Sharing Best Practices

PMMAI – 25th July 2014Ahmedabad

Page 2: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

What do we think, when we hear Indian Quality?

•April 19, 2023 2

Aesthetics

TechnologyLong Lasting

Performance

Reliability

Capability!!

Value addition?

Page 3: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Why should I do business with you?

3

Page 4: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Current State to Future StatePresent Assessment 3-year Objective (2016)

Manufacturing Capacity1,500 machines per annum

Cost reduction & product innovation

Driven by FMI for self & suppliers

Standard operating process (SOP)Preparation, validation & implementation by FMI

Quality, Reliability & Aesthetic improvement FMI driven improvement initiativesInitiated DMAIC for improvements

Territories ServedIndia, SAARC, Middle East, Africa & USA

Manufacturing Capacity2,500 machines per annum

Cost reduction & product innovation

Self Initiatives from Strategic partnersVendors based adjacent/near to FMI

Standard operating process (SOP)Supplier driven SOP

Quality, Reliability & Aesthetic improvement Zero defect parts & improvement plans by suppliers

Additional Territories ServedEast Europe, Latin America, South East Asia

Improvements & Innovations initiated at FMI

Improvements & Innovations at Strategic partners with FMI

Page 5: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Process Improvement . . . . A Journey

Get Fast! . . .or Go Broke!

Page 6: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Process Improvement House

Page 7: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Organization Concerns

House Keeping not up to Expectations.

Poor Safety.

Gangways cramped with machines.

Material storage issues.

Stock Discrepancy and material damage issues.

Lack of Space.

Material stored directly on floor and at undefined areas.

Raw material yard also not organized.

Page 8: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Higher lead times.

Lack of ownerships.

Lack of Self initiating.

Slow rate of Productivity of machines.

Fire fighting in all areas.

Inward Quality issues.

Plug & Produce index not improving.

Organization Concerns

Page 9: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Goal – Operational Excellence

Path – Best Practices

9

Page 10: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Modern Manufacturing Facility

Page 11: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Bring Customers closer – they are the best critics

Page 12: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Project: “PARIVARTAN” (Change)

Objective: To Make FMIPL a World Class Organization.

Launched On: 17th January 2012.

Sustained From : 31st December 2012.

Progress Update :

1S Initiated from 18th January till 31st March 2012.

2S Initiated from 18th April till 31st August 2012.

3S Launched on 2nd October 2012 & in practice.

4S FMIPL Company Standards Released on 31st Dec. 2012.

5S In practice and self Sustaining mode from 31st Dec. 2012.

5S

Page 13: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Parivartan - 5S Initiative Launched on 17th Jan 12

Page 14: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

5S Parivartan

AFTERBEFORE

Page 15: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

AFTERBEFORE

5S Parivartan

Page 16: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

AFTERBEFORE

5S Parivartan

Page 17: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

AFTERBEFORELife with “3S”

5S Parivartan

Page 18: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

AFTERBEFORELife with “3S”

5S Parivartan

Page 19: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Material Handling - Improvements

AFTERBEFORE

Page 20: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Material Handling - Improvements

AFTERBEFORE

5S Parivartan

Page 21: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

All fixtures and spanners arranged in master base O-80 to 250

AFTERBEFORE

5S Parivartan

Page 22: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Fabrication Kit Movement Trolley

AFTERBEFORE

5S Parivartan

Page 23: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Mega Cleaning

5S Parivartan

Page 24: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Mega Cleaning

5S Parivartan

Page 25: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Money Saved

Year

Lean Saving in INR Lacs

5S Recovery

in INR Lacs

Total Value in INR Lacs

2012 42.8 66.1 108.9

2013 46.8 58.7 105.5

2014 till Date

11.9 37.3 49.2

YearRed Tag

Items

Transferred Location

Scraped Parts

Obsolete Parts

2012 1227 180 510 183

2013 763 34 991 48

2014till Date

543 56 TBD 56

Space saved

5S Parivartan

Page 26: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

•Lost Time Injury Incidence Rate

•G

oo

d

•28

Page 27: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Project: SIX SIGMA

Objective: To Make FMIPL a World Class Organization through process driven approach.

Launched On: 5th April 2013.

Progress Update SIX SIGMA:

First batch of Green Belt Training covered in 3 sessions for selected 26 Participants.

DMAIC Approach training as per Six Sigma methodology imparted.

8 Improvements projects identified and these are in Purchase / Assembly / Quality

with a aim of improvement in processes of Procurement / Quality / Manufacturing

& Productivity.

Subsequently based on the progress and implementation of these projects the Black

Belt Training would be imparted and thereafter the improvement projects would be

worked upon.

•29

Page 28: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Sr # Project Title Area Of ProjectData Reference

Period in months

Improvement Period in months

Expected Savings in INR Lacs

Actual Savings In in INR Lacs

1Reduce variation in Actual Lead time V/S Planned Lead time Mentioned in MRP for Bought out parts

Purchase / OEC / Stores Jan'12-Jun'13 Aug'13-Dec'13 44.0 53.7

2 Reduction in Inventory and no shortages in injection cell.

Purchase / OEC / Stores July'13-Aug'13 Jul'13 to Dec'13 5.8 1.9

3 Reduction in YRI hours in Injection cell. Injection Cell Jan'13-Jun'13 Jul'13 to Dec'13 5.2 1.8

4 Reduction in PDF of Injection cell Quality Jan'12-Jun'13 Jul'13 to Dec'13 3.2 3.0

5 Reduce electrical issues at machine run off start up Electrical Cell Jan'12-Jun'13 Jul'13 to Dec'13 9.9 1.3

Final Savings 68.0 61.7

Project Savings Expected V/s Actual Savings Achieved

•30

Page 29: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Value Engineering Project

MT / Nova 110 / Hydron100 = 94 Machines / Q3+Q4--2014.

MT / Nova / Hydron 150 = 135 Machines / Q3+Q4--2014.

Total Savings / Year = 229 * 8560 = Rs. 19.6 Lacs

VE

• For MT 150 Gates & Guarding – Value Engineering of Raw material, variety

reduction, Assembly Time Reduction Leading to cost saving.

•31

Page 30: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Project : TPM

Objective: To Make FMIPL a World Class Organization through process driven approach.

Launched On: 5th April 2013.

Progress Update TPM:

First batch of TPM Training covered in 2 sessions for selected 15 Participants.

The Team comprises of Cell Supervisor/Machine Operator/Mechanical & Electrical Fitter and maintenance manager.

3 Machines and 1 Utility machine selected for the first prototype approach.

Changed the daily method of logging of stoppages on these machines and revised the breakdown maintenance logs.

Initiated the red tagging of the machine and the as per the training of 16 types of losses the tags affixed by the team.

TPM

•32

Page 31: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Quality

Page 32: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

ISO 9001:2008 ISO 14001:2004

Adhering to World Class Quality Standards

Export House StatusServing over 40 Countries across the World including USA

Accreditations

•34

Page 33: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Where are we?

We are not meeting our commitments to Customers

We need...

deep thinkingcreativity

determinationand resolve…

To go from…

VALUE CRISIS to VALUE CREATION

•April 19, 2023 33

Page 34: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Make it happen!

We are all an integral part of the journey!

Our Role, My Role?

34

Page 35: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

35

Page 36: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

WE CAN, WE WILL

•April 19, 2023 36

Page 37: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Questions?

37

Page 38: Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.

Thank You

38