Page 1
Monday,OCTOBER17,2016– Germantown,MD
AMMWorkshop
Self-ConsolidatingConcreteforSCModularStructures
Monday, OCTOBER17,2016– Germantown, MD
RussellGentry(PI)KimberlyKurtis(Co-PI)LarryKahn(Co-PI)SchoolofCivilandEnvironmentalEngineering(CEE)– GeorgiaInstituteofTechnology
GiovanniLoreto(Researcher/Presenter)CollegeofArchitectureandConstructionManagement– KennesawStateUniversity(Atlanta,GA)
Bojan Petrovic (Co-PI)NuclearandRadiologicalEngineering)– GeorgiaInstituteofTechnology
Jurie vanWyk (Industrypartner)BerndLaskewitz (Industrypartner)WestinghouseElectric
Page 2
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
2.Task1– DevelopmentofSelf-RougheningConcrete(SRC)MixDesign
3.Task2– AssessmentofColdJointShearFrictionCapacity
1.Intro
6.ConclusionsandOutlooks
4.Task3– AssessmentofShearandFlexuralPerformances
5.Task4– ValidationthroughFull-scaleTestandModeling
Page 3
Monday,OCTOBER17,2016– Germantown,MD
AMMWorkshop
Objectives and outcomes
- Developmentofaself-consolidatingconcretemixturessothatconcreteplacementcanbemadeintosteelplatecomposite(SC)modularstructureswithouttheneedforcontinuousconcreteplacement.
- SCCmixturestoensuresufficientshearcapacityacrosscold- joints(self-roughening),whileminimizingshrinkageandtemperatureincreaseduringcuringtoenhanceconcretebondingwiththesteelplates.
- SCCmixturesfeaturingaself-rougheningcapabilitytoproduceadequateshearfrictionbetweencoldjointsandtoproducedraftprovisionsaddressingshear-friction,forconsiderationintheAISCN690-12AppendixN9codeusedforthedesignofSCmodularstructures.
Task1:DevelopmentofSCCwithShear-FrictionCapacityforMassPlacement
Task2:AssessmentofColdJointShear-FrictionCapacityTask1:DevelopmentofSCCwithShear-FrictionCapacityforMassPlacement
Task3:AssessmentofShearandFlexuralPerformanceTask4:ValidationthroughFull-ScaleTestingandModelingTask5:DraftCodeRequirementforShearFrictionDesignofColdJoints
1.Intro
Page 4
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
1.Intro
- Next10years40%ofNPPwillapproachtheir40ysofservice- AveragetimeforconstructionforexistingNPPs:9.3years
- Longesttimeforconstruction:23years
Problem statement
Someconsideration
Page 5
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
1.IntroLooking at Containment Buildings
Page 6
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
1.Intro- Inthirdgenerationmodular(steelcomposite)constructionofcontainmentstructures,concreteisplacedbetweentwosteelplates,tied together
Looking at Confinement Buildings
Page 7
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
1.Intro
- Toavoidcoldjoints,requirescontinuousconcreteplacementà 1200trucks!
- Inthirdgenerationmodular(steelcomposite)constructionofcontainmentstructures,concreteisplacedbetweentwosteelplates,tied together
Facts
Page 8
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
1.Intro
Researchneed(DOE-NEET)
Problem statement
- Next10years40%ofNPPwillapproachtheir40ysofservice- AveragetimeforconstructionforexistingNPPs:9.3years
- Longesttimeforconstruction:23years
(1)Assemblyandmaterialinnovationtoenhancemodularbuildingtechniquessuchasadvancesinhighstrengthconcreteandrebar,inspectionequipment,andpre-assembled
rebarsystems;and
(2)Advancesinmodularconstructiontoincludeimproveddesigncodes,improvedmethodsfortransportanddeliveryandadvancementsinintegratedprefabrication.
Someconsideration
Page 9
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Objectives
- Developmentofaself-consolidatingconcretemixturessothatconcreteplacementcanbemadeintosteelplatecomposite(SC)modularstructureswithouttheneedforcontinuousconcreteplacement(coldjoint).
1.Intro
Page 10
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Objectives
- Developmentofaself-consolidatingconcretemixturessothatconcreteplacementcanbemadeintosteelplatecomposite(SC)modularstructureswithouttheneedforcontinuousconcreteplacement(coldjoint).
1.Intro
- SCCmixturestoensuresufficientshearcapacityacrosscold- joints(self-roughening),whileminimizingshrinkageandtemperatureincreaseduringcuringtoenhanceconcretebondingwiththesteelplates.
