    Accomplishment report:

    For: MERCEDITA P. JABAGATRegional Director andProject Director, KC-KKB

    Thru: MITA GUPANA-LIMAsst. Regional Director andProject Manager, KC-KKB

    CC: AC MARIFI VILLAMunicipal Area Coordinator

    Pilar, Surigao Del Norte

    From: MICHAELLESTER O. MONTERON

    Municipal Monitor

    Pilar, Surigao Del Norte

    Date: October 28, 2010

    Acknowledgement:

    Grateful thanks to Municipal Mayor Lucio Gonzales and his Municipal Coordinating Team for

    their warmest accommodations and hospitality, for providing convenient working space, and allowing me

    to use some of the office materials.

    Executive summary:

    September to October 2010 Makamasang Tugon Project implementation is generally satisfactory

    in terms of level of participation among the residence and the support of LGU towards the project. This is

    observed during the Municipal Orientation that was attended by involved sectors of the community both

    direct and indirect beneficiaries of the project. The first Barangay Assembly has a participation

    percentage ranges from 82% as lowest while 100% as the highest rate of participants attended.

    Volunteers composing of old and newly elected ones are expressing their willingness to learn and

    to execute implements of the project. This is one of the observations done during the conduct of CSW andPDW. Their attentive and responsive attitude towards the implementing activities of the project is very

    impressive. From the beginning of the activity until the end of the session they tend to clarify things and

    personally ask questions to the MCT members for technical assistance. As personally observed it during

    the workshop, there was a mutual interaction between the participants and speaker with MCT members.

    MCT staffs are exhibiting their innate and achieved aptitude in dealing with people and

    community organizing. They are expressing competency and capacities in executing the implements of

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    2/19

    the project. This will somehow warrant the successful implementation and accomplishment of the project.

    The Municipal Area Coordinator was formerly the area coordinator of Kalahi-CIDSS in Vereuala,

    Agusan Sur, is now the current MAC of the Makamasang Tugon Project in Pilar. The MCfs have already

    engaged and have their experienced in previous 3 year cycle of Kalahi-CIDSS implementation and some

    of them are formerly an active BSPMC and Volunteers during those years. This is an assurance that

    everything concerning the processes of the project will be fully carried out towards its accomplishment.

    The community in general is performing so well, close coordination of MCTs, brgy.

    captains, and other concerned offices is being assured for the smooth implementation of the project and so

    that they must be able to capture all the activities as already being planned. Timetable of activities are

    strictly followed, thus, activities undertaken are placed according to its timeframe.

    Introductory statement:

    The highlights of this report are the major activities have been done in the month of

    September to October in Municipality of Pilar. The Municipal Orientation-MOA or project lunching is

    conducted last September 21, 2010; weeks after, the first Barangay assembly is conducted; October 9-13-

    a five days activity is devoted for the reviewing, revisiting and evaluation of PSA result from the previous

    KALAHI-CIDSS implementation and supplemented with CBMS data result in the last three years and

    Barangay Development Plan in identifying issues and concerns; the criteria setting workshop is took place

    last October 14, 2010- this is a one day activity workshop, and the following day October 15-16 two

    days activity is set for project development workshop.

    The abovementioned activities involved several documents that embedded in the

    process. These are as well included in this report base on its purpose. These documents includes

    resolutions, program of activities of activity undertaken, detailed data on level of participation, minutes of

    each major activity and different forms- brgy. monthly report, PDW report which are to be filled-out by

    CFs; site validation forms for sub-projects: roads, post harvest facilities, buildings, and water system; andSub Project Concept Form of the said projects.

    Date

    Accomplishments/ Major Activities Activities Undertaken

    Sept

    21,201

    0

    Municipal Orientation & MOA signing

    Figure 1. FrontPage

    of program

    As shown in figure 1, the program is started by

    an invocation, followed by singing of national anthemand a welcome address of Mayor Lucio Gonzales-

    introducing the provincial officials, MIAC members,

    DSWD team, 15 brgy captains, SB members, 4Ps

    members, and other guests. He gave a heartfelt welcome

    to them and seeks for their best support for the program.

    Afterwards, the MC gave the floor to RIE MacSumagang for the orientation.

