We build, before we build Prefabricated Integrated Services Modules Discover innovative off-site solutions that deliver projects on time and on budget, every time. Grange Hotel | St Pauls | London
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ses_prism_for_issuu

We build, before we build

Prefabricated Integrated Services Modules

Page 2: ses_prism_for_issuu

Discover innovativeoff-site solutions thatdeliver projects ontime and on budget,every time.

Grange Hotel | St Pauls | London

Off-site | Quality | Solutions | Innovation

Page 3: ses_prism_for_issuu

Prefabricated Integrated Services Modules

SES PRISM is the off-site manufacturing arm of Shepherd EngineeringServices (SES), one of the leading providers of building servicessolutions in the UK.

With a strong engineering heritage, SES PRISM has led the way in realising the benefits of prefabrication, modularisationand off-site construction of building services across a wide range of industry sectors. Specialising in the design, manufactureand installation of building services modules, we have established a solid reputation for technical excellence,project efficiency, and a guaranteed commitment to quality.

Construction sites can be inefficientThe traditional lack of control of information, materials and manpower inevitably lead to delay, disruption and increased cost.On an average site, over 50% of the working day is lost to poor productivity and delays*. Furthermore only 63%of site-based construction projects are delivered on time and only 49% delivered to budget**.*source BSRIA, **source BCIS/RICS.

| Safety | Sustainability | Experience

Page 4: ses_prism_for_issuu

Why SES PRISM?The evolution of the construction industry demands that buildingsare delivered more economically, within shorter time frames,more cost effectively and with reduced impact to the naturalenvironment. In response, SES PRISM offers you an effectiveand proven solution for today’s construction needs.

Guaranteed | Cost | Quality | Programme

Improved | Health and Safety | Sustainability | Productivity | Efficiency

Decreased | Material Wastage | Road Miles | Carbon Footprint | Trade Congestion | Service Clashes

Enables | Innovation | Engineering Quality | Environmental Best Practice

Page 5: ses_prism_for_issuu

“Every project we take on, we take on with enthusiasm, dedication andcommitment. Commitment to providing the best solutions for our customers,commitment to getting it right first time and commitment to taking the individualmerits of each project into account.“We do more than just a job; we are a ‘thinking business’. That’s what we believeour customers deserve and that’s what we deliver.”Az Jasat | Director | SES PRISM

Picadilly Place 4 | Manchester

Page 6: ses_prism_for_issuu

Off-site quality

Quality guaranteedWe help you deliver certainty in quality by taking the complex assembly ofM&E services into a more controlled environment. Based at our manufacturingcentre in York, our operatives benefit from working at bench height in a well-lit,safe, dry and controlled environment. Our skill base is a balanced mixture ofspecifically trained assembly operatives and industry experienced professionals,and when combined, have a direct impact on quality and efficiency.

Delivering quality, on time, every time.

Page 7: ses_prism_for_issuu

SES PRISM Factory | York

“SES PRISM’s extensive use of prefabrication has added real value to our project,particularly their phenomenal rate of progress within the service spine. They havecertainly assisted the project with the sequencing of follow-on trades in zones thatwould generally have suffered from poor productivity. I have no doubt that this isthe future of M&E installations and SES PRISM is definitely at the forefront.”

Brendan Lunn | Carillion

Page 8: ses_prism_for_issuu

Project SCAN | Manchester

Off-site solutionsThrough first class engineering and design, we will build our product,and your project, efficiently and effectively - right first time, every time.

By being involved at an early stage, we provide our clients with a virtual prototype of their project, andwith the use of 3D technology we also offer project stakeholders the opportunity to ‘walk through’ theirproject in virtual reality. This enables early assessment of spatial co-ordination and access requirementsbefore a single operative sets foot on site. And because we are confident of the fit, you can be confidentof your costs and timescales.

The use of the latest techniques in CAD and 3D visualisation enables us to spatially co-ordinateservices, eliminate service clashes and maintain clear access for installation and maintenance.

Disruption and downtime on site is also reduced through minimised rework and revisits.

By interfacing our CAD systems directly with our procurement and labour planning system, wegenerate detailed material schedules and labour plans, enabling us to minimise waste procurementand really drive the standardisation of components.

The level of detail to which our manufacturing information is engineered ensures world-classstandards in productivity.

Project SCAN | Manchester

Page 9: ses_prism_for_issuu

We build, before we build.

AstraZeneca PR&D | Service Bulkhead

"Working with SES PRISM has been a really positiveexperience. The co-ordination of the design and the 3Dmodelling has been excellent. Modularisation has resultedin less labour on site and ultimately a project that has beeneasier to manage. Thanks to the use of 3D visualisationand off-site construction, we managed to deliver thisproject on time and within budget"

Mick Bodecott | Project Leader | Shepherd Construction

Page 10: ses_prism_for_issuu
Page 11: ses_prism_for_issuu

"The prefabrication strategy on the PR&D project wasone of the main project successes. The alliance teamworked together in an excellent co-ordinated effort tomanufacture 340 multi-service modules consisting ofmechanical pipework and ductwork alongside electricalcable tray. The modules were all finished, lagged andinspected off-site. They were then delivered to siteahead of the programme where they were installed onthe open lab floor plate like large pieces of a jigsaw."