Page 11
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Objectives
- Developmentofaself-consolidatingconcretemixturessothatconcreteplacementcanbemadeintosteelplatecomposite(SC)modularstructureswithouttheneedforcontinuousconcreteplacement(coldjoint).
1.Intro
- SCCmixturestoensuresufficientshearcapacityacrosscold- joints(self-roughening),whileminimizingshrinkageandtemperatureincreaseduringcuringtoenhanceconcretebondingwiththesteelplates.
Task1
Task 2, Task 3, Task 4
Page 12
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Proposed idea2.Task1– DevelopmentofaSelf-RougheningConcrete
Paste
CoarseAggregate
LWA
Page 13
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Strategies2.Task1– DevelopmentofaSelf-RougheningConcrete
Page 14
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Let’stakealook!
Outcomes2.Task1– DevelopmentofaSelf-RougheningConcrete
Page 15
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 16
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Proprieties and tests
Self-ConsolidatingConcrete Self-RougheningConcrete
- Flowability:flowseasilyatsuitablespeedintoformwork(T20=4-5sec;FlowSlump=24-26”)
- HardenedVisualStabilityIndex(VSI=0)- SGroovetest(goodself-healingability)
Fresh SCC proprieties
Hardened SRC proprieties- Compressivestrength:6-7ksi- Shrinkage:<250με
2.Task1– DevelopmentofaSelf-RougheningConcrete
Page 17
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
MeasurementofRoughness
Quantifying surface roughness2.Task1– DevelopmentofaSelf-RougheningConcrete
Page 18
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Measurements of Roughness - Qualitative2.Task1– DevelopmentofaSelf-RougheningConcrete
Page 19
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Measurements of Roughness - Quantitative2.Task1– DevelopmentofaSelf-RougheningConcrete
Page 20
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Mechanical tests for shear friction characterization3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 21
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
WallElevation WallSection
Formwork
Hotrolledstructuralsteel
channels
ColdJoint
“…whenconcreteisplacedagainstpreviouslyhardenedconcrete,theinterfaceforsheartransfershallbecleanandfreeoflaitance.Ifμisassumedequalto1.0λ,interfaceshallberoughenedtoafullamplitudeofapproximately1/4in.”
ACI 318-11 (11.6.9):
Mechanical tests for shear friction characterization3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 22
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
WallSection
Formwork
Hotrolledstructuralsteel
channels
ColdJoint
Whenwetconcreteiscastuptodryconcrete.
Cold Joint
Mechanical tests for shear friction characterization3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 23
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Test Matrix3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 24
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Test Matrix
Coldjoint No Yes Yes Yes Yes YesReinforcementratio-ρ(%) 0.75 0.75 0.25 0.50 0.75 0.75#3shearreinforcement Yes Yes No No No No
Steelplate(thickness) No No
0.03125in.(22gauge)
0.0625in.(16gauge)
0.09375in.(13gauge)
0.375in.(16gauge)h=2.90in.
Repetitionwith5%LWA n/a 2 2 2 2 2Repetitionwith15%LWA n/a 3 3 3 3 3Tot.N.ofrepetitions 2 5 5 5 5 5
3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 25
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Test Matrix3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 26
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Step1
Step3
Step2
Step4
Step5
Specimens preparation3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 27
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Test set up
Knife-edgesupport
LVDT
LVDTsupport
200kiploadcell
Knife-edgesupport
3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 28
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 29
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
0
10
20
30
40
50
60
70
0 0.1 0.2 0.3 0.4 0.5 0.6
Load
(kip
s)
Slip (in.)
CJ1575 - 1
SP1550-1
Behavior at cold joint with internal reinforcement3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 30
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
3.Task2- AssessmentofColdJointShearFrictionCapacityBehavior at cold joint with external steel plates
Page 31
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 32
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Behavior at cold joint comparing internal and external reinforcement.
0
10
20
30
40
50
60
70
0 0.1 0.2 0.3 0.4 0.5 0.6
Load
(kip
s)
Slip (in.)
CJ1575 - 1
SP1550-1
3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 33
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
InternalReinforcement
ρ=0.75%
ExternalSteelPlate
ρ=0.25%t=0.031in.(22gage)
ExternalSteelPlate
ρ=0.50%t=0.063in.(16gage)
ExternalSteelPlate
ρ=0.75%t=0.094in.(13gage)
ExternalSteelStrips
ρ=0.75%t=0.375in.
