ENERGIA ELECTRICA GRUPO 75 KWCOSTOS ENERGIA ELECTRICA Comb.
G/h3.5P.U Combust15.5RESUMEN DE J COSTOS DE ENERGIA ELECTRICA
(SEMANA I )Costo Maqui.1.74Cost. Oper (s/h)4.8FECHATIEMPO
(h)COMBUSTIBLE (Gl/h)P.U COMBUST. (S/Gl)COSTO COMBUST. (S/)COSTO
MAQUI. (S/h)COSTO OPERARIOS. (S/h)COSTO SUB TOTAL (S/)
5/27/1473.515.5379.751.744.8425.535/28/1443.515.52171.744.8243.16FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB
TOTAL5/29/1483.515.54341.744.8486.325/30/1403.515.501.744.805/31/1433.515.5162.751.744.8182.375/27/14IIICX-565G&H3162.75182.376/1/1423.515.5108.51.744.8121.585/27/14IIIINCL-
610G&H4217243.166/2/143.53.515.5189.8751.744.8212.7655/28/14IIIINCL-
610G&H4217243.165/28/14IIIINCL- 800P.C005/28/14IIIINCL-
610-S.N-02 Melva n
20005/29/14IIICX-565G&H8434486.325/29/14IIIINCL-
800P.C005/29/14IIIINCL- 610-S.N-02 Melva n 20005/30/14IIIINCL-
610G&H005/30/14IIIINCL- 8004.8005/30/14IIIINCL- 610-S.N-02
Melva n 20005/31/14IIIINCL- 610G&H3162.75182.375/31/14IIIINCL-
800P.C005/31/14IIIINCL- 610-S.N-02 Melva n
2000FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST. (S/)COSTO
SUB TOTAL
6/1/14IIIINCL- 610G&H0006/1/14IIIINCL-
800P.C0006/1/14IIIS.N-02 Melva n 202108.5121.586/2/14IIIINCL-
610G&H3.5189.875212.7656/2/14IIIINCL- 800P.C0006/2/14IIIINCL-
610-S.N-02 Melva n
200006/5/14IIIINCL-610G&H2.5135.625151.9756/5/14IIIINCL-610G&H2108.5121.586/5/14IIIINCL-610G&H3162.75182.376/5/14IIIINCL-610G&H3162.75182.376/5/14IIIINCL-610Melva
n
20154.2560.796/6/14IIICX-565G&H2108.5121.586/7/14IIICX-565G&H154.2560.796/8/14IIICX-565G&H4217243.166/9/14IIICX-565G&H2108.5121.586/10/14IIIPQ-638Melva
n 202108.5121.586/11/14IIIventilacionMelva n
204217243.166/11/14IIIINCL-800P.C3162.75182.376/12/14IIIventilacionMelva
n
204217243.166/13/14IIIINCL-800P.C3162.75182.376/16/14IIICX-565G&H4217243.166/17/14IIIINCL-610G&H3162.75182.376/17/14IIIINCL-610G&H1.581.37591.1856/18/14IIICX-565G&H3162.75182.376/18/14IIIINCL-610A.
Trujillo154.2560.79CONTRATA TIEMPO (h) COSTO COMBUST. (S/) COSTO
SUB TOTAL6/19/14IIIS.N-02 Juan Agreda2108.5121.58A.
Trujillo154.2560.796/19/14IIIINCL-610G&H3162.75182.37Constante
Pizan4217243.166/20/14IIIGL-565G&H3162.75182.37G&H653526.253951.356/21/14IIIGL-565G&H2108.5121.58Juan
Agreda2108.5121.586/23/14IIIINCL-610G&H2108.5121.58Melva n
2013705.25790.276/24/14IIIINCL-610G&H3162.75182.37P.C6325.5364.746/25/14IIIINCL-610G&H154.2560.79(en
blanco)6/25/14IIIINCL-610G&H3162.75182.37Total
general914936.755531.896/26/14IIIINCL-610G&H3162.75182.376/26/14IIIPQConstante
Pizan4217243.166/26/14IIIINCL-610G&H1.581.37591.1856/27/14IIICX-565G&H4217243.166/28/14IIIINCL-610G&H2108.5121.586/30/14IIIINCL-611G&H3162.75182.37FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
7/1/14IIIINCL- 610G&H4217243.167/1/14IIIPQConstante
Pizan2.5135.625151.9757/2/14IIIPQConstante
Pizan2.5135.625151.9757/2/14IIICX-565G&H3.5189.875212.7657/3/14IIIPQConstante
Pizan2.5135.625151.9757/3/14IIIINCL-610G&H0.3318.083152520.26313077/3/14IIICH-610G&H4217243.167/4/14IIICH-610G&H4217243.167/4/14IIIPQConstante
Pizan2.5135.625151.9757/5/14IIICH-610G&H4217243.167/5/14IIIPQConstante
Pizan2.5135.625151.9757/5/14IIICH-610G&H3162.75182.377/7/14IIIINCL-610G&H0.527.12530.3957/7/14IIICH-610G&H1.581.37591.185FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTALOBSERVACION
7/8/14IIIINCL-
610G&H4217243.167/9/14IIIINCL-610G&H4217243.167/10/14007/11/14IIIINCL-610G&H3.5189.875212.7657/12/14IIICX-520G&H3162.75182.377/12/14IIICX-520G&H4217243.167/13/14IIICX-520G&H2.5135.625151.9757/13/14IIIINCL-610G&H2.5135.625151.975VENTILACION7/14/14IIIINCL-800Juan
Altamirano1.581.37591.185FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
7/15/14IIIGLMelva n 202108.5121.58VENTILACION7/16/14IIIGLMelva n
202108.5121.58VENTILACION7/16/14IIIINCL-610G&H6325.5364.747/18/14IIIINCL-610G&H2.5135.625151.9757/18/14IIIINCL-610G&H4217243.167/19/14IIIINCL-610G&H4217243.167/19/14IIICX-565NG&H2108.5121.587/20/14IIIINCL-610G&H1.581.37591.1857/20/14IIIINCL-610G&H154.2560.797/21/14IIIINCL-610G&H4217243.16FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
7/22/14IIIINCL-610G&H1.581.37591.1857/22/14IIIINCL-610G&H3162.75182.377/22/14IIIINCL-610G&H1.581.37591.1857/23/14IIIINCL-610G&H3.5189.875212.7657/24/14IIIINCL-610G&H0.527.12530.3957/25/14IIIINCL-610C.
