Page 2: Selected Projects

Concentrating Solar DishStructural design services were provided for this concentrating solar dish. A RISA-3D design model consisting of 27,000 nodes, 26,000 plates, and 1,100 members was generated from scratch to analyze this structure.

Page 3: Selected Projects

Ridgehill Playground Structure– Yonkers, NYThis unique playground structure, constructed by Bollinger Atelier and designed by artist Tom Otterness, is constructed nearly entirely with bronze.

Page 4: Selected Projects

Hampton Inn – Littleton, COThis 6-story hotel structure is unique in that the roof, walls, and floors for were all constructed with CFS framing. The walls were panelized off-site, delivered to the site, and then lifted into place. The lateral system consisted of steel-sheathed shear walls.

Page 5: Selected Projects

Burlingame Ranch – Aspen, COThis project consisted of several multi-story wood framed residential unit. The wood framed structures were designed using Advanced Framing utilizing single top plates, no trimmer studs and vertically aligned trusses, joists, and wall studs. Frost protected shallow foundations allowed foundations to be founded above the frost depth.

Page 6: Selected Projects

Summit Hall – Ft Collins, COThis 650-bed, four story wood frame dormitory was constructed on CSU’s main campus. The lateral force resisting system consists of wood frame shear walls while the foundation system is comprised of grade beams and spread footings.

Page 7: Selected Projects

Custom Residence – Aspen, COStructural engineering services were provided for this custom residence, constructed with, wood framing, steel, concrete, CMU and rammed earth. This structure was designed in accordance with the city of Aspen’s Green Building requirements.

Page 8: Selected Projects

Ft Lupton Schools – Ft Lupton, COStructural engineering services were provided for this masonry and steel framed school addition. The gym is composed of 95 ft. long custom lenticular tube steel trusses on 16 ft. centers with 3.5” acoustic deck spanning between the trusses. This framing system provided a clean aesthetically pleasing roof structure.