Mechanical tests for shear friction characterization3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 34
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
0
10
20
30
40
50
60
70
80
90
100
110
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35
Loa
d (k
ips)
Slip (in.)
CJ0575
SP0525
SP0550
SP0575
ST0575
0
10
20
30
40
50
60
70
80
90
100
110
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35
Loa
d (k
ips)
Slip (in.)
CJ1575
SP1525
SP1550
SP1575
ST1575
5%LWA 15%LWA
Behavior at cold joint comparing internal and external reinforcement.
- Self-rougheningconcretecarrieshigherload.- HigherloadwithgreaterfractionofLWA.
3.Task2- AssessmentofColdJointShearFrictionCapacity
Page 35
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 36
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 37
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 38
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 39
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 40
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
0
10
20
30
40
0 0.1 0.2 0.3 0.4 0.5 0.6
Loa
d (k
ips)
Slip (in.)
0.25% Steel Plate (Experimental)
0.25% Steel Plate (Simulation)
Page 41
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 42
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 43
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 44
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 45
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 46
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 47
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 48
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 49
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Out-of-Plane
In-Plane
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 50
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen Design4.Task3– AssessmentofShearandFlexurePerformances
Page 51
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction – welding 4.Task3– AssessmentofShearandFlexurePerformances
Page 52
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction – welding4.Task3– AssessmentofShearandFlexurePerformances
Page 53
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction – formwork4.Task3– AssessmentofShearandFlexurePerformances
Page 54
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction – formwork4.Task3– AssessmentofShearandFlexurePerformances
Page 55
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction – formwork4.Task3– AssessmentofShearandFlexurePerformances
Page 56
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction4.Task3– AssessmentofShearandFlexurePerformances
Page 57
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction – ready to be picked up4.Task3– AssessmentofShearandFlexurePerformances
Page 58
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction – cast4.Task3– AssessmentofShearandFlexurePerformances
Page 59
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Casting day4.Task3– AssessmentofShearandFlexurePerformances
Page 60
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Casting day
Facingconstructionchallenges
4. Task3– AssessmentofShearandFlexurePerformances
Page 61
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
FirstTrial
Page 62
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
SecondTrial
Page 63
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
ThirdTrial
Page 64
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Inthelab
Page 65
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen construction – cast
Concreteplacement1
Concreteplacement2
Concreteplacement3
4.Task3– AssessmentofShearandFlexurePerformances
Page 66
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Inthelab– AfterCasting
Page 67
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Measurements of Temperature4.Task3– AssessmentofShearandFlexurePerformances
Page 68
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 69
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
0
20
40
60
80
0 2 4 6 8 10 12 14 16
Tempe
rature(C
)
Time(days)
DOESCC:Task3ConcreteTemperatureMonitoring
Corner
Midpoint
Measurements of Temperature4.Task3– AssessmentofShearandFlexurePerformances
Page 70
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Getting ready to test
After28dd
4.Task3– AssessmentofShearandFlexurePerformances
Page 71
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Behavior at cold joint 4.Task3– AssessmentofShearandFlexurePerformances
Page 72
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
In-Plane and Out-of-Plane set up4.Task3– AssessmentofShearandFlexurePerformances
Page 73
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Page 74
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Out-of-Plane behavior
0
40
80
120
160
0 0.4 0.8 1.2 1.6 2
Load[kip]
Displacement[in]
Series1
Series2
4.Task3– AssessmentofShearandFlexurePerformances
Page 75
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Monolithic Out-of-Plane failure mode4.Task3– AssessmentofShearandFlexurePerformances
Page 76
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Out-of-Plane failure mode4.Task3– AssessmentofShearandFlexurePerformances
Page 77
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
In-Plane and Out-of-Plane failure mode4.Task3– AssessmentofShearandFlexurePerformances
Page 78
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
In-Plane and Out-of-Plane failure mode4.Task3– AssessmentofShearandFlexurePerformances
Page 79
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Test Results and Analytical Model
0
20
40
60
80
100
120
140
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6
Load
[Kip
]
Displacement [in.]
In-Plane
MO-IP
CJ-IP-1
CJ-IP-2
IP-Th
N690 App N90
20
40
60
80
100
120
140
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7Lo
ad [K
ip]
Displacement [in.]
