  • Setting up of an Experimentto Test Vertical Axis Water-

    Turbines

    Linda Guittet Mil Kusulja Thierry Maitre

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 2

    Vertical Axis Water TurbineDavis concept (Blue Energy, Canada)-Airfoiled straight blades-Structures to direct the flowon the turbine-Tests on several turbines inthe 1980s

    -Turbine unit : 250 kW-Projects : four-kilometer longtidal fence in the SanBernardino Strait in thePhilippines, 1100 MW

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 3

    Vertical Axis Water TurbineKobold concept (Ponte di Archimede S.p.A, Italy )

    -Airfoiled straight blades-Balancing mass as pitchangle regulator-Floating platform in MessinaStrait, Italy: 20 kW,Efficiency: 23 %

    -Diameter : 6 m-Blade span : 5 m-Chord : 0.4 m-3 blades

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 4

    Vertical Axis Water TurbineGorlov concept (GKC Technology, USA)

    -Airfoiled twisted blades

    -Farm : array of turbine lines

    -Many tests done in the 1990sin laboratories and natural sites

    Tests in Cape CodCanal :

    0.6 m diameterFlow speed : upto 2.2 m/sEfficiency : 35%

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 5

    Vertical Axis Water TurbineLEGI concept Achard turbine

    Airfoiled bladesWing shaped blades : use ofaeronautic technologyWinglets : limit induced dragStreamlined arms : reduce losses

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 6

    Vertical Axis Water TurbineLEGI concept Achard turbine

    Turbine unit

    Turbine line

    Farm

    T

    r

    o

    n

    o

    n

    Flotteur

    Hydrolienne

    Bride

    Axe

    Lest ouAncrage

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 7

    HARVEST ProjectHydrolienne Axe de Rotation Vertical Stabilis

    Stabilized Vertical Axis Water Turbine

    Aims : Solve the potential technological problems

    (hydraulical, mechanical, electrical) for acomplete farm

    Optimize Achard turbine and farm structure Consider linked questions : environmental

    impacts, laws, setting up andmaintenance,

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 8

    HARVEST Project

    3S and LDMSNumerical

    LDMSNumerical and Exprimental

    3SNumerical and Exprimental

    Turbine lineSingle water turbineAnchoringMechanical researches :

    NumericalComplete farm analysis

    LEGINumerical and ExprimentalSingle water turbine

    Turbines :NumericalPotential sites

    Hydraulical researches :

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 9

    LEGI ExperimentHydrodynamic tunnel- Flow speed : 0 to 2.85

    m/s (0 to 500 l/s)- Pressure : Pv to 2 bars

    Measurements Torque Rotating speed Forces Pressure, flow speed...

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 10

    LEGI Experiment

    Section : 250 * 700 mm

    Manufacturer :Collet-Amblard,

    Grenoble

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 11

    LEGI ExperimentTurbine performances :

    average valuesR? /V8 : Tip speed

    ratio

    Nc/R : Solidity

    SVDCD 2

    5.0 =

    SVC

    PPCtheory

    P 3max

    21*27

    16

    == Power

    coefficient

    Dragcoefficient

    I. Paraschivoiu, 2002

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 12

    LEGI Experiment

    Turbine performances :dynamical features Instability

    Dynamic stall

    Right/ left asymmetry

    Difficulty of calculation

    M.T. Brahimi, I.Paraschivoiu, 1995

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 13

    LEGI Experiment

    Manufacturer : SERAS, CNRS Grenoble

    Lenght and diameter : 175 mmChord : 30 mm

    Darrieus AchardGorlov

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 14

    LEGI Experiment

    Tests on differentturbine types

    Performances

    Instability

    Forces

    Technologiescomparison

    Results to studyfatigue of blades

    and axes

    Anchoringcalculations

    Experiment interests :

  • Setting up of an experiment to testvertical axis water-turbines

    Thank you for your attention

    Your questions

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 16

    Schmas Annexes

    Ur

    rR rVr

    =0

    C N

    C T

    C D

    F

    U

    Profi l

    rrr RVUr+=

    CL

    Forces on ablade

  • 20th of October 2004 Setting up of an experiment to test vertical axis water turbine 17

    Schmas Annexes

    Drawingconcerningthe Kobold

    turbine

    Setting up of an Experiment to Test Vertical Axis Water-TurbinesVertical Axis Water TurbineVertical Axis Water TurbineVertical Axis Water TurbineVertical Axis Water TurbineVertical Axis Water TurbineHARVEST Project Hydrolienne Axe de Rotation Vertical StabilisStabilized Vertical Axis Water TurbineHARVEST ProjectLEGI ExperimentLEGI ExperimentLEGI ExperimentLEGI ExperimentLEGI ExperimentLEGI ExperimentSetting up of an experiment to test vertical axis water-turbinesSchmas AnnexesSchmas Annexes