Carbajal154.2560.797/25/14IIIINCL-610G&H6325.5364.747/26/14IIIINCL-610G&H4217243.167/26/14IIIINCL-610G&H3162.75182.377/27/14IIIINCL-610G&H4217243.167/29/14IIIINCL-610G&H3.5189.875212.7657/30/14IIIINCL-610G&H3.5189.875212.7657/31/14IIIINCL-610G&H154.2560.798/1/14IIIINCL-610C.
Carbajal154.2560.798/1/14IIIINCL-610G&H4217243.168/1/14IIIINCL-610Juan
Altamirano1.581.37591.1858/2/14IIIINCL-610G&H4217243.168/3/14IIIINCL-610G&H4217243.168/4/14IIIINCL-610G&H4217243.16FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
8/5/14IIIINCL-610G&H4217243.168/6/14IIIINCL-610G&H4217243.168/7/14IIIINCL-610G&H4217243.168/7/14IIIPQHilder
TandaypaN2108.5121.588/7/14IIIINCL-610G&H3.5189.875212.7658/8/14IIIINCL-610Melva
n
203162.75182.378/8/14IIIINCL-610G&H4217243.168/9/14IIIINCL-610G&H4217243.168/10/14IIIINCL-610G&H4217243.168/11/14IIIINCL-610G&H3.5189.875212.765FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
8/13/14IIIINCL-610G&H3162.75182.378/13/14IIIINCL-610Melva n
204217243.168/13/14IIIINCL-610Melva n
21154.2560.798/14/14IIIPQHilder
TandaypaN2108.5121.588/14/14IIIPQConstante
Pizan2108.5121.588/14/14IIIINCL-610G&H6325.5364.748/15/14IIIINCL-610G&H4217243.168/16/14IIIINCL-610G&H5271.25303.958/16/14IIIINCL-610G&H2108.5121.588/17/143190INCL-610G&H154.2560.798/18/14IIIINCL-610G&H4217243.168/18/143190INCL-610Bladimir1.581.37591.1858/19/14IIIINCL-610G&H4217243.168/20/14IIIINCL-610J.
Carbajal1.581.37591.1858/22/14IIIINCL-610G&H6325.5364.748/22/14IIIINCL-610G&H2108.5121.588/23/14IIIINCL-610G&H4217243.168/23/14IIICX-635P.CRUZ154.2560.798/24/14IIIINCL-610G&H4217243.168/25/14IIIINCL-610G&H4217243.168/26/14IIIINCL-610G&H5271.25303.95FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
9/5/14IIIINCL-610Carbajal154.2560.799/8/14IIIINCL-610Leodan
Avila4217243.16FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL
9/10/14IIIINCL-610Leodan
Avila3162.75182.379/10/14IIIINCL-610Leodan
Avila3162.75182.379/11/14IIIINCL-610Leodan Avila4217243.16
ENERGIA GRUPO CHICOCOSTOS ENERGIA ELECTRICA Comb. G/h0.22P.U
Combust15.5Costo Maqui.1.74Cost. Oper
(s/h)4.8FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL
9/9/14IIISNG&H26.8219.99/10/14IIISN26.8219.99/11/14IIISN26.8219.99/12/14IIISN26.8219.99/12/14IIISN413.6439.8
AIRE -EXPLORACIONCOSTOS AIRE COMPRIMIDOComp 185cfm2.5P.U
Combust15.5RESUMEN DE COSTOS DE AIRE COMPRIMIDO EXPLORACION (SEMANA
I JUNIO)Cost.Maquina0.96Cost.Operativ4.8FECHATIEMPO (h)COMBUSTIBLE
(Gl/h)P.U COMBUST. (S/Gl)COSTO COMBUST. (S/)COSTO MAQUI. (S/h)COSTO
OPERARIOS. (S/h)COSTO SUB TOTAL (S/)COMPREN-250 CFMCOMPREN-185
CFM5/27/1452.515.5193.750.964.8222.55FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
(s/)5/28/1442.515.51550.964.8178.045/29/1422.515.577.50.964.889.025/30/1402.515.500.964.805/27/14IICX-
635P.C2.596.875111.2755/31/1432.515.5116.250.964.8133.535/27/14IIICX-730Juan
Esco.1.558.12566.7656/1/1402.515.500.964.805/27/14IIICX-700Julio de
la Cruz138.7544.515/2/1432.515.5116.250.964.8133.535/28/14IIICX-
635P.C277.589.025/28/14IIICX-638P.C277.589.025/29/14IICX-730Juan
Esco.277.589.025/30/14IICX-750Juan Esco.00Etiquetas de fila TIEMPO
(h) COMBUST. (S/) COSTO SUB TOTAL
(s/)5/30/14IIGL-780Obdulio005/2/143116.25133.535/30/14IIICX-
635P.C005/27/145193.75222.555/30/14IIICX-638G&H005/28/144155178.045/30/14IIICX-565G&H005/29/14277.589.025/30/14IIIGL-800Marcial005/30/14005/31/14IICX-750Juan
Esco.005/31/143116.25133.535/31/14IIGL-780Obdulio006/1/14005/31/14IIICX-
635P.C3116.25133.53(en blanco)5/31/14IIICX-638G&H00Total
general17658.75756.675/31/14IIICX-565G&H005/31/14IIIGL-800Marcial00FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL (s/)
6/1/14IICX-750Juan Esco.0006/1/14IIGL-780Obdulio0006/1/14IIICX-
635P.C0006/1/14IIICX-638G&H0006/1/14IIICX-565G&H0006/1/14IIIGL-800Marcial0005/2/14IICX-73OJuan
Esco.3116.25133.535/2/14IIGL-780Obdulio0005/2/14IIICX-
635P.C0005/2/14IIICX-565G&H0005/2/14IIICX-565G&H0005/2/14IIIGL-800Marcial0006/3/14IIICX-635P.C3116.25133.536/4/14IICX-730Juan
Esco.277.589.026/4/14IICX-730Juan
Esco.1.558.12566.7656/5/14IICX-730Juan
Esco.1.558.12566.7656/5/14IICX-730Juan
Esco.1.558.12566.7656/6/14IICX-730Juan
Esco.1.558.12566.7656/6/14IICX-730Juan
Esco.277.589.026/7/14IICX-730Juan Esco.277.589.026/9/14IICX-730Juan
Esco.277.589.026/10/14IICX-730Juan
Esco.277.589.026/11/14IIICX-730Juan
Esco.277.589.026/11/14IIGL-7800bdulio
