SHEAR REINFORCEMENT Ved = 55.255 kN Vrd= 233.798 kN for 45 degree 161.018 kN for 22 degree If Ved < Vrd,max Asw/s= Ved/(0.78(fyk)(d)(cotϴ) 0.173 spacing,s Asw/(Asw/s) 328 Max spacing= 0.75d= 0.75x 328 246 SHEAR REINFORCEMENT Ved = 86.259 kN Vrd= 225.245 kN for 45 degree 155.127 kN for 22 degree If Ved < Vrd,max Asw/s= Ved/(0.78(fyk)(d)(cotϴ) 0.280 spacing,s Asw/(Asw/s) 202 (0.36(bw)(d)(fck)(1-fck/250))/(cotϴ+tanϴ) cotϴ=2.5, use cotϴ=2.5, and calculate the shea (0.36(bw)(d)(fck)(1-fck/250))/(cotϴ+tanϴ) cotϴ=2.5, use cotϴ=2.5, and calculate the shea
21

Shear and Tranverse Design

Feb 01, 2016

Download

Documents

Ikram Rimli

rc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Shear and Tranverse Design

SHEAR REINFORCEMENT

Ved = 55.255 kNVrd=

233.798 kN for 45 degree

161.018 kN for 22 degree

If Ved < Vrd,max

Asw/s= Ved/(0.78(fyk)(d)(cotϴ)0.173

spacing,s= Asw/(Asw/s)328

Max spacing= 0.75d= 0.75x 328 246 use H6-225

SHEAR REINFORCEMENT

Ved = 86.259 kNVrd=

225.245 kN for 45 degree

155.127 kN for 22 degree

If Ved < Vrd,max

Asw/s= Ved/(0.78(fyk)(d)(cotϴ)0.280

spacing,s= Asw/(Asw/s)202

(0.36(bw)(d)(fck)(1-fck/250))/(cotϴ+tanϴ)

cotϴ=2.5, use cotϴ=2.5, and calculate the shear reinforcement as follows:

(0.36(bw)(d)(fck)(1-fck/250))/(cotϴ+tanϴ)

cotϴ=2.5, use cotϴ=2.5, and calculate the shear reinforcement as follows:

Page 2: Shear and Tranverse Design

Max spacing= 0.75d= 0.75x 316 237 mm use H6-200

SHEAR REINFORCEMENT

Ved = 44.422 kNVrd=

233.798 kN for 45 degree

161.018 kN for 22 degree

If Ved < Vrd,max

Asw/s= Ved/(0.78(fyk)(d)(cotϴ)0.139

spacing,s= Asw/(Asw/s)407

Max spacing= 0.75d= 0.75x 328 246 use H6-225

SHEAR REINFORCEMENT

Ved = 86.259 kNVrd=

225.245 kN for 45 degree

155.127 kN for 22 degree

If Ved < Vrd,max

Asw/s= Ved/(0.78(fyk)(d)(cotϴ)0.280

spacing,s= Asw/(Asw/s)202

(0.36(bw)(d)(fck)(1-fck/250))/(cotϴ+tanϴ)

cotϴ=2.5, use cotϴ=2.5, and calculate the shear reinforcement as follows:

(0.36(bw)(d)(fck)(1-fck/250))/(cotϴ+tanϴ)

cotϴ=2.5, use cotϴ=2.5, and calculate the shear reinforcement as follows:

Page 3: Shear and Tranverse Design

Max spacing= 0.75d= 0.75x 316 237 use H6-200

SHEAR REINFORCEMENT

Ved = 55.255 kNVrd=

233.798 kN for 45 degree

161.018 kN for 22 degree

If Ved < Vrd,max

Asw/s= Ved/(0.78(fyk)(d)(cotϴ)0.181

spacing,s= Asw/(Asw/s)313

Max spacing= 0.75d= 0.75x 328 246 use H6-225

(0.36(bw)(d)(fck)(1-fck/250))/(cotϴ+tanϴ)

cotϴ=2.5, use cotϴ=2.5, and calculate the shear reinforcement as follows:

Page 4: Shear and Tranverse Design

Ved= 55.255 Med,max= 1.88bw= 150 z= 312d= 328fck= 30cotϴ= 1 ϴ= 0.785 45 Additional longitudinalcotϴ= 2.5 ϴ= 0.384 22fyk= 500 ∆Ftd =hf 125 69.07L 3600 tan 45 = 1b 1158 tan 22 = 0.404 Med,max/z 6.026fctm = 2.9

As,req= ∆Ftd/0.87(fyk)158.78

try link = H6 = Asw= 56.6 mm

Ved= 86.259 Med,max= 51.136bw= 150 z= 281d= 316fck= 30cotϴ= 1 ϴ= 0.785 45 Additional longitudinalcotϴ= 2.5 ϴ= 0.384 22fyk= 500 ∆Ftd =hf 125 107.82L 3600 tan 45 = 1b 1158 tan 22 = 0.404 Med,max/z 181.979fctm = 2.9

As,req= ∆Ftd/0.87(fyk)247.87

try link = H6 = Asw= 56.6 mm

0.5(Ved)(cotϴ)

0.5(Ved)(cotϴ)