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    3/19

    RIE: discussing the Makamasang TugonProject as LGU-lead-implementation during

    the preparation, designing, and development of

    community sub-projects and packaging ofcommunity project proposals

    Emphasizing the following aspects:a. The role of established MCT andMunicipal monitor as front liner

    during the implementation.

    b. CDD-LPP harmonization processc. Project principles and objectives.d. Project backgrounde. The role of peoples participationf. Organizational structure and

    staffing

    g. Community planning and sub-project cycle/ CEAC

    h. Importance of volunteers in theproject implementationi. Local counterpart

    Right after the orientation, MOA signing is

    followed, and it is represented by DSWD Head,Division Office Ramil F. Jamen, Gov. Sol F. Matugas,

    Mayor Lucio Gonzales and DILG representative. This is

    witnessed by 15 brgys captains, media, SB members,

    volunteers and MIAC members and other residencepresent during the program.

    In his speech more focusing on how the

    prevailing principles of the project must be highly

    practiced. Quoted he said: I will make sure that the

    prevailing principles of the project which participatory,

    transparency, and accountability must prevail in alltransactions more on financial matters and these must be

    highly observed. This statement matters most,

    particularly for us implementers and for thosebeneficiaries. This will somehow conveys an assurance

    that the project will be truthfully implemented without

    disparity, discrepancy, and anomalies.

    He thanks the grateful welcome of LGU to

    Makamasang Tugon project and for their continuous

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    4/19

    support and for good performance for the three years

    cycle of Kalahi-CIDSS project implementation. He

    further emphasized that this project is a bonus price for

    them for having a job well done. And since this is LGU-implemented with their counterpart from the province,

    municipal and brgy fund, DSWD is still monitoring and

    supervising in its entire implementation by providingwith them the technical assistance they will need.

    In her speech, she is expressing a grateful

    gratitude to DSWD for continually providing

    opportunities-facilities in her respective Province of

    Siargao. She underscores the importance of having thesefacilities in the community which helps the people a lot

    in terms of improving their livelihood and income

    generation. And gradually alleviate the incidence of

    poverty. Also, emphasizing the salient function of

    establishing school buildings in line with her prioritizedprojects to improve the level of education among youths

    of the province.

    His speech is consistent with Gov. Matugas,

    similarly pronouncing his full support and acceptance of

    the project. Accordingly, he is one of those officialsappreciating and valuing facilities sub-project of the

    province. Through which people could retain their

    confidence that they can attain a quality of life.

    Promised to have a full-blown supervision of the

    project.

    Participation Rate: Project lunching

    To ensure full participation among thestakeholders of the municipality rigid followed up is

    made by Municipal Local Government of Pilar. And

    after the program there is an estimates of 98.56%

    participation percentage generated from the target

    participants:

    1. Municipal Mayor2. Sanguniang Bayan Members

    Municipal Planning and

    Development Officer3. Municipal Social Welfare and

    Development Officer

    4. Municipal Health officer5. Municipal Agriculture Officer6. Municipal budget officer7. Municipal Treasurer8. Municipal Engineer9. Municipal Local Government officer

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    5/19

    Congregated pictures show the level of participation during

    Orientation and MOA signing.

    10. Community Environment andNatural Resources Officer

    11. District Superintendent of the DepEd12. All Barangay Chairman of the

    municipality and councilors

    13. Representative from POs, NGOs,religious sectors and academe.

    14. 4ps membersSetting: Venue of the Program

    Tables and chairs are arranged in an oblique form

    facing the front of the Gymnasium. There are

    participants sat at the side portion and the government

    officials, DSWD team and other VIPs sat in thepresidential table. Sound system is well managed

    amplified volume is used so that everybody can hear

    during the orientation. Well placed projector and has a

    wide coverage of presentation.

    After the Orientation, they took their lunch breakwhile the municipal area coordinator personally calls

    the attention of brgy. captains for the meeting after the

    break. The meeting is for the scheduling of 1st Barangay

    assembly and the clustering of brgy according to the

    assigned MCFs. And also to introduce the MCTs andother team involve during the implementation of the

    sub-project.

    Right after they agreed among themselves and

    have decided that the following schedules and

    agreements reached/settled are official and it should be

    followed accordingly.

    Table 1. Schedules of BA and clustering of brgy

    according to MCFs assigned

    Barangay assembly is conducted from the month of

    September 27-30, 2010.

