September 2012 Public Comment Meetings June 12,14 and 21, 2012 Updated: June 20, 201
Jan 18, 2015
September 2012Public Comment Meetings
June 12,14 and 21, 2012
Updated: June 20, 2012
Housekeeping items
The purpose of this meeting is to take public comments on proposed
service changes for September 2012.
Silence all cell phones.
Be considerate of all meeting attendees and COTA staff.
When it is your turn to make a comment or ask a question about COTA’s proposed service changes, remain at your seat and we will call upon you.
Comments and questions are limited to two minutes per person.
Participants are encouraged to complete comment cards.
Ask one question at a time so the appropriate COTA staff member may address your comment.
2
Timelines
COTA modifies service three times per year.
First Monday of:
January
May
September
September 2012 changes will begin on Monday, Sept. 3
3
Major construction delays
4
September 2012 proposed service changes
September 2012 proposed service changes Dodridge Bridge reopening
The Dodridge Bridge over the Olentangy River will be reopening in the fall of 2012
The following lines will be realigned to pre-construction alignments:
• #7 Neil• #81 Hudson/Ohio
5
September 2012 proposed service changes #7 Neil
Discontinue service on Olentangy River Road south of Dodridge Street
Realign to use Dodridge Street to Neil Avenue
6
September 2012 proposed service changes #81 Hudson/Ohio
Discontinue service on Olentangy River Road south of Dodridge Street
Realign to use Dodridge Street to Neil Avenue
7
West Side and Hollywood Casino
8
September 2012 proposed service changes
September 2012 proposed service changes West Side and Hollywood Casino
Service realigned in September 2012 or January 2013 to serve the Hollywood Casino
The following lines will be affected:
• #6 Sullivant
• #10 W. Broad
New Friday and Saturday evening service
• #777 Lucky Owl
9
September 2012 proposed service changes #6 Sullivant (All Days)
Serve Westland Mall from Georgesville Road
Realign service to serve the Hollywood Casino
10
September 2012 proposed service changes #10 W. Broad (All Days)
Realign service to serve the Hollywood Casino
11
September 2012 proposed service changes #777 Lucky Owl (Friday and Saturday)
New service to the Hollywood Casino beginning approximately the time the casino opens
12
Local lines
13
September 2012 proposed service changes
September 2012 proposed service changes #1 Cleveland (Weekday)
Modify trip times to improve on-time performance
#1 Cleveland/Livingston (All Days)
Bus Stop Service Improvement Project
#2 N. High (All Days)
Modify trip times to improve on-time performance
#2 N. High (Weekday)
Late night trips frequency may improve to relieve overcrowding
#2 E. Main (Weekday)
To relieve overcrowding, additional trips may end at Reynoldsburg Park and Ride instead of Hamilton Road
14
September 2012 proposed service changes #3 W. Mound (All Days)
Modify trip times to improve on-time performance
#3 Northwest Blvd. (Weekday and Saturday)
Modify trip times to improve on-time performance
#6 Sullivant/Mt. Vernon (All Days)
Improve service frequencies
#7 Neil (All Days)
Modify trip times to improve on-time performance
#10 E. Broad/W. Broad (Weekday)
Modify trip times on select trips to improve on-time performance
15
September 2012 proposed service changes #16 E. Long/S. High (Weekday)
Modify trip times to improve on-time performance
16
Express lines
(Note: Weekday-only modifications)
17
September 2012 proposed service changes
September 2012 proposed service changes #26 Beechwold (Weekday)
Due to low ridership, service will be discontinued
#29 Polaris (Weekday)
Bus Stop Service Improvement Project
18
September 2012 proposed service changes #30 Smoky Row (Weekday)
Extend service to Sawmill and Hard roads
Beginning of morning and end of evening service at Sawmill and Hard roads
Modify trip times to improve on-time performance
19
September 2012 proposed service changes #31 Worthington (Weekday)
Modify trip times to improve on-time performance
#35 Tamarack (Weekday)
Bus Stop Service Improvement Project
#36 Annehurst (Weekday)
Modify trip times to improve on-time performance. Due to low ridership, reduce the number of morning trips to four
#37 Westerville (Weekday)
