Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 03/21/ 22 1 Copyright-Lean Quality Associates, all rights reserved
20

Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Dec 22, 2015

Download

Documents

Ernest Ray
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Setup Time Reduction

Using: Single Minute Exchange of Die

G.V. Clarke Lean Quality Assoc., LLC

04/19/23 1Copyright-Lean Quality Associates, all rights reserved

Page 2: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

04/19/23Copyright-Lean Quality Associates, all rights

reserved 2

Page 3: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

In the beginning, there was…STORAGE. Definitions of TIME Typical Old procedures /Wastes EOQ Assumptions / Computation Improvement process / SMED Necessary cultural preparation Basics & Principles Typical Results Q & A

www.leanquality.net

04/19/23 3Copyright-Lean Quality Associates, all rights reserved

Page 4: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Lean

Definition:

“A systematic approach to identifying and eliminating waste(non-value-added activities) through continuous improvement by flowing the product at the pull of the customer in pursuit of perfection”

04/19/23 4Copyright-Lean Quality Associates, all rights reserved

Page 5: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

About Lead Time

“One of the most noteworthy accomplishments in keeping the price of Ford products low is the gradual shortening of the production cycle. The longer an article is in the process of manufacture and the more it is moved about, the greater is its ultimate cost.”

Henry Ford, 1926

04/19/23 5Copyright-Lean Quality Associates, all rights reserved

Page 6: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Set Up Time

Definition:

“The time between the last good piece off the current run and the first good piece off the next run.”

04/19/23 6Copyright-Lean Quality Associates, all rights reserved

Page 7: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Historical setup Procedures

Preparation cleaning up completed job receiving instructions for next job storing/retrieving tools, parts, materials checking functionality

Parts removal and attachment Centering, dimensioning, and setting

tools, dies, jigs, gauges

Trial processing and adjustments

50%30%

15%5%

04/19/23 7Copyright-Lean Quality Associates, all rights reserved

Page 8: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Wastes in Set-Up Defects

Overproduction

Waiting

Non-utilized people

Transportation

Inventory

Motion excess

Extra processing

Typically 95% of Total Lead Time is Non-Value Added!!!04/19/23 8Copyright-Lean Quality Associates, all rights reserved

Page 9: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Traditional setup Assumptions

Long runs are necessary to amortize the cost of setups

Managing production using economic order quantities (EOQ) balances setup costs and inventory carrying costs

Inventory

04/19/23 9Copyright-Lean Quality Associates, all rights reserved

Page 10: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Traditional setup Math

Do these assumptions make sense if setup time can be significantly reduced?

Fixed Cost

Variable Cost

Lot/Batch SizeEOQ

setup Cost

Inventory Carrying Cost

setup Cost + Inventory Carrying Cost

04/19/23 10Copyright-Lean Quality Associates, all rights reserved

Page 11: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Economic Order Quantity (EOQ)

xUnitCostyCostInventCarr

xOrderCosteAnnualUsagx

EOQ

(%)

/)(2

04/19/23 11Copyright-Lean Quality Associates, all rights reserved

Page 12: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Effect of SUTR on EOQ

04/19/23 12Copyright-Lean Quality Associates, all rights reserved

Page 13: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

The SMED System Step-by-step method to

reduce setup time

Developed by Shigeo Shingo

Applicable in all industries

Useful in streamlining other processes

xchange of

SSMMEEDD

ingle

inute

ie

setup in under 10 minutes04/19/23 13Copyright-Lean Quality Associates, all rights reserved

Page 14: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Reducing setup Time

Put the “basics” in place workplace organization 5 S’s visual controls

Analyze and improve setup using SMED

04/19/23 14Copyright-Lean Quality Associates, all rights reserved

Page 15: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

SMED: Basics

There are two types of setup tasks: internal (machine down) external (machine running)

Eliminating or streamlining a setup task requires a clear understanding of that task’s real purpose and function

Focus first on no/low cost solutions The best setup is no setup!

04/19/23 15Copyright-Lean Quality Associates, all rights reserved

Page 16: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

The Stages of SMED

• 1-Separate internal and external steps• 2-Convert internal to external• 2-Streamline all aspects of setup

operations.

104/19/23 16Copyright-Lean Quality Associates, all rights reserved

Page 17: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

04/19/23 Copyright-Lean Quality Associates, all rights reserved 17

Page 18: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

.

Parallel operations Eliminating adj. Functional clamps Mechanization Planning Work place Layout Team/Organize Training

Pit-Crew Practice Documentation

Streamline all elements

04/19/23 18Copyright-Lean Quality Associates, all rights reserved

Page 19: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Experience with SUTR

Cold Rolling Mill 62 min to 16 min Grinding Op 35 min to 10 min Press Brake 16:51 min to 7:08m Vacuum Evaporator65 min to 22 min

04/19/23 19Copyright-Lean Quality Associates, all rights reserved

Page 20: Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.

Additional questions?

Industrial Engr. Lean & Lean Six Sigma RABQSA-Principal Auditor ISO-9000, TS-16949, 17025 (262)-834-8476 [email protected] www.leanquality.net

04/19/23 20Copyright-Lean Quality Associates, all rights reserved