    Excerpts from the minutes:

    Among others, there are issues have been raised

    during the said meeting. Since the duration of the

    project is so short. They suggested a reevaluation of the

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    6/19

    non-prioritized sub-projects identified during last KC

    implementation. What follows are the sub-projects

    suggested for reevaluation:

    Table 2. list of identified sub-projects

    After the meeting is adjourned, RIE calls for a

    meeting together with MPDC, DILG representative,MCTs, foreign observer and MM for further

    instructions:1. Set of activities to be undertaken2. Role of MM in the area3. Staffs of MCT must render full time service4. MPIP-harmonization process5. Sympathizing for full support of the project.

    After then, MCTs and MM are both busy for the

    preparation of coming brgy assembly. There are

    rehearsals of presentation of each MCF on how they

    will deliver the report. This is done to ensure the quality

    of information they can provide to the residence of each

    brgy and to mitigate lapses.

    Sept

    .

    27-

    30

    Barangay Assembly As agreed among brgy captains during themeeting that there will be a parallel

    sessions of Barangay assembly to be

    conducted morning and afternoon.

    The first brgy assembly is conducted inbrgy Asinan and it is assisted by MMparticularly in discussing the

    harmonization process of LPP and CDD.

    Most of the discussions are well explainedby the MCF alone, thinking that rehearsals

    made help them a lot in familiarizing the

    topics being discussed.

    Alternate joining of MM from differentbrgys assembly and providing themaccurate assistance, helps them more in

    performing their job.

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    7/19

    Overall MCFs are doing so well despitethe absence of MAC that time.

    Level of participation:

    Participation rate vary according to areas.

    The highest participation percentage obtainedranges from 82%-100%. Those previously known

    as outstanding brgys in terms of performance level

    in sub-project implementation are still reining.Highest participation rate connotes greater

    possibility of achievements towards the sub-project

    implementation and more projects to be offered.

    This is the thing being emphasized to those brgywith unsatisfactory rating.

    Table 3. Participation rate of each brgy

    Based on personal observation, in the height of

    coming election-people are political incline. Eachconflicting party intends to defeat one another forthe sake of political position. They wont and dont

    want to engage any activities related to the

    opposition. This might be the reason why some ofbrgys have less participation rate.

    Excerpts from the minutes of brgy assembly;

    Among other things, during the conduct of brgy

    assembly there are certain clarifications have beenraised from the volunteers themselves. These are as

    follows;

    Overview:

    Honorarium for volunteers After the sub-project turn over into the

    brgy, who is responsible for maintenance

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    8/19

    and operation.

    Why there is a need to repeat the processor CEAC when the brgy had alreadyidentified major problems and already had

    their proposed (non-prioritized project)

    project.

    Questions concerning these matters have been

    accommodated by providing with them enoughand accurate information.

    The project has the sense of ownership interms of process and benefits. You as

    volunteers and residences are the directbeneficiaries of the sub-project and to thateffect as owners as well.

    Turnover could be mean of full rights,privileges and responsibilities of the given

    sub-project are being entrusted to therightful owner.

    CEAC or CDD is the central focus of thisproject implementation, by not solelygiving them the sub-project they need, aswell, teaching the LGU and the residence

    on how people be able to chart, shape,

    formulate, decide, design, a form of

    development in their own terms-inadherence to the principles of

    participatory, transparency and

    accountability.

    Schedules of BA can be read in the previous p.

    Oct

    14,

    201

    0

    Criteria Setting Workshop

    It is a major activity conducted to let theBrgy formulates the criteria for rankingsub-project concept. It is done only for the

    purpose of prioritizing sub-projects in the

    context of limited funds.

    This activity is formally started at 7:30 am

    with prayer and the singing of national anthem

    through power point presentation facilitated byMunicipal Area Coordinator. Then, Mayor LucioGonzales gave his opening remarks. The Mayor

    was creatively facilitated the introduction of

    participants.

