8/14/2019 Setting Engineering Change Order Options_SPD
1/17
System Process DocumentSetting Engineering Change Order Options
Department
Responsibility/Role
File Name 27762209.docRevision
Document Generation Date 18/01/2010 09:37:00
Date Modified 1/18/2010 09:37:00 AM
Last Changed by
Status
Setting Engineering Change Order Options
Trigger:
Concept
The Set ECO Options page enables you to set engineering change order options for Oracle
Engineering only. You can enter an item whose use-up date is tied to each revised item effective
date. The default is the use-up item associated with the plan name. This can be the revised item or
a component of the revised item.
Oracle Alert automatically notifies the planner for the revised item if the use-up date changes
based on information from a new MRP plan.
In this topic, you will set engineering change order options.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:37:00 AM Page 1
8/14/2019 Setting Engineering Change Order Options_SPD
2/17
System Process DocumentSetting Engineering Change Order Options
Procedure
Step Action
1. Begin by navigating to the Mass Changes page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Setting Engineering Change Order Options_SPD
3/17
System Process DocumentSetting Engineering Change Order Options
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:37:00 AM Page 3
8/14/2019 Setting Engineering Change Order Options_SPD
4/17
System Process DocumentSetting Engineering Change Order Options
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Mass Changes link.
Page 4 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Setting Engineering Change Order Options_SPD
5/17
System Process DocumentSetting Engineering Change Order Options
Step Action
5. Use the Organization page to select your organization.
Last changed on: 1/18/2010 09:37:00 AM Page 5
8/14/2019 Setting Engineering Change Order Options_SPD
6/17
System Process DocumentSetting Engineering Change Order Options
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Setting Engineering Change Order Options_SPD
7/17
System Process DocumentSetting Engineering Change Order Options
Step Action
8. Use the Mass Change Bills page to set the engineering change order (ECO)
options.
Last changed on: 1/18/2010 09:37:00 AM Page 7
8/14/2019 Setting Engineering Change Order Options_SPD
8/17
System Process DocumentSetting Engineering Change Order Options
Step Action
9. Click in the Number field.
Step Action
10. Press [F11].
Page 8 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Setting Engineering Change Order Options_SPD
9/17
System Process DocumentSetting Engineering Change Order Options
Step Action
11. Enter the desired information into the Number field. Enter "M1-100".
Last changed on: 1/18/2010 09:37:00 AM Page 9
8/14/2019 Setting Engineering Change Order Options_SPD
10/17
System Process DocumentSetting Engineering Change Order Options
Step Action
12. Press [Ctrl+F11].
Step Action
13. Click the Tools menu.
orPress [Alt+T].
Page 10 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Setting Engineering Change Order Options_SPD
11/17
8/14/2019 Setting Engineering Change Order Options_SPD
12/17
System Process DocumentSetting Engineering Change Order Options
Step Action
15. Use the Set ECO Options page to indicate whether you want MRP to include the
revised item and to enter an item whose use-up date is tied to each revised item's
effective date.
Page 12 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Setting Engineering Change Order Options_SPD
13/17
System Process DocumentSetting Engineering Change Order Options
Step Action
16. Enable the MRP Active check box to indicate whether you want Oracle Master
Scheduling/MRP to include the revised item in the planning process.
Click the MRP Active option.
Step Action
17. Use the Use Up option to indicate whether each revised item's effective date is
based upon the planned item's use-up date.
Click the Use Up option.
Last changed on: 1/18/2010 09:37:00 AM Page 13
8/14/2019 Setting Engineering Change Order Options_SPD
14/17
System Process DocumentSetting Engineering Change Order Options
Step Action
18. Click in the Item field.
Page 14 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Setting Engineering Change Order Options_SPD
15/17
System Process DocumentSetting Engineering Change Order Options
Step Action
19. Enter an item whose use-up date is tied to each revised item effective date. The
default is the use-up item associated with the plan name. This can be the revised
item or a component of the revised item.
Enter the desired information into the Item field. Enter "CM45470".
Step Action
20. Click in the Item Description field.
Last changed on: 1/18/2010 09:37:00 AM Page 15
8/14/2019 Setting Engineering Change Order Options_SPD
16/17
System Process DocumentSetting Engineering Change Order Options
Step Action
21. Oracle Alert automatically notifies the planner for the revised item if the use-up
date changes based on information from a new MRP plan.
Click the Save button.
Page 16 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Setting Engineering Change Order Options_SPD
17/17
System Process DocumentSetting Engineering Change Order Options
Step Action
22. You have completed the Setting Engineering Change Order Options procedure.
End of Procedure.
Last changed on: 1/18/2010 09:37:00 AM Page 17