Top Banner
Pleasant Grove High School 9531 Bond Road Elk Grove, CA 95624 JANUARY 14, 2016 6—8 PM SHELDON ROAD & BRADSHAW ROAD INTERSECTION IMPROVEMENT PROJECT
4

Sheldon & Bradshaw Intersection Handout

Jul 25, 2016

Download

Documents

Intersection Improvement Project
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Sheldon & Bradshaw Intersection Handout

Pleasant Grove High School9531 Bond Road

Elk Grove, CA 95624

JANUARY 14, 20166—8 PM

SHELDON ROAD & BRADSHAW ROAD

INTERSECTION IMPROVEMENT PROJECT

Tom Metcalf (916) 478-2281 [email protected]

City of Elk Grove Public Works Department 8401 Laguna Palms Way Elk Grove, CA 95758

CONTACT US

ROUNDABOUT INTERSECTION

ROUNDABOUT INTERSECTION OPTION

SIGNAL INTERSECTION OPTION

Sheldon RoadSheldon Road

Bra

dsh

aw R

oad

Bra

dsh

aw R

oad

Sheldon RoadSheldon Road

Bra

dsh

aw R

oad

Bra

dsh

aw R

oad

LEGEND:

Proposed Roadway

Proposed Paths

LEGEND:

Proposed Roadway

Proposed Paths

Page 2: Sheldon & Bradshaw Intersection Handout

WHAT IS BEING PROPOSED?

Improvements to the intersection of Sheldon Road and Bradshaw Road are planned because threshold values for increased traffic have been met, per the process outlined in the Rural Road Improvement Policy and Standards.

Based on community input and City Council direction, two options are being considered for the intersection: a signal or a roundabout. All proposed designs, currently 35% complete, take into consideration design preferences expressed in the Rural Road Improvement Policy and Standards.

Tonight we would like to get your input on these designs and understand your design preferences.

This Open House meeting is being held to provide the public an opportunity to review the proposed project, view project designs (currently 35% complete), obtain the latest information about the project, ask questions, and offer input to the project team.

WHAT IS THE PURPOSE OF THIS MEETING?

WHAT IS THE PLAN FOR THE EVENING?

6—8 PM OPEN HOUSE Sign in, review displays, provide input, ask questions, and enjoy refreshments

6:30—7 PM PRESENTATION Learn more about the project details.

SIGNAL PROJECT COST = $6.1M$5.2M in federal funds$900K in City funds

ROUNDABOUT PROJECT COST = $7.9M$5.2M in federal funds$2.7M in City funds

WHAT IS THE PROJECT SCHEDULE?

WHAT WILL THIS PROJECT COST?

November 30, 2011 First Open House with the entire Rural Roads area invited to provide input on intersection alternatives to be considered

June 13, 2012 City Council directed to proceed with a signal and a roundabout design

November, 2015 • Design advanced to the 35% level • Environmental field studies completed • Environmental technical reports approved by Caltrans (federal funding requirement)

December, 2015 City environmental document (IS/MND) completed and circulated for public review/comment

January 14, 2016 Community Open House

January 27, 2016 City Council Meeting

Summer 2016 Federal environmental documents approved by Caltrans and FHWA

Early 2017 Community Open House

Summer 2017 Right-of-way acquisition completed

Summer 2017 Final design completed

Fall 2017 Advertise for construction

Late 2017—2018 Construction

DATE MILESTONE

Here we are today!

Page 3: Sheldon & Bradshaw Intersection Handout

WHAT IS BEING PROPOSED?

Improvements to the intersection of Sheldon Road and Bradshaw Road are planned because threshold values for increased traffic have been met, per the process outlined in the Rural Road Improvement Policy and Standards.

Based on community input and City Council direction, two options are being considered for the intersection: a signal or a roundabout. All proposed designs, currently 35% complete, take into consideration design preferences expressed in the Rural Road Improvement Policy and Standards.

Tonight we would like to get your input on these designs and understand your design preferences.

This Open House meeting is being held to provide the public an opportunity to review the proposed project, view project designs (currently 35% complete), obtain the latest information about the project, ask questions, and offer input to the project team.

WHAT IS THE PURPOSE OF THIS MEETING?

WHAT IS THE PLAN FOR THE EVENING?

6—8 PM OPEN HOUSE Sign in, review displays, provide input, ask questions, and enjoy refreshments

6:30—7 PM PRESENTATION Learn more about the project details.

SIGNAL PROJECT COST = $6.1M$5.2M in federal funds$900K in City funds

ROUNDABOUT PROJECT COST = $7.9M$5.2M in federal funds$2.7M in City funds

WHAT IS THE PROJECT SCHEDULE?

WHAT WILL THIS PROJECT COST?

November 30, 2011 First Open House with the entire Rural Roads area invited to provide input on intersection alternatives to be considered

June 13, 2012 City Council directed to proceed with a signal and a roundabout design

November, 2015 • Design advanced to the 35% level • Environmental field studies completed • Environmental technical reports approved by Caltrans (federal funding requirement)

December, 2015 City environmental document (IS/MND) completed and circulated for public review/comment

January 14, 2016 Community Open House

January 27, 2016 City Council Meeting

Summer 2016 Federal environmental documents approved by Caltrans and FHWA

Early 2017 Community Open House

Summer 2017 Right-of-way acquisition completed

Summer 2017 Final design completed

Fall 2017 Advertise for construction

Late 2017—2018 Construction

DATE MILESTONE

Here we are today!

Page 4: Sheldon & Bradshaw Intersection Handout

Pleasant Grove High School9531 Bond Road

Elk Grove, CA 95624

JANUARY 14, 20166—8 PM

SHELDON ROAD & BRADSHAW ROAD

INTERSECTION IMPROVEMENT PROJECT

Tom Metcalf (916) 478-2281 [email protected]

City of Elk Grove Public Works Department 8401 Laguna Palms Way Elk Grove, CA 95758

CONTACT US

ROUNDABOUT INTERSECTION

ROUNDABOUT INTERSECTION OPTION

SIGNAL INTERSECTION OPTION

Sheldon RoadSheldon Road

Bra

dsh

aw R

oad

Bra

dsh

aw R

oad

Sheldon RoadSheldon Road

Bra

dsh

aw R

oad

Bra

dsh

aw R

oad

LEGEND:

Proposed Roadway

Proposed Paths

LEGEND:

Proposed Roadway

Proposed Paths