Page 5: Shear and Tranverse Design

Ved= 44.422 Med,max= 21.218bw= 150 z= 312d= 328fck= 30cotϴ= 1 ϴ= 0.785 45 Additional longitudinalcotϴ= 2.5 ϴ= 0.384 22fyk= 500 ∆Ftd =hf 125 55.53L 3600 tan 45 = 1b 1158 tan 22 = 0.404 Med,max/z 68.006fctm = 2.9

As,req= ∆Ftd/0.87(fyk)127.65

try link = H6 = Asw= 56.6 mm

Ved= 86.259 Med,max= 52.067bw= 150 z= 279d= 316fck= 30cotϴ= 1 ϴ= 0.785 45 Additional longitudinalcotϴ= 2.5 ϴ= 0.384 22fyk= 500 ∆Ftd =hf 125 107.82L 3600 tan 45 = 1b 1158 tan 22 = 0.404 Med,max/z 186.620fctm = 2.9

As,req= ∆Ftd/0.87(fyk)247.87

try link = H6 = Asw= 56.6 mm

0.5(Ved)(cotϴ)

0.5(Ved)(cotϴ)

Page 6: Shear and Tranverse Design

Ved= 57.852 Med,max= 1.88bw= 150 z= 310d= 328fck= 30cotϴ= 1 ϴ= 0.785 45 Additional longitudinalcotϴ= 2.5 ϴ= 0.384 22fyk= 500 ∆Ftd =hf 125 72.32L 3600 tan 45 = 1b 1158 tan 22 = 0.404 Med,max/z 6.065fctm = 2.9

As,req= ∆Ftd/0.87(fyk)166.24

try link = H6 = Asw= 56.6 mm

0.5(Ved)(cotϴ)

Page 7: Shear and Tranverse Design

Asw/s= Ved/(0.78(fyk)(d)(cotϴ)0.17

spacing,s= Asw/(Asw/s)330

Max spacing= 0.75d= 0.75x 328246

If Vrd,max cotϴ=2.5<Ved<Vrd,max cotϴ=1.0

Page 8: Shear and Tranverse Design

Ved= 55.255bw= 150d= 328fck= 30cotϴ= 1 ϴ= 0.7854 45cotϴ= 2.5 ϴ= 0.38397 22fyk= 500

try link = H6= Asw= 57175

Page 9: Shear and Tranverse Design

Minimum link=Asw/s= 0.08(fck)^(1/2)(bw)/(fyk)

0.131

spacing,s= Asw/(Asw/s)430.5708 <0.75d= 246

use = 225 mm

Shear resisitance of minimum linksVmin= (Asw/s)(.78(fyk)(d)(cotϴ)

80.447

Page 10: Shear and Tranverse Design

bw= 150d= 328fck= 30cotϴ= 1 ϴ= 0.7854 45cotϴ= 2.5 ϴ= 0.38397 22fyk= 500

try link = H6= Asw= 56.6275

Page 11: Shear and Tranverse Design

Transverse steel in flange

∆x= (1675/2)837.5

∆M= (46.53-28.922x0.5x0.8375)34.419

the change in logitudinal force,

∆Fd= (∆M/(d-0.5hf)((b-bw)/2b))59.09

longitudinal shear stress

Ved= ∆Fd/(hf(∆x))0.56

Ved > 0.27(fctk) = 0.54 N/mm2 Therefore transverse reinforcement required

Page 12: Shear and Tranverse Design

hf= 125L= 1675bw= 150d= 316fck= 30cotϴ= 1 ϴ= 45cotϴ= 2 ϴ= 26.5fyk= 500b= 1158fctk = 2

Therefore transverse reinforcement required

Page 13: Shear and Tranverse Design

if Ved<= 0.27fctk

no required transverse (step 4)

Asf/sf == 0.08

try link : H10= Asf= 79spacinf, sf= Asf/(Asf/sf)

974

Ved(hf)/0.87(fyk)(cotϴf)

Page 14: Shear and Tranverse Design

L= 3600Ved= 55.255bw= 150d= 328fck= 30cotϴ= 1 ϴ= ϴ=cotϴ= 2 ϴ= ϴ=fyk= 500b= 1158hf= 125

Page 15: Shear and Tranverse Design

if Ved > 0.27fctk required transverse

45Vedmax=

5.28

26.5Vedmax= 4.22

Ved< 4.22Ved< 5.28

therefore use angle = 26.5

Asf/sf == 0.08

try link : H6= Asf= 28.3spacinf, sf=Asf/(Asf/sf)

349

minimum transverse

As,min= 0.26(b)(hf)(fctm)/fyk use b= 1000= 0.26(fctm/fyk)(b)(hf)= 0.0015 bhf > 0.0013bhf Therefore use == 189

0.40(fck)(1-(fck/250))/(cotϴf+tanϴf)

Ved(hf)/0.87(fyk)(cotϴf)

Page 16: Shear and Tranverse Design

L= 3600Ved= 55.255bw= 150d= 328fck= 30cotϴ= 1 ϴ= 45 tanϴ= 1cotϴ= 2 ϴ= 26.5 tanϴ= 0.5fyk= 500b= 1158hf= 125fctm= 2.9

H6-150(189mm2)

Page 17: Shear and Tranverse Design

Med,max= 207z= 428.9

Additional longitudinal

∆Ftd =55.26

Med,max/z = 482.63

As,req= ∆Ftd/0.87(fyk)127.02

0.5(Ved)(cotϴ)