Top Banner
Copyright of Cansolv Technologies Inc SHELL CANSOLV DEPLOYING CCS WORLDWIDE PCCC2 Bergen, September 2013 Paul-Emmanuel Just R&D Team Lead Use this area for cover image (height 6.5cm, width 8cm) 1
24

SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Mar 06, 2018

Download

Documents

phungtruc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Copyright of Cansolv Technologies Inc

SHELL CANSOLV DEPLOYING CCS WORLDWIDE

PCCC2

Bergen, September 2013

Paul-Emmanuel Just

R&D Team Lead

Use this area for cover image (height 6.5cm, width 8cm)

1

Page 2: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Copyright of INSERT COMPANY NAME HERE

DEFINITIONS AND CAUTIONARY NOTE

2

Resources: Our use of the term “resources” in this presentation includes quantities of oil and gas not yet classified as SEC proved oil and gas reserves. Resources are consistent with the Society of Petroleum Engineers 2P and 2C definitions. The companies in which Royal Dutch Shell plc directly and indirectly owns investments are separate entities. In this presentation “Shell”, “Shell group” and “Royal Dutch Shell” are sometimes used for convenience where references are made to Royal Dutch Shell plc and its subsidiaries in general. Likewise, the words “we”, “us” and “our” are also used to refer to subsidiaries in general or to those who work for them. These expressions are also used where no useful purpose is served by identifying the particular company or companies. ‘‘Subsidiaries’’, “Shell subsidiaries” and “Shell companies” as used in this presentation refer to companies over which Royal Dutch Shell plc either directly or indirectly has control. Companies over which Shell has joint control are generally referred to “joint ventures” and companies over which Shell has significant influence but neither control nor joint control are referred to as “associates”. In this presentation, joint ventures and associates may also be referred to as “equity-accounted investments”. The term “Shell interest” is used for convenience to indicate the direct and/or indirect (for example, through our 23% shareholding in Woodside Petroleum Ltd.) ownership interest held by Shell in a venture, partnership or company, after exclusion of all third-party interest. This presentation contains forward-looking statements concerning the financial condition, results of operations and businesses of Royal Dutch Shell. All statements other than statements of historical fact are, or may be deemed to be, forward-looking statements. Forward-looking statements are statements of future expectations that are based on management’s current expectations and assumptions and involve known and unknown risks and uncertainties that could cause actual results, performance or events to differ materially from those expressed or implied in these statements. Forward-looking statements include, among other things, statements concerning the potential exposure of Royal Dutch Shell to market risks and statements expressing management’s expectations, beliefs, estimates, forecasts, projections and assumptions. These forward-looking statements are identified by their use of terms and phrases such as ‘‘anticipate’’, ‘‘believe’’, ‘‘could’’, ‘‘estimate’’, ‘‘expect’’, ‘‘goals’’, ‘‘intend’’, ‘‘may’’, ‘‘objectives’’, ‘‘outlook’’, ‘‘plan’’, ‘‘probably’’, ‘‘project’’, ‘‘risks’’, “schedule”, ‘‘seek’’, ‘‘should’’, ‘‘target’’, ‘‘will’’ and similar terms and phrases. There are a number of factors that could affect the future operations of Royal Dutch Shell and could cause those results to differ materially from those expressed in the forward-looking statements included in this presentation, including (without limitation): (a) price fluctuations in crude oil and natural gas; (b) changes in demand for Shell’s products; (c) currency fluctuations; (d) drilling and production results; (e) reserves estimates; (f) loss of market share and industry competition; (g) environmental and physical risks; (h) risks associated with the identification of suitable potential acquisition properties and targets, and successful negotiation and completion of such transactions; (i) the risk of doing business in developing countries and countries subject to international sanctions; (j) legislative, fiscal and regulatory developments including regulatory measures addressing climate change; (k) economic and financial market conditions in various countries and regions; (l) political risks, including the risks of expropriation and renegotiation of the terms of contracts with governmental entities, delays or advancements in the approval of projects and delays in the reimbursement for shared costs; and (m) changes in trading conditions. All forward-looking statements contained in this presentation are expressly qualified in their entirety by the cautionary statements contained or referred to in this section. Readers should not place undue reliance on forward-looking statements. Additional risk factors that may affect future results are contained in Royal Dutch Shell’s 20-F for the year ended December 31, 2012 (available at www.shell.com/investor and www.sec.gov ). These risk factors also expressly qualify all forward looking statements contained in this presentation and should be considered by the reader. Each forward-looking statement speaks only as of the date of this presentation, 19 April 2013. Neither Royal Dutch Shell plc nor any of its subsidiaries undertake any obligation to publicly update or revise any forward-looking statement as a result of new information, future events or other information. In light of these risks, results could differ materially from those stated, implied or inferred from the forward-looking statements contained in this presentation. We may have used certain terms, such as resources, in this presentation that United States Securities and Exchange Commission (SEC) strictly prohibits us from including in our filings with the SEC. U.S. Investors are urged to consider closely the disclosure in our Form 20-F, File No 1-32575, available on the SEC website www.sec.gov. You can also obtain these forms from the SEC by calling 1-800-SEC-0330.