Modify trip times to improve on-time performance
#40 New Albany Business Park (Weekday)
Bus Stop Service Improvement Project
20
September 2012 proposed service changes #41 Gahanna (Weekday)
ODOT partially funded an extra a.m. and p.m. trip Survey conducted to determine if rider work start and end times
are served by current service Depending on survey results, modify or discontinue extra trip
#55 Gender (Weekday)
Add an additional a.m. and p.m. trip to serve the 7, 7:30, 8 a.m. work start and 4, 4:30 and 5 p.m. work end times
#60 Arlington (Weekday)
Due to low ridership, may modify alignment or discontinue service
#64 Grove City (Weekday)
Modify trip times to improve on-time performance
21
LINK line
22
September 2012 proposed service changes
#74 Linden (Weekday)
Bus Stop Service Improvement Project
Crosstown lines
23
September 2012 proposed service changes
September 2012 proposed service changes #81 Hudson/Ohio (Weekday)
Extend southbound bus ending at Alum Creek Drive and Winslow Drive at 5:41 p.m. to London-Groveport Road
24
September 2012 proposed service changes #84 Arlington/OSU (Weekday)
Improve frequency to 30 minutes between OSU and Kingsdale Extend service to Hilliard at 60-minute frequency
25
September 2012 proposed service changes #89 Hamilton Rd. (Saturday/Sunday)
Extend all trips to Homer-Ohio Lane
#89 Hamilton Rd. (Sunday)
Improve span of service
#92 James/Stelzer (Weekday)
Modify trip times to improve on-time performance
#96 5th Ave. (Weekday)
Modify trip times to better serve class schedules at the Everest Institute
26
September 2012 proposed service changes
#98 Columbus Zoo (All Days)
Last day for Saturday summer service will be Saturday, Sept. 1, 2012
Last day for Sunday and Holiday summer service will be Labor Day, Monday, Sept. 3, 2012
Last day for weekday summer service will be on Friday, Aug. 31, 2012
27
Zoo Service
September 2012 proposed service changes
Questions?
28
September 2012 proposed service changes
#1 Cleveland (Saturday)
Improve frequencies to 20 to 25 minutes from 30 minutes from SR 161 to Reynoldsburg Park and Ride
#16 E. Long/S. High (Saturday)
Improve frequencies to 30 minutes from 45 minutes
#81 Hudson/Ohio (Sunday)
Add Sunday service between University City Shopping Center and Alum Creek Drive and Williams Road
#95 Morse/Henderson (Weekday) – Added 6/21
Improve frequencies to 30 minutes
29
Changes Added June 21, 2012
Bus Stop Service Improvement Project
30
Bus Stop Service Improvement Project
BSSIP will be reinstated for the September 2012 service change Lines being analyzed for September 2012:
#1 Cleveland/Livingston (Local)
#29 Polaris (Reverse-Commute Express)
#35 Tamarack (Express)
#40 New Albany Business Park (Reverse-Commute Express)
#74 Linden LINK (Circulator)
31
Bus Stop Service Improvement Project
All service will be removed from stops that are removed as a part of this project
The following lines may also have minor bus stop changes:
#4 Parsons (Local) #8 Frebis (Local) #9 Leonard/Brentnell (Local) #27 Brooksedge (Reverse-Commute Express) #36 Annehurst (Express) #37 Westerville (Express) #45 Reynoldsburg (Express) #83 Oakland/Weber (Crosstown) #87 Cassady (Crosstown) #92 James/Stelzer (Crosstown)
32
Bus Stop Service Improvement Project
Commuter Bulletins are currently posted at all bus stops that are proposed to be removed or consolidated
The open public comment period about these proposals lasts from June 4–June 22, 2012
Maps of all proposed changes, and a list of all affected stops are available: Online: http://www.cota.com/BusStopServiceImprovement.aspx Hard copies available at the front table for your review
Commuter Bulletins about the final decisions will be posted on all affected stops in August 2012
33
Bus Stop Service Improvement Project
COTA update
Downtown Columbus Action Plan
Ticket Vending Machine
North High Street turnaround
Delawanda Park and Ride expansion
Northeast Corridor Alternatives Analysis Project (NECAA)
Recommended Locally Preferred Alternative (LPA) is the option
terminating at SR 161
2012 Long-Range Transit Plan
Final version is available on COTA’s website
McKinley Operations planning completed for new compressed natural
gas (CNG) fueling station
34
COTA update
Questions?
35