179 180 180 171 171 171 171 171 171 179 179 179 178 178 178 177 177 177 177 177 176 176 176 176 176 175 175 175 175 175 174 174 174 174 174 174 173 173 173 173 173 173 173 173 173 173 173 173 173 173 173 172 172 172 172 172 172 172 172 172 172 172 172 170 1 174 174 178 174 174 174 174 174 174 174 174 174 174 174 173 173 900 950 1000 1050 1100 1150 1200 VF - (96) VF - (97) 850 900 950 1000 1050 1100 1150 1200 -2.50% -2.50% -2.50% 0.00% 3.50% -3.50% 3.50% -3.50% -2.50% -2.50% 0.00% -2.50% 2.50% -2.50% 2.50% -2.50% Indicative alignment of existing fenceline, re-aligned since survey undertaken Fs 3 No. FS 3 No. FS 3 No. FS 4 No. FS 2 No. FS 3 No. FS 5 No. FS 164 164 164 164 164 165 165 165 165 165 164 164 164 164 164 163 163 163 163 161 161 162 162 162 162 162 162 162 162 161 161 161 161 161 161 160 171 171 171 163 163 163 163 163 163 162 162 162 162 162 164 164 164 164 163 163 163 163 163 163 163 4 164 164 164 164 165 165 165 166 166 166 166 170 170 170 169 169 169 168 168 168 168 167 167 167 167 167 166 166 166 166 163 165 167 166 166 166 166 165 165 165 165 164 163 163 163 163 165 167 161 500 550 600 650 700 750 800 850 00 50 88 00 50 100 106 00 50 68 500 550 600 650 700 750 800 850 -2.50% -2.50% 5.00% -5.00% 5.00% -5.00% 0.00% -2.50% 0.00% -2.50% 2.50% -2.50% 2.50% -2.50% -5.00% 5.00% -5.00% 5.00% -2.50% -2.50% -2.50% 0.00% % -2.50% 2.50% -2.50% 2.50% 00 50 88 00 50 100 106 00 50 68 2 No. FS 4 No. FS 7 No. FS 4 No. FS 4 No. FS 184 189 181 182 183 185 186 187 188 191 189 189 190 192 192 1200 1250 1300 1350 1400 1200 1250 1300 1350 1400 1409 -2.50% -2.50% 0.00% -2.50% 2.50% -2.50% -2.50% -2.50% 1 No. Fs 2 No. Fs 3 No. Fs 2 No. Fs 2 No. Fs Scale Date Revision Project No Drawing No Drawing Title Project J:\21000-21999\21100-21199\21199 - Hightown Quarry, Belfast\A4 - Dwgs & Registers\Landscape\21199 Landscape Proposals Plans.dwg - Sheet 6 - L21 Check by Drawn by bartonwillmore.co.uk Certificate FS 29637 Offices at Birmingham Bristol Cambridge Cardiff Ebbsfleet Edinburgh Glasgow Leeds London Manchester Newcastle Reading Southampton Planning ● Master Planning & Urban Design ● Architecture ● Landscape Planning & Design ● Environmental Planning ● Graphic Communication ● Public Engagement ● Development Economics Client Becon Consortium N Key Plan 21199 Residual Waste Project Hightown Quarry, Ballyutoag L21 Landsape Proposals Plan Sheet 6 of 9 04.02.2019 1:500 @A1 K ML JB 1:1,000 @A3 Reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO. Crown Copyright Reserved. Licence No. 100019279. The scaling of this drawing cannot be assured Revision Date Drn Ckd A B C D E F G H I J K Arboricultural Input Added regenerating grass Revised road alignment Revised visibility splays and field entrances Revised road / fence alignment Arboricultural Input Updated road alignment Field Access Graphics Updated road alignment Update Hedgerow alignment Update fence line alignment 02.01.13 18.01.13 05.08.13 04.10.13 31.10.13 26.11.13 29.08.14 30.09.14 10.12.18 18.12.18 25.01.19 ML ML ML ML ML ML ML ML ML SS SS C PC PC PC PC PC PC PC CM CM CM 0 10 20 5 15 25m Application Site Boundary Existing Vegetation to be Retained Proposed Specimen Trees Proposed Structural Woodland Mix Existing Roadside Hedgerow to be Retained Proposed Roadside Hedgerow Notes: For planting notes and schedules refer to Sheet 9, drawing L23. For site layout refer to Atkins drawing GE-C-BOG-XX-02. For road layout and visibility splays refer to Atkins drawing GE-C-BOG-XX-07. For roadway levels see Atkins proposed sections (Series) Proposed Stock-Proof Fence To Engineers Specification Proposed Roadside Wildflower Seeding British Seed Houses RE1 Traditional Hay Meadow or similar Existing Watercourse to be Retained / Diverted LEGEND FOR ROAD Proposed Field Gate Proposed Roadway (by Others) Existing Vegetation to be Removed Proposed Footway (by Others) 3m Offset to Proposed Junction Visibility Splays Proposed Junction Visibility Splays Proposed Embankment Chainage (from Hydepark Road) 0.00 10.00 N