Sekoko Resources STRATFOR Presentation 17 October 2011
25

Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Jul 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Sekoko Resources STRATFOR Presentation

17 October 2011

Page 2: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Sekoko Resources

• Chairman and Founder: Timothy Tebeila

• Wholly black owned company

• Original Focus: Mining projects in located in Limpopo of RSA

• Strategy: Move into other provinces and neighbouring countries

• Widen business focus by mining additional commodities

Page 3: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Sekoko Projects

Page 4: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Waterberg Project, Smitspan

Page 5: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Waterberg Locality Map

Page 6: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Waterberg Project

• Total of 8 tenements, with total surface

area of 7,500 ha

• Adjacent to existing Exxaro Mine,

Grootegeluk

• Initial drilling by Sekoko from 2007

• 1.8bn tonnes GTIS

• Definitive Feasibility Study (DFS)

completed in October 2010

• Mining Rights Application granted as off

August 2011

Page 7: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Waterberg Project

Page 8: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Drilling on Smitspan

Borehole Positions and Stripping Ratio on Smitspan

Page 9: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Geology

• Zone 11 -7:

• Overburden = 32m

• Avg. seam width = 9m

• Zone 11–1: Sulphur ≈ 1

Moisture ≈ 3

Zone 11 – 7

•CV ≈ 22

•Ash ≈ 29

•Volatiles ≈ 29

Zone 6 – 4

• CV ≈ 19

•Ash ≈ 35

•Volatiles ≈ 24

Zone 3 – 1

•CV ≈ 24

•Ash ≈ 22

•Volatiles ≈ 22

Page 10: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Smitspan Mine Design

Page 11: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Railway Logistics

• Conceptual

design completed

• Three (3) options

identified

• Specialist studies

conducted on

options

• ROD expected in

February 2012

(DEA process and

timelines)

Page 12: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

The Customer: Eskom

• Existing MOU allocated for 525 000t is being

reviewed and a possible allocation of 10mt to be

resolved by September 2011, for a 30-40year

supply

• Coal to be supplied to Tutuka and Majuba Power Stations located in Mpumalanga

• Additional production of export quality (CV ≈ 24)

• Determined agreements, dictate project timeline

Page 13: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Key Milestones

Completed

DFS

Mining Right

Rail – Preliminary

design

Infrastructure

CHPP design

Outstanding

WULA

EIA/ROD: Smitspan

EIA/ROD: Rail

Eskom final MOU

Page 14: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Capricorn Iron Ore, Limpopo

Page 15: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Capricorn Iron Ore – Locality Plan

The Capricorn project involves the development of a greenfield open-cast iron ore mine 30km

NE of Polokwane, Limpopo. The project area includes 4 farms(A) located adjacent to the

Zandrivierspoort low-grade magnetite iron ore deposit of Kumba Resources(B).

Page 16: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Capricorn Iron Ore

Sekoko has 2 Iron Ore Prospecting Rights on the

farms DeLoskop, Roodewal, Ruigedraai and

Kalkfontein with a total exploration target of iron ore

mineralisation estimated at 200Mt at a

grade of between 30% Fe and 40% Fe. The

target formation, the Zandrivierspoort Banded

Ironstone Formation (BIF), hosts mineralisation

at a locality 35km to the SE at a grade of 35%

Fe where the geology of the regional deposits

is well understood as a result of historical

exploration having been undertaken previously

by ISCOR/Kumba.

Page 17: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Roodewal & Ruigedraai

Zandrivierspoort

Roodewal

Ruigedraai

Page 18: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Kalkfontein

Page 19: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Timeline Project Planning

2008/09 •Drilling

2010 •Reserve 2011

•Compilation of Mining Right

Application; EIA/EMP

2012 •Mining Right Application

2014 • Construction

•Commissioning

2016 •Production

2013 •Mining Right Granted

2015 •Production

Production

Exploration

Page 20: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Tuli Block Coal, Musina, Limpopo

Page 21: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Tuli Block – Locality Plan

Page 22: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Tuli Drilling

Page 23: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Exploration Results

• Main coal zone at shallow depths ranging

from 22 to 26 metres

• The coal zone varies in thickness from 13

to 22 metres

• Free Swelling Indices were mostly in the

range 5 to 7 indicating that the coal has

coking potential

• Coal qualities are quite attractive with

theoretical yields of up to 50% for a 12%

ash product

Page 24: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

2008/09 •Drilling

2010 •Reserve 2011

•Compilation of Mining Right

Application; EIA/EMP

2012 •Mining Right Application

2014 • Construction

•Commissioning

2016 •Production

2013 •Mining Right Granted

2015 •Production

Production

Exploration

Timeline Project Planning

Page 25: Sekoko Resources...Waterberg Project • Total of 8 tenements, with total surface area of 7,500 ha • Adjacent to existing Exxaro Mine, Grootegeluk • Initial drilling by Sekoko

Acknowledgements

• Management of Sekoko Resources and

Board of Firestone Energy Ltd. for

permission to present

• Staff of Sekoko for assistance

• Chris Goodale; Consulting Geologist

• Dave Newman; Wirtgen South Africa, and

WirtgenGmbH

• Parsons Brinckerhoff; who carried out the

feasibility study of the project