Out-of-Plane
MO-OOP
CJ-OOP-1
CJ-OOP-2
OOP-Th
N690AppN9
4.Task3– AssessmentofShearandFlexurePerformances
Page 80
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen5.Task4– ValidationthroughFull-ScaleTesting
Page 81
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Specimen5.Task4– ValidationthroughFull-ScaleTesting
Page 82
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
5.Task4– ValidationthroughFull-ScaleTestingExternal steel plates
Page 83
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Vertical5.Task4– ValidationthroughFull-ScaleTesting
Page 84
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Three concrete lifts3.Scalingthingsup
ColdJoint2
ColdJoint1
ConcretePlacement1
ConcretePlacement2
ConcretePlacement3
Page 85
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Cold joint3.Scalingthingsup
ColdJoint2
ColdJoint1
ConcretePlacement1
ConcretePlacement2
ConcretePlacement3
Page 86
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
5.Task4– ValidationthroughFull-ScaleTesting
Page 87
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Moving the test specimen5.Task4– ValidationthroughFull-ScaleTesting
Page 88
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Test setup5.Task4– ValidationthroughFull-ScaleTesting
Page 89
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Test setup5.Task4– ValidationthroughFull-ScaleTesting
Page 90
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Expected behavior5.Task4– ValidationthroughFull-ScaleTesting
Page 91
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Cold joint detail5.Task4– ValidationthroughFull-ScaleTesting
Page 92
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Cold joint detail5.Task4– ValidationthroughFull-ScaleTesting
Page 93
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Cold joint detail5.Task4– ValidationthroughFull-ScaleTesting
Cold joint detail5.Task4– ValidationthroughFull-ScaleTesting
Page 94
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
0
100
200
300
400
500
600
700
800
0.0 0.5 1.0 1.5 2.0 2.5
AppliedLoad
(kips)
DisplacementatLoadPoint(in.)
SCCforModularUnits,Task4ValidationTest,Loadvs.Displacement
InitialStiffness
Flexural YieldingofTensionPlate
0
100
200
300
400
500
600
700
800
0 0.0005 0.001 0.0015 0.002 0.0025 0.003 0.0035 0.004 0.0045 0.005
AppliedLoad
(kips)
StraininTensileFaceofModule
SCCforModularUnits,Task4ValidationTest,Loadvs.Strain
GageatLoadPoint
GageatColdJoint
yieldstrain
0
100
200
300
400
500
600
700
800
0.0 0.5 1.0 1.5 2.0 2.5
AppliedLoad
(kips)
DisplacementatLoadPoint(in.)
SCCforModularUnits,Task4ValidationTest,Loadvs.Displacement
InitialStiffness
Flexural YieldingofTensionPlate
0
100
200
300
400
500
600
700
800
0 0.0005 0.001 0.0015 0.002 0.0025 0.003 0.0035 0.004 0.0045 0.005Ap
pliedLoad
(kips)
StraininTensileFaceofModule
SCCforModularUnits,Task4ValidationTest,Loadvs.Strain
GageatLoadPoint
GageatColdJoint
yieldstrain
Load displacement curve5.Task4– ValidationthroughFull-ScaleTesting
Page 95
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
0
100
200
300
400
500
600
700
800
-0.14 -0.12 -0.1 -0.08 -0.06 -0.04 -0.02 0 0.02
AppliedLoad
(kips)
DisplacementAcrossCold-JointatLVDT3(in.)
SCCforModularUnits,Task4ValidationTest,Loadvs.LVDT3
ConcreteinTensionCrackOpening
0
100
200
300
400
500
600
700
800
-0.0008 -0.0006 -0.0004 -0.0002 0 0.0002 0.0004 0.0006 0.0008 0.001
AppliedLoad
(kips)
DisplacementAcrossCold-JointatLVDT1(in.)
SCCforModularUnits,Task4ValidationTest,Loadvs.LVDT1
ConcreteinCompression
0
100
200
300
400
500
600
700
800
-0.07 -0.06 -0.05 -0.04 -0.03 -0.02 -0.01 0 0.01
AppliedLoad
(kips)
DisplacementAcrossCold-JointatLVDT2(in.)
SCCforModularUnits,Task4ValidationTest,Loadvs.LVDT2
Concrete inTensionCrackOpening
0
100
200
300
400
500
600
700
800
-0.35 -0.3 -0.25 -0.2 -0.15 -0.1 -0.05 0 0.05
AppliedLoad
(kips)
DisplacementAcrossCold-JointatLVDT4(in.)