    All the expected participants are present:1. Barangay representation team2. Municipal Mayor3. AC4. CFs

    Materials to be used in this program are well

    prepared ahead of time:

    1. Minimum criteria for ranking2. Mechanics for ranking

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    9/19

    Figure above is the program flow of theCSW

    3. Proposed rules on decorum4. Sample Tally5. Agenda in cartolina ( already presented)6. Objectives in Cartolina (already presented)7. Attendance sheet ( facilitated by FA)

    The objectives of CSW is presented by the

    Municipal Area coordinator which discusses thefollowing points:

    1. Minimum criteria for ranking the sub-project

    2. The mechanics for ranking- votingprocedure, resolutions, complaints

    mechanism

    3. Rules of decorumAnd also discusses the basic principles on

    prioritization/ranking:

    1. SP should not be in negative list2. Should identify the most important needs of

    the community

    3. Voting system should be democratic4. Considered the needs of those who are in

    needs

    5. Should encourage participation6. Easy to understand

    The participants are given the opportunity to laythe criteria and ground rules/or mechanics of

    ranking the sub-project. And present it into their

    co-participants on how each of the criteria beingset is weight.

    The revisited PSA output is also presented by the

    municipal area coordinator and followed bypresentation of Municipal Development Plan-

    discussed by Alex Literato.

    The criteria for ranking is composite of two parts:1. Quantitative criteria

    1.1 percentage of local counterpart2. Percentage of household attendance in

    BA3. percentage of direct beneficiary

    Qualitative Criteria:

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    10/19

    1. Responsiveness2. Strategic value3. Environmental impact4. Benefits for the poor5. Urgency6. Seriousness7. Extent8. Consequence Overall assessments:

    1. They able to formulate the criteriafor ranking the sub-projects andcollaboratively discuss current

    problems confronting their

    respective brgys.2. They able to present the PSA output

    and MDP

    3. They able to formulate themechanics for the conduct of MIBF

    a) Voting procedureb) Decorumc) And come up with three

    resolutions

    The three resolutions are presented in the rightcolumn. These resolutions are for Technical

    assistance fund. TAF is subsidized funds grantedto communities with prioritized sub-projects whichtechnical Assistance for planning, designing and

    supervising requires actual cost. As follows:

    001-Adopting and approving the resultof the expanded municipal developmentcouncil- inter barangay criteria setting

    for the implementation of makamasang

    tugon project.

    002- approving the six brgy of themunicipality og pilar,sdn as contracting

    parties of the service provider fortechnical assistance fund (TAF) of their

    eligible community priority sub-projects.

    003-designating and authorizing brgyasinan as the lead brgy in contracting

    with service providers for the technicalassistance fund for and in behalf of thesix brgys.

    1. Water system2. Street travelling3. Construction of cum

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    11/19

    fishermen warf4. Rehabilitation and

    upgrading seawall

    5. Road for crossing tobrgy proper

    6. Construction of sea wall 004-requesting to avail Technical

    ASSITANCE Fund amounting

    to one hundred thirty fivethousand pesos for the payment

    of professional fee or service,

    reproduction of plans and othertechnical documents neededduring the preparation of

    detailed sub-project proposals of

    the three brgys.

    Presentation of PSA and identified problems ofeach brgy.

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    12/19

    October 15-16

    Excerpts from the minutes of criteria setting: Otherdiscussions raised

    Overview:

    Declaration of qourom;acquisiting for best support ofresidence and officials to

    cooperate during theimplementation

    Discussion of local counterpartdistribution of the project- from

    provicial, municipality and brgy.

    They agreed that each of the brgymust avail the project.

    This is a training activity that involves

    hands-on capability building process where the

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    13/19

    Project Development Workshop

    participants are taught on procurement process,filling out the Sub-project concept form and

    familiarization of different attachments necessary

    during the actual implementation of the sub-

    project. After this activity, local volunteers must atleast familiarize the basic process in sub-project

    preparation, designing, and development of

    community projects, and also the packaging ofcommunity project proposal.

    This activity is started with a prayer andfollowed by singing of national anthem. Anopening remark is initiated by Mayor Lucio

    Gonzales and introducing the participants and

    recognizing the presence of the guest speaker.

    In this activity, the participants are sought to give

    an expectations on the topics to be discussed.Expectations are divided into four categories

    namely: venue, topic, speaker, participants.

    Common among the expectations are;speaker:

    1. The discussion must be simplified2. Full of excitement, there is no place for

    boredom3. Do not use English

    Venue:1. Peaceful2. Wide3. Cold

    Participants:1. Responsive2. Attentive3. Good listeners

    Topics:1. Procurement2. Proposal3. POW4. And many others

    The guest speaker is introduced by Municipal

    Area Coordinator, in a way or sort of

    autobiographical presentation. He is the RegionalInfrastructure Engineer, act as a consultant that

    provides training and extend technical assistance tothe volunteers and even to the MCTs.

