INCIDENT MANAGEMENT SYSTEM SETS & REPS DEPLOYMENT
Jan 27, 2016
INCIDENT MANAGEMENT SYSTEM
SETS & REPS
DEPLOYMENT
INCIDENT MANAGEMENT SYSTEM
The IC is responsible for the initial & ongoing deployment of the
resources REQUIRED to support all phases of Incident operations.
INCIDENT MANAGEMENT SYSTEM
IC’s must maintain an awareness of the standard TFS
response levels, apparatus capabilities and available
specialty apparatus.
(know your resources)
INCIDENT MANAGEMENT SYSTEM
The Deployment process starts with Communications dispatching the appropriate
level of resource for the problem described by the
caller (our customer).
INCIDENT MANAGEMENT SYSTEM
The process continues with the 1st arriving IC performing an
initial Size-Up of Incident conditions to determine what
resources are required to stabilize the Incident.
(what do you need?)
INCIDENT MANAGEMENT SYSTEM
The Deployment of resources requires the IC to:
• Request• Assign• Track• Rotate• Rehab• Clear crews as the Incident
downgrades
INCIDENT MANAGEMENT SYSTEM
One of the most critical pieces of the Deployment process is
for additional responding Apparatus to report to a Base Sector and wait to be assigned
by the IC.
(Controlled arrival)
INCIDENT MANAGEMENT SYSTEM
On Scene Crew Status:
Unassigned Staged
Rehabbing
Rehabbed / Ready to go
On Deck Relief Cycle
Reinforce
RIT
Assigned Initial crews
To a sector
INCIDENT MANAGEMENT SYSTEM
Teams being assigned at all incidents must operate within the TFS Incident Management
System to ensure accountability and an
effective command structure.
*NO Freelancing
INCIDENT MANAGEMENT SYSTEM
Command needs to have a realistic awareness of the number of required tasks, their priority, and the time needed to complete those
tasks prior to assigning crews to the hazard area.
INCIDENT MANAGEMENT SYSTEM
Once assigning units to the Fire Ground, the IC must track, account for, and
manage the Work / Rest cycle of all crews.
(FF Safety/Air Management)
INCIDENT MANAGEMENT SYSTEM
The IC’s level of organizational support needs to match the
deployment of Incident resources:
(span of control)
Sectors
Command Team
Branches
INCIDENT MANAGEMENT SYSTEM
Sets & Reps Sets & Reps Based on the following scenarios:
•Estimate the amount of resources (alarm level) that will be required to stabilize the Incident
•The specific tasks that will be required to stabilize the Incident
•How long it will take to get companies to where the work needs to be done
•The tactical reserve needed to conduct safe operations
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
First Hose line / Size / Entry Point / Destination?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
Primary Life Hazards?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
Second Hose line / Location?
Ventilation / When / Where / Type?
Construction considerations?
First Hose line / Size / Entry Point / Destination?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
First Hose line / Size / Entry Point / Destination?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
First Hose line / Size / Entry Point / Destination?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning / Crew Deployment (3 vs 4 FF’s) / Equipment required?
Strategy – Offensive / Defensive / Marginal?
Alarm Level?
First Hose line / Size / Destination?
Second Hose line / Size / Location?
Ventilation / When / Where / Type?
Primary Life Hazards / Stairwells / Upper Floors?
Elevator considerations?
Fire Spread Considerations / Interior / Exterior?
IMS Considerations / Lobby Control / Entry / RIT / Account./ Sectoring / Air Management / Rehab?
Worst case scenario?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning / Crew Deployment (3 vs 4 FF’s) / Equipment required?
Strategy – Offensive / Defensive / Marginal?
Alarm Level?
First Hose line / Size / Destination?
Second Hose line / Size / Location?
Ventilation / When / Where / Type?
Elevator considerations?
Fire Spread Considerations / Interior / Exterior?
IMS Considerations / Lobby Control / Entry / RIT / Account./ Sectoring / Air Management / Rehab?
Worst case scenario?
Primary Life Hazards / Stairwells / Upper Floors?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
First Hose line / Size / Destination?
Second Hose line / Size / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations—lightweight truss?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario? Firefighter hazards?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
First Hose line / Size / Destination?
Second Hose line / Size / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations—lightweight truss?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario? Firefighter hazards?
INCIDENT MANAGEMENT SYSTEM
Strategy – Offensive / Defensive / Marginal?
Alarm Level ? Other agencies?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards? The public / Firefighters?
Extinguishment considerations?
Fire Spread Considerations?
Explosion Potential? Electrocution potential?
Worst case scenario?
Reference SOG G-HYDR
INCIDENT MANAGEMENT SYSTEM
Strategy – Offensive / Defensive / Marginal?
Alarm Level ? Other agencies?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards? The public / Firefighters?
Extinguishment considerations?
Fire Spread Considerations?
Explosion Potential? Electrocution potential?
Worst case scenario?
Reference SOG G-HYDR
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – Specialty Apparatus / Agencies?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire Spread Considerations / Interior / Exterior?
Explosion Potential?
Worst case scenario?
Reference SOG G-HOPP
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level / Specialty Apparatus / Agencies / Recon?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Explosive considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
Reference SOG G-HAZB / HAZC
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy?
Alarm Level?
First Hose line / Size?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire / Smoke Spread Considerations / Interior / Exterior?Worst case scenario?
INCIDENT MANAGEMENT SYSTEM
Command Mode?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
First Hose line / Size / Destination?
Second Hose line / Size / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations—lightweight truss?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario? Firefighter hazards?
INCIDENT MANAGEMENT SYSTEM
Strategy – Offensive / Defensive / Marginal?
Alarm Level / Specialty Apparatus / Agencies / Recon?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Explosive considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
Reference SOG G-HAZB / HAZC
INCIDENT MANAGEMENT SYSTEM
Apparatus Positioning?
Strategy – Offensive / Defensive / Marginal?
Alarm Level – based on 360 size up?
First Hose line / Size / Destination?
Second Hose line / Location?
Ventilation / When / Where / Type?
Primary Life Hazards?
Construction considerations?
Fire Spread Considerations / Interior / Exterior?
Collapse Potential?
Worst case scenario?
INCIDENT MANAGEMENT SYSTEM
End of Show
Thank you
End of Show