Copyright of Cansolv Technologies Inc

Page 3: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

AGENDA

Shell Cansolv and Shell Projects

The Journey to Boundary Dam Project

Next Steps on CO2 Capture at Shell Cansolv

3 Copyright of Cansolv Technologies Inc

Page 4: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Copyright of Cansolv Technologies Inc

Developing CCS projects globally

CANSOLV AND SHELL PROJECTS

1.0

4

Page 5: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

ROYAL DUTCH SHELL & CANSOLV

NATURAL GAS: A DESTINATION FUEL

Exploration and production of hydrocarbon

50% oil / 50% gas

3.4 million BOE per day

80% of RDS net earnings & CAPEX

Production, supply distribution (retail) of petroleum products & chemicals

Trading

Maintain Shell Brand

Delivering major projects eg. > 500 mln CAPEX

Providing differentiating technologies to Upstream and DS business & key Shell partners

Shell Cansolv

UPSTREAM DOWNSTREAM

PROJECTS &

TECHNOLOY

Source: IEA World Energy Outlook, WoodMackenzie, Shell Interpretation

North America

South America

Europe Eurasia

Middle East

Africa Asia Pacific

Conventional O&G Resources

Unconventional O&G Resources

RDS 2012 Financial Results

CFFO – $46 Billions (B)

Net earnings – $25 B

Dividends Redust. $11 B

Net CAPEX $30 B

Fun facts

Total oil production 85 mmb/d

Canada #6 at 3.6 mmb/d

Canada second largest oil reserves in the world

5 Copyright of Cansolv Technologies Inc

Page 6: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Demonstration projects, joint industry partnerships

Industrial scale projects in construction

Industrial scale projects planned

Weyburn Midale

Otway

TCM

Gorgon

SHELL DEVELOPING CCS PROJECTS GLOBALLY

Peterhead

Shell involvement in CCS Projects;

Aberthaw

Boundary Dam

Industrial scale projects in operation

Quest

Shell Technology Operator: Saskpower

6

Page 7: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

SSE PETERHEAD – CCGT CO2 CAPTURE AND SEQUESTRATION

Completed Pre-FEED study for Scottish & Southern Energy

Project co-funded by DECC (UK)

Retrofit of a ~300MW CCGT to include CCS

Sequestration of CO2: Goldeneye (off-shore North Sea)

7 Copyright of Cansolv Technologies Inc

Page 8: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Copyright of Cansolv Technology Inc

CANSOLV CO2 CAPTURE UNIT AT LANXESS

Location: South Africa Scale: 170 tpd CO2 capture —90% removal Natural Gas Boilers —Not CCGT’s Construction complete: June 2013 Successful start-up: August 2013 CO2 generated for on-site use Strategy: Project makes client self-sufficient on steam and CO2

8 Copyright of Cansolv Technologies Inc

Page 9: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

COMPARISON BETWEEN CO2 AND SO2 CAPTURE PLANTS

9 Copyright of Cansolv Technologies Inc

Page 10: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Copyright of CansolvTechnologies Inc

