September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation
19

September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Dec 29, 2015

Download

Documents

Jemima Cross
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

September 26, 2013

Electrical Safety-(Including Lock, Tag & Try)

Independent Assessment

Out-Brief

Presentation

Page 2: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Agenda

Welcome/Introductions Assessment Objective Results Questions

Agenda

Page 3: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Welcome & IntroductionsTeam Members:

Todd Kujawa, Team Lead [757-575-9862]

Paul Powers, Electrical Engineer, FM [757-876-1780]

Steve Neilson, Industrial Health & Safety, TJSO-DOE [757-768-9794]

* DOE-Oak Ridge (unable to attend)

Sign-in Sheet

Page 4: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Objective

Electrical Safety Program

The primary focus is geared toward compliance with the 10 CFR 851 standard.

Review of the over-site relationship towards safe electrical work practices for the lab’s service contractors. Lab’s in-house staff work, planning, and control for electrical work.

Lock, Tag and Try (LTT)

The primary objective is to identify any potential weaknesses in the procedure, in employee training, or in enforcement of the requirements.

Page 5: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results

Typical Lines of Inquiry (Objectives/CRAD-LOI)Met (the specified criteria are substantially met) Partially met (some but not substantially all of the specified criteria are met)Not met

Classification of Results Findings (non-compliance with a requirement) Observations/Opportunities For Improvement (deviation from best practice or minor deviation from procedural requirements that can be considered a ‘quick fix’) Noteworthy Practices (positive aspects of a program)

Recommendations (where appropriate)

Team Follow Ups

Page 6: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment ResultsRESULTS SUMMARY FOR ELECTRICAL SAFETY:

(1) Finding

(5) Opportunities for Improvement

(2) Noteworthy Practice

(3) Recommendations

(2) Team Follow Ups

Page 7: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results FINDINGS (MINOR NON-CONFORMANCE):

1.) BOAs continuing to operate while in a state of flux; deliverables to the contractual requirements (i.e. electrical safety program, LOTO program….) are not all on record with the contracting officer/SOTR.

Page 8: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results OPPORTUNITIES FOR IMPROVEMENT:

1.) Some panelboard schedules are still misrepresented of actual circuit identification and circuit breaker sizing. (This is a repeat OFI from the 2013 LTT review).

2.) Improvement on Work, Planning & Control (WPC) in the task involving non-electrical workers; when their work is in close proximity to the exposed magnet terminals in the tunnel/halls. This OFI is to include equipment specific LTT training when required.

Page 9: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results OPPORTUNITIES FOR IMPROVEMENT:

3.) Follow up on the temporary wiring discrepancies discovered during the field visit portion of the assessment.

4.) Follow up on the unprotected (open closures) electrical discrepancies discovered during the field visit portion of the assessment.

5.) Improvement on the oversight of electrical work , on service type contracts (BOA), by SOTRs not having adequate electrical training/knowledge.

Page 10: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results NOTEWORTHY PRACTICES:

1.) SOTR monthly safety meeting is very informative and discusses current safety related incidents, lesson learned and OSHA related requirements. (this is considered a good training tool for SOTRs).

2.) The RF group uses a spreadsheet to track equipment specific trained LTT persons to play the role as a second person during off shift hours.

Page 11: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results RECOMMENDATIONS:

1.) All panel schedules be updated in FY14 with the newer style AutoCAD displays; during the annual panelboard maintenance check.

2.) The Electrical Safety Committee to revisit the changes, between the 2004 edition and 2012 edition of NFPA 70E, in electrical work ppe and make appropriate changes to the electrical safety program if deemed necessary.

3.) Track the work being done by Contracts, with the updating of the BOAs, in the lab’s issue management process (CATS).

Page 12: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results ASSESSMENT TEAM FOLLOW UPS:

1.) To provide feedback to Sam Holben (and lab wide) on the availability of newly developed technology regarding ARC rated face shields. The concern brought up during the field observation portion of the assessment was that it was difficult to read the multi-meter display while donning the ARC rated face shield.

2.) Follow up with DC power on the measurement device (meter) to be used on the new 12GeV magnets since the voltage levels will exceed current handheld multimeter capabilities.

Page 13: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Post Assessment Schedule

Draft IA report to Quality Assurance (QAS) [Target 10/17]

Submit IA report for factual accuracy check [Target 10/18]

Reconcile comments and transmit final report to QAS [Target 11/11]

Note: Dates may be extended due to some team members being away from the lab in the upcoming week (this will be worked through the QAS).

Page 14: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results

Page 15: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results

Page 16: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results

Page 17: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results

Page 18: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results

Page 19: September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.

Independent Assessment Results

Questions???