urtecho1.558.12566.7656/12/14IICX-730Juan
Esco.1.558.12566.7656/12/14IIICX-635P.C3116.25133.536/13/14IICX-780Obdulio138.7544.516/13/14IICX-730Juan
Esco.277.589.026/13/14IIICX-635P.C3116.25133.536/14/14IIICX-802P.C1.66271.2166/16/14IIICX-635P.C4.5174.375200.2956/17/14IIICX-635P.C277.589.026/17/14IICX-730Juan
Esco.138.7544.516/18/14IIIGL-565G&H1.558.12566.7656/18/14IIICX-635P.C3116.25133.536/19/14IICX-730Juan
Esco.138.7544.516/20/14IICX-730Juan
Esco.138.7544.516/20/14IIICX-635P.C5193.75222.556/21/14IICX-730Juan
Esco.277.589.026/23/14IICX-731Juan
Esco.1.558.12566.7656/23/14IIICX-635P.C2.596.875111.2756/24/14IIICX-700Julio
de la
Cruz138.7544.516/24/14IIICX-635P.C2.596.875111.2756/24/14IICX-730Juan
Esco.1.558.12566.7656/25/14IICX-635P.C277.589.026/25/14IICX-730Juan
Esco.277.589.026/25/14IIICX-635P.C2.596.875111.2756/25/14IIICX-565G&H1.558.12566.765CONTRATA
TIEMPO (h) COSTO COMBUST. (S/) COSTO SUB TOTAL
(s/)6/25/14IIISN-660Alejandro T.138.7544.510bdulio
urtecho1.558.12566.7656/26/14IICX-730Juan
Esco.1.558.12566.765Alejandro
T.3.5135.625155.7856/26/14ICX-700Julio de la
Cruz138.7544.51G&H11426.25489.616/26/14IIICX-565G&H277.589.02Juan
Esco.411588.751824.916/27/14IIICX-565G&H138.7544.51Julio de la
Cruz277.589.026/27/14IICX-730Juan
Esco.1.558.12566.765Marcial0006/27/14IIICX-635P.C2.596.875111.275Obdulio138.7544.516/27/14IIICX-565G&H277.589.02P.C38.11476.3751695.8316/28/14IICX-730Juan
Esco.1.558.12566.765(en blanco)6/28/14IIISN-660Alejandro
T.138.7544.51Total
general98.13801.3754366.4316/28/14IIICX-565G&H138.7544.516/29/14IIICX-565G&H277.589.026/30/14IIISN-660Alejandro
T.1.558.12566.7656/30/14IICX-730Juan
Esco.277.589.026/30/14IIICX-635P.C138.7544.51FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL (s/)
7/1/14IICX-730Juan Esco.277.589.027/1/14IIISN-660Alejandro
T.1.558.12566.7657/2/14IIISN-660Alejandro
T.138.7544.517/2/14IIICX-635P.C1.558.12566.7657/2/14IIICX-565G&H138.7544.517/2/14IICX-730Juan
Esco.277.589.027/3/14IICX-730Juan
Esco.1.558.12566.7657/3/14IIISN-660Alejandro
T.138.7544.517/3/14IIICX-730Juan
Esco.277.589.027/3/14IIICX-635P.C1.558.12566.7657/3/14IIICX-565G&H0.519.37522.2557/3/14IIISN-660Alejandro
T.138.7544.517/4/14IICX-730Juan
Esco.1.558.12566.7657/4/14IICX-730Juan
Esco.277.589.027/4/14IIISN-660Alejandro
T.1.558.12566.7657/4/14IIICX-565G&H138.7544.517/5/14IIICX-730Juan
Esco.277.589.027/5/14IIICX-565NG&H138.7544.517/6/14IIICX-565G&H138.7544.517/7/14IIISN-660Alejandro
T.1.558.12566.7657/7/14IICX-730Juan
Esco.277.589.027/7/14IIICX-635P.C277.589.027/7/14IIICX-565G&H138.7544.51FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL (s/)
7/8/14IICX-730Juan Esco.2.596.875111.2757/9/14IIISN-660Alejandro
T.1.558.12566.7657/9/14IICX-730Juan
Esco.277.589.027/9/14IIICX-565G&H138.7544.517/9/14IIICX-635P.C3116.25133.537/10/14IIICX-635P.C277.589.027/10/14IICX-730Juan
Esco.277.589.027/10/14IIISN-660Alejandro
T.1.558.12566.7657/10/14IICX-730Juan
Esco.138.7544.517/10/14IIICX-520G&H1.558.12566.7657/11/14IIISN-660Alejandro
T.1.558.12566.7657/11/14IIICX-730Juan
Esco.277.589.027/12/14IIICX-520G&H1.558.12566.7657/12/14IIICX-520G&H138.7544.517/12/14ICX-700Julio
de la Cruz1.558.12566.7657/12/14IICX-730Juan
Esco.1.558.12566.7657/13/14IIICX-520G&H1.558.12566.7657/14/14IIICX-520G&H277.589.027/14/14IIICX-635P.C277.589.02FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL (s/)
7/15/14IIICX-565G&H1.558.12566.7657/15/14IIICX-520G&H1.558.12566.7657/15/14IIICX-730Juan
Esco.277.589.027/15/14IIISN-660Alejandro
T.1.558.12566.7657/16/14IIICX-635P.C277.589.027/16/14IIICX-730Juan
Esco.2.596.875111.2757/17/14IIICX-730Juan
Esco.277.589.027/17/14IIISN-660Alejandro
T.1.558.12566.7657/18/14IIICX-730Juan
Esco.277.589.027/19/14IIICX-635P.C277.589.027/19/14IICX-730Juan
Esco.277.589.027/21/14IICX-730Juan
Esco.2.596.875111.2757/21/14IISN-660Alejandro
T.138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL (s/)
7/22/14IIISN-660Alejandro T.138.7544.517/22/14IICX-730Juan
Esco.277.589.027/25/14IICX-730Juan
Esco.2.596.875111.2757/25/14IIICX-635P.C277.589.027/26/14IIISN-660Alejandro
T.1.558.12566.7657/26/14IICX-730Juan
Esco.2.596.875111.2757/26/14IIICX-635P.C2.596.875111.2757/28/14IIISN-660Alejandro
T.138.7544.517/28/14IICX-730Juan
Esco.277.589.027/29/14IIICX-635P.C0.27.758.9027/29/14IIISN-660Alejandro
T.138.7544.517/29/14IICX730Juan
Esco.2.596.875111.2757/30/14IICX-730Juan