SCCforModularUnits,Task4ValidationTest,Loadvs.LVDT4
ConcreteinTensionCrack Opening
Load strain 5.Task4– ValidationthroughFull-ScaleTesting
Page 96
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
8.61
18.5
430.0
0
36.00
29.5
0
As = 18.0 in*2
(a) faces only (b) faces plus continuous angles (c) faces plus continuous angles,compression concrete transformed
As = 24.5 in^2
27.9
5
27.1
5
Atr = 52.78 in^2
As = 24.5 in^2
10.4
319
.57
1.03
1.82
0
5
10
15
20
25
30
0 0.0002 0.0004 0.0006 0.0008 0.001
NeutralA
xisLo
catio
n
Curvature(1/inch)
SCCforModularUnits,Task4ValidationTest,SectionAnalysis
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 0.0002 0.0004 0.0006 0.0008 0.001
Bend
ingMom
ent(kip-ft)
Curvature(1/inch)
SCCforModularUnits,Task4ValidationTest,SectionAnalysis
0
5
10
15
20
25
30
0 0.0002 0.0004 0.0006 0.0008 0.001
NeutralA
xisLo
catio
n
Curvature(1/inch)
SCCforModularUnits,Task4ValidationTest,SectionAnalysis
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 0.0002 0.0004 0.0006 0.0008 0.001
Bend
ingMom
ent(kip-ft)
Curvature(1/inch)
SCCforModularUnits,Task4ValidationTest,SectionAnalysis
Model5.Task4– ValidationthroughFull-ScaleTesting
Page 97
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
And outlooks6.Conclusions
Concluding
Page 98
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
- SCCwhichself-roughenshasbeendevelopedbyreplacingsmallfractionofcoarsewithlightweightaggregate(LWA)à avoidsneedforcontinuousplacement- Achieveimprovedshearfrictioncapacity,whichscaleswithLWAfraction.- Fullscaleconvalidation- Meetstrengthandshrinkagetargets.
6.ConclusionsAnd outlooks
Page 99
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
6.Acknowledgments
TheresearchdescribedinthisreportwasconductedattheStructuralEngineeringandMaterialsLaboratoryattheGeorgiaInstituteofTechnology(GeorgiaTech)andfundedbytheDepartmentofEnergy(DOE).ThefinancialsupportofDOE,theassistanceofthelaboratorystaffatGeorgiaTech,andtheinputoftheDOEprojectadvisorypanel,includingtechnicaloversightfromAlisonHahnandJackLance,aregratefullyacknowledged.Thefollowingcompaniescontributedmaterialandexpertisetotheresearchproject:1.Mr.RayNixonandIanHoustonoftheNelsonStudWeldingCompanyprovidedsignificantsupporttoourunderstandingofheadedstudweldingandqualitycontrol.Mr.NixonspentcountlesshoursteachingGeorgiaTechfaculty,studentsandstafftoweldstudsandarrangedforagiftofastudweldertoGeorgiaTech.2.TheCarolinaStalite Companyprovidedexpandedlightweightslateaggregatefortheproject.Mr.KenHarmon,PEoftheStalite Companyprovidedtechnicalsupportduringthedesignofconcretemixesusingthelightweightaggregate.3.ThomasConcreteprovidedready-mixconcreteforcastingoftheTask3and4specimens.Mr.JohnCookandJustinLazenby providedtechnicalassistanceinscalingthelaboratorymixesusedinTasks1and2intoself-rougheningSCCmixescapableofbeingbatchedinaready-mixplant.4.TheVulcanMaterialsCompanyprovidedalluvialsand,crushedman-madesand,andcrushedgraniteaggregateforthelaboratorymixesusedinTask1andTask2oftheproject.
Page 100
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Thankyou.Questions?
“This material is based upon work supported by the Department of Energy [DE-NE0000667 NEET]”Disclaimer: “This report was prepared as an account of work sponsored by an agency of the UnitedStates Government. Neither the United States Government nor any agency thereof, nor any of theiremployees, makes any warranty, express or implied, or assumes any legal liability or responsibility forthe accuracy, completeness, or usefulness of any information, apparatus, product, or processdisclosed, or represents that its use would not infringe privately owned rights. Reference herein to anyspecific commercial product, process, or service by trade name, trademark, manufacturer, orotherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring bythe United States Government or any agency thereof. The views and opinions of authors expressedherein do not necessarily state or reflect those of the United States Government or any agencythereof.”
6.Disclaimer
Page 101
Self-ConsolidatingConcreteforSCModularStructuresMonday,OCTOBER17,2016– AMMWorkshop– Germantown,MD
Questions?