Top Banner
Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center
24

Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Jan 19, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Session Number 1

General Session – Solution Center UpdateMike Reid – Director, CCC Solutoin Center

Page 2: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

The Scoop

• Organizational Update• CALB/CALB HR Support • Getting YOU Involved• Product Calendar

Page 3: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

C3SC - A Year of Change

• Increased staff size– HR/Finance Primary Consultant– 2 additional developers

• Transitioned from contract to SunGard development resources

Page 4: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

The Expanded C3SC Team

Functional Consultants

TJ Baugus – Student

Jan Wilder – HR/Finance

Developers

Chris Leuer - Lead

Noor Ahmed

Venkata Krishna

Nevil Palayur

Anshu Sayal

Mihir Vipura

Page 5: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

The Effects of Change

• 12.5 hours time difference• New Banner developers• We all speak English but do we speak the same

language?• Cultural learning• Ability to leverage resources

Page 6: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Immediate Benefit

• Assumed responsibility for HR MIS and STRS/PERS reporting

• Released CALB HR 7.2 • CALB HR 8.0 10/31/09• HR Focus Group working on PERS reporting

changes

Page 7: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

CALB/CALB HR Support

• Banner 7 support extended through April 2011• CALB / CALB HR 7 – same timeline

– Maintenance only• Regulatory updates to existing functionality• Support baseline required releases

– NO NEW FEATURES

Page 8: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

CALB/CALB HR Support

• Multiple version support– CALB 7 and CALB 8– CALB HR 7 and CALB HR 8– REPT 7 and REPT 8

• PLEASE – UPGRADE to Banner/CALB 8 as soon as it is convenient!

Page 9: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

CALB/CALB HR Support

• Actionline – First line support for all C3SC modules

• Professional Services Consultants

Page 10: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Your Role in C3SC Development

• CCB – Project priority recommendations• Focus Groups - Expanded Role

– Feature requirements– Monthly review of deliverables– Client testing

• Looking from the outside in...

Page 11: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Planned Releases 2009

• CALB 8.2 – October 31, 2009– Support for Banner 8.2

• CALB HR 8.0 – October 31, 2009– Support for Banner 8.2– STRS classification changes– HR MIS update (new ethnicity)

• CALB 7.8 – December 31, 2009– Support for Banner 7.6– BOGW dependency update

Page 12: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Planned Releases 2010

• CALB 8.3 – Q1 2010– Support for Banner 8.3– Instructor Drop Roster– BOGW enhancements

• CALB HR 8.1 – Q1 2010– Support for Banner 8.3– New PERS reporting requirements

Page 13: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Planned Releases 2010

• CALB 8.4 – Q3 2010– Support for Banner 8.x– New student and BOGW features to be determined

• CALB HR 8.2 – Q3 2010– Support for Banner 8.x– New HR features to be determined

Page 14: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

The End

To print this presentation:UDC Support Center FAQ 1-7RHNO3

Customer Support Center website:   http://connect.sungardhe.com

Page 15: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Session Number 1

General Session – Solution Center UpdateMike Reid – Director, CCC Solutoin Center

Page 16: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

The Scoop

• Organizational Update• CALB/CALB HR Support • Getting you Involved• Product Calendar

Page 17: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

TJ Baugus

Page 18: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Jan Wilder

Page 19: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Chris Leuer

Page 20: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Noor Ahmed

Page 21: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Venkata Krishna

Page 22: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Nevil Palayur

Page 23: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Anshu Sayal

Page 24: Session Number 1 General Session – Solution Center Update Mike Reid – Director, CCC Solutoin Center.

Mihir Vipura