Esco.277.589.027/31/14IIISN-660Alejandro
T.138.7544.517/31/14IICX-730Juan
Esco.277.589.028/1/14IIISN-660Alejandro
T.138.7544.518/1/14IIICX-635P.C3116.25133.538/1/14IIICX-635P.C138.7544.518/1/14IICX-730Juan
Esco.277.589.028/2/14IIISN-660Alejandro
T.1.558.12566.7658/3/14IIICX-585G&H277.589.028/3/14IIICX-550G&H1.558.12566.7658/4/14IIICX-635P.C277.589.028/4/14IIICX-635P.C4.5174.375200.2958/4/14IICX-730Juan
Esco.1.558.12566.7658/4/14IIICX-550G&H277.589.028/4/14IIICH-635Juan
Esco.138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL (s/)
8/5/14IIICX-580G&H277.589.028/5/14IIICX-635P.C4155178.048/5/14IIICX-550G&H277.589.028/6/14IIISN-660Alejandro
T.138.7544.518/6/14IIICX-635P.C4155178.048/6/14IIICX-730Juan
Esco.277.589.028/6/14IIICX-550G&H277.589.028/7/14IIICX-585G&H4155178.048/7/14IIICX-550G&H277.589.028/7/14IIICX-635P.C4155178.048/7/14IICX-730Juan
Esco.277.589.028/8/14IIICX-635P.C4155178.048/8/14IIICX-585G&H277.589.028/8/14IIICX-550G&H277.589.028/8/14IIISN-660Alejandro
T.138.7544.518/9/14IIICX-635P.C3116.25133.538/9/14IIICX-585G&H4155178.048/9/14IICX-730Juan
Esco.138.7544.518/9/14IICX-730Juan
Esco.0.519.37522.2558/10/14IIICX-585G&H277.589.028/10/14IIICX-550G&H277.589.028/11/14IIICX-550G&H277.589.028/11/14IIICX-635P.C4155178.048/11/14IIICX-730Juan
Esco.138.7544.518/11/14IIICX-585G&H277.589.028/11/14IIICX-550G&H277.589.02FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL (s/)
8/12/143190CX-585G&H277.589.028/12/14IICX-730Juan
Esco.138.7544.518/12/14IIICX-635P.C4155178.048/12/143190CX-585G&H277.589.028/13/14IIICX-635P.C4155178.048/13/143190CX-585G&H277.589.028/14/14IIISN-660Alejandro
T.138.7544.518/14/143190CX-585G&H277.589.028/15/143190CX-585G&H277.589.028/16/143190CX-585G&H277.589.028/17/143190CX-585G&H2.596.875111.2758/17/143190CX-550G&H277.589.028/18/143190CX-585G&H1.558.12566.7658/18/143190CX-550G&H1.558.12566.7658/18/14IIICX-635P.C3116.25133.538/19/14IIICX-550G&H3.5135.625155.7858/19/14IIICX-550G&H277.589.028/19/14IIISN-660Alejandro
T.138.7544.518/21/14IIICX-585G&H138.7544.518/21/14IIICX-635P.C0.519.37522.2558/22/143190CX-550G&H138.7544.518/22/143190CX-550G&H0.519.37522.2558/23/143190CX-550G&H0.519.37522.2558/24/143190CX-585G&H277.589.028/24/143190CX-550G&H1.558.12566.7658/25/14IIICX-635P.C0.519.37522.2558/25/143190CX-550G&H1.558.12566.7658/25/143190CX-585G&H0.519.37522.255FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL (s/)
9/2/14IIIGLSixto Pizan0.519.37522.2559/2/14IIICX-635Juan
Esco.0.519.37522.2559/3/14IIICX-550Leodan
Avila0.519.37522.2559/3/14IIISNRosas
Villanueva0.519.37522.2559/3/14IIIGLSixto
Pizan0.519.37522.2559/4/14IIICX-635Juan
Esco.138.7544.519/4/14IIICX-550Leodan
Avila1.558.12566.7659/5/14IIICX-550Leodan
Avila138.7544.519/5/14IIICX-585Leodan
Avila138.7544.519/6/14IIICX-550Leodan
Avila138.7544.519/6/14IIICX-585NLeodan
Avila138.7544.519/8/143190CX-585SLeodan
Avila277.589.02FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL (s/)
9/9/14IIICX-585NLeodan Avila138.7544.519/9/14IIICX-550Leodan
Avila138.7544.519/10/14IIICX-550Leodan
Avila2.596.875111.2759/11/14IIICX-55NLeodan
Avila2.596.875111.2759/12/14IIICX-580Leodan
Avila277.589.029/13/14IIICX-580Leodan Avila277.589.02
VALORIZACIONsostenimientoNIVELLABORCONTRATISTAN DE CUADROSP.U/
CUADROCOSTO S/IIGLRoger pea5100500IICX-730Juan
escobedo4100400IIICX-560Pedro
Briceo3100300total1200limpiezaNIVELLABORCONTRATISTALIMPIEZACOSTO
s/IIGLRoger Peadesmonte200CONTRATAIICX-730Juan
Ecobedodesmonte450total650Alquiler comprensora
victoriaNIVELCONTRATISTACOSTO s/VICTORIADaniel Carrion306
AIRE-PRE Y DESA.COSTOS AIRE COMPRIMIDOComp 185cfm2.5P.U
Combust15.5RESUMEN DE COSTOS DE AIRE COMPRIMIDO PREPARACION (SEMANA
III MAYO)Cost.Maquina0.96Cost.Operario4.8FECHATIEMPO (h)COMBUSTIBLE
(Gl/h)P.U COMBUST. (S/Gl)COSTO COMBUST. (S/)COSTO MAQUI. (S/h)COSTO
OPERA. (S/h)COSTO SUB TOTALCOMPREN-250 CFMCOMPREN-185
CFMFECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST. (S/)COSTO SUB
TOTAL5/27/145.52.515.5213.1250.964.8244.8055/28/1422.515.577.50.964.889.025/31/1432.515.5116.250.964.8133.535/27/14IICX-565G&H2.596.875111.2755/30/1402.515.500.964.805/27/14IISN-610-02MELVA1.558.12566.7655/31/1402.515.500.964.805/27/14IIICX-638Pedro
Cruz1.558.12566.7656/1/1402.515.500.964.805/27/14IIICHI-
610G&H006/2/1412.515.538.750.964.844.515/28/14ICX-565G&H0.519.37522.255TOT.