4X

2X

SO2 CO2

COMPARISON BETWEEN CO2 AND SO2 CAPTURE PLANTS

0.0

100.0

200.0

300.0

400.0

500.0

600.0

700.0

Xstrata CEZ Lanxess ConocoPhillips DCU Coker DCU FCCU Chalco Boiler IOCL GDLY RWE Lanxess SaskPower SSE Peterhead

2001 2002 2002 2006 2006 2009 2012 2013 2012 2013 2013 TBD

Tota

l Ab

sorb

er C

ross

Sec

tio

nal

Are

a [m

2 ]

Concrete Concrete Concrete

10

Page 11: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Copyright of Cansolv Technologies Inc

Project Scope and Lessons learned

THE JOURNEY TO THE BOUNDARY DAM PROJECT

2.0

11

Page 12: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

SASKPOWER BD3 150MW SO2/CO2 CAPTURE

1,000,000+ tpy CO2 captured

CO2 sold to Cenevous for EOR

SO2 (~60 tpd) converted to acid & sold

Overall investment: CAD 1.24BB

Construction @ 85%+

Start-up will be early 2014

Page 13: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

CANSOLV SO2 / CO2 CAPTURE UNIT AT BD3 - THE PLAN

Intercooler

CO2 Intercooler Pumps

CO2 Rich Amine Pumps

Wash Water Pumps

Wash Water Cooler

Treated Flue Gas

CO2 Lean Amine Tank

Amine Purification Unit

Lean Amine CoolerFilter

Lean Amine Feed Pumps

CO2 Lean Amine Pumps

CO2 Stripper Condenser

CO2 To Compression

CO2 Lean / Rich Exchanger

CO2 Reflux Pumps

CO2 Reflux Accumulator

CO2 Steam

Reboilers

SO2 Stripper Condenser

SO2 To Acid Plant

SO2 Reflux Accumulator

SO2 Reflux Pumps

SO2 Lean / Rich Exchanger

SO2 Stripper

SO2 Lean Amine Pumps

SO2 Steam

Reboilers

Flue Gas From Pre-

Conditioning

Prescrubber Cooler

SO2 Rich Amine Pumps

Prescrubber Pumps

SO2 Caustic Polisher Pumps

SO2 Lean Amine Tank

Amine Purification Unit

Lean Amine CoolerFilter

Lean Amine Feed Pumps

Prescrubber Section

SO2 Absorber Section

SO2 Caustic Polisher Section

SO2 Absorber

Intercooled Section

Main Absorption Section

Water Wash Section

CO2 Absorber

CO2 Stripper

Booster Fan

Heat Recovery 1

Heat Recovery 2

13 Copyright of Cansolv Technologies Inc

Page 14: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

ABSORBER - BREAKDOWN

Prescrubber section (higher corrosion resistance zone) quenches gas and removes some dust, chlorides and fluorides

SO2 Absorber removes SO2

CO2 Absorber removes CO2

Water wash (cooled) is last line of defense – keeps amine from exiting the system

14 Copyright of Royal Dutch Shell plc Copyright of Cansolv Technologies Inc

Page 15: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

SASKPOWER BD3 : CO2 REGENERATOR

One of the largest strippers worldwide

5 large Compabloc reboilers

Equipped with MVR heat recovery

Constructed offsite

8 meters

15

Page 16: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

LESSON LEARNED #1: ABSORBER GEOMETRY Detailed engineering reviews done to

confirm compatibility and effectiveness, including:

• CFD analysis • Value Engineering • Aspen + design modeling • Estimate TIC Cost

comparison

Outcome: Design Validation

CFD analysis confirmed expected performance and mechanical design

Rectangular/Square geometry equivalent in process and superior in costs

Copyright of Royal Dutch Shell plc 16 Copyright of Cansolv Technologies Inc

Page 17: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

LESSON LEARNED #2: ABSORBER MOC

Detailed engineering reviews done to confirm compatibility and effectiveness, including:

• Review of past corrosion coupon

analysis • Vendor qualification • 3rd party specialist confirmations • Estimate TIC Cost comparison

OUTCOME: MOC SELECTED

Analysis and studies confirmed compatibility of alternate (to steel) MOC Concrete structure (with acid resistant lining) equivalent in process and superior in costs