Mike Dewsbury | Project Manager | AstraZeneca

AstraZeneca PR&D | Laboratory Floor

Page 12: ses_prism_for_issuu

So you know you are in safe hands

Employees in the building industry are more likelyto be seriously injured at work than those in anyother sector*.

As one of the first companies in our industry toachieve the prestigious OHSAS 18001:1999accreditation from the British Standards Institute(a world renowned standard for excellence inoccupational health and safety management),safety is paramount in everything we do.

SES PRISM reduces the risks associated with:

/ Working at height/ Hot works/ Open riser shafts/ Manual handling/ Trade congestion/ Poor housekeeping/ Trips slips and falls

We replace hazardous site operations with plannedand controlled manufacturing processes, and byoperating under factory conditions, our highly skilledteam ensure that safety policies and procedures areimplemented and adhered to.* Source HSE

Safety first - without compromise

The London Clinic | Cancer Centre

"At SES PRISM we realise thatsafety is paramount on everyproject. So, by building modulesand skids we can reduce ourlabour on site by up to 60%,which allows us to better controlthe working environment and inturn considerably reduce anyassociated health and safetyrisks."

Steve JoyceNon-Executive DirectorSES PRISM

Off-site safety

Page 13: ses_prism_for_issuu

Off-site innovationLeading innovation in off-site servicesWe recognise that standardisation is difficult to achieve within the construction industry. Whilst we wouldall benefit from applying a standard set of pre-designed modules on every project, we are aware thatsome projects require a bespoke approach. Our expertise and flexibility enables us to design the mostefficient and innovative solution for every project, however complex.

As well as integrating multiple trades within fully finished and tested modules, such as wet pipe work,ventilation, electrical services, gases and fire protection, we also incorporate non M&E trades includingraised floors, walls, fire and acoustic barriers, false ceilings and bulk heads.

Pioneering innovation - delivering results

Teesside University Sports and Sciences | Middlesbrough

Page 14: ses_prism_for_issuu

Off-sitesustainabilityReduce the carbon footprint of your building

The current economic climate presents us all withnew challenges to deliver cost effective projects.Add this to the increasing pressure to reduce ourcarbon footprint, and you’ll find that the role of offsite manufacturing goes a lot further than simplyreducing timescales and costs.

Sustainable advantages

/ Better building performance/ 85% less waste than traditional site methods*/ Greater control of waste recycling/ Reduced noise and pollution/ Deliveries that always maximise the availablevehicle space

/ Reduction in traffic through fewerdaily site commutes

In recognition of our approach to sustainability,SES PRISM is accredited to the internationalenvironmental standard ISO 14001:2004by the British Standards Institute (BSi).

Providing solutions that lower aprojects carbon footprint beforewe even arrive on site.*Souce MTech

Kingsway Hospital | Three Shires | Derby

"Costain are delighted to encourage and assist SES in their off-site pre-fabricationinitiatives. We fully recognise the impact that off-site prefabrication has on our siteswith reduced man hours, reduced SHE site issues, reduced waste and all theassociated reduced traffic to and from site. All this has recently been recognisedand delivered by SES PRISM on the Costain Spalding Three Shires project."

Lee Bateson | Costain M&E Supply Chain Manager | Costain

Page 15: ses_prism_for_issuu

“We’ve worked with SES at Piccadilly Place, Manchester for the past four years, and undertaken four very successfulprojects - all of which made extensive use of SES PRISM, delivering excellent and cost effective off-site solutions.Their experience and innovative approach to product development has consistently taken prefabrication to the nextlevel with each successive project. There is no doubt that SES PRISM has been a major contributor to the successof Piccadilly Place, from the reduction of risk to enhancing our drive for zero accidents.”

John Rodaway | Account Director | Carillion

Collaborative working with our clientsWhat makes SES PRISM different?

Quite simply, we work best when we work together.

You need people with experience. Who understand that budgets must be adhered to.That quality must be guaranteed. People who will be focused on just one thing - your needs.

The Headrow | Leeds

Off-siteexperienceInformed expertise to develop the best solution for your project

We have a strong track record of realising the benefits of the prefabrication, modularisation and off-siteconstruction of building services across a range of industry sectors.

In addition to new builds, our experience extends to a number of successfully modularised refurbishedbuildings; projects that others may disregard due to the difficulty in engineering and complex off-siterequirements. Not SES PRISM - we welcome all opportunities to apply our flexible approach to bespokemodular design, no matter how challenging the project. Our track record speaks for itself.

Our product range also extends to:

/ Small-scale assemblies / Horizontal service distribution modules/ Vertical riser modules / Plant-room skids and assemblies/ Packaged plant-rooms / Electrical risers

/ Pre-wired electrical solutions

Page 16: ses_prism_for_issuu

Let’s

SES PRISMUnit 2New LaneHuntingtonYorkYO32 9PT

01904 673 [email protected]

Why not come and see for yourself?We would be happy to arrange a personaltour of our manufacturing base in York.

QualityTeamworkHonesty & IntegritySafetyEnjoymentInnovationCommitment

Our values