(h/Semana10.5TOT. COMB. (S/semana)406.875TOT.
(S/semana)511.8655/28/14IIICX-636G&H1.558.12566.7655/31/14ICX-565G&H277.589.025/31/14IIBP-700Julio
de la C.138.7544.515/31/14IIBP - 660Roger Pea00FECHA TIEMPO (h)
COMBUST. (S/) COSTO SUB TOTAL(S/)5/31/14IIIINClI-800Pedro
Cruz005/27/145.5213.125244.8055/31/14IIIGL-638,636G&H005/28/14277.589.025/31/14IIIGL-800Marcial005/30/14005/30/14IBP
- 700Julio de la C.005/31/143116.25133.535/30/14IIBP-650Juan
Escob.006/1/14005/30/14IIBP - 660Roger
Pea006/2/14138.7544.515/30/14IIIINClI-800Pedro Cruz00(en
blanco)5/30/14IIIGL565G&H00Total
general11.5445.625511.8655/31/14IBP - 700Julio de la
C.005/31/14IIBP-650Juan Escob.005/31/14IIBP - 660Roger
Pea005/31/14IIIINClI-800Pedro
Cruz005/31/14IIIGL565NG&H00FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
6/1/14IBP - 700Julio de la C.0006/1/14IIBP-650Juan
Escob.0006/1/14IIBP - 660Roger Pea0006/1/14IIIINClI-800Pedro
Cruz0006/1/14IIICHI-
610G&H0006/1/14IIIGL-800Marcial0006/2/14IIIGLAlejandro
T.138.7544.516/2/14IICX-730Juan Escob.0006/2/14IIBP - 660Roger
Pea0006/2/14IIIINClI-800Pedro Cruz0006/2/14IIICHI-
610G&H0006/2/14IIIGL-800Marcial0006/8/14ICX-700Pedro
Cruz138.7544.516/10/14IIIBP-610G&H138.7544.516/10/14IIISN-610-02MELVA138.7544.516/11/14IIIBP-610G&H1.558.12566.7656/11/14IIIBP-610Pedro
Cruz277.589.026/12/14IIIBP-610G&H277.589.026/12/14IIIINClI-800Pedro
Cruz138.7544.516/13/14IIIBP-610G&H1.558.12566.7656/16/14IIIINClI-800Pedro
Cruz138.7544.516/16/14IIIBP-610G&H138.7544.516/17/14IBP -
700Julio de la
C.138.7544.516/17/14IIIBP-610G&H1.558.12566.7656/18/14IIIBP-610G&H1.558.12566.7656/18/14IIIGL-635Pedro
Cruz277.589.026/18/14IIIGL-635Pedro
Cruz1.558.12566.7656/18/14IIIGL-565G&H1.558.12566.7656/19/14IIIGL-565Pedro
Cruz1.558.12566.7656/19/14IIIBay
passMarcial1.558.12566.7656/19/14IIIGL-635Pedro
Cruz277.589.026/20/14IBP-700Julio de la
C.138.7544.516/20/14IIIBP-610G&H277.589.026/21/14IIIGL-635Pedro
Cruz3116.25133.536/21/14IIIBP-610G&H277.589.026/23/14IIIBPMarcial1.558.12566.7656/23/14IIIGL-565G&H1.558.12566.765CONTRATA
TIEMPO (h) COSTO COMBUST. (S/) COSTO SUB
TOTAL6/24/14IIIBPMarcial138.7544.51Alejandro
T.4155178.046/24/14IIIBPMarcial1.558.12566.765G&H18.5716.875823.4356/24/14IIIGL-565G&H1.558.12566.765Juan
Escob.0006/24/14IIBP-660Roger Pea1.558.12566.765Julio de la
C.277.589.026/26/14IIIGLAlejandro
T.1.558.12566.765Marcial5.5213.125244.8056/26/14IIIGLPedro
Cruz277.589.02MELVA138.7544.516/26/14IIBay passTeofilo
Espejo277.589.02Pedro Cruz17.5678.125778.9256/27/14IIIGLAlejandro
T.1.558.12566.765Roger Pea1.558.12566.7656/27/14IIBP-656Teofilo
Espejo138.7544.51Teofilo
Espejo9.5368.125422.8456/27/14IIBP-656Teofilo Espejo277.589.02(en
blanco)6/28/14IIBP-625Teofilo Espejo277.589.02Total
general59.52305.6252648.3456/28/14IIICX-635Pedro
Cruz0.519.37522.2556/30/14IIBP-625Teofilo
Espejo138.7544.517/30/14IIBP-626Teofilo
Espejo1.558.12566.765FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
7/1/14IIBP-645Teofilo Espejo138.7544.517/1/14IIIGL-635Pedro
Cruz1.558.12566.7657/1/14IIBP-645Teofilo
Espejo1.558.12566.7657/2/14IIBP-645Teofilo
Espejo0.519.37522.2557/2/14IIIGL-565G&H138.7544.517/3/14IIBP-645Teofilo
Espejo1.558.12566.7657/3/14IIIGL-635Pedro
Cruz1.558.12566.7657/3/14IIBP-645Teofilo
Espejo1.558.12566.7657/3/14IIIGL-565G&H138.7544.517/4/14IIIGL-635Pedro
Cruz1.558.12566.7657/4/14IIBP-645Teofilo
Espejo1.558.12566.7657/7/14IIBP-645Teofilo
Espejo138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL
7/8/14IIBP-645Teofilo Espejo138.7544.517/8/14IIIGL-635Teofilo
Espejo277.589.027/9/14IIIGL-565G&H138.7544.517/10/14IIGLAntonio
Lujan138.7544.517/10/14IIICX-520G&H138.7544.517/10/14IIBP-645Teofilo
Espejo1.83371.0287581.586837/10/14IIBP-645Teofilo
Espejo277.589.027/10/14IIIESTOCADAG&H1.558.12566.7657/11/14IIIESTOCADAG&H1.558.12566.7657/11/14IIGLAntonio
