MEASUREMENT OF QUANTITIES
● Mat Naim bin Abdullah @ Mohd Asmoni● Diploma QS (UTM), BSc. QS (Glasgow
Caledonian University), M.Eng. Construction (UTM), PhD Facilities Management (UTM)
www.utm.my innovative ● entrepreneurial ● global 2
MEASUREMENT OF QUANTITIES
Assumption No. 1: Total land area = 10m x 10m
Project Title: Construction and completion of guard houseOwner: Panicsonic Sdn BhdArchitect: A to Z Sdn BhdDrawing Title: Ground beam and foundation plan-------------------------------------------------------------------------Drawn by: SheilaChecked by: Aaron
www.utm.my innovative ● entrepreneurial ● global 3
MEASUREMENT OF QUANTITIES
www.utm.my innovative ● entrepreneurial ● global 4
MEASUREMENT OF QUANTITIES
Construction Method
1. Preliminaries (Initial site works) - % of total cost2. Site clearance and earthwork3. Foundation construction (E.g. Piling and footing)4. Work below lowest floor finish5. Frame6. Staircase7. Upper Floor8. Roof9. Wall and partition10. Door and window11. Finishes12. Sundries (Built-in furniture)13. Building services (M&E, ICT etc)14. External works (Water reticulation, landscape etc)
www.utm.my innovative ● entrepreneurial ● global 5
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
1) Site clearance
1.1) Clear the site including grubbing of trees, shrubs and demolish any existing structure and cart away and dump to the specified location.
10.00 10.00 ---------- 100.00 100 m2 ----------
Area of the site:10 x 10 = 100m2
www.utm.my innovative ● entrepreneurial ● global 6
MEASUREMENT OF QUANTITIES
www.utm.my innovative ● entrepreneurial ● global 7
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
2) Foundation
2.1) Piling including all related works
6.10 6.10 ---------- 37.21 37 m2 ----------
Area of the building:Length = 3048 + 3048 = 6096Width = 3048 + 3048 = 6096
www.utm.my innovative ● entrepreneurial ● global 8
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
www.utm.my innovative ● entrepreneurial ● global 15
MEASUREMENT OF QUANTITIES
@100 c/c
www.utm.my innovative ● entrepreneurial ● global 16
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF Taker off : Checked by:3.1) Column stump3.1.1) Reinforced concrete Grade 30 for
column stump
9/0.23 0.23 1.04 ---------- 0.50 1 m3 ----------
Size of column stump:Length = 229Width = 229Height = 1524 – 305 thickness of pile
cap – (351/2) Half of beam’s thickness
= 1043.50
www.utm.my innovative ● entrepreneurial ● global 17
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF3.1) Column stump3.1.2) Formwork for column stump
9/4/0.23 1.04 ---------- 8.61 9 m2 ----------
Size of column stump:Length = 229Width = 229Height = 1524 – 305 thickness of pile
cap – (351/2) Half of beam’s thickness
= 1043.50
www.utm.my innovative ● entrepreneurial ● global 18
MEASUREMENT OF QUANTITIES
@100 c/c
Height of column stump
www.utm.my innovative ● entrepreneurial ● global 19
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF3.1) Column stump3.1.3) Reinforcement bar Y12 for
column stump
9/4/2.97 ---------- 106.92m x 0.89kg/m = 95.16kg ----------
95kg
Length = a + half beam’s thickness – cover + 2 laps
= 1524 + (351/2) – 50 + (660x2)= 2969.50
lap
a
lap
www.utm.my innovative ● entrepreneurial ● global 20
MEASUREMENT OF QUANTITIES
General Notes
www.utm.my innovative ● entrepreneurial ● global 21
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF3.1) Column stump3.1.4) R6 link in for column stump
9/6/0.62 ---------- 33.48m x 0.22kg/m = 7.36kg ----------
7kg
Length of link: (length of CS– 2cover) x 4 +hook
=(229-100)+(229-100)+(229-100)+(229-100)+100=616
No. of link:Height of column stump = 1043.50=(1043.50/229)+1= 6 nos.