Copyright of Royal Dutch Shell plc 17 Copyright of Cansolv Technologies Inc

Page 18: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

HSSE COMPONENT – EMISSION & OCCUPATIONAL

Shell Cansolv supporting clients/partners in their Permits to Operate

Complete mapping of emission points and stream characterization

Generation of consistent HSE package

based on laboratory testing for:

Toxicology

Environmental fate

Biodegradability

Compatibility with PPE

(gloves and cartridges)

Challenges: Lack of available data applicable for such a project

Outcomes: Data generated indicate that CANSOLV amine-based CO2 Capture system is eco-friendly and can be operated with low HSE risk

Copyright of Royal Dutch Shell plc 18

Ecotox Example: Chronic toxicity results reported as the LC50 (trout, daphnia) or EC50 (growth, yield for algae).

95% Confidence interval and NOEC reported in brackets where applicable.

Chemical

7-day Larval Growth & SurvivalPimephales promelas

3-brood Reproduction & Survival Ceriodaphnia dubia

Survival (LC50, mg/ L)

Growth (IC25, mg/ L)

Survival (LC50, mg/ L)

Reproduction (IC25, mg/ L)

Reproduction (NOEC, mg/ L)

Amine 1 > 100 > 100> 100 72.1

(53.7-89.5)25.0

Amine 2 > 100 > 100 > 100 > 100 > 100

Nitrosamine 1 > 100 > 100 > 10034.7

(11.7-60.4)12.5

Copyright of Cansolv Technologies Inc

Page 19: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

SASKPOWER BD3 150MW SO2/CO2 CAPTURE

Unique Cost savings features employed

Material on construction: Ceramic/carbon tile lined concrete absorbers & lean amine tank

Rectangular tower to save on plot space and optimize packing design/installation

Integrate Heat Recovery between SO2 and CO2 systems for ultimate energy performance

Unique plant permitting experience (operation & environmental)

Unique proven constructability: Only commercial scale project worldwide

Page 20: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

What else we’re doing…

NEXT STEPS IN CO2 CAPTURE

AT SHELL CANSOLV

20 Copyright of Cansolv Technology Inc Copyright of Royal Dutch Shell plc Copyright of Cansolv Technologies Inc

3.0

Page 21: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Copyright of Cansolv Technology Inc

TESTING STRATEGY FOR CO2 CAPTURE TECHNOLOGY

21

Sca

le (

ton

CO

2/da

y)

Discover Develop Demonstrate Deploy

Lab bench 0.05 1 - 10

50

3,300

AVU

Lab Pilot

Pilot External

Commercial

RWE Demo

LAB 170

Lanxess CISA

Copyright of Cansolv Technologies Inc

Page 22: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Copyright of INSERT COMPANY NAME HERE

PILOTING NEW DC-201 FOR CO2 AT NCCC, ALABAMA, USA

Copyright of Cansolv Technology Inc

Pilot unit: 10ton CO2/day (0.5MWe slipstream) Operated by the National Carbon Capture Center Absorber overall dimensions 35 m tall by 0.64 m OD diameter 3 packing sections of 6.1 m each 2 intercooling stages

Copyright of Royal Dutch Shell plc

Capacity: X2 over MEA

MEA 30 to 35wt%

-35 % over MEA

STEAM

13% CO2 in inlet gas

Copyright of Cansolv Technologies Inc 22

Page 23: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects

Carbonate Slurry – 3rd Generation Post Combustion Technology

Pilot plant Shell Technology Center Amsterdam, Capacity of pilot plant max 25 kg/d CO2

Demonstrated continuous operation for precipitating carbonate process

Energy efficiency confirmed for regeneration in the lower end of the 2.2 -4 MJ/kg through pilot plant operation and detailed process modeling

Additional energy efficiency improvements identified

23

Chemistry 1. CO2 (aq)+ H2O + CO3

2- 2 HCO3- 2. K++ HCO3

- KHCO3 k An accelerator is used to enhance mass transfer of CO2 to liquid phase

Copyright of Cansolv Technologies Inc

Page 24: SHELL CANSOLV DEPLOYING CCS WORLDWIDE pdfs/3_PCCC2-J… · Demonstration projects, joint industry partnerships . Industrial scale projects in construction . Industrial scale projects