    RIE: discussions on;

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    14/19

    1. what is community project2. site validation3. environmental scanning4. project development and management5. filling up the sub-project concept form6. presentation and critiquing of output7. discussion on complete documents on sub-

    project full blown proposals8. appropriate technology9. engaging service provider and technical

    assistance fund10.sub-project technical standards11.packaging proposal and approval12.discussion on the policy and compliance of

    the subproject environmental and socialsafeguards

    13.environmental and social safeguards14.environmental management plan15.critiquing of social and environmental

    management plan

    16.orientation on the operation andmaintenance of the proposed sub-project

    17.formulation of the o&m core group18.Tariff setting

    The above discussions are facilitating in

    nature which there is no place for boredom. He putsome add-ons of exercises undertaken by therespondents just to let them feel rejuvenate from a

    load of so much familiarization. For example,

    during discussions in environmental scanning- EngMac used the San Francisco plant with 22 leaves

    being placed in a distance and letting the

    participants count the leaves from a distance till

    closer to the plant. This has an implication toenvironmental scanning. Every part of the

    discussion, he deliberately imparts sort of greenjokes, wisdom to whisper, realistic ideas and the

    like.

    And also at the first part of the workshop, the

    Municipal Area Coordinator has presented the final

    revisited PSA output and final criteria adopted bythe MIBF for the ranking of the sub-project

    concept. Presentations pertaining to it are alreadybeing presented in the previous page.

    Right after the discussions, the participants started

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    15/19

    After the community consultation-

    they decided to propose a one unit room forpre-school within the existing elem. Area.

    filling out the sub-project concept form, assistedby MCFs. And these are subject for presentation

    and critiquing.

    Excerpts from the minutes of PDW;

    Critiquing: focuses in;

    On how to work with negative conditionsthat created the sub-project.

    It should be convincing to the readers There should be a difference from

    conditions before and after the

    establishment of the sub-project.

    Entries in project type according to three:enterprise, public goods and humanresource development

    How to sustain the project.

    Estimated damages will be done toenvironment and how to mitigate it.

    Percentage of beneficiaries Technical aspect is to be fill-out by

    MDAC

    Crucial issue: Operation and Maintenance of thesub-project.

    During the presentation of SPCF of brgyCaridad, Eng Mac has found out that they are

    proposing a project that is, already being

    established in the area (water system level II). Thisis strictly not allowed in Makamasang Tugon

    project. And he further inquires, if there is an

    existing O&M primarily responsible for the sub-project. Accordingly, there is, yet, the problem isthey pay it expensively and the residence

    themselves do not pay the exact amount imposed.

    Eng Mac, see it difficult to resolve rather headvised to conduct community consultation with

    brgy officials and some community residence todiscuss this issue and propose another sub-project.

    Then, Eng Mac, give his go signal to every brgy to

    proceed in POW except from Caridad.

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    16/19

    Site Validation: October 17, 2010

    Afterwards, MCTs facilitated the giving ofCertificate of Attendance to the participants,

    together with the Eng Mac and Mayor LucioGonzales.

    After that, Eng Mac calls the attention of MCTsand MM for the meeting after the program. This is

    each of us are required to shared their evaluationand assessments of undertook workshop. Ourobservations based on venue, discussions,

    learnings and recommendation or improvements

    are sought. This is accordingly a tradition rightafter the program end.

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    17/19

    One community volunteer per clusteredbrgy. This activity is simultaneously

    conducted in three clustered brgy.

    Instruction of taking picture is just see to it

    that you can mark the three vantage points.

    Example picture:

    Asinan; rehabilitation of brgy road

    For road sub-project, the beginning point

    and the end point are needed to be markedKatipunan; Health Station

    Rural access component;

    Structural representation of volunteers by clusteredbrgy.

    Structural model for taking picture on site

    validation

    Site validation forms;

    Post harvest facilities:

    Buildings:

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    18/19

    Bridges

    Road;

    Since then, MCTs and MM are both busy helping

    each other preparing the documents necessary foreach sub-project proposed based on the checklist

    provided by Eng. Mac.

    Checklist; Buildings

    Bridges and drainage

  • 7/30/2019 September- October Accomplishment Report-MM _Repaired_ _Repaired

    19/19

    Water system;