Hook
www.utm.my innovative ● entrepreneurial ● global 22
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam3.2.1) Excavation for ground beam
2/3/6.10 0.23 0.35 ---------- 2.95m3 ----------
3m3
Size of ground beam:Length=3048+3048=6096Width = 229Thickness = 351
Excavation for ground beam
www.utm.my innovative ● entrepreneurial ● global 23
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam3.2.2) Reinforced concrete Grade 30 for
ground beam
2/3/6.10 0.23 0.35 ---------- 2.95m3 ----------
3m3
Size of ground beam:Length=3048+3048=6096Width = 229Thickness = 351
RC for ground beam
www.utm.my innovative ● entrepreneurial ● global 24
MEASUREMENT OF QUANTITIES
Assumption No. 1: Total land area = 10m x 10m
Project Title: Construction and completion of guard houseOwner: Panicsonic Sdn BhdArchitect: A to Z Sdn BhdDrawing Title: Ground beam and foundation plan-------------------------------------------------------------------------Drawn by: SheilaChecked by: Aaron
www.utm.my innovative ● entrepreneurial ● global 25
MEASUREMENT OF QUANTITIES
@100 c/c
Height of column stump
www.utm.my innovative ● entrepreneurial ● global 26
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF
3.2) Ground beam3.2.3) Formwork for ground beam
2/3/2/6.10 0.35 ---------- 25.62 26m2 ----------
Size of ground beam:Length=3048+3048=6096Width = 229Thickness = 351
Installation of reinforcement bar and formwork for ground beam
www.utm.my innovative ● entrepreneurial ● global 27
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
3) WBLFF3.2) Ground beam3.2.4) Reinforcement bar Y10 for
ground beam
2/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ----------
www.utm.my innovative ● entrepreneurial ● global 43
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
4) FRAME3.2) Roof beam3.2.5) R6 stirrup for roof beam
2/3/28/1.06 ---------- 178.08m x 0.22kg/m = 39.18kg ----------
39kg
Length of stirrup:
=(229-50)+(351-50)+(229-50)+(351-50)+100=1060
No. of stirrup:Length of beam= 6096=(6096/229)+1= 28 nos.
Hook
www.utm.my innovative ● entrepreneurial ● global 44
MEASUREMENT OF QUANTITIES
Assumption No. 1: Total land area = 10m x 10m
Project Title: Construction and completion of guard houseOwner: Panicsonic Sdn BhdArchitect: A to Z Sdn BhdDrawing Title: Ground beam and foundation plan-------------------------------------------------------------------------Drawn by: SheilaChecked by: Aaron
www.utm.my innovative ● entrepreneurial ● global 45
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
5) ROOF = area of roof= a x b x 2
a = 42482 + 30002
a = 5200
b = 6096 + 1200 + 1200b = 8496
5.1) Roof trusses and covering
2/8.50 5.20 ---------- 88.40m2 88 m2 ---------- Front and rear elevation
Right and left elevation
a
b
3m
www.utm.my innovative ● entrepreneurial ● global 46
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
6) DOOR and WINDOW Door can bemeasured eitherin m2 or number. If enumerated thenneed to state type and size
6.1) Single leaf panel door size 2100 x 900 including frame and painting
2 2 nos. ---------- Front and rear elevation
Right and left elevation
a
b
3m
www.utm.my innovative ● entrepreneurial ● global 47
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
6) DOOR and WINDOW Window can bemeasured eitherin m2 or number. If enumerated thenneed to state type and size
6.2) Adjustable louvres window 1200 x 600 including frame , painting and glass
6 6 nos. ---------- Front and rear elevation
Right and left elevation
a
b
3m
www.utm.my innovative ● entrepreneurial ● global 48
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
7) WALL AND PARTITION
7.1) Half brickwall in comon brick
4/ 6.10 3.00 73.20 Less opening (e.g. door and window) 2/2.10 0.90 3.78 (door)
65 m2 6/1.20 0.60 4.32 (window) 65.10
Front and rear elevation
Right and left elevation
a
b
3m
Brickwall
www.utm.my innovative ● entrepreneurial ● global 49
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
8) FINISHES Area of plasteringand panting =Area of wall x 2
Area of ceiling =area of slab
8.1) Plastering and painting
2/ 65m2 130m2
8.2) Floor Finishes – cement render
37 m2
8.3) Ceiling 37m2
Front and rear elevation
Right and left elevation
a
b
3m
Brickwall
www.utm.my innovative ● entrepreneurial ● global 50
MEASUREMENT OF QUANTITIES
Project: Construction and completion of Guard House for Panicsonic Sdn Bhd
9) SUNDRIES
9.1) Built-in counter size 1800mm x 900mm x 725mm(h).