September 8, 2016 Southern Eden Landing Hydrodynamic Modeling
20

September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Aug 26, 2018

Download

Documents

hoangkhue
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

September 8, 2016 Southern Eden Landing Hydrodynamic Modeling

Page 2: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Agenda 1. Project Background 2. Modeling Overview

a. Purpose b. Input Parameters c. Layout Configurations

3. Modeling Results a. Restoration b. Flood

2

Southern Eden Landing

Alternatives Analysis

Conceptual Design 2016

EIS/R 2017

30-60% Design

Construction by Design-

Builder

Hydrodynamic Modeling

Cris Benton

Page 3: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Project Background

3

Project Goals: 1. Habitat restoration 2. Maintain or improve

existing flood protection

3. Provide public access and recreation

Page 4: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Project Background

4

Page 5: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Modeling Overview

5

Page 6: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Modeling Overview Purpose

Modeling Purpose: • Determine levee improvement heights • Size and locate:

- Levee breaches - Channels - Water control structures

• From these, locate public trails Pre-design Process: • Historical slough network • Breach sizes

– Empirical geometries of SF Bay historic marshes

– Short-term & long-term tidal prisms

6

Historical Slough Network

Page 7: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Modeling Overview Input Parameters

Model: • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry • Ponds between MSL & MHW Triangular Mesh Elements: • 10 m2 - Narrow levee crests • 200 m2 - Southern ponds • 1,250 m2 - Large flat ponds • 5,000 m2 - Bay Connected Element Paths: • Levee crests and channels

Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec

7

Tide Gates

Railroad Bridge

Page 8: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Modeling Overview Input Parameters

8

Restoration • Maximize tidal prism for

habitat enhancement

• Typical Tide (3-4 weeks)

-4

1

6

5/4/15 5/14/15 5/24/15

Elev

atio

n, F

t N

AVD

88

• Existing Conditions (Alt. A) • Tidal Restoration (Alt. B) • Tidal Restoration & Managed Ponds (Alt. C)

Flood Control • Maintain or minimize max.

water surface elevations

• 100-year tide with 10-year riverine discharge

• 10-year tide with 100-year riverine discharge

Objectives: Hydrologic Scenarios: Layout Configurations:

Page 9: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Modeling Overview Layout Configurations

9

Tidal Restoration (Alt. B)

Page 10: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Modeling Overview Layout Configurations

10

Tidal Restoration & Managed Ponds (Alt. C )

Page 11: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Restoration Results

11

Page 12: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Restoration Results Tidal Restoration (Alt. B)

Objective: • Maximize tidal prism for habitat

enhancement Tidal Propagation Results: • Optimized breach & channel size • Tidal exchange sufficient with

connections to Old Alameda Creek

12

Most Flooded

Least Flooded

Page 13: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Restoration Results

13

Bay & Inland Ponds

C-Ponds

• Old Alameda Creek restricts flow; may erode in future

• C-Ponds will become less muted with additional water control structures

Page 14: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Flood Results

14

Page 15: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

EL 10

Flood Results

Effective 2009 (pending update)

15

FEMA FIRM: • Project is within the coastal floodplain • Unaccredited levees • Modeled both Coastal and Riverine

flooding combinations

Hydrologic Scenarios: • 100-year tide with 10-year riverine discharge • 10-year tide with 100-year riverine discharge

ACFCC: Alameda Creek Flood Control Channel OAC: Old Alameda Creek

Coastal Flooding

Riverine Flooding

Coastal Flooding

Riverine Flooding

Page 16: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Flood Results Existing Conditions (Alt. A)

10-yr Tide & 100-yr Discharge 100-yr Tide & 10-yr Discharge

16

9.5 9.5

9.5 8.6 9.8 9.1

9.4 8.4

Maximum Water Surface Elevation Elevations in Feet, NAVD88

Page 17: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Flood Results Tidal Restoration (Alt. B)

10-yr Tide & 100-yr Discharge 100-yr Tide & 10-yr Discharge

17

Maximum Water Surface Elevation Elevations in Feet, NAVD88

-0.8 +0.4

+0.2

-0.5 +0.4

+0.8

Landside Levee Max. WSL : 9.9 feet NAVD88

Page 18: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Flood Results Tidal Restoration & Managed Ponds (Alt. C)

10-yr Tide & 100-yr Discharge 100-yr Tide & 10-yr Discharge

18

Maximum Water Surface Elevation Elevations in Feet, NAVD88

+0.6 +1.2 -2.8

-2.4 -2.4 -2.2

Mid-complex Levee Max. WSL : 10.4 feet NAVD88

Page 19: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Flood Results

19

• Improve levees to 12 feet NAVD88, creating 1.5 to 2.5 feet of freeboard

• Upstream water surface elevations in Creeks maintained or improved

• Flood protection goals were balanced with restoration goals (and recreation)

Example Levee Improvements

Page 20: September 8, 2016 Southern Eden Landing … · • MIKE21 Flexible Mesh Combined LiDAR & Bathymetry ... Variable Time Step: • Max: 60 sec • Computed Avg.: 0.25 sec . 7 Tide Gates

Questions?

20