Lujan138.7544.517/11/14IIIGL-635Pedro
Cruz1.558.12566.765FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
7/15/14IIBP-660Roger Pea277.589.027/15/14IIBP-645Teofilo
Espejo138.7544.517/15/14IIBP-645Teofilo
Espejo1.558.12566.7657/16/14IIICX-565NG&H277.589.027/16/14IIIGL-635Pedro
Cruz138.7544.517/16/14IIBP-645Teofilo
Espejo1.558.12566.7657/17/14IIIGL-635Pedro
Cruz1.558.12566.7657/18/14IIICX-565NG&H277.589.027/18/14IIICX-565NG&H138.7544.517/19/14IIIGL-570G&H1.558.12566.7657/20/14IIIGL-570G&H1.558.12566.7657/20/14IIIGL-570G&H138.7544.517/21/14IIIGL-635Pedro
Cruz277.589.027/21/14IIICX-580Pedro
Cruz138.7544.517/21/14IIICX-565NG&H277.589.027/21/14IIICX-580Pedro
Cruz277.589.027/21/14IIICX-565NG&H138.7544.51FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
7/22/14IIICX-565NG&H1.558.12566.7657/22/14IIIGL-780Obdulio138.7544.517/25/14IIICX-565NG&H2.596.875111.2757/25/14IIBP-645Teofilo
Espejo138.7544.517/25/14IIIGL-635Pedro
Cruz2.596.875111.2757/25/14IIICX-565NG&H1.558.12566.7657/26/14IIICX-565NG&H138.7544.517/26/14IIICX-565NG&H277.589.027/26/14IIICX-565NG&H1.558.12566.7657/28/14IIICX-565NG&H1.558.12566.7657/29/14IIIGL-635Pedro
Cruz2.596.875111.2757/30/14IIICX-635Pedro
Cruz3116.25133.537/30/14IIICX-565NG&H1.558.12566.7657/31/14IIICX-565G&H3116.25133.537/31/14III610SG&H3116.25133.537/31/14IICX-645Teofilo
Espejo138.7544.518/1/14IIICX-565NG&H1.558.12566.7658/2/14IIICHI-
610G&H1.558.12566.7658/2/14IIIGL-635Pedro
Cruz138.7544.518/2/14IIICX-565NG&H1.558.12566.7658/2/14IIICH-610G&H1.558.12566.765FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB TOTAL
8/5/14IIIGLMarcial138.7544.518/5/14IIICH-635Juan
Escob.277.589.028/7/14IIIGL-580Pedro
Cruz0.519.37522.2558/8/14IIICH-610G&H1.558.12566.7658/8/14IIIGL-635Pedro
Cruz0.519.37522.2558/8/14IIICH-635Juan
Escobedo277.589.028/9/14IIICH-635JUAN
ESCOB277.589.028/11/14IIICH-635Juan
Escobedo277.589.02FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
8/13/14IIBP-725Juan Escobedo277.589.028/14/14IIIGL-635Juan
Escobedo138.7544.518/14/14IIBP-725Juan
Escobedo277.589.028/14/14IIIPQ-635Pedro
Cruz138.7544.518/15/14IIIGL-635Juan
Escobedo277.589.028/15/14IIIBP-725Juan
Escobedo277.589.028/16/14IIIGL-635Juan
Escobedo277.589.028/16/14IIIBP-725Juan
Escobedo277.589.028/16/14IIIPQ-635Pedro
Cruz138.7544.518/16/14IIIPQ-635Pedro
Cruz277.589.028/18/14IIBP-725Juan
Escobedo277.589.028/18/14IIIGL-635Juan
Escobedo277.589.028/19/14IIBP-725J.
Escobedo277.589.028/19/14IIGL-780Obdulio1.558.12566.7658/20/14IIIPQ-635Pedro
Cruz138.7544.518/22/14IIIVariasEsc-
Flores0.519.37522.2558/22/14IIIGL-580Obdulio0.519.37522.2558/22/14IIIGL-580
Flores0.519.37522.255APOYO8/25/14IIIGL-580
Flores0.519.37522.255APOYO8/25/14IIIGL-580
Flores0.519.37522.255APOYOFECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
9/8/14IIIGL-580SAlex Rubio0.519.37522.2559/8/14IIISNJuan
Escobedo138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
9/13/14IIIGLJuan Escobedo138.7544.519/15/14IIIGLJuan
Escobedo138.7544.51
AIRE EXPLOTA.COSTOS AIRE COMPRIMIDOComp 185cfm2.5RESUMEN DE
COSTOS DE AIRE COMPRIMIDO EXPLOTACION (SEMANA III MAYO)P.U
Combust15.5Cost.Maquina0.96FECHATIEMPO (h)COMBUSTIBLE (Gl/h)P.U
COMBUST. (S/Gl)COSTO COMBUST. (S/)COSTO MAQUI. (S/h)COSTO OPERA.
(S/h)COSTO SUB TOTALCost.Operativ4.8COMPREN-250 CFMCOMPREN-185
CFM5/27/141.5215.546.50.964.855.14FECHANIVELLABORCONTRATISTATIEMPO
(h)COSTO COMBUST. (S/)COSTO SUB
TOTAL5/28/142.5215.577.50.964.891.95/29/141215.5310.964.836.765/27/14IIICH-638Administracion
D.138.7544.515/30/141215.5310.964.836.765/27/14IIIPQ-638Administracion
D.0.519.37522.2556/1/143.5215.5108.50.964.8128.665/28/14IIICH-638Administracion
D.138.7544.516/2/142215.5620.964.873.525/28/14IIIPQ-638Administracion
D.0.519.37522.2555/28/14IIIPQMarcial de la cruz138.7544.51TOT.
(h/Semana11.5TOT. COMB. (S/semana)356.5TOT.
