CHINAURBAN PLANNING PROJECT : DAYUN NAN COMMERCIAL DISTRICT PLANNING, SHENZHEN, CHINAGraphic design | Schematic Design | Concept development

INTERN WORKDAYUN NAN COMMERCIAL DISTRICT PLANNING

STADIUM RENOVATION OF THE 26TH SUMMER INTERNATIONAL UNIVERSIADE

FUTURE CITY – BAISHIzHOU REDEVELOPMENT

LONGHUA AIRPORT ADDITION

OTHER WORKDEPARTMENT OF ENERGY - STUDENT CHALLENGE HOME COMPETITION

POP-UP MODEL DESIGN - [ARCHITECTURE] IN THE AGE OF [DIGITAL] REPRODUCTION

WATERCOLORWATERCOLOR OF HAITI

Page 48: Shengxi's Portfolio

INTERN WORKURBANUS ARCHITECTURE & DESIGN, SHENZHEN, CHINARENOVATION PROJECT : STADIUM RENOVATION OF THE 26TH SUMMER INTERNATIONAL UNIVERSIADE, SHENZHEN, CHINAGraphic design | Schematic Design | Concept development

Page 49: Shengxi's Portfolio

URBANUS ARCHITECTURE & DESIGN, SHENZHEN, CHINAURBAN PLANNING PROJECT: FUTURE CITY - BAISHIZHOU REDEVELOPMENT, SHENZHEN, CHINAUrban Planning | Modeling | Concept development | Meeting with Clients

INTERN WORK

Page 50: Shengxi's Portfolio

URBANUS ARCHITECTURE & DESIGN, SHENZHEN, CHINAHISTORIC PRESERVATION PROJECT : LONGHUA AIRPORT ADDITION, SHANGHAI, CHINAFacade & Landscape design | Schematic Design | Concept development

INTERN WORK

Page 51: Shengxi's Portfolio

UNIVERSITY OF ILLINOIS AT URBANA CHAMPAIGNDEPARTMENT OF ENERGY - STUDENT CHALLENGE HOME COMPETITIONSite Analysis | Modeling | Concept development | Meeting with Engineer StudentsTeam Member: Anthony Dombrowski, Arnau Gascon, Shengxi Wu, Xinshi zheng, Nicholas FranzInstructor: Mark Taylor

ARCH576 - [ARCHITECTURE] IN THE AGE OF [DIGITAL] REPRODUCTIONA Pop-up Model in a BoxSelect Case: Folded Bridge by Axi:OmeInstructor: Erik Hemingway

OTHER WORK

Page 52: Shengxi's Portfolio

WATERCOLOR OF HAITISUMMER 2014

Page 53: Shengxi's Portfolio

ContactPhone: 217-419-4327Email : [email protected] #7 106 E Healey St Champaign, Illinois 61820United States of America

Permanent AddressRm 902 Unit 1 Bldg 9 Xiangxieli Garden Nongxuan Rd Futian District Shenzhen, 518040, Guangdong Peoples Republic of China