SFOBB East Span Seismic Safety Sarah Picker Duty Senior Toll Bridge Program, Caltrans
21

SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

Jan 11, 2016

Download

Documents

Violet Henry
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Sarah Picker

Duty Senior

Toll Bridge Program, Caltrans

Page 2: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review for the SFOBB Self-

Anchored Suspension Span/Yerba Buena Island

(ECR SAS/YBI)04-012064

Page 3: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI

• Caltrans is asking for Contractor input

• We want to hear from you now

• We value your knowledge and experience

Page 4: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

• Enhanced Constructibility Review SAS/YBI is the opportunity for Contractor to comment on constructibility of plans, specifications and items before advertisement

Page 5: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

We take Brainstorming

Page 6: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

ECR SAS/YBI

• build a safe bridge

• biddable job

• increase competition

• prevent costly change orders

Page 7: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Contractors can comment on

• Safety

• NO BID item

• NO BID Specification

• Risk

Page 8: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI

• Phase 1

• Contractor Outreach Handout contents

• posted on Caltrans Office Engineer Website• http://www.dot.ca.gov/hq/esc/oe/ecr/index.html

Page 9: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI

• Phase 1

• initiation March 18

• three weeks to review and comment

• submit constructibility review comments by April 8

Page 10: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI

• provide comments to SFOBB Duty Senior [email protected]

• include contract number 04-012064

• include company name, phone number and name of commenter

Page 11: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Enhanced Constructibility Review SAS/YBI Disclaimer

• ECR SAS/YBI are not contract plans or specifications and items

• the contract documents will be bid on

Page 12: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

IDEAS

• ability to place steel tower

• temporary detour

• access to the work on YBI steep slope

• milestone completion

Page 13: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

IDEAS

• steel market and fabrication

• bonding capacities

• working days

• foundation issues

• schedule

• other

Page 14: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

SAS/YBI 04-012064

• Advertisement Fall 2002

• Contract documents available from Plans and Document Section

• http://www.dot.ca.gov/hq/esc/oe/project_status/order_bid_location.html

• (916) 654-4490 or 4492

Page 15: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Slide Show available

http://www.dot.ca.gov/hq/esc/tollbridge/index.html

Page 16: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Web Addresses for DBE information

http://www.dot.ca.gov/hq/bep/index.htm

Page 17: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

WEB ADDRESS FOR ECR SAS/YBI

http://www.dot.ca.gov/hq/esc/oe/ecr

Page 18: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

BUY AMERICA WAIVER APPROVED BY FHWA

• Tower Saddle (Upper Portion)

• S-Wire Cable Wrapping

• MacAlloy Bars

Page 19: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

Requested Buy America Waiver but not approved

PPWS Strand

Page 20: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

REQUEST FOR SOLE SOURCE ITEM APPROVED

• Tower Saddle (Upper Portion)

• S-Wire Cable Wrapping

• Macalloy Bars

• Swivel Joint Seal Assembly

• Epoxy Asphalt Concrete

Page 21: SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.

SFOBB East Span Seismic Safety Project

SOLE SOURCE ITEM Requested but not approved

PPWS Strand

Cable Wire Rod