(S/semana)422.745/29/14IIIPQ-638Administracion
D.138.7544.515/30/14IIICH-638Administracion
D.138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL
6/1/14IIICH-638Administracion
D.277.589.026/1/14IIISN-610Administracion
D.1.558.12566.7656/2/14IGL-715Alejandro
Quispe.277.589.026/3/14IIIGLAlejandro
Trujillo.138.7544.516/3/14IIIPQHilder
Tandaypan138.7544.516/3/14IICX-730Administracion
D.277.589.026/3/14IIGL-780Obdulio
Urtecho1.558.12566.7656/4/14IIIGLAlejandro
Trujillo.138.7544.516/4/14IIIPQHilder
Tandaypan277.589.026/4/14IIIPQ-638Administracion
D.138.7544.516/5/14IIIGLAlejandro
Trujillo.138.7544.516/5/14IIGL-780Obdulio
Urtecho1.558.12566.7656/5/14IIIPQ-638Administracion
D.138.7544.516/5/14IIIPQHilder
Tandaypan138.7544.516/6/14IIIPQ-638Administracion
D.138.7544.516/6/14IIIPQ-639Administracion
D.138.7544.516/7/14IIICX-638Sixto
Pizan138.7544.516/7/14IIISNAlejandro
Trujillo.138.7544.516/8/14IIIPQ-638Administracion
D.138.7544.516/9/14IIGL-780Obdulio
Urtecho1.558.12566.7656/9/14IIIGL-800Sixto
Pizan138.7544.516/9/14IIIPQHilder
Tandaypan138.7544.516/9/14IIISNAlejandro
Trujillo.138.7544.516/10/14IIIPQ-638MELVA138.7544.516/11/14IIIPQHilder
Tandaypan138.7544.516/11/14IICHRoger
Pea277.589.026/11/14IIIGL-635Administracion
D.1.558.12566.7656/11/14IIISNAlejandro
Trujillo.138.7544.516/12/14IIGL-780Obdulio
Urtecho1.558.12566.7656/12/14IIGLRoger
Pea1.558.12566.7656/12/14IIIGL-635Administracion
D.138.7544.516/13/14IIPQRoger Pea138.7544.516/13/14IISNAlejandro
Quispe.138.7544.516/13/14IIIPQHilder
Tandaypan138.7544.516/16/14IIIPQHilder
Tandaypan138.7544.516/16/14IIISNAlejandro
Trujillo.138.7544.516/16/14IIIGLRoger
Pea1.558.12566.7656/17/14IICHRoger Pea277.589.026/17/14IIIPQHilder
Tandaypan138.7544.516/18/14IICHRoger
Pea277.589.026/18/14IIGL-780Obdulio
Urtecho1.558.12566.7656/19/14IIIPQHilder
Tandaypan138.7544.516/19/14IIISN-610-02Alejandro
Trujillo.138.7544.516/20/14IIISN-610-02Alejandro
Trujillo.138.7544.51CONTRATA TIEMPO (h) COSTO COMBUST. (S/) COSTO
SUB TOTAL6/20/14IICHRoger Pea1.558.12566.765Administracion
D.13403477.886/21/14IIIGLAlejandro Trujillo.138.7544.51Alejandro
Quispe.5155183.86/21/14IIGL-780Obdulio
Urtecho1.558.12566.765Alejandro
Trujillo.15.5480.5569.786/21/14ICX-700Julio de la
Cruz138.7544.51Hilder Tandaypan13403477.886/23/14IIIGLAlejandro
Trujillo.138.7544.51Julio de la Cruz13136.766/23/14IIIPQHilder
Tandaypan138.7544.51MELVA13136.766/23/14IICHRoger
Pea277.589.02Obdulio Urtecho9279330.846/24/14IIIGLAlejandro
Trujillo.1.558.12566.765Roger Pea18.5573.5680.066/25/14ICHAlejandro
Trujillo.3116.25133.53Sixto Pizan26273.526/25/14IIIPQHilder
Tandaypan138.7544.51(en blanco)6/26/14IICHRoger Pea138.7544.51Total
general7824182867.286/27/14IIICHAlejandro
Quispe.277.589.026/27/14IIIPQHilder
Tandaypan138.7544.516/27/14IIICHRoger Pea277.589.026/30/14IICHRoger
Pea277.589.02FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL
7/1/14IIIGLAlex Infantes1.558.12566.7657/4/14IIIPQObdulio
Urtecho138.7544.517/4/14IIIPQHilder
Tandaypan138.7544.517/4/14ICHAlejandro
Quispe.277.589.027/4/14IIIPQObdulio
Urtecho138.7544.517/7/14IIIPQObdulio
Urtecho138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
7/8/14IIIPQObdulio Urtecho0.519.37522.2557/8/14ICHAlejandro
Quispe.277.589.027/9/14IIISNObdulio
Urtecho138.7544.517/10/14ICHAlejandro
Quispe.0.83332.2787537.076837/10/14IIIPQHilder
Tandaypan1.558.12566.7657/11/14IIIPQObdulio
Urtecho138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
7/15/14IIIPQObdulio Urtecho138.7544.517/15/14IIIPQHilder
Tandaypan138.7544.517/15/14IIIGLSixto
Pizan1.558.12566.7657/15/14IIIGLSixto
Pizan138.7544.517/15/14IIICX-700Julio de la
Cruz138.7544.517/16/14IIIGLSixto Pizan138.7544.517/17/14IICHRoger
Pea1.558.12566.7657/17/14GLAntonio
Lujan138.7544.51vendido7/18/14IIICHRoger
Pea277.589.027/18/14IIIGLSixto Pizan138.7544.517/19/14IIIPQHilder
Tandaypan0.6725.8329.677/19/14IIICHAlejandro
Trujillo.0.8332.2937.097/21/14IIICHAlejandro
Quispe.1.558.12566.7657/21/14IIC HRoger
Pea277.589.027/21/14IIIPQHilder
Tandaypan138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
7/22/14IIIPQHilder Tandaypan138.7544.517/22/14IIIGLSixto
Pizan138.7544.517/22/14IPQJulio de la
Cruz138.7544.517/22/14IIPQRoger Pea277.589.027/25/14IIPQRoger
Pea277.589.027/25/14IIPQJulio de la
Cruz138.7544.517/25/14IIGL-780Obdulio
Urtecho138.7544.517/26/14IIGL-780Obdulio
Urtecho277.589.027/28/14IIGL-780Obdulio
Urtecho1.558.12566.7657/28/14IIIPQHilder
Tandaypan138.7544.517/28/14IIPQRoger Pea277.589.027/29/14ISNJulio
de la
Cruz138.7544.517/30/14IIICH-635J.Escobedo138.7544.517/31/14ISNJulio
