Integrating Measurements through the Construction Cycle of Shale Wells
Aug 07, 2015
Integrating Measurements through the
Construction Cycle of Shale Wells
What happens when you assume the “frac will get it”
8 Month Cum vs # of Stages (Entire Play)8 Month Cum vs # of Stages (Core Area)8 Month Cum vs # of Stages (Bull Bayou Field)
2
Modeland, N., Buller, D. and Chong, K.K. 2011. Statistical Analysis of Completion Methodology on Production in the Haynesville Shale. Paper SPE 144120 presented at the SPE North American Unconventional Gas Conference and Exhibition, The Woodlands, Texas, 14-16 June
Old ProblemOld Solution
$0.30
$0.40
$0.50
$0.60
$0.70
$0.80
Fra
c F
ind
ing
Co
sts
, $/E
UR
mcf
Pre-Reservoir Description Usage
Average = $0.21 STD Dev = $0.18
Post-Reservoir Description Usage
Average = $0.10 STD Dev = $0.05
Fig. 10 - Frac Finding Costs for Project Wells
$-
$0.10
$0.20
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
Well List
Fra
c F
ind
ing
Co
sts
, $/E
UR
mcf
SPE 39918 Schubarth et al. 1998
Drill an Evaluation Well
� Drilling: Efficient Wellbore Construction
� Logging: Characterize the Reservoir
� PE: Define the Target
Drill a Horizontal / High Angle Well
� Drilling: LWD Logging, Chemostratigraphy,
Geosteering, Real Time Reservoir Characterization
Complete the Well
� Optimize Zonal Isolation
� Instrument Completion String
Stimulate the Well
� Optimize each stage with appropriate stimulation
design
� Monitor Each Stage in real time
Monitor Results
� Instrumented Completion
� PLT logging
Shale Brittleness Index
Rickman et al. Paper SPE 115258
Brittleness Index vs Gas Production
Post Frac Production Log – day 45, well flowing 9MM
Buller, D., Suparman, F., Kwong, S., Spain, D. and Miller, M. 2010. A Novel Approach to Shale-Gas Evaluation Using a Cased-Hole Pulsed Neutron Tool. Presented at the SPWLA 51st Annual Logging Symposium held Perth, Australia, June 19-23
BP George A9H
Buller, D., Hughes, S., Market, J., Petre, E., Spain, D., and Odumosu, T. 2010. Petrophysical Evaluation for Enhancing Hydraulic Stimulation in Horizontal Shale Gas Wells.
Paper SPE 132990 presented at the SPE Annual Technical Conference and Exhibition held in Florence, Italy, 19–22 September.
BP CGU 13-17H
Prop
62.2%
Prop
85.3%
Prop 79% Prop 29.5% Prop
2.6%
Prop 89.5% Prop
100%
Prop
3%
Prop
55.4%
Prop 35%
XX XX
BP George A9H – 9 of 10 Water Fracs Placed – PL rate 8.2 MMCF/D
BP CGU 13-17H – 6 of 10 Fracs Placed > 50% – PL rate 4.5 MMCF/DBP CGU 13-17H – 6 of 10 Fracs Placed > 50% – PL rate 4.5 MMCF/D
Horizontal PNL CHI Model Shalelog – Haynesville Shale
Brittleness Index, Fracture Ease, Effective Porosity, Free Gas, & TOC
CHI Model Triple Combo Data CHI Model Triple Combo Data
Horizontal In & Out of Primary
Target Interval
Free Gas
Stress
Fracture
Ease
Brittleness Index
LithologyEffective
Porosity
CHI Model Triple Combo Data CHI Model Triple Combo Data
Buller, D., Suparman, FNU., Kwong, S., Spain, D., and Miller, M. 2010. A Novel Approach to Shale-Gas Evaluation Using a Cased-Hole Pulsed Neutron Tool. SPWLA Paper 87257 presented at the SPWLA 51st Annual Logging Symposium, Perth, Australia, 19-23 June.
Horizontal PNL CHI Model Shalelog – Haynesville
Shale
Evenly spaced stages Unevenly spaced stages
XX XX
Shale Completion Strategy: Based on
Formation Brittleness Index & Liquid Production
SPE 115258
ProppantProppant
ExtrudedShale
Shale Stimulation Strategy
19
Shale / Prop Interface
Summary and Conclusion • Shale reservoirs are statistical plays
� Current Practice has limitations
• Well placement strategy dictated by geomechanics
� Real Time Sonic
• Geosteering enhances production by maximizing
20
• Geosteering enhances production by maximizing fracable reservoir contact
• Data acquired while drilling has a long shelf life
� Data used in completion and stimulation optimization
Thank You
Спасибо
Gracias
Merci
谢谢你Grazie
TakkTakk
�ًا ���ً�
Sağol
ありがとう
Obrigado
Jason Pitcher
Global Wellbore Placement Solutions Champion
Halliburton Sperry Drilling