de la Cruz138.7544.517/31/14IIGL-780Obdulio
Urtecho277.589.027/31/14IPQJulio de la
Cruz138.7544.517/31/14IICHRoger Pea277.589.028/1/14ISNJulio de la
Cruz138.7544.518/1/14ICHAlejandro
Quispe.277.589.028/1/14IIICH-635Juan
Escobedo1.558.12566.7658/1/14iSNJulio de la
Cruz1.558.12566.7658/2/14IICX-730J.Escobedo1.558.12566.7658/4/14ISNJulio
de la Cruz138.7544.518/4/14IICHRoger
Pea277.589.02FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL
8/5/14IIGL-780Roger Pea138.7544.518/5/14IICHRoger
Pea277.589.028/5/14IIICX-520Carlos
Carbajal138.7544.518/5/14ISNJulio de la
Cruz138.7544.518/6/14IIISNMarcial de la
cruz0.519.37522.2558/6/14IIIGL-520Carlos
Carbajal138.7544.518/6/14IIISNJulio de la
Cruz138.7544.518/8/14IIGLRoger
Pea3116.25133.538/8/14IIGL-780Obdulio
Urtecho138.7544.518/8/14ICH-715A.Quispe277.589.028/8/14IIIPQMarcial
de la cruz138.7544.518/8/14IIICHFlores138.7544.518/9/14ISNJulio de
la Cruz138.7544.518/9/14IIGL-780Obdulio
Urtecho138.7544.518/9/14IIIPQHilder
Tandaypan138.7544.518/10/14IICHObdulio
Urtecho138.7544.518/11/14ISNJulio de la
Cruz138.7544.518/11/14IIGLRoger Pea138.7544.518/11/14IIGLRoger
Pea138.7544.518/11/14IICHRoger Pea138.7544.518/11/14ICHAlejandro
Quispe.277.589.028/11/14IIIPQHilder
Tandaypan138.7544.518/12/14IIISNJulio de la
Cruz138.7544.518/12/14IIIPQMarcial de la
cruz138.7544.518/12/14IIICX-520Alex
Infantes138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
8/12/14IIGL-780Obdulio Urtecho277.589.028/13/14IICHRoger
Pea3116.25133.538/13/14IIIPQHilder
Tandaypan138.7544.518/14/14IIIPQMarcial de la
cruz138.7544.518/15/14IIIPQMarcial de la
cruz138.7544.518/15/14IIIPQHilder
Tandaypan138.7544.518/16/14ISNJulio de la
Cruz138.7544.518/18/14IIIPQHilder
Tandaypan138.7544.518/18/14ISNJulio de la
Cruz138.7544.518/18/14IIIGLAlejandro
Trujillo.1.558.12566.7658/18/14IIIPQMarcial de la
cruz138.7544.518/18/14IICHObdulio
Urtecho138.7544.518/19/14IIIPQHilder
Tandaypan138.7544.518/19/14IPQJulio de la
Cruz138.7544.518/19/14IIIPQMarcial de la
cruz138.7544.518/20/14IIIPQHilder
Tandaypan138.7544.518/21/14ISNJulio de la
Cruz0.519.37522.2558/21/14IIIPQSixto
Pizan0.519.37522.2558/22/14IIIPQMarcial de la
cruz0.519.37522.2558/22/14ISNJulio de la
Cruz0.519.37522.2558/23/14ISNJulio de la
Cruz138.7544.518/23/14IICHObdulio
urtecho0.519.37522.2558/25/14IIIPQSixto
Pizan138.7544.518/25/14IIIPQRoger Pea0.83135.6088/25/14IIIPQHilder
Tandaypan0.519.37522.2558/25/14IIIPQJuan
Escobedo0.519.37522.2558/25/14IIIPQMarcial de la
cruz138.7544.518/26/14IICHObdulio
urtecho0.519.37522.2558/26/14IIPQRoger
Pea0.519.37522.2558/26/14IIIPQSixto
Pizan0.519.37522.2558/26/14IIIPQMarcial de la
cruz0.519.37522.255FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO
COMBUST. (S/)COSTO SUB TOTAL
9/2/14IIIPQHilder Tandaypan0.259.687511.12759/2/14IIIPQAlex
Rubio0.259.687511.12759/2/14IIISNAlejandro
Trujillo.0.519.37522.2559/2/14IIISNRosas
Villanueva0.519.37522.2559/2/14IICHRoger
Pea0.519.37522.2559/2/14IICHObdulio
Urtecho0.519.37522.2559/3/14IICHRoger
Pea0.519.37522.2559/3/14IICHObdulio
Urtecho0.519.37522.2559/4/14ICHJulio de la
Cruz138.7544.519/4/14IIIPQHilder
Tandaypan0.519.37522.2559/4/14IIISNMarcial de la
cruz138.7544.519/5/14IIISNMarcial de la
cruz0.519.37522.2559/5/14IIICX-635Juan
Escobedo0.519.37522.2559/5/14ICHJulio de la
Cruz138.7544.519/5/14IICHObdulio
Urtecho138.7544.519/6/14IICHObdulio
Urtecho0.519.37522.2559/6/14IICHRoger
Pea0.519.37522.2559/6/14ICHJulio de la
Cruz138.7544.519/8/14IIIPQHilder
Tandaypan138.7544.519/8/14IIISNMarcial de la
cruz138.7544.519/8/14ICHJulio de la
Cruz138.7544.51FECHANIVELLABORCONTRATISTATIEMPO (h)COSTO COMBUST.
(S/)COSTO SUB TOTAL
9/9/14ISNJulio de la Cruz138.7544.519/9/14IICHRoger
Pea0.519.37522.2559/9/14IISNObdulio
Urtecho0.519.37522.2559/9/14IIISNSixto
Pizan0.519.37522.2559/10/14IIIGLSixto
Pizan0.519.37522.2559/10/14IIIGL-580NAlex
Rubio0.519.37522.2559/10/14IIICHHilder
Tandaypan138.7544.519/10/14IIICX-635Juan
Escobedo138.7544.519/10/14IISNObdulio
Urtecho1.558.12566.7659/11/14IICHObdulio
Urtecho1.558.12566.7659/11/14IIISNRosas
Villanueva0.519.37522.2559/11/14IIICX-635Juan
Escobedo0.519.37522.2559/11/14IIISNAlex
Rubio0.519.37522.2559/11/14IIIPQHilder
Tandaypan138.7544.519/12/14IICHObdulio
Urtecho138.7544.519/12/14IIISNRosas
Villanueva0.519.37522.2559/12/14IIIGLJuan
Escobedo0.519.37522.2559/12/14IIIPQAlex
Rubio0.519.37522.2559/13/14ICHAlejandro
Quispe.138.7544.519/13/14IISNObdulio
Urtecho138.7544.519/13/14IIIGLSixto
Pizan138.7544.519/13/14IISNObdulio
Urtecho138.7544.519/15/14IIIPQAlex Rubio0.519.37522.255